## Overview
The entries from May 27, 2026, detail a QA team meeting and site walk focused on electrical specifications and cable pathways. Key discussions included fire alarm placements and RFI status regarding rack direction and proximity to electrical boxes.
## By Area / Equipment
- **NCB RPL10**
- Discussed specifications and upcoming FOK.
- Completed site walk with Supers and DPR.
- **GSCMDF1**
- Started L2 FOK.
- Noted cable system pathways and fire alarm locations.
- **MDF2**
- Identified issues with AP location next to fire alarm.
- **CMDF**
- RFI regarding rack direction pending response.
- Faceplates for south wall needed.
- Vertical ladder rack installation planned after cement sets.
- **EGsidf2**
- Need to arrange box for outside WAP.
## Issues / Open Items
- RFI on rack direction near electrical box still unanswered (2026-05-27).
- Fire alarm AP locations need adjustment to meet minimum distance EMI/spec (2026-05-27).
- Need to ensure all end caps are placed before pulling cable (2026-05-27).
## Progress / Completed
- Completed Tiger Meeting discussing GC handovers and cable tray pathways (2026-05-27).
- Exterior cans hung, pending QA closeout (2026-05-27).
## People Mentioned
- Caleb Bourghs
- Supers
- DPR
- Chance
Wednesday, May 27, 2026
Caleb Bourghs
NCB RPL10
· logged 05/27/2026 03:57 PM CT
Qa Team meeting discussing Specifications, upcoming FOK, FOK specifics with photo information, and site walk preparations. Started L2 FOK for GSCMDF1. Completed Tiger Meeting going over GC handovers, cable tray system pathways, and bridges for cable pulling. Completed a site walk with our Supers and DPR. Took notes on all discussed and saved in Teams. Took site photos to complete GSCMDF FOK.
Notes from walk:
Qa GC MDF WALK
CABLE PATHWAY FOR NORTH WALL LOCATION
EPMS LOCATION?
FIBER WILL BE ON TOP OF TRANSITIONS
FOK CABLE SYSTEM PATHWAYS
FIRE ALARM MIDDLE LANE, NEED TO SHIFT AP TO MEET MIN DISTANCE EMI/SPEC
Mdf2, same issue with ap location next to fire alarm.
Extending ap piping to be way from alarm
Swap rack direction rfi CMDF?
NO ANSWER ON RFI YET. POTENTIAL ISSUE BEING CLOSE TO ELECTRICAL BOX
E 1
25% WHEN ROW 5 IS ANCHORED
NEED TO VERIFY ALL ROWS ARE EVEN AND MATCHING MEASUREMENTS BEFORE LAST 2 BOLTS ARE PLACED
Front o base 84 1/2, back to back 77 1/2
ENSURE ALL END CAPS ARE PLACED BEFORE STARTING TO PULL CABLE!
Place end caps while material is on ground.
EGsidf2 - fe needs to arrange Box for outside wap
Exterior cans are hung, need close out with qa
Get fok for external, send to chance
CMDF 2 - FACEPLATES FOR SOUTH WALL
CMDF1 - vertical ladder rack for south wall after cement sets