Schedule Viewer

Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260412.xer · Uploaded Apr 16, 2026 12:51 PM · 8408 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
99
Completed
1
In Progress
100
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.INT.SSB.01160 RPL10.Interior.SSB - Office Space (ERAD, Maintance, Network infra, Spoke, Bathroom, etc) - WBS Summary - OBSOLETE Obsolete Active 10/17/24 07/27/32 2448.8 0.0
100%
0.0
RPL10.INT.SSB.01180 RPL10.Interior.SSB - Office Space - Install Door Frames OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.01190 RPL10.Interior.SSB - Loading Dock and Storage - Install Electrical Rough-Ins OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSB.01210 RPL10.Interior.SSB - Install Electrical OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSB.01230 RPL10.Interior.SSB - Office Space - Install Controls / EPMS / BMS OH and In-wall OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSB.01330 RPL10.Interior.SSB - Loading Dock and Storage - Hang Tape Finish OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.01340 RPL10.Interior.SSB - Office Space - Tape Finish Paint OBSOLETE Obsolete Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.01370 RPL10.Interior.SSB - Office Space - Ceiling Grid and Tiles - OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSB.01410 RPL10.Interior.SSB - Loading Dock and Storage - Install DAS ***OBSOLETE*** Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.01440 RPL10.Interior.SSB - Loading Dock and Storage - Install Store Front Frames OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSB.01450 RPL10.Interior.SSB - BoW - Install DAS ***OBSOLETE*** Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.01680 RPL10.Interior.SSB - Priority - Install Mechanical Piping/ Refrigerant (Highside OH space) - OBSOLETE Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.01700 RPL10.Interior.SSB - BoW - Install Plumbing (Lowside OH Space) OBSOLETE Obsolete Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.01880 RPL10.Interior.SSB - Kitchen - Frame/Blocking Walls & Ceilings - OBSOLETE Obsolete Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.02440 RPL10.Interior.SSB - Office Space - Install Acoustic Ceiling Tiles in specific rooms - OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSB.02860 RPL10.Interior.SSB - Kitchen - MEP Rough-Ins - OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.02900 RPL10.Interior.SSB - Loading Dock and Storage - Prioirity Install Layout, Unistruts & Hangers (All Trades) *OBSOLETE* Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.02920 RPL10.Interior.SSB - Loading Dock and Storage - Install Headers and Top Out and Fire/Caulking OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.02940 RPL10.Interior.SSB - Loading Dock and Storage - Install Blocking OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.02980 RPL10.Interior.SSB - Office Space - Pre Prioirty OH & Walls Tasks (Unistruts,Hangers,Track) OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.03000 RPL10.Interior.SSB - Office Space - Install Headers and Top Out and Fire/Caulking OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.03020 RPL10.Interior.SSB - Loading Dock and Storage - Install Steel support Assemply for Metal Canopy OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.03060 RPL10.Interior.SSB - Kitchen - Hang Tape Bed and Fire/Caulking - OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.03080 RPL10.Interior.SSB - Loading Dock and Storage - Tape, Float and Paint (Top Out) OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 10.0 0.0
100%
0.0
RPL10.INT.SSB.03100 RPL10.Interior.SSB - Office Space - Tape, Float and Paint (Top Out) OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.03120 RPL10.Interior.SSB - Loading Dock and Storage - Install Store Front Glazing OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.03520 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - Tape Float Paint Pony Wall (both sides) OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.03560 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - Frame Remaining Wall OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.03580 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - Mechanical Inwall OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 10.0 0.0
100%
0.0
RPL10.INT.SSB.03600 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - Electrical Inwall OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 10.0 0.0
100%
0.0
RPL10.INT.SSB.03620 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - Fire Alarm/ BMS inwall OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 10.0 0.0
100%
0.0
RPL10.INT.SSB.03640 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - Backing Wall OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.03660 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - One Side Drywall Remaining Wall OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 7.5 0.0
100%
0.0
RPL10.INT.SSB.03680 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - Tape Float Paint One Side Remaining Wall *OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.03700 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - Two Side Drywall Remaining Wall OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 7.5 0.0
100%
0.0
RPL10.INT.SSB.03720 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - Tape Float Paint Two Side Remaining Wall OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.04040 RPL10.Interior.SSB - Priority - Grid line 10-C - Loading Dock Area - P5 - MEP OH Pentrations OBSOLETE Priority Wall (P5) - Grid Line 10-C Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.04100 RPL10.Interior.SSB - Priority - Grid line 10-C - Loading Dock Area - P5 - Remaining Hangers & Strut (All Trades)OBSOLETE Priority Wall (P5) - Grid Line 10-C Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.04160 RPL10.Interior.SSB - Priority - Grid line 10-C - Loading Dock Area - P5 - Electrical Inwall OBSOLETE Priority Wall (P5) - Grid Line 10-C Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.04180 RPL10.Interior.SSB - Priority - Grid line 10-C - Loading Dock Area - P5 - Fire Alarm/ BMS inwall OBSOLETE Priority Wall (P5) - Grid Line 10-C Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.04440 RPL10.Interior.SSB - Priority - Grid line 10-D - Loading Dock Area - P5 - Electrical Inwall OBSOLETE Priority Wall (P5) - Grid Line 10-D Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.04460 RPL10.Interior.SSB - Priority - Grid line 10-D - Loading Dock Area - P5 - Fire Alarm/ BMS inwall OBSOLETE Priority Wall (P5) - Grid Line 10-D Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.04480 RPL10.Interior.SSB - Priority - Grid line 10-D - Loading Dock Area - P5 - Backing Wall OBSOLETE Priority Wall (P5) - Grid Line 10-D Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.04500 RPL10.Interior.SSB - Priority - Grid line 10-D - Loading Dock Area - P5 - One Side Drywall Remaining Wall OBSOLETE Priority Wall (P5) - Grid Line 10-D Complete 10/17/24 10/17/24 4.0 0.0
100%
0.0
RPL10.INT.SSB.04520 RPL10.Interior.SSB - Priority - Grid line 10-D - Loading Dock Area - P5 - Tape Float Paint One Side Remaining Wall ***** Priority Wall (P5) - Grid Line 10-D Complete 10/17/24 10/17/24 8.0 0.0
100%
0.0
RPL10.INT.SSB.04540 RPL10.Interior.SSB - Priority - Grid line 10-D - Loading Dock Area - P5 - Two Side Drywall Remaining Wall OBSOLETE Priority Wall (P5) - Grid Line 10-D Complete 10/17/24 10/17/24 4.0 0.0
100%
0.0
RPL10.INT.SSB.04560 RPL10.Interior.SSB - Priority - Grid line 10-D - Loading Dock Area - P5 - Tape Float Paint Two Side Remaining Wall OBSOL Priority Wall (P5) - Grid Line 10-D Complete 10/17/24 10/17/24 8.0 0.0
100%
0.0
RPL10.INT.SSB.04580 RPL10.Interior.SSB - Admin Area - Frame Pony Walls OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.04600 RPL10.Interior.SSB - Admin Area - MEP OH Pentrations OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.04620 RPL10.Interior.SSB - Admin Area - Hang Drywall Pony Wall (both sides) OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 7.5 0.0
100%
0.0
RPL10.INT.SSB.04640 RPL10.Interior.SSB - Admin Area - Tape Float Paint Pony Wall (both sides) OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.04660 RPL10.Interior.SSB - Admin Area - Remaining Hangers & Strut (All Trades) OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.04680 RPL10.Interior.SSB - Admin Area - Frame Remaining Wall OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.04700 RPL10.Interior.SSB - Admin Area - Mechanical Inwall OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.04720 RPL10.Interior.SSB - Admin Area - Electrical Inwall OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.04740 RPL10.Interior.SSB - Admin Area - Fire Alarm/ BMS inwall OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.04760 RPL10.Interior.SSB - Admin Area - Backing Wall OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.04780 RPL10.Interior.SSB - Admin Area - One Side Drywall Remaining Wall OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 7.5 0.0
100%
0.0
RPL10.INT.SSB.04800 RPL10.Interior.SSB - Admin Area - Tape Float Paint One Side Remaining Wall ***** OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 15.0 0.0
100%
0.0
RPL10.INT.SSB.04820 RPL10.Interior.SSB - Admin Area - Two Side Drywall Remaining Wall OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 7.5 0.0
100%
0.0
RPL10.INT.SSB.04840 RPL10.Interior.SSB - Admin Area - Tape Float Paint Two Side Remaining Wall OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 15.0 0.0
100%
0.0
RPL10.INT.SSB.04860 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Frame Pony Wall OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.04880 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - MEP OH Pentrations OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.04900 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Hang Drywall Pony Wall (both sides) OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 7.5 0.0
100%
0.0
RPL10.INT.SSB.04920 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Tape Float Paint Pony Wall (both sides) OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSB.04940 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Remaining Hangers & Strut (All Trades) OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.04960 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Frame Remaining Wall OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.04980 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Mechanical Inwall OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 5.0 0.0
100%
0.0
RPL10.INT.SSB.05000 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Electrical Inwall OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 5.0 0.0
100%
0.0
RPL10.INT.SSB.05020 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Fire Alarm/ BMS inwall OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 5.0 0.0
100%
0.0
RPL10.INT.SSB.05040 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Backing Wall OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 5.0 0.0
100%
0.0
RPL10.INT.SSB.05060 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - One Side Drywall Remaining Wall OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 7.5 0.0
100%
0.0
RPL10.INT.SSB.05080 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Tape Float Paint One Side Remaining Wall ***** OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 15.0 0.0
100%
0.0
RPL10.INT.SSB.05100 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Two Side Drywall Remaining Wall OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 7.5 0.0
100%
0.0
RPL10.INT.SSB.05120 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - Tape Float Paint Two Side Remaining Wall OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 15.0 0.0
100%
0.0
RPL10.INT.SSB.05140 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Frame Pony Walls (Fire Riser Room) OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.05160 RPL10.Interior.SSB - SSB Corridor Priority Rooms - MEP OH Pentrations (Fire Riser Room) OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.05180 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Hang Drywall Pony Wall (both sides) (Fire Riser Room) OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.05200 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Tape Float Paint Pony Wall (both sides) (Fire Riser Room) OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.05240 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Frame Remaining Wall OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.05260 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Mechanical Inwall OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.05280 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Electrical Inwall OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.05300 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Fire Alarm/ BMS inwall OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.05320 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Backing Wall OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSB.05340 RPL10.Interior.SSB - SSB Corridor Priority Rooms - One Side Drywall Remaining Wall OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 4.0 0.0
100%
0.0
RPL10.INT.SSB.05360 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Tape Float Paint One Side Remaining Wall OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 8.0 0.0
100%
0.0
RPL10.INT.SSB.05380 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Two Side Drywall Remaining Wall OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 4.0 0.0
100%
0.0
RPL10.INT.SSB.05400 RPL10.Interior.SSB - SSB Corridor Priority Rooms - Tape Float Paint Two Side Remaining Wall OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 8.0 0.0
100%
0.0
RPL10.INT.SSB.05440 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Frame Pony Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.05460 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - MEP OH Pentrations OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.05480 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Hang Drywall Pony Wall (both sides)OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 7.5 0.0
100%
0.0
RPL10.INT.SSB.05500 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Install Layout, Unistruts & Hangers OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 17.5 0.0
100%
0.0
RPL10.INT.SSB.05540 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Tape Float Paint Pony Wall (both sides) OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.05580 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Frame Remaining Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.05600 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Mechanical Inwall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.05620 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Electrical Inwall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.05640 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Fire Alarm/ BMS inwall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.05660 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - One Side Drywall Remaining Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.05680 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Backing Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.05700 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Tape Float Paint One Side Remaining Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0