Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260412.xer
· Uploaded Apr 16, 2026 12:51 PM
· 8408 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
3
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.SKN.SSB.01390 |
RPL10.SKIN.BLDG - Install Coping | Skin | Not Started | 04/21/26 | 04/27/26 | 6.2 | 6.2 |
|
343.8 |
RPL10.CTRC.BB.3315 |
RPL10.Int.Build Back.Center-Corr - LO #13 - P6 Hang Drywall (Around 30"" Mech Pipe) | Build Back Interior Leave Out Wall #12 #13 @ 30"" Mech Piping (Center Corr) | Not Started | 04/22/26 | 04/23/26 | 2.5 | 2.5 |
|
140.0 |
RPL10.EY.EF2.01160 |
RPL10.EY.EF2 - Install RPL-3 FSP Columns F/R/P | Fiber Support Platform - RPL-3 | Not Started | 04/22/26 | 04/28/26 | 6.2 | 6.2 |
|
225.0 |
RPL10.EY.NS2.01240 |
RPL10.EY.NS2 - Install GS.IDF Hut (1x GS.IDF) NX06 (04.22.26) | OFE | Not Started | 04/22/26 | 04/28/26 | 6.2 | 6.2 |
|
31.2 |
RPL10.EY.NS4.01210 |
RPL10.EY.NS4 - Tent Temp Conditioning Startup and Available (Including Acclimation) (04/10/26) | Tent and Temp Conditions | Not Started | 04/22/26 | 04/29/26 | 7.5 | 7.5 |
|
115.0 |
RPL10.INT.ENDC.01010 |
RPL10.Interior.End-Corridor - Priority - Install Duct (Highside OH space) | Priority Walls & OverHead | Not Started | 04/22/26 | 05/05/26 | 12.5 | 12.5 |
|
115.0 |
RPL10.INT.NS1.01750 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 04/22/26 | 04/27/26 | 5.0 | 5.0 |
|
127.5 |
RPL10.INT.NS2.01130 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 04/22/26 | 04/28/26 | 6.2 | 6.2 |
|
31.2 |
RPL10.INT.NS2.01160 |
RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 6 SQ1.2 - WBS Summary | Tie-Ins NS2 Control Fault Domain 6 | Not Started | 04/22/26 | 07/06/26 | 65.0 | 65.0 |
|
16.2 |
RPL10.MCUP.LP2.1560 |
RPL10.MCUP.Loop 2 - Tie-in Electrical (LOE) | Tie-Ins Electrical | Not Started | 04/22/26 | 05/29/26 | 33.8 | 33.8 |
|
130.0 |
RPL10.MCUP.LP2.1620 |
RPL10.MCUP.Loop 2 - Tie-in Electrical #2 | Tie-Ins Electrical | Not Started | 04/22/26 | 05/04/26 | 11.2 | 11.2 |
|
137.5 |
RPL10.SSB.BB.1120 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Exterior Backing, In Wall | Build Back Exterior Leave Out Wall #5 (East SSB) | Not Started | 04/22/26 | 04/27/26 | 5.0 | 5.0 |
|
441.2 |
RPL10.WP2.01010 |
RPL10.Conn SSB - Construction Cx Server Ready - At GSMDF | WP2 (GS/CARRIER/SFZ - INF, CAB [ISP/OSP], NET) | Not Started | 04/22/26 | 04/22/26 | 0.0 | 0.0 |
|
45.0 |
RPL10.WP4.08420 |
RPL10.Conn 10GSMDF2 Pull/Install Fanout (MMC<>UPC) [PON] | Pre ORv3 Rack | Not Started | 04/22/26 | 04/27/26 | 5.0 | 5.0 |
|
187.5 |
RPL10.CTRC.BB.2020 |
RPL10.Int.Build Back.Center-Corr - LO #12 - P3 Hang Drywall (Around 30"" Mech Pipe) | Build Back Interior Leave Out Wall #12 #13 @ 30"" Mech Piping (Center Corr) | Not Started | 04/23/26 | 04/24/26 | 2.5 | 2.5 |
|
138.8 |
RPL10.INT.NS1.01770 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 04/23/26 | 04/28/26 | 5.0 | 5.0 |
|
81.2 |
RPL10.INT.NS1.01800 |
RPL10.Interior.NS1 - Tie-ins - Control Fault Domain 2 SQ5.1 - WBS Summary | Tie-Ins NS1 Control Fault Domain 2 | Not Started | 04/23/26 | 08/26/26 | 110.0 | 110.0 |
|
45.0 |
RPL10.INT.SSB.01280 |
RPL10.Interior.SSB - BoW - Duct Drops / Trim out | Balance of Walls and OverHead | Not Started | 04/23/26 | 05/01/26 | 8.8 | 8.8 |
|
177.5 |
RPL10.INT.SSB.01310 |
RPL10.Interior.SSB - BoW - MEPF Hard Lid Rough | Balance of Walls and OverHead | Not Started | 04/23/26 | 04/29/26 | 6.2 | 6.2 |
|
113.8 |
RPL10.INT.SSBC.02780 |
RPL10.Interior.SSB-Corridor - BoW - Duct Drops Trim out | Balance of Walls & OverHead | Not Started | 04/23/26 | 04/28/26 | 5.0 | 5.0 |
|
66.2 |
RPL10.INT.SSBC.03000 |
RPL10.Interior.SSB-Corridor - BoW - Security Trim Out (Both Side of Corridor Wall) | Balance of Walls & OverHead | Not Started | 04/23/26 | 05/01/26 | 8.8 | 8.8 |
|
68.8 |
RPL10.MCUP.LP2.1840 |
RPL10.MCUP.Loop 2 - Tie-in EPMS #6 | Tie-Ins EPMS | Not Started | 04/23/26 | 04/30/26 | 7.5 | 7.5 |
|
141.2 |
RPL10.MCUP.LP2.1880 |
RPL10.MCUP.Loop 2 - Tie-in BMS #6 | Tie-Ins BMS | Not Started | 04/23/26 | 05/01/26 | 8.8 | 8.8 |
|
141.2 |
RPL10.CTRC.BB.3335 |
RPL10.Int.Build Back.Center-Corr - LO #13 - P6 Tape, Float and Paint (Around 30"" Mech Pipe) | Build Back Interior Leave Out Wall #12 #13 @ 30"" Mech Piping (Center Corr) | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
140.0 |
RPL10.EY.EF1.01560 |
RPL10.EY.EF1 - Install CU (12) | OFE | Not Started | 04/24/26 | 04/27/26 | 2.5 | 2.5 |
|
127.5 |
RPL10.EY.EF2.01770 |
RPL10.EY.EF2 - Install Remaining CU (12) | OFE | Not Started | 04/24/26 | 04/27/26 | 2.5 | 2.5 |
|
192.5 |
RPL10.EY.ENDC.01170 |
RPL10.EY.End - Install Lighting | Hardscape and Landscape | Not Started | 04/24/26 | 05/14/26 | 18.8 | 18.8 |
|
453.8 |
RPL10.INT.CTRC.01180 |
RPL10.Interior.Center-Corridor - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls & OverHead | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
123.8 |
RPL10.INT.CTRC.01300 |
RPL10.Interior.Center-Corridor - BoW - Frame Hard Lid | Balance of Walls & OverHead | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
112.5 |
RPL10.INT.CTRC.01930 |
RPL10.Interior.Center-Corridor - BoW - QC BoW - Backing/In-Wall | Balance of Walls & OverHead | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.NS1.01204 |
RPL10.Interior.NS1 - MES Skids - BMS Tie-Ins | NS1 - MES Skids | Not Started | 04/24/26 | 05/28/26 | 30.0 | 30.0 |
|
161.2 |
RPL10.INT.NS2.01220 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
40.0 |
RPL10.INT.NS2.01490 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 3 SQ4.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS2 Control Fault Domain 3 | Not Started | 04/24/26 | 07/23/26 | 78.8 | 78.8 |
|
-22.5 |
RPL10.INT.NS2.02485 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 6 SQ1.2 - (Mech Side Aisle) | OFE NS2 Control Fault Domain 6 | Not Started | 04/24/26 | 05/19/26 | 22.5 | 22.5 |
|
-15.0 |
RPL10.INT.NS2.02625 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 3 SQ4.2 (LV Side Aisle) | OFE NS2 Control Fault Domain 3 | Not Started | 04/24/26 | 04/29/26 | 5.0 | 5.0 |
|
30.0 |
RPL10.INT.SSB.01250 |
RPL10.Interior.SSB - Loading Dock and Storage - Install Security | Loading Dock and Storage | Not Started | 04/24/26 | 05/04/26 | 8.8 | 8.8 |
|
151.2 |
RPL10.INT.SSB.01470 |
RPL10.Interior.SSB - Loading Dock and Storage - Install Unit Heaters | Loading Dock and Storage | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
203.8 |
RPL10.INT.SSB.01530 |
RPL10.Interior.SSB - Loading Dock and Storage - Install OverHead Doors | Loading Dock and Storage | Not Started | 04/24/26 | 05/07/26 | 12.5 | 12.5 |
|
161.2 |
RPL10.INT.SSB.01760 |
RPL10.Interior.SSB - Loading Dock and Storage - Mechanical Tie-In | Loading Dock and Storage | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
161.2 |
RPL10.INT.SSB.01820 |
RPL10.Interior.SSB - BoW - Mechanical Tie-In | Balance of Walls and OverHead | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
227.5 |
RPL10.INT.SSBC.01252 |
RPL10.Interior.SSB-Corridor - BoW - Install Electrical - Lighitng Inverter Room (10.S2.07) | Balance of Walls & OverHead | Not Started | 04/24/26 | 05/04/26 | 8.8 | 8.8 |
|
183.8 |
RPL10.INT.SSBC.01590 |
RPL10.Interior.SSB-Corridor - BoW - Install Mechanical Tie-Ins (needs to micro plan) | Balance of Walls & OverHead | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
63.8 |
RPL10.INT.SSBC.02900 |
RPL10.Interior.SSB-Corridor - BoW - Final Paint | Balance of Walls & OverHead | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
53.8 |
RPL10.MCUP.LP2.1660 |
RPL10.MCUP.Loop 2 - Tie-in BMS (LOE) ??? Check Relation | Tie-Ins BMS | Not Started | 04/24/26 | 05/29/26 | 31.2 | 31.2 |
|
130.0 |
RPL10.MCUP.LP2.1720 |
RPL10.MCUP.Loop 2 - Tie-in BMS #2 | Tie-Ins BMS | Not Started | 04/24/26 | 05/06/26 | 11.2 | 11.2 |
|
137.5 |
RPL10.EY.EF1.01680 |
RPL10.EY.EF1 - Install RPL-2 FSP Columns Cap Cure | Fiber Support Platform - RPL-2 | Not Started | 04/25/26 | 04/29/26 | 6.2 | 6.2 |
|
311.2 |
PL10.WP2.GSIDF.1920 |
RPL10.Conn GSIDFN13 Install & Test Network (FIM) | Network | Not Started | 04/27/26 | 04/29/26 | 3.8 | 3.8 |
|
246.2 |
RPL10.CTRC.BB.2040 |
RPL10.Int.Build Back.Center-Corr - LO #12 - P3 Tape, Float and Paint (Around 30"" Mech Pipe) | Build Back Interior Leave Out Wall #12 #13 @ 30"" Mech Piping (Center Corr) | Not Started | 04/27/26 | 05/01/26 | 6.2 | 6.2 |
|
138.8 |
RPL10.EY.EF1.01230 |
RPL10.EY.EF1 - Install RPL-2 FSP Grounding Wire | Fiber Support Platform - RPL-2 | Not Started | 04/27/26 | 04/28/26 | 2.5 | 2.5 |
|
293.8 |
RPL10.EY.NS3.01140 |
RPL10.EY.NS3 - Install Tent Electrical Panels | Tent and Temp Conditions | Not Started | 04/27/26 | 05/01/26 | 6.2 | 6.2 |
|
101.2 |
RPL10.EY.NS3.01150 |
RPL10.EY.NS3 - Install Tent Heating and Cooling Equipment | Tent and Temp Conditions | Not Started | 04/27/26 | 05/01/26 | 6.2 | 6.2 |
|
107.5 |
RPL10.EY.NS3.01160 |
RPL10.EY.NS3 - Install Tent Overhead Doors | Tent and Temp Conditions | Not Started | 04/27/26 | 05/01/26 | 6.2 | 6.2 |
|
107.5 |
RPL10.EY.NS3.01190 |
RPL10.EY.NS3 - Install Tent Mechanical Tie-ins | Tent and Temp Conditions | Not Started | 04/27/26 | 05/04/26 | 7.5 | 7.5 |
|
107.5 |
RPL10.INT.CTRC.01260 |
RPL10.Interior.Center-Corridor - BoW - Remaining Electrical OFE Tie In | Balance of Walls & OverHead | Not Started | 04/27/26 | 05/01/26 | 6.2 | 6.2 |
|
137.5 |
RPL10.INT.EF1.01380 |
RPL10.Interior.EF1 - EF1 East - Install Upper Trays | East EF-1 | Not Started | 04/27/26 | 05/01/26 | 6.2 | 6.2 |
|
55.0 |
RPL10.INT.EF1.01390 |
RPL10.Interior.EF1 - CFCI - Install CFCI Prefab Cable Rack - EF1 West | OFE | Not Started | 04/27/26 | 05/22/26 | 25.0 | 25.0 |
|
30.0 |
RPL10.INT.EF2.01400 |
RPL10.Interior.EF2 - Tie-ins - EF2 East - WBS Summary | East EF-2 | Not Started | 04/27/26 | 07/28/26 | 81.2 | 81.2 |
|
162.5 |
RPL10.INT.EF2.01435 |
RPL10.Interior.EF2 - EF2 East - Install Wall Mounted Ladder Racks on Full Height EF Walls | East EF-2 | Not Started | 04/27/26 | 05/01/26 | 6.2 | 6.2 |
|
231.2 |
RPL10.INT.NS1.01300 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 04/27/26 | 05/22/26 | 25.0 | 25.0 |
|
38.8 |
RPL10.INT.NS1.01870 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 04/27/26 | 04/30/26 | 5.0 | 5.0 |
|
111.2 |
RPL10.INT.NS1.02480 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 5 SQ2.1 (HAC) | OFE NS1 Control Fault Domain 5 | Not Started | 04/27/26 | 05/15/26 | 18.8 | 18.8 |
|
-11.2 |
RPL10.INT.NS2.01210 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 04/27/26 | 05/01/26 | 6.2 | 6.2 |
|
40.0 |
RPL10.INT.SSBC.03020 |
RPL10.Interior.SSB-Corridor - BoW - Plumbing Trim Out | Balance of Walls & OverHead | Not Started | 04/27/26 | 05/05/26 | 8.8 | 8.8 |
|
68.8 |
RPL10.INT.SSBC.03040 |
RPL10.Interior.SSB-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls & OverHead | Not Started | 04/27/26 | 05/08/26 | 12.5 | 12.5 |
|
68.8 |
RPL10.MCUP.LP2.1680 |
RPL10.MCUP.Loop 2 - Tie-in EPMS (LOE) | Tie-Ins EPMS | Not Started | 04/27/26 | 05/29/26 | 30.0 | 30.0 |
|
130.0 |
RPL10.MCUP.LP2.1700 |
RPL10.MCUP.Loop 2 - Tie-in EPMS #2 | Tie-Ins EPMS | Not Started | 04/27/26 | 05/05/26 | 8.8 | 8.8 |
|
137.5 |
RPL10.MCUP.LP2.2020 |
RPL10.MCUP.Loop 2 - Tie-in Mechanical #8 WBS Summary | Tie-in Mechanical #8 | Not Started | 04/27/26 | 05/11/26 | 13.8 | 13.8 |
|
130.0 |
RPL10.MCUP.LP2.2720 |
RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #8 | Tie-in Mechanical #8 | Not Started | 04/27/26 | 04/29/26 | 3.8 | 3.8 |
|
130.0 |
RPL10.WP2.01030 |
RPL10.Conn SSB - Early Construction Cx Server Ready - At NS1 (LV) | WP2 (GS/CARRIER/SFZ - INF, CAB [ISP/OSP], NET) | Not Started | 04/27/26 | 04/27/26 | 0.0 | 0.0 |
|
75.0 |
RPL10.WP2.GSIDF.1500 |
RPL10.Conn GSIDFN23 Install & Test Network (FIM) | Network | Not Started | 04/27/26 | 04/29/26 | 3.8 | 3.8 |
|
246.2 |
RPL10.WP2.GSIDF.3100 |
RPL10.Conn GSIDFN13 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 04/27/26 | 05/12/26 | 15.0 | 15.0 |
|
203.8 |
RPL10.WP2.GSIDF.3140 |
RPL10.Conn GSIDFN23 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 04/27/26 | 05/12/26 | 15.0 | 15.0 |
|
203.8 |
RPL10.EY.EF1.01210 |
RPL10.EY.EF1 - Install Mechanical Tie-ins (include penetration detail) | Tie-ins | Not Started | 04/28/26 | 05/07/26 | 10.0 | 10.0 |
|
142.5 |
RPL10.EY.EF1.01220 |
RPL10.EY.EF1 - Tie-ins - WBS Summary | Tie-ins | Not Started | 04/28/26 | 06/09/26 | 37.5 | 37.5 |
|
127.5 |
RPL10.EY.EF1.01330 |
RPL10.EY.EF1 - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 04/28/26 | 05/18/26 | 18.8 | 18.8 |
|
127.5 |
RPL10.EY.EF2.01620 |
RPL10.EY.EF2 - Install Remaining Mechanical Tie-ins | Tie-ins | Not Started | 04/28/26 | 05/07/26 | 10.0 | 10.0 |
|
192.5 |
RPL10.EY.EF2.01630 |
RPL10.EY.EF2 - Install Remaining Electrical Tie-ins | Tie-ins | Not Started | 04/28/26 | 05/04/26 | 6.2 | 6.2 |
|
196.2 |
RPL10.INT.NS1.01890 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 04/28/26 | 05/01/26 | 5.0 | 5.0 |
|
146.2 |
RPL10.INT.NS4.01100 |
RPL10.Interior.NS4 - Tie-ins - WBS Summary | Tie-Ins | Not Started | 04/28/26 | 01/06/27 | 217.5 | 217.5 |
|
123.8 |
RPL10.INT.NS4.01110 |
RPL10.Interior.NS4 - MES Skids Tie-ins (LOE) | NS4 - MES Skids | Not Started | 04/28/26 | 07/22/26 | 75.0 | 75.0 |
|
237.5 |
RPL10.INT.NS4.01111 |
RPL10.Interior.NS4 - MES Skids - Set & Anchor Interconnects | NS4 - MES Skids | Not Started | 04/28/26 | 06/01/26 | 30.0 | 30.0 |
|
135.0 |
RPL10.INT.SSB.02540 |
RPL10.Interior.SSB - BoW - ACT - Ceiling Grid & Wires | Balance of Walls and OverHead | Not Started | 04/28/26 | 05/06/26 | 8.8 | 8.8 |
|
71.2 |
RPL10.INT.SSBC.01360 |
RPL10.Interior.SSB-Corridor - BoW - Set Equipment / Interior | Balance of Walls & OverHead | Not Started | 04/28/26 | 05/04/26 | 6.2 | 6.2 |
|
42.5 |
RPL10.MCUP.LP1.2020 |
RPL10.MCUP.Loop 1 - Tie-in - MV Loop L2 Checklist Completion | Tie-Ins Electrical | Not Started | 04/28/26 | 05/08/26 | 11.2 | 11.2 |
|
17.5 |
RPL10.MCUP.LP1.2080 |
RPL10.MCUP.Loop 1 - Tie-in - Mechanical L2 Checklist Completion | Tie-Ins Mechanical | Not Started | 04/28/26 | 05/08/26 | 11.2 | 11.2 |
|
28.8 |
RPL10.SKN.SSB.01410 |
RPL10.SKIN.BLDG - Install Lightning Protection | Skin | Not Started | 04/28/26 | 05/04/26 | 6.2 | 6.2 |
|
343.8 |
RPL10.SSB.BB.1240 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Security Lowside OH | Build Back Exterior Leave Out Wall #5 (East SSB) | Not Started | 04/28/26 | 05/01/26 | 5.0 | 5.0 |
|
451.2 |
RPL10.SSB.BB.1300 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Electrical Lowside OH | Build Back Exterior Leave Out Wall #5 (East SSB) | Not Started | 04/28/26 | 05/01/26 | 5.0 | 5.0 |
|
451.2 |
RPL10.SSB.BB.1320 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Controls / EPMS / BMS Lowside OH | Build Back Exterior Leave Out Wall #5 (East SSB) | Not Started | 04/28/26 | 05/01/26 | 5.0 | 5.0 |
|
451.2 |
RPL10.SSB.BB.1360 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Frame, Doors, Hardware | Build Back Exterior Leave Out Wall #5 (East SSB) | Not Started | 04/28/26 | 04/29/26 | 2.5 | 2.5 |
|
441.2 |
RPL10.WP2.CMDF1.1000 |
RPL10.Conn CMDF1 Install Infrastructure Racks, Tier1 | Infrastructure | Not Started | 04/28/26 | 05/04/26 | 6.2 | 6.2 |
|
171.2 |
RPL10.WP2.CMDF2.1000 |
RPL10.Conn CMDF2 Install Infrastructure Racks, Tier1 | Infrastructure | Not Started | 04/28/26 | 05/04/26 | 6.2 | 6.2 |
|
170.0 |
RPL10.WP2.GSIDF.1200 |
RPL10.Conn GSIDFNE1 Install & Test Network (FIM) | Network | Not Started | 04/28/26 | 04/30/26 | 3.8 | 3.8 |
|
161.2 |
RPL10.WP2.GSIDF.3000 |
RPL10.Conn GSIDFNX13 Install & Test Network (FIM) | Network | Not Started | 04/28/26 | 04/30/26 | 3.8 | 3.8 |
|
245.0 |
RPL10.WP2.GSIDF.3060 |
RPL10.Conn GSIDFNE1 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 04/28/26 | 05/18/26 | 18.8 | 18.8 |
|
488.8 |
RPL10.WP2.GSIDF.3520 |
RPL10.Conn GSIDFNX13 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 04/28/26 | 05/11/26 | 12.5 | 12.5 |
|
495.0 |
RPL10.EY.EF2.01190 |
RPL10.EY.EF2 - Install RPL-3 FSP Grounding Wire | Fiber Support Platform - RPL-3 | Not Started | 04/29/26 | 04/30/26 | 2.5 | 2.5 |
|
303.8 |
RPL10.EY.EF2.01810 |
RPL10.EY.EF2 - Install RPL-3 FSP Columns Cap Erect Shoring & Decking & F/R/P | Fiber Support Platform - RPL-3 | Not Started | 04/29/26 | 05/05/26 | 6.2 | 6.2 |
|
225.0 |
RPL10.EY.NS2.01270 |
RPL10.EY.NS2 - Install GS.IDF Hut (1x GS.IDF) NX07 (04.22.26) | OFE | Not Started | 04/29/26 | 05/05/26 | 6.2 | 6.2 |
|
31.2 |
RPL10.EY.NS3.01180 |
RPL10.EY.NS3 - Install Tent Electrical Tie-ins | Tent and Temp Conditions | Not Started | 04/29/26 | 05/01/26 | 3.8 | 3.8 |
|
101.2 |