## Overview
This briefing covers the period from May 18 to May 27, 2026, focusing on the GSCMDF project. Key themes include ongoing site walks, equipment specifications, and addressing clearance issues related to VCMs.
## By Area / Equipment
- **RPL10 EF2**
- Walk and measurements completed with QA Team.
- Clearance verified for rack doors; ongoing efforts to improve VCM door access.
- Material transport confirmed through RPL10 Gate 2.
- **GSCMDF**
- Started FOK (Field Operations Kit) for GSCMDF, gathering specifications.
- L2 FOK initiated for GSCMDF1.
- Notes taken during site walk regarding cable pathways and fire alarm placements.
- **CMDF**
- RFI regarding rack direction swap pending response.
- Issues noted with AP location near fire alarm; adjustments needed.
- Faceplates for south wall of CMDF2 and vertical ladder rack for CMDF1 planned post-cement setting.
## Issues / Open Items
- GSCMDF VCMs clearance issue (May 18).
- RFI on rack direction swap for CMDF pending response (May 27).
- Need to verify all rows are even and matching measurements before final bolts are placed (May 27).
- AP location adjustments required to meet minimum distance from fire alarm (May 27).
## Progress / Completed
- Completed L1s and updated QA tracker to match forms (May 18).
- Created L0s for warehouse inventory and updated tracker (May 26).
- Completed Tiger Meeting discussing GC handovers and cable tray system pathways (May 27).
- Site photos taken for GSCMDF FOK (May 27).
## People Mentioned
- Caleb Bourghs
- QA Team
- GC (General Contractor)
- PM (Project Manager)
- Supers (Superintendents)
- DPR (Designated Project Representative)
Wednesday, May 27, 2026
Caleb Bourghs
NCB RPL10
· logged 05/27/2026 03:57 PM CT
Qa Team meeting discussing Specifications, upcoming FOK, FOK specifics with photo information, and site walk preparations. Started L2 FOK for GSCMDF1. Completed Tiger Meeting going over GC handovers, cable tray system pathways, and bridges for cable pulling. Completed a site walk with our Supers and DPR. Took notes on all discussed and saved in Teams. Took site photos to complete GSCMDF FOK.
Notes from walk:
Qa GC MDF WALK
CABLE PATHWAY FOR NORTH WALL LOCATION
EPMS LOCATION?
FIBER WILL BE ON TOP OF TRANSITIONS
FOK CABLE SYSTEM PATHWAYS
FIRE ALARM MIDDLE LANE, NEED TO SHIFT AP TO MEET MIN DISTANCE EMI/SPEC
Mdf2, same issue with ap location next to fire alarm.
Extending ap piping to be way from alarm
Swap rack direction rfi CMDF?
NO ANSWER ON RFI YET. POTENTIAL ISSUE BEING CLOSE TO ELECTRICAL BOX
E 1
25% WHEN ROW 5 IS ANCHORED
NEED TO VERIFY ALL ROWS ARE EVEN AND MATCHING MEASUREMENTS BEFORE LAST 2 BOLTS ARE PLACED
Front o base 84 1/2, back to back 77 1/2
ENSURE ALL END CAPS ARE PLACED BEFORE STARTING TO PULL CABLE!
Place end caps while material is on ground.
EGsidf2 - fe needs to arrange Box for outside wap
Exterior cans are hung, need close out with qa
Get fok for external, send to chance
CMDF 2 - FACEPLATES FOR SOUTH WALL
CMDF1 - vertical ladder rack for south wall after cement sets
Tuesday, May 26, 2026
Caleb Bourghs
NCB
· logged 05/27/2026 07:20 AM CT
Created L0s for warehouse inventory, updated tracker. Started FOK for GSCMDF, gathering all specs pertaining to the room.
Monday, May 18, 2026
Caleb Bourghs
NCB RPL10
· logged 05/18/2026 04:01 PM CT
Completed walk and measurements with QA Team for RPL10 EF2. Received notice from DPR about GSCMDF VCMs are too close to the wall to open rack doors for full clearance. Verified our teams are working on it. Returned after lunch to verify clearance, there is enough room for doors to open comfortably. Verified they are still trying to make more room for opening VCM doors. Did RPL10 EF2 site walk with GC, PM, and Supers. Verified our team is bringing all material through RPL10 Gate 2 (Front right gate if your facing rpl10 from trailer city). Completed L1s and edited older L1s adding name and quantity. Updated qa tracker to match L1 forms.