Schedule Viewer

Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260412.xer · Uploaded Apr 16, 2026 12:51 PM · 8408 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
3
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.INT.NS1.01910 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install Duct (LV Side) LV Side Tie-ins Not Started 04/29/26 05/04/26 5.0 5.0
0%
92.5
RPL10.INT.NS1.01940 RPL10.Interior.NS1 - Tie-ins - Control Fault Domain 1 SQ6.1 - WBS Summary Tie-Ins NS1 Control Fault Domain 1 Not Started 04/29/26 09/10/26 117.5 117.5
0%
37.5
RPL10.INT.NS2.01260 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Duct (LV Side) LV Side Tie-ins Not Started 04/29/26 05/04/26 5.0 5.0
0%
35.0
RPL10.INT.NS2.01300 RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 5 SQ2.2 - WBS Summary Tie-Ins NS2 Control Fault Domain 5 Not Started 04/29/26 08/03/26 83.8 83.8
0%
1.2
RPL10.INT.NS4.02020 RPL10.Interior.NS4 - OFE - Ancillary Skids - Set / Place / Anchor (04.29.26) OFE Not Started 04/29/26 05/04/26 5.0 5.0
0%
137.5
RPL10.INT.NS4.02440 RPL10.Interior.NS43 - Temp Conditions - Drop Curtains (from Corridor to EJ) Temp Conditions Not Started 04/29/26 04/30/26 2.5 2.5
0%
103.8
RPL10.INT.ENDC.01160 RPL10.Interior.End-Corridor - OFE - NS4 (1x GS.IDF) N43 (04.24.26) OFE Not Started 04/30/26 05/06/26 6.2 6.2
0%
217.5
RPL10.INT.ENDC.01190 RPL10.Interior.End-Corridor - OFE - NS3 (1x GS.IDF) N33 (04.24.26) OFE Not Started 04/30/26 05/06/26 6.2 6.2
0%
217.5
RPL10.INT.NS1.01355 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 04/30/26 05/28/26 25.0 25.0
0%
30.0
RPL10.INT.NS1.01360 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 04/30/26 05/28/26 25.0 25.0
0%
51.2
RPL10.INT.NS1.01370 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 04/30/26 05/28/26 25.0 25.0
0%
30.0
RPL10.INT.NS1.02220 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 04/30/26 05/28/26 25.0 25.0
0%
30.0
RPL10.INT.NS1.02500 RPL10.Interior.NS1 - OFE - Control Fault Domain 5 SQ2.1 (Mech Side Aisle) OFE NS1 Control Fault Domain 5 Not Started 04/30/26 05/18/26 16.2 16.2
0%
-1.2
RPL10.INT.NS2.01113 RPL10.Interior.NS2 - MES Skids - CDU Tie-Ins ( 2 per day) NS2 - MES Skids Not Started 04/30/26 06/03/26 30.0 30.0
0%
157.5
RPL10.INT.NS2.01630 RPL10.Interior.NS2 - OFE - Control Fault Domain 2 SQ5.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary OFE NS2 Control Fault Domain 2 Not Started 04/30/26 08/13/26 92.5 92.5
0%
-25.0
RPL10.INT.NS2.02685 RPL10.Interior.NS2 - OFE - Control Fault Domain 2 SQ5.2 (LV Side Aisle) OFE NS2 Control Fault Domain 2 Not Started 04/30/26 05/05/26 5.0 5.0
0%
43.8
RPL10.MCUP.LP2.2000 RPL10.MCUP.Loop 2 - Tie-in Electrical #8 Tie-Ins Electrical Not Started 04/30/26 05/12/26 11.2 11.2
0%
130.0
RPL10.MCUP.LP2.2740 RPL10.MCUP.Loop 2 - Condenser Water Tie-in Mechanical #8 Tie-in Mechanical #8 Not Started 04/30/26 05/11/26 10.0 10.0
0%
130.0
RPL10.SSB.BB.1125 RPL10.Ext.Build Back.SSB - LO #5 - Hang Exterior Drywall, Paint Build Back Exterior Leave Out Wall #5 (East SSB) Not Started 04/30/26 05/06/26 6.2 6.2
0%
441.2
RPL10.WP2.GSIDF.1210 CorpNet & FacNet Available - EF Network Not Started 04/30/26 04/30/26 0.0 0.0
0%
245.0
RPL.10.D.X1440.XR Ready for Fiber Support Platform Construction - AI 2 (TCCO est Release 01-May-26) Connectivity (XREFs) Not Started 05/01/26 05/01/26 0.0 0.0
0%
216.2
RPL10.INT.CTRC.01280 RPL10.Interior.Center-Corridor - BoW - Install Duct and Drops Balance of Walls & OverHead Not Started 05/01/26 05/07/26 6.2 6.2
0%
127.5
RPL10.INT.CTRC.01320 RPL10.Interior.Center-Corridor - BoW - MEPF Frame Hard Lid Rough In/Close of Inspection Balance of Walls & OverHead Not Started 05/01/26 05/07/26 6.2 6.2
0%
112.5
RPL10.INT.CTRC.01330 RPL10.Interior.Center-Corridor - BoW - Hang Drywall BoW Balance of Walls & OverHead Not Started 05/01/26 05/11/26 8.8 8.8
0%
110.0
RPL10.INT.CTRC.01850 RPL10.Interior.Center-Corridor - BoW - Install VAV's/Duct Branches Balance of Walls & OverHead Not Started 05/01/26 05/06/26 5.0 5.0
0%
123.8
RPL10.INT.CTRC.01870 RPL10.Interior.Center-Corridor - BoW - Install Split Systems/Humidifiers Balance of Walls & OverHead Not Started 05/01/26 05/06/26 5.0 5.0
0%
143.8
RPL10.INT.EF1.01150 RPL10.Interior.EF1 - CFCI - Set North CRAH Units OFE Not Started 05/01/26 05/07/26 6.2 6.2
0%
113.8
RPL10.INT.NS1.02010 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 05/01/26 05/06/26 5.0 5.0
0%
116.2
RPL10.INT.NS2.01370 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 05/01/26 05/06/26 5.0 5.0
0%
43.8
RPL10.INT.NS4.02460 RPL10.Interior.NS43 - Temp Conditions - Install Early Temp Conditions Temp Conditions Not Started 05/01/26 05/04/26 2.5 2.5
0%
103.8
RPL10.INT.SSB.01780 RPL10.Interior.SSB - Loading Dock and Storage - Install Split Systems/Humidifiers Loading Dock and Storage Not Started 05/01/26 05/07/26 6.2 6.2
0%
161.2
RPL10.INT.SSBC.02860 RPL10.Interior.SSB-Corridor - BoW - Install Doors (Verify with Trades before Installation) Balance of Walls & OverHead Not Started 05/01/26 05/05/26 3.8 3.8
0%
53.8
RPL.10.D.X33X0.XR Pull and Term mCUP Skids - RPL10 North Power (XREFs) Not Started 05/04/26 05/04/26 0.0 0.0
0%
35.0
RPL.10.D.X33X1.XR Pull and Term MV Skids - RPL10 NS1 Loop 1 & 2 Power (XREFs) Not Started 05/04/26 05/04/26 0.0 0.0
0%
42.5
RPL.10.D.X3900.XG Ready for MV Cable Pull mCUP South Loop (Loop#2) Give Milestones (XREFs) Not Started 05/04/26 05/04/26 0.0 0.0
0%
1971.2
RPL10.EY.EF1.01140 RPL10.EY.EF1 - Install RPL-1 FSP Grounding Wire Fiber Support Platform - RPL-1 Not Started 05/04/26 05/05/26 2.5 2.5
0%
287.5
RPL10.EY.EF1.01160 RPL10.EY.EF1 - Install RPL-1 FSP Steel Span Structure Modules Fiber Support Platform - RPL-1 Not Started 05/04/26 05/15/26 12.5 12.5
0%
202.5
RPL10.EY.EF1.01170 RPL10.EY.EF1 - Install RPL-1 FSP Road Closure For Steel Erection Fiber Support Platform - RPL-1 Not Started 05/04/26 05/15/26 12.5 12.5
0%
202.5
RPL10.EY.EF1.01180 RPL10.EY.EF1 - Install RPL-1 Total Road Closure For Fiber Supprt Platform Fiber Support Platform - RPL-1 Not Started 05/04/26 07/14/26 62.5 62.5
0%
237.5
RPL10.EY.NS1.01290 RPL10.EY.NS1 - Install Sleeves MEPL Hardscape and Landscape Not Started 05/04/26 05/08/26 6.2 6.2
0%
188.8
RPL10.EY.NS1.01300 RPL10.EY.NS1 - MV Loop 1 - L2 Checklist Completion Tie-ins Not Started 05/04/26 05/15/26 12.5 12.5
0%
30.0
RPL10.EY.NS1.01310 RPL10.EY.NS1 - MV Loop 2 - L2 Checklist Completion Tie-ins Not Started 05/04/26 05/15/26 12.5 12.5
0%
72.5
RPL10.EY.NS1.01320 RPL10.EY.NS1 - Install Hardscape and Landscape - WBS Summary Hardscape and Landscape Not Started 05/04/26 10/22/26 151.2 151.2
0%
351.2
RPL10.EY.NS3.01210 RPL10.EY.NS3 - Tent Temp Conditioning Startup and Available (Including Acclimation) (03/27/26) Tent and Temp Conditions Not Started 05/04/26 05/11/26 7.5 7.5
0%
101.2
RPL10.INT.CTRC.01290 RPL10.Interior.Center-Corridor - BoW - Remaining Mechanical OFE Tie In Balance of Walls & OverHead Not Started 05/04/26 05/06/26 3.8 3.8
0%
137.5
RPL10.INT.EF1.01410 RPL10.Interior.EF1 - EF1 East - Install Lower Trays East EF-1 Not Started 05/04/26 05/08/26 6.2 6.2
0%
55.0
RPL10.INT.EF1.01420 RPL10.Interior.EF1 - EF1 East - Install Lighting East EF-1 Not Started 05/04/26 05/19/26 15.0 15.0
0%
132.5
RPL10.INT.EF2.01490 RPL10.Interior.EF2 - Tie-ins - EF2 West - WBS Summary West EF-2 Not Started 05/04/26 08/11/26 87.5 87.5
0%
156.2
RPL10.INT.EF2.01525 RPL10.Interior.EF2 - EF2 West - Install Wall Mounted Ladder Racks on Full Height EF Walls West EF-2 Not Started 05/04/26 05/08/26 6.2 6.2
0%
231.2
RPL10.INT.NS1.01340 RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 05/04/26 06/01/26 25.0 25.0
0%
40.0
RPL10.INT.NS1.02020 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 05/04/26 05/07/26 5.0 5.0
0%
146.2
RPL10.INT.NS2.01380 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 05/04/26 05/07/26 5.0 5.0
0%
43.8
RPL10.INT.NS3.01070 RPL10.Interior.NS3 - OFE - MES Skids - Set / Place / Anchor OFE Not Started 05/04/26 06/01/26 25.0 25.0
0%
123.8
RPL10.INT.SSB.01360 RPL10.Interior.SSB - BoW - Electrical Trim Out Balance of Walls and OverHead Not Started 05/04/26 05/08/26 6.2 6.2
0%
177.5
RPL10.INT.SSB.01380 RPL10.Interior.SSB - BoW - Security Trim Out Balance of Walls and OverHead Not Started 05/04/26 05/12/26 8.8 8.8
0%
177.5
RPL10.MCUP.LP2.1980 RPL10.MCUP.Loop 2 - Tie-in BMS #8 Tie-Ins BMS Not Started 05/04/26 05/14/26 11.2 11.2
0%
130.0
RPL10.SSBC.BB.1000 RPL10.Int.Build Back.SSB-Corr - LO #2,3,4 - MEPF Trim Out Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Not Started 05/04/26 05/22/26 18.8 18.8
0%
183.8
RPL10.WP2.GSIDF.1580 RPL10.Conn GSIDFN41 Install & Test Network (FIM) Network Not Started 05/04/26 05/06/26 3.8 3.8
0%
240.0
RPL10.WP2.GSIDF.1820 RPL10.Conn GSIDFN31 Install & Test Network (FIM) Network Not Started 05/04/26 05/06/26 3.8 3.8
0%
240.0
RPL10.WP2.GSIDF.2020 RPL10.Conn IDF Huts - (GSMDF to GSIDF) NS1 NX01 WBS Summary GSIDFNX01 Not Started 05/04/26 05/20/26 16.2 16.2
0%
486.2
RPL10.WP2.GSIDF.2040 RPL10.Conn GSIDFNX01 Set Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 05/04/26 05/08/26 6.2 6.2
0%
227.5
RPL10.WP2.GSIDF.2100 RPL10.Conn IDF Huts - (GSMDF to GSIDF) NS1 NX02 WBS Summary GSIDFNX02 Not Started 05/04/26 05/20/26 16.2 16.2
0%
486.2
RPL10.WP2.GSIDF.2120 RPL10.Conn GSIDFNX02 Set Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 05/04/26 05/08/26 6.2 6.2
0%
30.0
RPL10.WP2.GSIDF.3160 RPL10.Conn GSIDFN41 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 05/04/26 05/19/26 15.0 15.0
0%
312.5
RPL10.WP2.GSIDF.3220 RPL10.Conn GSIDFN31 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 05/04/26 05/19/26 15.0 15.0
0%
312.5
RPL10.WP4.027220 RPL10.Conn NS1.CFD6.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/04/26 05/06/26 3.8 3.8
0%
147.5
RPL10.WP4.027420 RPL10.Conn NS1.CFD5.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/04/26 05/05/26 2.5 2.5
0%
148.8
RPL10.WP4.NS1.01800 RPL10.Conn NS1.CFD6 Network - WBS Summary Network Not Started 05/04/26 11/16/26 171.2 171.2
0%
45.0
RPL10.WP4.NS1.02480 RPL10.Conn NS1.CFD5 Network - WBS Summary Network Not Started 05/04/26 11/18/26 173.8 173.8
0%
42.5
JCL.C.1320 RPL10 - Cost Risk LOE-17 Site Cost LOEs Not Started 05/05/26 03/02/27 257.5 257.5
0%
243.8
RPL.GF.D.N0125.XR 4 of 4 Fiber Test Complete CAV2/3 to GS.EF2/ Prod.EF2B Connectivity (XREFs) Not Started 05/05/26 05/05/26 0.0 0.0
0%
170.0
RPL.GF.D.N0600.XG GS.IDF Hut Install Complete (01, 02, 06, 07) Give Milestones (XREFs) Not Started 05/05/26 05/05/26 0.0 0.0
0%
1970.0
RPL10.INT.NS2.01400 RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install Duct (LV Side) LV Side Tie-ins Not Started 05/05/26 05/08/26 5.0 5.0
0%
46.2
RPL10.INT.NS2.01430 RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 4 SQ3.2 (including IDF) - WBS Summary Tie-Ins NS2 Control Fault Domain 4 Not Started 05/05/26 08/17/26 91.2 91.2
0%
16.2
RPL10.INT.NS3.02020 RPL10.Interior.NS3 - OFE - Ancillary Skids - Set / Place / Anchor (04.29.26) OFE Not Started 05/05/26 05/08/26 5.0 5.0
0%
137.5
RPL10.INT.NS4.01060 RPL10.Interior.NS4 - OFE - LV Skids and TopHat - Set / Place / Anchor (04.22.26) (Rev-05.04.26) OFE Not Started 05/05/26 06/02/26 25.0 25.0
0%
103.8
RPL10.INT.SSB.01270 RPL10.Interior.SSB - Loading Dock and Storage - Install Controls / EPMS / BMS *Separate EPMS *Whats Scope Check Trade Loading Dock and Storage Not Started 05/05/26 05/08/26 5.0 5.0
0%
151.2
RPL10.INT.SSBC.01390 RPL10.Interior.SSB-Corridor - BoW - Install Battery Balance of Walls & OverHead Not Started 05/05/26 05/18/26 12.5 12.5
0%
42.5
RPL10.MCUP.LP1.2100 RPL10.MCUP.Loop 1 - Install Exterior Signage Hardscape and Landscape Not Started 05/05/26 05/18/26 12.5 12.5
0%
488.8
RPL10.MCUP.LP2.1520 RPL10.MCUP.Loop 2 - Install Hardscape and Landscape - WBS Summary Hardscape and Landscape Not Started 05/05/26 06/16/26 37.5 37.5
0%
463.8
RPL10.MCUP.LP2.1540 RPL10.MCUP.Loop 2 - Install Sleeves MEPL Hardscape and Landscape Not Started 05/05/26 05/11/26 6.2 6.2
0%
477.5
RPL10.MCUP.LP2.1640 RPL10.MCUP.Loop 2 - Install Site Grading for Paving *Start 05/08 Hardscape and Landscape Not Started 05/05/26 05/26/26 18.8 18.8
0%
463.8
RPL10.MCUP.LP2.1760 RPL10.MCUP.Loop 2 - Install Lighting Hardscape and Landscape Not Started 05/05/26 05/15/26 11.2 11.2
0%
477.5
RPL10.MCUP.LP2.1940 RPL10.MCUP.Loop 2 - Tie-in EPMS #8 Tie-Ins EPMS Not Started 05/05/26 05/13/26 8.8 8.8
0%
130.0
RPL10.WP2.CMDF1.1010 RPL10.Conn CMDF1 Install Cabling (Pull, Splice & terminate) Cabling Not Started 05/05/26 05/08/26 5.0 5.0
0%
171.2
RPL10.WP2.CMDF2.1020 RPL10.Conn CMDF2 Install Cabling (Pull, Splice & terminate) Cabling Not Started 05/05/26 05/11/26 6.2 6.2
0%
170.0
RPL10.WP2.MDF1.1240 RPL10.Conn C.MDF1 <> GS.MDF1 - Pull, Splice, Terminate & Test Cabling Not Started 05/05/26 05/08/26 5.0 5.0
0%
173.8
RPL10.WP2.MDF2.1240 RPL10.Conn C.MDF2 <> GS.MDF2 - Pull, Splice, Terminate & Test Cabling Not Started 05/05/26 05/08/26 5.0 5.0
0%
173.8
RPL10.EY.EF2.01220 RPL10.EY.EF2 - Install RPL-3 Total Road Closure For Fiber Supprt Platform Fiber Support Platform - RPL-3 Not Started 05/06/26 07/16/26 62.5 62.5
0%
247.5
RPL10.EY.EF2.01380 RPL10.EY.EF2 - Install BMS Tie-ins Tie-ins Not Started 05/06/26 05/12/26 6.2 6.2
0%
150.0
RPL10.EY.NS2.01280 RPL10.EY.NS2 - Install BMS Tie-ins Tie-ins Not Started 05/06/26 05/19/26 12.5 12.5
0%
31.2
RPL10.INT.ENDC.01060 RPL10.Interior.End-Corridor - Balance of Walls & Overhead (Restroom, Janitor, Fire Riser, Humidifier) - WBS Summary Balance of Walls & Overhead Not Started 05/06/26 10/02/26 131.2 131.2
0%
190.0
RPL10.INT.ENDC.6420 RPL10.Interior.End-Corridor - BoW - BoW Frame Priority Soffit and Hang Drywall Balance of Walls & Overhead Not Started 05/06/26 05/11/26 5.0 5.0
0%
148.8
RPL10.INT.NS1.01205 RPL10.Interior.NS1 - MES Skids - EPMS Tie-Ins NS1 - MES Skids Not Started 05/06/26 06/09/26 30.0 30.0
0%
161.2
RPL10.INT.NS2.01790 RPL10.Interior.NS2 - OFE - Control Fault Domain 1 SQ6.2 (LV Side Aisle, HAC, Mech Side Aisle) OFE NS2 Control Fault Domain 1 Not Started 05/06/26 09/03/26 106.2 106.2
0%
-27.5
RPL10.INT.NS2.02745 RPL10.Interior.NS2 - OFE - Control Fault Domain 1 SQ6.2 (LV Side Aisle) OFE NS2 Control Fault Domain 1 Not Started 05/06/26 05/11/26 5.0 5.0
0%
57.5
RPL10.INT.SSB.01390 RPL10.Interior.SSB - BoW - Plumbing Trim Out Balance of Walls and OverHead Not Started 05/06/26 05/12/26 6.2 6.2
0%
215.0
RPL10.INT.SSB.01400 RPL10.Interior.SSB - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out Balance of Walls and OverHead Not Started 05/06/26 05/14/26 8.8 8.8
0%
215.0
RPL10.INT.SSBC.03060 RPL10.Interior.SSB-Corridor - BoW - Asset Tagging Balance of Walls & OverHead Not Started 05/06/26 05/12/26 6.2 6.2
0%
53.8
RPL10.WP4.027440 RPL10.Conn NS1.CFD5.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/06/26 05/08/26 3.8 3.8
0%
148.8