GSIDFNX09

RPL10
L1 – OFCI Verification
63 L1 forms total
L1 forms are no longer tied to areas. Manage them all on the L1 page.
Open L1 Page
L2 – Infrastructure
0%
Was 07/23/2026
Was 07/29/2026
50%
Target: 08/19/2026
100%
Target: 08/21/2026
L3 – ISP
0%
Was 08/13/2026
Was 08/17/2026
50%
Target: 09/09/2026
100%
Target: 09/10/2026
L3 – OSP
0%
25%
Target: 08/27/2026
50%
Target: 08/31/2026
75%
Target: 09/02/2026
100%
Target: 09/04/2026
L4 – Network
0%
50%
Target: 09/09/2026
100%
Target: 09/10/2026
L5 – Punchlist
0%
50%
Target: 08/18/2026
100%
Target: 08/19/2026