Building Report
Generated 06/17/2026 03:13 AMBuilding Report — 06/17/2026
RPL10
ACC Checklists 0/335
|
KPA Milestones
25% 2/62,
50% 7/190,
75% 1/62,
100% 0/190
- Insp10CMDF1 (L2 – Infrastructure): 1/0 ground cable needed
- Insp10CMDF2 (L2 – Infrastructure): 1/0 ground cable needed
- Insp10GSEF1 (L2 – Infrastructure): 24" triangle bracket needed RFI #DPR-NW-01258 OSE Label colors
- Insp10GSEF2 (L2 – Infrastructure): 18" triangle bracket needed RFI #DPR-NW-01258 OSE Label colors
- Insp10GSMDF1 (L2 – Infrastructure): 2 spill outs needed
- Insp10GSMDF2 (L2 – Infrastructure): 2 spill outs needed
RPL9
ACC Checklists 0/180
|
KPA Milestones
25% 0/33,
50% 0/67,
75% 0/33,
100% 0/67
RPL8
ACC Checklists 0/160
|
KPA Milestones
25% 0/27,
50% 0/55,
75% 0/27,
100% 0/55
RPL7
ACC Checklists 0/160
|
KPA Milestones
25% 0/27,
50% 0/56,
75% 0/27,
100% 0/56
RPL6
ACC Checklists 0/160
|
KPA Milestones
25% 0/29,
50% 0/58,
75% 0/29,
100% 0/58
EXTERNAL
ACC Checklists 0/50
|
KPA Milestones
25% 0/0,
50% 0/0,
75% 0/0,
100% 0/0