Daily Log

A running stream of daily inspection notes — what was inspected, where, and the progress. Type, dictate, or scan handwritten notes.
1 entry
Clear
1 entry match current filters.
AI Summary (read-only — original entries not modified)
## Overview This log covers activities and observations from June 10, 2026, focusing on the GSMDF1 area and related equipment. Key themes include labeling requirements, equipment shortages, and pending tasks related to splicing and network configuration. ## By Area / Equipment - **GSMDF1:** - 2x spill outs needed. - Networking constraints identified. - Missing 10 devices for corpnet and 24 power cords (IBOS). - Awaiting 110 fact net devices and optics (IBOS). - FIM is not updated; incomplete portmap for fiber or copper (ENS). - **GSMDF2:** - 2x spill outs needed. - Networking constraints identified. - Missing 10 devices for corpnet and 24 power cords (IBOS). - Awaiting 110 fact net devices and optics (IBOS). - FIM is not updated; incomplete portmap for fiber or copper (ENS). - **GSEF1:** - OSE labels colored per path; clarity needed on label requirements (IES). - Horizontal ladder rack on the West wall needs a 24-inch triangle bracket and to be moved 8" from the wall (IES). - Dress all OSP cables to the respective OSE (Mortenson/IES). - Concrete slabs need sanding and labeling with placards before splicing can start (Mortenson). - Possibly paint the slab (Mortenson). - **GSEF2:** - OSE labels colored per path; clarity needed on label requirements (IES). - Dress all OSP cables to the respective OSE (Mortenson). - Concrete slabs need sanding and labeling with placards before splicing can start (Mortenson). - Possibly paint the slab (Mortenson). - **CMDF1:** - Awaiting 1 OC to complete rack bonding and grounding; ordered and in transit (IES). - Concrete slabs need sanding and labeling before splicing can start; possibly paint the slab (Mortenson). - **CMDF2:** - Awaiting 1 OC to complete rack bonding and grounding; ordered and in transit (IES). - Concrete slabs need sanding and labeling before splicing can start; possibly paint the slab (Mortenson). ## Issues / Open Items - Clarification needed on OSE label requirements for multiple paths (GSEF1, GSEF2) (2026-06-10). - 2x spill outs needed for GSMDF1 and GSMDF2 (2026-06-10). - Missing devices and power cords for corpnet (GSMDF1, GSMDF2) (2026-06-10). - Awaiting fact net devices and optics (GSMDF1, GSMDF2) (2026-06-10). - FIM not updated; incomplete portmap for fiber or copper (GSMDF1, GSMDF2) (2026-06-10). ## Progress / Completed - No milestones or items signed off reported for this date. ## People Mentioned - Timeon P. - Mortenson - IES - IBOS - ENS
Wednesday, June 10, 2026
Timeon P. RPL10 · logged 06/10/2026 02:47 PM CT
GSEF1: OSE labels colored per path. Some OSE cans will have more than one path, clarity needed on label requirements. One label per path?(IES) Horizontal Ladder rack on the West wall needs a 24 inch triangle bracket, and needs to move to 8" from the wall. (IES) Dress all OSP cables to the respective OSE. (Mortenson/IES) Concrete slabs need to be sanded and labeled with placards before splicing can start. (Mortenson) Possibly paint the slab. (Mortenson) GSEF2: OSE labels colored per path. Some OSE cans will have more than one path, clarity needed on label requirements. One label per path?(IES) Dress all OSP cables to the respective OSE.(Mortenson/IES) Concrete slabs need to be sanded and labeled with placards before splicing can start. (Mortenson) Possibly paint the slab. (Mortenson) CMDF1: Awaiting 1 OC to complete rack bonding and grounding. Ordered and in transit (IES) Concrete slabs need to be sanded and labeled before splicing can start. Possibly paint the slab. (Mortenson) CMDF2: Awaiting 1 OC to complete rack bonding and grounding. Ordered and in transit (IES) Concrete slabs need to be sanded and labeled before splicing can start. Possibly paint the slab. (Mortenson) GSMDF1: 2x Spill outs needed Networking Constraints Missing 10 devices for corpnet and 24 power cords (IBOS) Waiting 110 of fact net devices and optics (IBOS) FIM is not updated, Do not have a complete portmap for fiber or copper (ENS) GSMDF2: 2x Spill outs needed Networking Constraints Missing 10 devices for corpnet and 24 power cords (IBOS) Waiting 110 of fact net devices and optics (IBOS) FIM is not updated, Do not have a complete portmap for fiber or copper (ENS)