Daily Log

A running stream of daily inspection notes — what was inspected, where, and the progress. Type, dictate, or scan handwritten notes.
1 entry
Clear
1 entry match current filters.
AI Summary (read-only — original entries not modified)
## Overview On April 30, 2026, the team conducted site updates and walkthroughs at RPL10, CMDF1, CMDF2, and GSIDFNX5, identifying several issues while verifying specifications and measurements for VCMs and splicing. ## By Area / Equipment - **CMDF1** - Conducted walkthrough with QA team. - Identified Issue #6394: Concrete hole on East Wall (66 1/2 inches from South wall, 2 1/2 inches long, 1 inch wide) for VCM placement. - **CMDF2** - Conducted walkthrough with QA team. - Identified Issue #6391: Blocked vertical ladder rack locations on South & West walls due to EPMS/BAS conduit. - **GSIDFNX5** - Verified splicing; findings reported to Superintendent Chance for follow-up with Clearcore. ## Issues / Open Items - Issue #6394: Concrete hole in CMDF1 (4/30/2026). - Issue #6391: Blocked ladder rack locations in CMDF2 (4/30/2026). - Additional 3 issues identified by other team members during walkthrough (4/30/2026). ## Progress / Completed - Verified specifications and measurements for CMDF2 VCMs; all met requirements (4/30/2026). - Verified splicing in IDFNX5 and reported findings (4/30/2026). ## People Mentioned - Caleb Bourghs - Chance (Superintendent) - Clearcore (vendor)
Thursday, April 30, 2026
Caleb Bourghs RPL10, CMDF1, CMDF2, GSIDFNX5 · logged 04/30/2026 04:54 PM CT
Started with daily specs, site updates, and team coordination. CMDF1, CMDF2, IDFNX5 Walk Throughs with QA Team. Created 2 Issues- Issue #6394: Concrete has a hole on the East Wall 66 1/2 inches from the South wall in CMDF1. Hole is 2 1/2 inches in length and 1 inch wide. Hole is where the first VCM will be located. Issue #6391: CMDF2 South & West wall vertical ladder rack locations blocked by EPMS/BAS conduit. Other team members placed 3 other issues today we found in the field during our walk-through. Verified specs and measurements for our CMDF2 VCMs on-site. All measurements met requirements and standards. Verified splicing in our IDFNX5. Reported findings to our Super Intendant Chance to contact Clearcore to make needed changes to meet all Splicing specs/Housekeeping.