## Overview The entries from May 6 to May 27, 2026, highlight ongoing QA/QC activities at NCB, particularly focusing on FOK (Field Operations Kit) preparations, coordination with DPR and other GCs, and addressing site-specific issues. Key themes include alignment meetings, progress verification, and documentation updates. ## By Area / Equipment - **RPL10** - Created L1 checklists for shipments (May 6). - Walked RPL10 for FOK verification and progress checks (May 11, May 13, May 18). - Completed measurements and site walk for RPL10 EF2 (May 18). - Started L2 FOK for GSCMDF1 (May 27). - Addressed clearance issues with GSCMDF VCMs (May 18). - Discussed cable pathways and fire alarm placements during site walks (May 27). - **General** - Met with DPR and other GCs for alignment on scheduling and procedures (May 11, May 13). - Conducted QA team meetings to discuss specifications and upcoming FOK details (May 27). ## Issues / Open Items - GSCMDF VCMs are too close to the wall, affecting rack door clearance (May 18). - RFI regarding rack direction swap for CMDF pending response (May 27). - Need to verify all rows are even and matching measurements before final bolt placements (May 27). - External cans need QA closeout and FOK submission (May 27). - Faceplates for CMDF2 south wall and vertical ladder rack for CMDF1 pending after cement sets (May 27). ## Progress / Completed - Created and updated L1s for accurate tracking (May 11, May 18). - Completed Tiger Meeting discussing GC handovers and cable systems (May 27). - Took site photos and documented discussions during walks (May 27). ## People Mentioned - Caleb Bourghs - Meta - Joe (PM) - DPR QA Team - Supers
Wednesday, May 27, 2026
Caleb Bourghs NCB RPL10 · logged 05/27/2026 03:57 PM CT
Qa Team meeting discussing Specifications, upcoming FOK, FOK specifics with photo information, and site walk preparations. Started L2 FOK for GSCMDF1. Completed Tiger Meeting going over GC handovers, cable tray system pathways, and bridges for cable pulling. Completed a site walk with our Supers and DPR. Took notes on all discussed and saved in Teams. Took site photos to complete GSCMDF FOK. Notes from walk: Qa GC MDF WALK CABLE PATHWAY FOR NORTH WALL LOCATION EPMS LOCATION? FIBER WILL BE ON TOP OF TRANSITIONS FOK CABLE SYSTEM PATHWAYS FIRE ALARM MIDDLE LANE, NEED TO SHIFT AP TO MEET MIN DISTANCE EMI/SPEC Mdf2, same issue with ap location next to fire alarm. Extending ap piping to be way from alarm Swap rack direction rfi CMDF? NO ANSWER ON RFI YET. POTENTIAL ISSUE BEING CLOSE TO ELECTRICAL BOX E 1 25% WHEN ROW 5 IS ANCHORED NEED TO VERIFY ALL ROWS ARE EVEN AND MATCHING MEASUREMENTS BEFORE LAST 2 BOLTS ARE PLACED Front o base 84 1/2, back to back 77 1/2 ENSURE ALL END CAPS ARE PLACED BEFORE STARTING TO PULL CABLE! Place end caps while material is on ground. EGsidf2 - fe needs to arrange Box for outside wap Exterior cans are hung, need close out with qa Get fok for external, send to chance CMDF 2 - FACEPLATES FOR SOUTH WALL CMDF1 - vertical ladder rack for south wall after cement sets
Monday, May 18, 2026
Caleb Bourghs NCB RPL10 · logged 05/18/2026 04:01 PM CT
Completed walk and measurements with QA Team for RPL10 EF2. Received notice from DPR about GSCMDF VCMs are too close to the wall to open rack doors for full clearance. Verified our teams are working on it. Returned after lunch to verify clearance, there is enough room for doors to open comfortably. Verified they are still trying to make more room for opening VCM doors. Did RPL10 EF2 site walk with GC, PM, and Supers. Verified our team is bringing all material through RPL10 Gate 2 (Front right gate if your facing rpl10 from trailer city). Completed L1s and edited older L1s adding name and quantity. Updated qa tracker to match L1 forms.
Wednesday, May 13, 2026
Caleb Bourghs NCB RPL10 · logged 05/14/2026 07:13 AM CT
Daily QA meeting to discuss walk, upcoming FOK, and standards. Had meeting with Meta, DPR, and other GCs to discuss upcoming walks, alignment, and new procedures for hand offs. Walked field with Meta to update issues. Helped Timeon complete FOK with field photos. Completed L1s to Qa tracker for accurate tracking.
Monday, May 11, 2026
Caleb Bourghs NCB RPL10 · logged 05/12/2026 10:45 AM CT
Daily QA Team meeting to discuss FOK, L1, Warehouse storing, and IES team alignments for scheduling. Met with PM, Joe, and QA Team to discuss FOK requirements. Verified steps for FOK completion across Teams. Created L1s, started GSEF1 FOK with Timeon, and walked RPL10. Took photos for FOK and verified progress according to specs. Met with DPR QA team in the field to verify progress. Notated changes and upcoming phases. Had evening meeting with QA Team going over Warehouse Audit and future expectations.
Wednesday, May 06, 2026
Caleb Bourghs NCB · logged 05/07/2026 06:03 AM CT
Created L1 checklist for 45 different shipments to the warehouse. Met with Meta, DPR, and other GCs for 11am to discuss upcoming weekly Wednesday walks with needed personnel to better align our scheduling and progress. Qa Team meeting discussing IES QA/QC Workflow Process.