Daily Log

A running stream of daily inspection notes — what was inspected, where, and the progress. Type, dictate, or scan handwritten notes.
1 entry
Clear
1 entry match current filters.
AI Summary (read-only — original entries not modified)
## Overview This log covers activities from April 30, 2026, focusing on site inspections and issue identification related to the EPMS/BAS systems in CMDF1 and CMDF2. ## By Area / Equipment - **CMDF1** - Conducted walk-through with QA team. - Identified Issue #6394: Concrete hole on the East Wall (66 1/2 inches from the South wall) where the first VCM will be located. - **CMDF2** - Conducted walk-through with QA team. - Identified Issue #6391: Vertical ladder rack locations blocked by EPMS/BAS conduit. - Verified specs and measurements for VCMs; all met requirements. - **IDFNX5** - Verified splicing on-site; reported findings for necessary changes. ## Issues / Open Items - Issue #6394: Concrete hole in CMDF1 (4/30/2026). - Issue #6391: Blocked vertical ladder rack locations in CMDF2 (4/30/2026). - Additional 3 issues identified by team during walk-through (4/30/2026). ## Progress / Completed - Verified all measurements for CMDF2 VCMs met requirements (4/30/2026). - Reported splicing findings in IDFNX5 to Superintendent for follow-up (4/30/2026). ## People Mentioned - Caleb Bourghs - Chance (Superintendent) - QA Team
Thursday, April 30, 2026
Caleb Bourghs RPL10, CMDF1, CMDF2, GSIDFNX5 · logged 04/30/2026 04:54 PM CT
Started with daily specs, site updates, and team coordination. CMDF1, CMDF2, IDFNX5 Walk Throughs with QA Team. Created 2 Issues- Issue #6394: Concrete has a hole on the East Wall 66 1/2 inches from the South wall in CMDF1. Hole is 2 1/2 inches in length and 1 inch wide. Hole is where the first VCM will be located. Issue #6391: CMDF2 South & West wall vertical ladder rack locations blocked by EPMS/BAS conduit. Other team members placed 3 other issues today we found in the field during our walk-through. Verified specs and measurements for our CMDF2 VCMs on-site. All measurements met requirements and standards. Verified splicing in our IDFNX5. Reported findings to our Super Intendant Chance to contact Clearcore to make needed changes to meet all Splicing specs/Housekeeping.