Daily Log

A running stream of daily inspection notes — what was inspected, where, and the progress. Type, dictate, or scan handwritten notes.
1 entry
Clear
1 entry match current filters.
AI Summary (read-only — original entries not modified)
## Overview This log covers activities from May 27, 2026, focusing on QA team meetings, site walks, and ongoing FOK preparations. Key discussions included cable pathways, fire alarm placements, and equipment arrangements. ## By Area / Equipment - **NCB RPL10** - Conducted QA team meeting regarding specifications and upcoming FOK. - Initiated L2 FOK for GSCMDF1. - Completed Tiger Meeting on GC handovers and cable tray pathways. - Site walk conducted with Supers and DPR, notes taken and saved in Teams. - **GSCMDF** - Documented cable pathway for north wall location. - Noted fiber will be on top of transitions. - Fire alarm middle lane requires AP shift to meet minimum distance EMI/spec. - **MDF2** - Similar AP location issue next to fire alarm as noted in GSCMDF. - Need to extend AP piping away from the alarm. - **CMDF** - RFI regarding rack direction swap pending response. - Potential issue with proximity to electrical box. - Faceplates for south wall required for CMDF2. - Vertical ladder rack for south wall to be installed after cement sets. - **E1** - 25% completion when row 5 is anchored. - Verification needed for even measurements before placing last two bolts. - End caps must be placed before cable pulling; recommended to do so while material is on the ground. - **EGsidf2** - FE needs to arrange a box for outside WAP. - **Exterior Cans** - Hung and need closeout with QA. - FOK for external to be sent to Chance. ## Issues / Open Items - No answer on RFI regarding rack direction swap (May 27). - Need to verify all rows are even and matching measurements before final bolt placement (May 27). - Fire alarm AP location adjustments needed (May 27). - Closeout with QA for exterior cans pending (May 27). ## Progress / Completed - Completed QA team meeting and site walk (May 27). - Initiated L2 FOK for GSCMDF1 (May 27). - Completed Tiger Meeting on GC handovers and cable pathways (May 27). ## People Mentioned - Caleb Bourghs - Supers - DPR - Chance
Wednesday, May 27, 2026
Caleb Bourghs NCB RPL10 · logged 05/27/2026 03:57 PM CT
Qa Team meeting discussing Specifications, upcoming FOK, FOK specifics with photo information, and site walk preparations. Started L2 FOK for GSCMDF1. Completed Tiger Meeting going over GC handovers, cable tray system pathways, and bridges for cable pulling. Completed a site walk with our Supers and DPR. Took notes on all discussed and saved in Teams. Took site photos to complete GSCMDF FOK. Notes from walk: Qa GC MDF WALK CABLE PATHWAY FOR NORTH WALL LOCATION EPMS LOCATION? FIBER WILL BE ON TOP OF TRANSITIONS FOK CABLE SYSTEM PATHWAYS FIRE ALARM MIDDLE LANE, NEED TO SHIFT AP TO MEET MIN DISTANCE EMI/SPEC Mdf2, same issue with ap location next to fire alarm. Extending ap piping to be way from alarm Swap rack direction rfi CMDF? NO ANSWER ON RFI YET. POTENTIAL ISSUE BEING CLOSE TO ELECTRICAL BOX E 1 25% WHEN ROW 5 IS ANCHORED NEED TO VERIFY ALL ROWS ARE EVEN AND MATCHING MEASUREMENTS BEFORE LAST 2 BOLTS ARE PLACED Front o base 84 1/2, back to back 77 1/2 ENSURE ALL END CAPS ARE PLACED BEFORE STARTING TO PULL CABLE! Place end caps while material is on ground. EGsidf2 - fe needs to arrange Box for outside wap Exterior cans are hung, need close out with qa Get fok for external, send to chance CMDF 2 - FACEPLATES FOR SOUTH WALL CMDF1 - vertical ladder rack for south wall after cement sets