Daily Log
A running stream of daily inspection notes — what was inspected, where, and the progress. Type, dictate, or scan handwritten notes.4 entries
Tags:
CMDF 4
RPL10 4
CMDF1 3
CMDF2 3
CMDF1/2 3
GSEF 3
IDFNX5 3
FE 2
GSEF1/2 2
ALARM 1
ALL 1
ANCHORED 1
AND 1
ANSWER 1
AP 1
ARE 1
BEFORE 1
BEING 1
BOLTS 1
BOX 1
CABLE 1
CAPS 1
CLOSE 1
DISTANCE 1
## Overview
The entries from April 30 to May 27, 2026, detail ongoing inspections and coordination efforts in various areas of the RPL10 project, focusing on rack positioning, splicing, and issue identification. Key themes include addressing construction discrepancies and ensuring compliance with specifications.
## By Area / Equipment
- **GSEF 1/2**
- Temporary splices of two 192 fibers completed by Clear Core.
- Photos taken of the temporary 2 post rack for splices.
- **CMDF 1/2**
- Horizontal ladder runway needs to be moved 5" from walls for fiber routing.
- Issue #6394: Hole in East Wall (2.5" length, 1" width) at CMDF1.
- Issue #6391: Blocked vertical ladder rack locations by EPMS/BAS conduit in CMDF2.
- Rack positioning confirmed in EF1; racks shifted 4 inches for clearance.
- **IDFNX5**
- Splicing verified; findings reported to Superintendent for necessary changes.
- **NCB RPL10**
- Site walk preparations and discussions on specifications and cable pathways.
- Issues with AP locations near fire alarms noted.
## Issues / Open Items
- RFI regarding rack direction swap in CMDF pending response (May 27).
- Need to verify all rows are even and matching measurements before final bolt placement (May 27).
- Faceplates for south wall in CMDF2 and vertical ladder rack for south wall in CMDF1 pending after cement sets (May 27).
- External cans need QA closeout and FOK for external to be sent to Chance (May 27).
## Progress / Completed
- Field walk completed with FE team through GSEF 1/2, CMDF 1/2, and IDFNX5 (April 30).
- Measurements for CMDF2 VCMs verified and met specifications (April 30).
- Racks anchored into place in EF1 after adjustments (May 21).
- Site walk completed with Supers and DPR; notes and photos taken for GSCMDF FOK (May 27).
## People Mentioned
- Timeon P.
- Caleb Bourghs
- Paul (SFE)
- Chance (Superintendent)
- DPR (vendor)
Wednesday, May 27, 2026
Caleb Bourghs
NCB RPL10
· logged 05/27/2026 03:57 PM CT
Qa Team meeting discussing Specifications, upcoming FOK, FOK specifics with photo information, and site walk preparations. Started L2 FOK for GSCMDF1. Completed Tiger Meeting going over GC handovers, cable tray system pathways, and bridges for cable pulling. Completed a site walk with our Supers and DPR. Took notes on all discussed and saved in Teams. Took site photos to complete GSCMDF FOK.
Notes from walk:
Qa GC MDF WALK
CABLE PATHWAY FOR NORTH WALL LOCATION
EPMS LOCATION?
FIBER WILL BE ON TOP OF TRANSITIONS
FOK CABLE SYSTEM PATHWAYS
FIRE ALARM MIDDLE LANE, NEED TO SHIFT AP TO MEET MIN DISTANCE EMI/SPEC
Mdf2, same issue with ap location next to fire alarm.
Extending ap piping to be way from alarm
Swap rack direction rfi CMDF?
NO ANSWER ON RFI YET. POTENTIAL ISSUE BEING CLOSE TO ELECTRICAL BOX
E 1
25% WHEN ROW 5 IS ANCHORED
NEED TO VERIFY ALL ROWS ARE EVEN AND MATCHING MEASUREMENTS BEFORE LAST 2 BOLTS ARE PLACED
Front o base 84 1/2, back to back 77 1/2
ENSURE ALL END CAPS ARE PLACED BEFORE STARTING TO PULL CABLE!
Place end caps while material is on ground.
EGsidf2 - fe needs to arrange Box for outside wap
Exterior cans are hung, need close out with qa
Get fok for external, send to chance
CMDF 2 - FACEPLATES FOR SOUTH WALL
CMDF1 - vertical ladder rack for south wall after cement sets
Thursday, May 21, 2026
Timeon P.
RPL10 GSEF 1/2, CMDF 1/2, EF
· logged 05/21/2026 03:33 PM CT
Confirmed rack positioning in EF1. Operations began to anchor the racks into place after shifting the racks over 4 inches to avoid hitting the bolts on the nearby columns.
Conducted a field walk with the superintendents and FE's. Walked the GSEFs and reviewed the plan on supporting the crossovers with Unistrut.
Thursday, April 30, 2026
Caleb Bourghs
RPL10, CMDF1, CMDF2, GSIDFNX5
· logged 04/30/2026 04:54 PM CT
Started with daily specs, site updates, and team coordination.
CMDF1, CMDF2, IDFNX5 Walk Throughs with QA Team.
Created 2 Issues- Issue #6394: Concrete has a hole on the East Wall 66 1/2 inches from the South wall in CMDF1. Hole is 2 1/2 inches in length and 1 inch wide. Hole is where the first VCM will be located.
Issue #6391: CMDF2 South & West wall vertical ladder rack locations blocked by EPMS/BAS conduit.
Other team members placed 3 other issues today we found in the field during our walk-through.
Verified specs and measurements for our CMDF2 VCMs on-site. All measurements met requirements and standards.
Verified splicing in our IDFNX5. Reported findings to our Super Intendant Chance to contact Clearcore to make needed changes to meet all Splicing specs/Housekeeping.
Timeon P.
RPL10 GSEF 1/2, CMDF 1/2, IDFNX5
· logged 04/30/2026 01:37 PM CT
Completed a field walk with the FE team through the GSEF's 1/2, CMDF 1/2, and IDFNX5.
Photos of the temporary 2 post rack in GSEF 1 for the temporary splices were taken. Temp splices of two 192 fibers in IDFNX5 were completed by Clear Core.
SFE Paul informed us that the horizontal ladder runway in both CMDF's will have to move away from their respective walls by approx. 5" to allow for adequate space for the fiber to be routed within the bend radius. The changes will be redlined after installation per Hargis. This will also allow for the horizontal crossovers to be installed with out the overhead support. As the CMDF's have been buildout to spec, the FE's are reviewing to see if this will be a change order.