Daily Log

A running stream of daily inspection notes — what was inspected, where, and the progress. Type, dictate, or scan handwritten notes.
9 entries
Clear
9 entries match current filters.
Wednesday, May 27, 2026
Caleb Bourghs NCB RPL10 · logged 05/27/2026 03:57 PM CT
Qa Team meeting discussing Specifications, upcoming FOK, FOK specifics with photo information, and site walk preparations. Started L2 FOK for GSCMDF1. Completed Tiger Meeting going over GC handovers, cable tray system pathways, and bridges for cable pulling. Completed a site walk with our Supers and DPR. Took notes on all discussed and saved in Teams. Took site photos to complete GSCMDF FOK. Notes from walk: Qa GC MDF WALK CABLE PATHWAY FOR NORTH WALL LOCATION EPMS LOCATION? FIBER WILL BE ON TOP OF TRANSITIONS FOK CABLE SYSTEM PATHWAYS FIRE ALARM MIDDLE LANE, NEED TO SHIFT AP TO MEET MIN DISTANCE EMI/SPEC Mdf2, same issue with ap location next to fire alarm. Extending ap piping to be way from alarm Swap rack direction rfi CMDF? NO ANSWER ON RFI YET. POTENTIAL ISSUE BEING CLOSE TO ELECTRICAL BOX E 1 25% WHEN ROW 5 IS ANCHORED NEED TO VERIFY ALL ROWS ARE EVEN AND MATCHING MEASUREMENTS BEFORE LAST 2 BOLTS ARE PLACED Front o base 84 1/2, back to back 77 1/2 ENSURE ALL END CAPS ARE PLACED BEFORE STARTING TO PULL CABLE! Place end caps while material is on ground. EGsidf2 - fe needs to arrange Box for outside wap Exterior cans are hung, need close out with qa Get fok for external, send to chance CMDF 2 - FACEPLATES FOR SOUTH WALL CMDF1 - vertical ladder rack for south wall after cement sets
Thursday, May 21, 2026
Timeon P. RPL10 GSEF 1/2, CMDF 1/2, EF · logged 05/21/2026 03:33 PM CT
Confirmed rack positioning in EF1. Operations began to anchor the racks into place after shifting the racks over 4 inches to avoid hitting the bolts on the nearby columns. Conducted a field walk with the superintendents and FE's. Walked the GSEFs and reviewed the plan on supporting the crossovers with Unistrut.
Tuesday, May 12, 2026
Caleb Bourghs NCB RPL10 · logged 05/13/2026 07:19 AM CT
Daily QA meeting to discuss walk, upcoming FOK, and standards. Met with FE team for GSEF1 & 2 walk to verify checklist. Took remaining photos and made updates to FOK. Completed L1s for: CB-FE-HT-384MCM-034 CB-FE-HT-096MCM-048 CB-FE-HT-288MCM-086 CB-FE-HT-096MCM-101 CB-FE-HT-096MCM-059 CB-FE-HT-096MCM-052 CB-FE-HT-096MCM-070 CB-FE-HT-096MCM-025 CB-FE-HT-096MCM-070 CB-FE-HT-096MCM-346 CB-FE-HT-192MCM-222 CB-FE-HT-096MCM-095 CB-FE-HT-096MCM-091 CB-FE-HT-096MCM-071 CB-FE-HT-096MCM-089 CB-FE-HT-096MCM-102 CB-FE-HT-096MCM-078 CB-FE-HT-096MCM-121 CB-FE-HT-096MCM-127 CB-FE-ET-384MCFMCM-103 CB-FE-HT-096MCM-082 CB-FE-HT-096MCM-051 CB-FE-HT-096MCM-076 CB-FE-HT-192MCM-064 CB-FE-ET-384MCFMCM-119 CB-FE-ET-384MCFMCM-285 CB-FE-ET-384MCFMCM-194 CB-FE-HT-096MCM-188 CB-FE-HT-192MCM-067 CB-FE-HT-096MCM-408 CB-FE-HT-096MCM-315 CB-FE-ET-384MCFMCM-305 CB-FE-ET-384MCFMCM-257 CB-FE-HT-096MCM-400 CB-FE-ET-384MCFMCM-200 CB-FE-ET-384MCFMCM-298 CB-FE-ET-384MCFMCM-151 CB-FE-ET-384MCFMCM-179
Friday, May 08, 2026
Timeon P. Warehouse · logged 05/10/2026 01:23 PM CT
Created L1 for the following materials received at the warehouse: CB-FE-ET-384MCFMCM-347 - 2 CB-FE-ET-384MCFMCM-265 - 2 CB-FE-ET-384MCFMCM-241 - 4 CB-FE-HT-096MCM-122 - 2 CB-FE-HT-096MCM-066 - 2 CB-FE-ET-384MCFMCM-273 - 2 CB-FE-ET-384MCFMCM-277 - 2 CB-FE-HT-192MCM-094 - 4 CB-FE-HT-192MCM-113 - 4 CB-FE-HT-288MCM-150 - 4 CB-FE-HT-288MCM-141 - 4 CB-FE-HT-288MCM-203 - 8 CB-FE-HT-192MCM-045 - 2 CB-FE-HT-288MCM-210 - 4 CB-FE-ET-384MCFMCM-129 - 4 CB-FE-ET-384MCFMCM-163 - 4 CB-FE-HT-096MCM-369 - 2 CB-FE-HT-192MCM-091 - 4 CB-FE-ET-384MCFMCM-145 - 2 CB-FE-ET-384MCFMCM-133 - 2 CB-FE-ET-384MCFMCM-151 - 2 CB-FE-ET-384MCFMCM-179 - 6 CB-FE-ET-384MCFMCM-298 - 1 CB-FE-ET-384MCFMCM-200 - 4 CB-FE-HT-096MCM-400 - 2 CB-FE-ET-384MCFMCM-257 - 2 CB-FE-ET-384MCFMCM-305 - 2 CB-FE-HT-192MCM-064 - 4 CB-FE-ET-384MCFMCM-119 - 4 CB-FE-ET-384MCFMCM-285 - 2 CB-FE-HT-096MCM-408 - 2 CB-FE-HT-096MCM-315 - 1 CB-FE-HT-192MCM-067 - 4 CB-FE-ET-384MCFMCM-194 - 2 CB-FE-HT-096MCM-188 - 1 CB-FE-ET-384MCFMCM-153 - 2 CB-FE-ET-384MCFMCM-190 - 4 CB-FE-ET-384MCFMCM-154 - 6 CB-FE-ET-384MCFMCM-169 - 4 CB-FE-ET-384MCFMCM-175 - 4 CB-FE-ET-384MCFMCM-137 - 2 CB-FE-ET-384MCFMCM-190 - 3 CB-FE-HT-096MCM-065 - 1 CB-FE-ET-384MCFMCM-225 - 4 CB-FE-ET-384MCFMCM-262 - 2 CB-FE-ET-384MCFMCM-327 - 2 CB-FE-HT-384MCM-141 - 32 CB-FE-ET-384MCFMCM-252 - 2 CB-FE-ET-384MCFMCM-097 - 2 CB-FE-ET-384MCFMCM-156 - 2 CB-FE-ET-384MCFMCM-212 - 2 CB-FE-ET-384MCFMCM-216 - 8 CB-FE-ET-384MCFMCM-220 - 2 CB-FE-ET-384MCFMCM-159 - 2 CB-FE-HT-096MCM-079 - 1 CB-FE-HT-096MCM-084 - 1 CB-FE-HT-096MCM-382 - 1 CB-FE-HT-096MCM-387 - 1 CB-FE-HT-096MCM-394 - 1 CB-FE-HT-096MCM-395 - 1 CB-FE-HT-096MCM-401 - 1 CB-FE-HT-096MCM-402 - 1 CB-FE-HT-096MCM-407 - 1 CB-FE-HT-096MCM-413 - 1 CB-FE-HT-096MCM-424 - 1 CB-FE-HT-192MCM-007 - 96 CB-FE-HT-192MCM-008 - 96 CB-FE-HT-192MCM-032 - 4 CB-FE-HT-192MCM-050 - 2 CB-FE-HT-192MCM-101 - 6 CB-FE-HT-192MCM-107 - 4 CB-FE-HT-192MCM-119 - 2 CB-FE-HT-192MCM-139 - 2 CB-FE-HT-192MCM-154 - 4 CB-FE-HT-192MCM-160 - 4 CB-FE-HT-288MCM-092 - 4 CB-FE-HT-288MCM-095 - 4 CB-FE-HT-288MCM-102 - 8 CB-FE-HT-288MCM-108 - 4 CB-FE-HT-288MCM-111 - 4 CB-FE-HT-288MCM-117 - 4 CB-FE-HT-288MCM-122 - 4 CB-FE-HT-288MCM-123 - 4 CB-FE-HT-288MCM-140 - 8 CB-FE-HT-288MCM-222 - 4 CB-FE-HT-384MCM-018 - 48 CB-FE-HT-384MCM-019 - 24 CB-FE-HT-384MCM-023 - 24 CB-FE-HT-384MCM-033 - 24 CB-FE-HT-384MCM-040 - 4
Thursday, May 07, 2026
Caleb Bourghs NCB, RPL10 · logged 05/07/2026 04:54 PM CT
Daily align with QA Team discussing upcoming walks and FOKs. Went over specs per FOK and upcoming walks in GSEF1, GSEF2, CMDF 1, CMDF 2. Met with our FE team at RPL10 and completed a walk through for each room. Verified spacing in between ladder racks support and worked with FE team to have it corrected. Verified splicing, cable management, and routing. Verified cleared issue #6394 in CMDF1. Created checklist with FE team to prepare for the 100% walk.
Wednesday, May 06, 2026
Timeon P. Warehouse · logged 05/07/2026 07:14 AM CT
Created L1 for the following materials received at the warehouse: CB-FE-ET-192MCFMCM-010 - 8 CB-FE-ET-192MCFMCM-022 - 6 CB-FE-ET-192MCFMCM-024 - 2 CB-FE-ET-192MCFMCM-023 - 12 CB-FE-ET-192MCFMCM-024 - 10 CB-FE-ET-192MCFMCM-025 - 24 CB-FE-ET-192MCFMCM-026 - 18 CB-FE-ET-192MCFMCM-027 - 12 CB-FE-ET-192MCFMCM-028 - 12 CB-FE-ET-192MCFMCM-038 - 4 CB-FE-ET-384MCFMCM-057 - 2 CB-FE-HT-288MCM-162 - 8 CB-FE-HT-288MCM-170 - 4 CB-FE-HT-096MCM-375 - 1 CB-FE-HT-384MCM-035 - 8 CB-FE-HT-192MCM-055 - 4 CB-FE-HT-288MCM-183 - 4 CB-FE-HT-288MCM-182 - 4 CB-FE-HT-288MCM-145 - 12 CB-FE-HT-288MCM-178 - 8 CB-FE-HT-384MCM-024 - 48 CB-FE-ET-384MCFMCM-105 - 4 CB-FE-ET-384MCFMCM-147 - 2 CB-FE-ET-384MCFMCM-131 - 2 CB-FE-HT-024MCM-013 - 32 CB-FE-ET-384MCFMCM-310 - 2 CB-FE-ET-384MCFMCM-049 - 2 CB-FE-HT-384MCM-139 - 2 CB-FE-HT-288MCM-234 - 4 CB-FE-HT-192MCM-138 - 2
Caleb Bourghs NCB · logged 05/07/2026 06:03 AM CT
Created L1 checklist for 45 different shipments to the warehouse. Met with Meta, DPR, and other GCs for 11am to discuss upcoming weekly Wednesday walks with needed personnel to better align our scheduling and progress. Qa Team meeting discussing IES QA/QC Workflow Process.
Thursday, April 30, 2026
Timeon P. GSIDFNX05 · logged 04/30/2026 04:49 PM CT
Walked CMDF2 and took measurements to ensure that the racks placed were at the correct locations before being anchored. Racks were landed according to prints. Super Chance informed us about issues he noticed in the field, took pictures and created formal issues in ACC, listed below: Issue #6395 GSIDFNX05 MOFE Door Issue #6393 GSIDFNX05 Labeling Conflict Richard reviewed splice cassette alignment with chance to ensure that they were aligned with the FE labels Walked the GSIDFNX05 and noticed that Clear Core left fiber clippings on the floor and that the fiber dressing in both the 432 can and the 1u unican fiber enclosure was not up to standard, they were called back to correct the dressing.
Timeon P. RPL10 GSEF 1/2, CMDF 1/2, IDFNX5 · logged 04/30/2026 01:37 PM CT
Completed a field walk with the FE team through the GSEF's 1/2, CMDF 1/2, and IDFNX5. Photos of the temporary 2 post rack in GSEF 1 for the temporary splices were taken. Temp splices of two 192 fibers in IDFNX5 were completed by Clear Core. SFE Paul informed us that the horizontal ladder runway in both CMDF's will have to move away from their respective walls by approx. 5" to allow for adequate space for the fiber to be routed within the bend radius. The changes will be redlined after installation per Hargis. This will also allow for the horizontal crossovers to be installed with out the overhead support. As the CMDF's have been buildout to spec, the FE's are reviewing to see if this will be a change order.