Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260412.xer · Uploaded Apr 16, 2026 12:51 PM · 8408 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
98
Completed
2
In Progress
100
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.INT.SSB.05720 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Two Side Drywall Remaining Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.05740 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - Tape Float Paint Two Side Remaining Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06060 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Install Layout, Unistruts & Hangers (All Trades)OBSO Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 17.5 0.0
100%
0.0
RPL10.INT.SSB.06080 RPL10.Interior.SSB Storage Area Storage Area - Priority - Grid line 10-41 - P0 - Frame Pony Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06100 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - MEP OH Pentrations OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06120 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Frame Remaining Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.06140 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Hang Drywall Pony Wall (both sides) OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 7.5 0.0
100%
0.0
RPL10.INT.SSB.06160 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Tape Float Paint Pony Wall (both sides) OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06180 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - One Side Drywall Remaining Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.06200 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Backing Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.06220 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Mechanical Inwall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.06240 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Electrical Inwall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.06260 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Tape Float Paint One Side Remaining Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06280 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Two Side Drywall Remaining Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.06300 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Tape Float Paint Two Side Remaining Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06320 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Remaining Hangers & Strut (All Trades) OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.06340 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - Fire Alarm/ BMS inwall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSB.06360 RPL10.Interior.SSB Storage Area - Priority - Grid line 10-41 - P0 - QC Walls Inspection/Scan OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.INT.SSB.06380 RPL10.Interior.SSB Admin Area - Priority - Grid line 10-41 - P0 - QC Walls Inspection/Scan OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.INT.SSB.06400 RPL10.Interior.SSB - Priority - Grid line 10-40 - P1 - QC Walls Inspection/Scan OBSOLETE Priority Wall (P1) - Grid Line 10-40 Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.06420 RPL10.Interior.SSB Storage Area - Priority - Install IMP Exterior Inwall Rough-Ins OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06440 RPL10.Interior.SSB Storage Area - Priority - Install Backing Exterior Wall OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06460 RPL10.Interior.SSB Storage Area - Priority - Install Drywall at Exterior Walls OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06480 RPL10.Interior.SSB Admin Area - Priority - Install IMP Exterior Walls Inwall Rough-Ins OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06500 RPL10.Interior.SSB Admin Area - Priority - Install Drywall at Exterior Walls OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06520 RPL10.Interior.SSB Admin Area - Priority - Install Backing Exterior Walls OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSB.06540 RPL10.Interior.SSB - Priority - QC Exterior Walls/Backings OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Admin Area - Area C) Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.INT.SSB.06560 RPL10.Interior.SSB - Priority - QC Exterior Walls/Backings OBSOLETE Priority Wall (P0) - Grid Line 10-41 (Storage Area - Area A) Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.INT.SSB.06660 RPL10.Interior.SSB - Admin Area - QC Walls Inspection/Scan OBSOLETE Admin Area (Area C) Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.06680 RPL10.Interior.SSB - Priority - Grid line 10-38 - P2 - QC Walls Inspection/Scan OBSOLETE Priority Wall (P2) - Grid Line 10-38 Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.INT.SSB.06700 RPL10.Interior.SSB - SSB Corridor Priority Rooms - QC Walls Inspection/Scan OBSOLETE SSB Corridor Rooms (SSB Elec, Fire Riser, Carrier MDF, GSEF, Lighting Inverter, GS MDF Elect) Complete 10/17/24 10/17/24 3.0 0.0
100%
0.0
RPL10.INT.SSBC.01170 RPL10.Interior.SSB-Corridor - Frame Walls OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSBC.01190 RPL10.Interior.SSB-Corridor - Install Doors Frame Hardware OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSBC.01200 RPL10.Interior.SSB-Corridor - Install Electrical OH and In-wall OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSBC.01210 RPL10.Interior.SSB-Corridor - Install Split Systems/Humidifiers OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSBC.01220 RPL10.Interior.SSB-Corridor - Install Fire Life Safety OH and In-wall OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSBC.01230 RPL10.Interior.SSB-Corridor - Install Plumbing OH and In-wall OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSBC.01240 RPL10.Interior.SSB-Corridor - Install Security OH and In-wall OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSBC.01250 RPL10.Interior.SSB-Corridor - Install Controls / EPMS / BMS OH and In-wall OBSOLETE Obsolete Complete 10/17/24 10/17/24 5.0 0.0
100%
0.0
RPL10.INT.SSBC.01260 RPL10.Interior.SSB-Corridor - Hang Tape Finish OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSBC.01270 RPL10.Interior.SSB-Corridor - F/R/P Pads OBSOLETE Obsolete Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSBC.01280 RPL10.Interior.SSB-Corridor - Paint OBSOLETE Obsolete Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.INT.SSBC.01300 RPL10.Interior.SSB-Corridor - Install DAS OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSBC.01310 RPL10.Interior.SSB-Corridor - Install Lighting OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSBC.01320 RPL10.Interior.SSB-Corridor - Security Trim Out OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSBC.01330 RPL10.Interior.SSB-Corridor - Plumbing Trim Out OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSBC.01340 RPL10.Interior.SSB-Corridor - Fire Life Safety Trim Out OBSOLETE Obsolete Complete 10/17/24 10/17/24 12.5 0.0
100%
0.0
RPL10.INT.SSBC.01350 RPL10.Interior.SSB-Corridor - Electrical Trim Out OBSOLETE Obsolete Complete 10/17/24 10/17/24 8.8 0.0
100%
0.0
RPL10.INT.SSBC.01370 RPL10.Interior.SSB-Corridor - Duct Drops Trim out OBSOLETE Obsolete Complete 10/17/24 10/17/24 5.0 0.0
100%
0.0
RPL10.INT.SSBC.01380 RPL10.Interior.SSB-Corridor - Asset Tagging OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSBC.01570 RPL10.Interior.SSB-Corridor - Install VAV's/Duct Branches OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSBC.02200 RPL10.Interior.SSB-Corridor - Priority - Install Mechanical Piping/ Refrigerant (Highside OH space) * Obsolete Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSBC.02520 RPL10.Interior.SSB-Corridor - Priority - QC - Exterior Wall - Backing/In-Wall OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSBC.02880 RPL10.Interior.SSB-Corridor - BoW - Install DAS ***OBSOLETE*** Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.INT.SSBC.03440 RPL10.Interior.SSB-Corridor - Frame Hang Drywall Bed Tape Paint (OFE Room Closing) -OBSOLETE Obsolete Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.MCUP.1-4.01000 RPL10.MCUP.1-4 - Install Piers - OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.MCUP.5-8.01000 RPL10.MCUP.5-8 - Install Piers - OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.MCUP.LP1.1120 Logistics Area #6 - Complete - ""Delete"" - OBSOLETE Obsolete Complete 10/17/24 10/17/24 0.0 0.0
100%
0.0
RPL10.MCUP.LP2.1040 RPL10.MCUP.Loop 2 - mCup L2 Construction Start - OBSOLETE Obsolete Complete 10/17/24 10/17/24 0.0 0.0
100%
0.0
RPL10.MR.1280 RPL10.RL - Mechanical Resource Load ( General Requriements) Make Ready Active 10/17/24 07/27/32 0.0 1991.2
100%
0.0
RPL10.MR.1300 RPL10.RL - Mechanical Resource Load ( General Conditions) Make Ready Active 10/17/24 07/27/32 0.0 1991.2
100%
0.0
RPL10.OFE.TIA OFE Delivery ROJ - FWM (CUP) - 1 (Orginal CD 09.29.25) - Post IGMP - DELAY ID'd on 07/15 - OBSOLETE Obsolete Complete 10/17/24 10/17/24 88.8 0.0
100%
0.0
RPL10.PR.EF1.01000 RPL10.Area Complete - EF1 - OBSOLETE Obsolete Complete 10/17/24 10/17/24 0.0 0.0
100%
0.0
RPL10.PR.EF2.01000 RPL10.Area Complete - EF2 -- OBSOLETE Obsolete Complete 10/17/24 10/17/24 0.0 0.0
100%
0.0
RPL10.PR.PR.01120 RPL10.PR.FENW NWS1 - Mega Pod 1.4 - Provisioning, Auditing, Issue Remediation, UnDrain (JXSW, SSW, FSW) (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 25.0 0.0
100%
0.0
RPL10.PR.PR.01200 RPL10.PR.FENW NWS2 - Mechanical Fault Domain 2.5 - Provisioning, Auditing, Issue Remediation, UnDrain (JXSW, SSW, FSW) ( Obsolete Complete 10/17/24 10/17/24 25.0 0.0
100%
0.0
RPL10.PR.PR.01260 RPL10.PR.FENW NWS4 - Mega Pod 4.4 - Provisioning, Auditing, Issue Remediation, UnDrain (JXSW, SSW, FSW) (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 25.0 0.0
100%
0.0
RPL10.PR.PR.01340 RPL10.PR.FENW NWS3 - Mega Pod 3.4 - Provisioning, Auditing, Issue Remediation, UnDrain (JXSW, SSW, FSW) (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 25.0 0.0
100%
0.0
RPL10.PR.PR12.01060 RPL10.PR.BENW NWS1 - Mega Pod 1.4 - Provisioning, Auditing, Issue Remediation, UnDrain (BAG) (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 25.0 0.0
100%
0.0
RPL10.PR.PR12.01140 RPL10.PR.BENW NWS2 - Mega Pod 2.4 - Provisioning, Auditing, Issue Remediation, UnDrain (BAG) (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 25.0 0.0
100%
0.0
RPL10.PR.PR43.01100 RPL10.PR.BENW NWS4 - Mega Pod 4.4 - Provisioning, Auditing, Issue Remediation, UnDrain (BAG) (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 25.0 0.0
100%
0.0
RPL10.PR.PR43.01180 RPL10.PR.BENW NWS3 - Mega Pod 3.4 - Provisioning, Auditing, Issue Remediation, UnDrain (BAG) (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 25.0 0.0
100%
0.0
RPL10.PRED PRED Obsolete Complete 10/17/24 10/17/24 5.0 0.0
100%
0.0
RPL10.SKN.E.01020 RPL10.SKIN.East - Install IMP Flashing and Caulking - OBSOLETE Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.SKN.E.01060 RPL10.SKIN.East - Install Metal Panel Sealant & Starter Flashing (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.SKN.EF12.01160 RPL10.SKIN.EF12 - Install Backing of Exterior Wall OBSOLETE **Duplicate of CC Exterior Wall Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.SKN.N.01030 OBSOLETE- Install IMP Flashing,Panels & Caulking - Grid lines 10-41/10-30 (with temp closures for openings) Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.SKN.N.01080 RPL10.SKIN.North - Install IMP Flashing and Caulking - OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.SKN.N.01120 RPL10.SKIN.North - Install Metal Panel Sealant & Starter Flashing (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.SKN.NS12.01160 RPL10.SKIN.NS12 - Install Backing of Exterior Wall OBSOLETE Duplicate Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.SKN.S.01080 RPL10.SKIN.South - Install IMP Flashing and Caulking (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.SKN.S.01120 RPL10.SKIN.South - Install Metal Panel Sealant & Starter Flashing (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.SKN.SSB.01010 RPL10.SKIN.SSB - Install Blocking of Canopy OBSOLETE Obsolete Complete 10/17/24 10/17/24 6.2 0.0
100%
0.0
RPL10.SKN.W.01020 RPL10.SKIN.West - Install IMP Flashing and Caulking (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.SKN.W.01060 RPL10.SKIN.West - Install Metal Panel Sealant & Starter Flashing (OBSOLETE) Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.SSBC.BB.2000 RPL10.Int.Build Back.SSB-Corr - LO #1 - MEPF Trim Out - OBSOLETE Obsolete Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.SSBC.BB.2160 RPL10.Int.Build Back.SSB-Corr - LO #1 - Final Punch Walk - OBSOLETE Obsolete Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.SSBC.BB.2180 RPL10.Int.Build Back.SSB-Corr - LO #1 - Final Clean - OBSOLETE Obsolete Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.SSBC.BB.2480 RPL10.Int.Build Back.SSB-Corr - LO #1 - MEPF - In Wall, OH, Lowside, Lights - OBSOLETE Obsolete Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.SSBC.BB.2600 RPL10.Int.Build Back.SSB-Corr - LO #5 - MEPF Trim Out -OBSOLETE Obsolete Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.SSBC.BB.2660 RPL10.Int.Build Back.SSB-Corr - LO #5 - Final Punch Walk -OBSOLETE Obsolete Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.SSBC.BB.2680 RPL10.Int.Build Back.SSB-Corr - LO #5 - Final Clean -OBSOLETE Obsolete Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.SSBC.BB.2980 RPL10.Int.Build Back.SSB-Corr - LO #5 - MEPF - In Wall, OH, Lowside, Lights -OBSOLETE Obsolete Complete 10/17/24 10/17/24 1.2 0.0
100%
0.0
RPL10.SUB.EF12.01060 RPL10.SubStructure.EF12 - Install Grounding Wire - Grid lines 10-20/10-10 (Obsolete) Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.SUB.NS12.01080 RPL10.SubStructure.NS12 - Install Grounding Wire - Grid lines 10-30/10-20 (Obsolete) Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.SUB.NS43.01080 RPL10.SubStructure.NS43 - Install Grounding Wire - Grid lines 10-10/10-01 (Obsolete) Obsolete Complete 10/17/24 10/17/24 2.5 0.0
100%
0.0
RPL10.SUB.SSB.01100 RPL10.SubStructure.SSB - Install Grounding Wire - Grid lines 10-42/10-30 (Obsolete) Obsolete Complete 10/17/24 10/17/24 3.8 0.0
100%
0.0
RPL10.VDC.1500 BIM - SSB - Tier 1 - Coordination / Sign-off - OBSOLETE RPL10 - SSB Complete 10/17/24 10/17/24 25.0 0.0
100%
0.0
RPL10.VDC.1510 BIM - SSB - Tier 2-4 - Coordination / Sign-off - OBSOLETE RPL10 - SSB Complete 10/17/24 10/17/24 37.5 0.0
100%
0.0
RPL10.VDC.1520 BIM - UG ALL - Tier 0 - Coordination / Sign-off (All Areas) - OBSOLETE Building Complete 10/17/24 10/17/24 56.2 0.0
100%
0.0