QA/QC Tracker
QA/QC Tracker
Dashboard
Buildings
RPL10
RPL9
RPL8
RPL7
RPL6
EXTERNAL
Inspections
Upcoming
Past Due
Completed
In Progress
Other
FOKs
OFCI
BOM Planning
L1
CFCI
Receiving
Warehouse
Issues
Lessons Learned
Daily Log
Process Flows
Specifications
Customer Milestones
Building Report
Calendar
Schedules
ACC Forms
Settings
Help
QA/QC Tracker
Dashboard
Buildings
RPL10
RPL9
RPL8
RPL7
RPL6
EXTERNAL
Inspections
Upcoming
Past Due
Completed
In Progress
Other
FOKs
OFCI
BOM Planning
L1
CFCI
Receiving
Warehouse
Issues
Lessons Learned
Daily Log
Process Flows
Specifications
Customer Milestones
Building Report
Calendar
Schedules
ACC Forms
Settings
Help
Dashboard
FOKs
#17
L2 Infra GSEF1 OSE RPL10.GS.EF1.C1.00 Wall Mounting — No Cable Required
FOK #17 · Status:
Past Due
· last saved 05/09/2026 02:52 PM CT
Form-Detail PDF
Checklist (English)
Lista (Español)
1. First-of-Kind Details
Description
*
1.1 Category
1.2 Date offered for inspection
1.3 Installing trade partner
1.4 Building ID
1.5 Room location
2. Reviewing Parties
Who is in attendance for First of Kind
2.1 Trade Partner Representative
Yes
No
N/A
2.2 GC Representative
Yes
No
N/A
3. Benchmark Review & Acceptance
3.1 Visual — first-of-kind details meet design / Div 27 / mfr guidelines
Yes
No
N/A
3.2 Material compliance — manufacturer / type / size / color verified
Yes
No
N/A
3.3 Benchmark installation complete and acceptable to all parties
Yes
No
N/A
3.4 Items needing improvement clearly noted with deadlines
Yes
No
N/A
3.5 Released as-constructed (no exceptions taken)
Yes
No
N/A
3.6 Record & Comments — Installation Steps
(this becomes the tech walk-through checklist; one step per sentence or paragraph)
FOK – OSE CAN INSTALLATION OSE cans will be installed with the top of can set at exactly 6'-0" AFF. Height will be measured from finished floor and verified prior to securing. All cans will be aligned consistently across the row to maintain uniform elevation and appearance, with 2"-3" between cans. At plywood-backed locations, OSE cans will be secured using 3/8" lag screws with flat washers, directly into plywood backing. All lags will be fully seated and tightened to ensure the can is firmly secured with no movement. All cans will be installed level and plumb, with adjustments made prior to final tightening of hardware. Care will be taken to ensure cans are not racked or twisted during installation. Spacing and placement will follow project drawings and approved RFIs, with consistency maintained across all installations to match the approved First Of Kind (FOK) standard.
Photos
Reference photos of the installed FOK (appear in the PDF and the tech checklist)
Add photos
JPEG / PNG, up to 15 MB each. They upload when you click Save below.
4. Sign Off
Sign with your finger on mobile (or mouse on desktop). The date / time stamps automatically when you save.
Telecom Partner — sign here
Sign above the line
Clear
Printed name
Stamped at
General Contractor — sign here
Sign above the line
Clear
Printed name
Stamped at
External Reference & Dates
Optional — useful when there's also an ACC link or scheduled milestones
ACC Form #
ACC Link
Needed by
Submitted
Signed
Completion
Notes
Delayed / unable to complete
Back to FOK list
Save Changes
1 / 1