Daily Log

A running stream of daily inspection notes — what was inspected, where, and the progress. Type, dictate, or scan handwritten notes.
2 entries
Clear
2 entries match current filters.
AI Summary (read-only — original entries not modified)
## Overview This briefing covers the daily logs from April 30, 2026, and May 27, 2026, focusing on the anchoring of racks and related quality assurance activities. Key themes include site inspections, issue identification, and preparations for upcoming work. ## By Area / Equipment - **GSIDFNX05** - Racks were placed according to prints before anchoring. - Issues identified: - Issue #6395: MOFE Door - Issue #6393: Labeling Conflict - Fiber clippings left by Clear Core; dressing in fiber enclosures not up to standard. - **NCB RPL10** - Discussed specifications and preparations for upcoming FOK. - Initiated L2 FOK for GSCMDF1. - Conducted site walk with Supers and DPR; noted cable pathways and fire alarm adjustments. - Addressed RFI regarding rack direction and proximity to electrical box. ## Issues / Open Items - RFI regarding rack direction at CMDF pending response (May 27, 2026). - Need to verify all rows are even and matching measurements before placing last two bolts (May 27, 2026). - Ensure all end caps are placed before starting to pull cable (May 27, 2026). - Close out required with QA for exterior cans (May 27, 2026). ## Progress / Completed - Completed site walk and discussions on cable tray system pathways and fire alarm adjustments (May 27, 2026). - Racks at GSIDFNX05 were landed according to prints (April 30, 2026). ## People Mentioned - Timeon P. - Super Chance - Richard - Caleb Bourghs
Wednesday, May 27, 2026
Caleb Bourghs NCB RPL10 · logged 05/27/2026 03:57 PM CT
Qa Team meeting discussing Specifications, upcoming FOK, FOK specifics with photo information, and site walk preparations. Started L2 FOK for GSCMDF1. Completed Tiger Meeting going over GC handovers, cable tray system pathways, and bridges for cable pulling. Completed a site walk with our Supers and DPR. Took notes on all discussed and saved in Teams. Took site photos to complete GSCMDF FOK. Notes from walk: Qa GC MDF WALK CABLE PATHWAY FOR NORTH WALL LOCATION EPMS LOCATION? FIBER WILL BE ON TOP OF TRANSITIONS FOK CABLE SYSTEM PATHWAYS FIRE ALARM MIDDLE LANE, NEED TO SHIFT AP TO MEET MIN DISTANCE EMI/SPEC Mdf2, same issue with ap location next to fire alarm. Extending ap piping to be way from alarm Swap rack direction rfi CMDF? NO ANSWER ON RFI YET. POTENTIAL ISSUE BEING CLOSE TO ELECTRICAL BOX E 1 25% WHEN ROW 5 IS ANCHORED NEED TO VERIFY ALL ROWS ARE EVEN AND MATCHING MEASUREMENTS BEFORE LAST 2 BOLTS ARE PLACED Front o base 84 1/2, back to back 77 1/2 ENSURE ALL END CAPS ARE PLACED BEFORE STARTING TO PULL CABLE! Place end caps while material is on ground. EGsidf2 - fe needs to arrange Box for outside wap Exterior cans are hung, need close out with qa Get fok for external, send to chance CMDF 2 - FACEPLATES FOR SOUTH WALL CMDF1 - vertical ladder rack for south wall after cement sets
Thursday, April 30, 2026
Timeon P. GSIDFNX05 · logged 04/30/2026 04:49 PM CT
Walked CMDF2 and took measurements to ensure that the racks placed were at the correct locations before being anchored. Racks were landed according to prints. Super Chance informed us about issues he noticed in the field, took pictures and created formal issues in ACC, listed below: Issue #6395 GSIDFNX05 MOFE Door Issue #6393 GSIDFNX05 Labeling Conflict Richard reviewed splice cassette alignment with chance to ensure that they were aligned with the FE labels Walked the GSIDFNX05 and noticed that Clear Core left fiber clippings on the floor and that the fiber dressing in both the 432 can and the 1u unican fiber enclosure was not up to standard, they were called back to correct the dressing.