Daily Log

A running stream of daily inspection notes — what was inspected, where, and the progress. Type, dictate, or scan handwritten notes.
1 entry
Clear
1 entry match current filters.
AI Summary (read-only — original entries not modified)
## Overview The entries from May 27, 2026, detail a QA team meeting focused on specifications and preparations for upcoming FOKs, alongside site walk observations and discussions regarding cable pathways and fire alarm placements. ## By Area / Equipment - **NCB RPL10** - Discussed specifications and upcoming FOK specifics. - Completed site walk with Supers and DPR. - Noted cable pathway for north wall location. - Addressed fiber placement on top of transitions. - Identified need to shift AP to meet minimum distance from fire alarm. - **CMDF** - RFI regarding swap rack direction pending response. - Noted potential issue with proximity to electrical box. - Faceplates for south wall required. - Vertical ladder rack for south wall to be installed after cement sets. - **EGsidf2** - FE needs to arrange box for outside WAP. ## Issues / Open Items - RFI regarding swap rack direction at CMDF pending response (2026-05-27). - Need to verify all rows are even and matching measurements before placing last two bolts (2026-05-27). - Ensure all end caps are placed before starting to pull cable (2026-05-27). - Close out required with QA for exterior cans (2026-05-27). - FOK for external needs to be sent to Chance (2026-05-27). ## Progress / Completed - Completed Tiger Meeting discussing GC handovers and cable tray system pathways (2026-05-27). - Completed site walk and took notes for GSCMDF FOK (2026-05-27). ## People Mentioned - Caleb Bourghs - Supers - DPR - Chance
Wednesday, May 27, 2026
Caleb Bourghs NCB RPL10 · logged 05/27/2026 03:57 PM CT
Qa Team meeting discussing Specifications, upcoming FOK, FOK specifics with photo information, and site walk preparations. Started L2 FOK for GSCMDF1. Completed Tiger Meeting going over GC handovers, cable tray system pathways, and bridges for cable pulling. Completed a site walk with our Supers and DPR. Took notes on all discussed and saved in Teams. Took site photos to complete GSCMDF FOK. Notes from walk: Qa GC MDF WALK CABLE PATHWAY FOR NORTH WALL LOCATION EPMS LOCATION? FIBER WILL BE ON TOP OF TRANSITIONS FOK CABLE SYSTEM PATHWAYS FIRE ALARM MIDDLE LANE, NEED TO SHIFT AP TO MEET MIN DISTANCE EMI/SPEC Mdf2, same issue with ap location next to fire alarm. Extending ap piping to be way from alarm Swap rack direction rfi CMDF? NO ANSWER ON RFI YET. POTENTIAL ISSUE BEING CLOSE TO ELECTRICAL BOX E 1 25% WHEN ROW 5 IS ANCHORED NEED TO VERIFY ALL ROWS ARE EVEN AND MATCHING MEASUREMENTS BEFORE LAST 2 BOLTS ARE PLACED Front o base 84 1/2, back to back 77 1/2 ENSURE ALL END CAPS ARE PLACED BEFORE STARTING TO PULL CABLE! Place end caps while material is on ground. EGsidf2 - fe needs to arrange Box for outside wap Exterior cans are hung, need close out with qa Get fok for external, send to chance CMDF 2 - FACEPLATES FOR SOUTH WALL CMDF1 - vertical ladder rack for south wall after cement sets