Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260412.xer
· Uploaded Apr 16, 2026 12:51 PM
· 8408 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
5
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL.GF.D.N0140.XG |
NWB FacNet/CorpNet Live - to IBOS & Admin Building (Mortenson) | Give Milestones (XREFs) | Not Started | 05/14/26 | 05/14/26 | 0.0 | 0.0 |
|
1962.5 |
RPL.GF.D.N0150.XG |
NWB FacNet/CorpNet Live - to AI Buildings (Turner) | Give Milestones (XREFs) | Not Started | 05/14/26 | 05/14/26 | 0.0 | 0.0 |
|
1962.5 |
RPL.GF.D.N0155.XG |
NWB FacNet/CorpNet Live - to SS Buildings (DPR) | Give Milestones (XREFs) | Not Started | 05/14/26 | 05/14/26 | 0.0 | 0.0 |
|
1962.5 |
RPL10.INT.NS1.01450 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/14/26 | 06/11/26 | 25.0 | 25.0 |
|
30.0 |
RPL10.INT.NS2.01660 |
RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 05/14/26 | 05/19/26 | 5.0 | 5.0 |
|
120.0 |
RPL10.INT.NS3.01090 |
RPL10.Interior.NS3 - LV Skids and TopHat Tie-ins (LOE) | NS3 - LV Skids and TopHat | Not Started | 05/14/26 | 06/19/26 | 32.5 | 32.5 |
|
171.2 |
RPL10.INT.NS3.01091 |
RPL10.Interior.NS3 - LV Skids and TopHat - Set & Anchor Interconnects | NS3 - LV Skids and TopHat | Not Started | 05/14/26 | 06/09/26 | 22.5 | 22.5 |
|
171.2 |
RPL10.OFCI.6960 |
OFCI - Delivery ROJ: FE Fiber for CFD NS2.5 (ROJ ) (RVCD ) | NS2 | Not Started | 05/14/26 | 06/04/26 | 18.8 | 18.8 |
|
53.8 |
RPL10.PR.PR.02320 |
RPL10.PR MDF - Set META gear at GS.MDFs for FacNet | GS-MDFs & IDFs | Not Started | 05/14/26 | 05/14/26 | 1.2 | 1.2 |
|
170.0 |
RPL10.SSB.BB.1200 |
RPL10.Ext.Build Back.SSB - LO #5 - MEPF Trim Out | Build Back Exterior Leave Out Wall #5 (East SSB) | Not Started | 05/14/26 | 05/28/26 | 12.5 | 12.5 |
|
441.2 |
RPL10.WP2.GSIDF.1720 |
RPL10.Conn GSIDFN43 Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 05/14/26 | 05/28/26 | 12.5 | 12.5 |
|
217.5 |
RPL10.WP2.GSIDF.1960 |
RPL10.Conn GSIDFN33 Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 05/14/26 | 05/28/26 | 12.5 | 12.5 |
|
217.5 |
RPL10.WP4.028460 |
RPL10.Conn NS2.CFD6.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/14/26 | 05/20/26 | 6.2 | 6.2 |
|
156.2 |
RPL10.CTRC.BB.3215 |
RPL10.Int.Build Back.Center-Corr - LO #12,13 - Arch Finishes - Hang Drywall, Paint, Final Finishes | Build Back Interior Leave Out Wall #12 #13 (Center Corr) | Not Started | 05/15/26 | 06/12/26 | 25.0 | 25.0 |
|
160.0 |
RPL10.EY.ENDC.01180 |
RPL10.EY.End - Install BMS Tie-ins | Tie-ins | Not Started | 05/15/26 | 06/05/26 | 18.8 | 18.8 |
|
185.0 |
RPL10.EY.ENDC.01190 |
RPL10.EY.End - Install Irrigation | Hardscape and Landscape | Not Started | 05/15/26 | 06/05/26 | 18.8 | 18.8 |
|
453.8 |
RPL10.INT.EF2.01170 |
RPL10.Interior.EF2 - CFCI - Set South CRAH Units | OFE | Not Started | 05/15/26 | 05/21/26 | 6.2 | 6.2 |
|
130.0 |
RPL10.INT.EF2.01200 |
RPL10.Interior.EF2 - Tie-ins - North CRAH Gallery - WBS Summary | North CRAH Gallery | Not Started | 05/15/26 | 06/26/26 | 37.5 | 37.5 |
|
177.5 |
RPL10.INT.EF2.01370 |
RPL10.Interior.EF2 - EF2 East - Install Upper Trays | East EF-2 | Not Started | 05/15/26 | 05/21/26 | 6.2 | 6.2 |
|
37.5 |
RPL10.INT.EF2.01390 |
RPL10.Interior.EF2 - CFCI - Install CFCI Prefab Cable Rack - EF2 West | OFE | Not Started | 05/15/26 | 06/05/26 | 18.8 | 18.8 |
|
18.8 |
RPL10.INT.EF2.01730 |
RPL10.Interior.EF2 - North CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) | North CRAH Gallery | Not Started | 05/15/26 | 05/28/26 | 11.2 | 11.2 |
|
136.2 |
RPL10.INT.NS2.01170 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/15/26 | 06/12/26 | 25.0 | 25.0 |
|
28.8 |
RPL10.INT.NS2.01180 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/15/26 | 06/12/26 | 25.0 | 25.0 |
|
28.8 |
RPL10.INT.NS2.01190 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Set TWMS, UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/15/26 | 06/12/26 | 25.0 | 25.0 |
|
16.2 |
RPL10.INT.NS2.01680 |
RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 05/15/26 | 05/20/26 | 5.0 | 5.0 |
|
56.2 |
RPL10.INT.NS2.01710 |
RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 2 SQ5.2 - WBS Summary | Tie-Ins NS2 Control Fault Domain 2 | Not Started | 05/15/26 | 09/29/26 | 118.8 | 118.8 |
|
20.0 |
RPL10.INT.NS4.01092 |
RPL10.Interior.NS4 - LV Skids and TopHat - Maintenance and Reserve Busways | NS4 - LV Skids and TopHat | Not Started | 05/15/26 | 06/05/26 | 18.8 | 18.8 |
|
165.0 |
RPL10.MCUP.LP2.2040 |
RPL10.MCUP.Loop 2 - Tie-in - MV Loop L2 Checklist Completion | Tie-Ins Electrical | Not Started | 05/15/26 | 05/29/26 | 12.5 | 12.5 |
|
130.0 |
RPL10.MCUP.LP2.2080 |
RPL10.MCUP.Loop 2 - Tie-in - Mechanical L2 Checklist Completion | Tie-Ins Mechanical | Not Started | 05/15/26 | 05/29/26 | 12.5 | 12.5 |
|
142.5 |
RPL10.PR.PR.02340 |
RPL10.PR MDF - Rack/ Stack/ Patch and Provisioning at GS.MDFs for FacNet | GS-MDFs & IDFs | Not Started | 05/15/26 | 06/19/26 | 31.2 | 31.2 |
|
170.0 |
GCD.RPL10.5765 |
RMU Loop Ready for Energization - NS1 Loop 1 | EY | Not Started | 05/18/26 | 05/18/26 | 0.0 | 0.0 |
|
30.0 |
GCD.RPL10.5785 |
RMU Loop Ready for Energization - NS1 Loop 2 | EY | Not Started | 05/18/26 | 05/18/26 | 0.0 | 0.0 |
|
72.5 |
RPL10.EY.EF1.01240 |
RPL10.EY.EF1 - Install RPL-2 Total Road Closure For Fiber Supprt Platform | Fiber Support Platform - RPL-2 | Not Started | 05/18/26 | 07/28/26 | 62.5 | 62.5 |
|
225.0 |
RPL10.EY.EF1.01270 |
RPL10.EY.EF1 - Install RPL-1 FSP Floor Grating | Fiber Support Platform - RPL-1 | Not Started | 05/18/26 | 06/01/26 | 12.5 | 12.5 |
|
227.5 |
RPL10.EY.EF1.01280 |
RPL10.EY.EF1 - Install RPL-2 FSP Steel Span Structure Modules | Fiber Support Platform - RPL-2 | Not Started | 05/18/26 | 06/01/26 | 12.5 | 12.5 |
|
202.5 |
RPL10.EY.EF1.01290 |
RPL10.EY.EF1 - Install RPL-2 FSP Road Closure For Steel Erection | Fiber Support Platform - RPL-2 | Not Started | 05/18/26 | 06/01/26 | 12.5 | 12.5 |
|
202.5 |
RPL10.EY.NS1.01340 |
RPL10.EY.NS1 - Install Lighting | Hardscape and Landscape | Not Started | 05/18/26 | 06/01/26 | 12.5 | 12.5 |
|
188.8 |
RPL10.INT.CTRC.01390 |
RPL10.Interior.Center-Corridor - BoW - Set Equipment / Interior | Balance of Walls & OverHead | Not Started | 05/18/26 | 05/22/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.CTRC.01430 |
RPL10.Interior.Center-Corridor - BoW - Electrical Trim Out (Both Side of Corridor Wall) | Balance of Walls & OverHead | Not Started | 05/18/26 | 05/21/26 | 5.0 | 5.0 |
|
192.5 |
RPL10.INT.CTRC.01460 |
RPL10.Interior.Center-Corridor - BoW - Install Remaining Lighting | Balance of Walls & OverHead | Not Started | 05/18/26 | 05/27/26 | 8.8 | 8.8 |
|
120.0 |
RPL10.INT.CTRC.01790 |
RPL10.Interior.Center-Corridor - BoW - Install Fire Safing/ Seal all Penetrations (Lowside space) | Balance of Walls & OverHead | Not Started | 05/18/26 | 05/22/26 | 6.2 | 6.2 |
|
120.0 |
RPL10.INT.CTRC.07740 |
RPL10.Interior.Center-Corridor - BoW - Install Fire Alarm Panel | Balance of Walls & OverHead | Not Started | 05/18/26 | 05/19/26 | 2.5 | 2.5 |
|
195.0 |
RPL10.INT.NS1.02540 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 4 SQ3.1 (HAC) | OFE NS1 Control Fault Domain 4 | Not Started | 05/18/26 | 06/08/26 | 18.8 | 18.8 |
|
-11.2 |
RPL10.INT.SSB.01900 |
RPL10.Interior.SSB - Kitchen & Office Spaces - Casework | Kitchen and Office Spaces | Not Started | 05/18/26 | 05/27/26 | 8.8 | 8.8 |
|
153.8 |
RPL10.WP2.01020 |
RPL10.Conn SSB - Early Construction Cx Server Ready - At NS1 EY (MV) | WP2 (GS/CARRIER/SFZ - INF, CAB [ISP/OSP], NET) | Not Started | 05/18/26 | 05/18/26 | 0.0 | 0.0 |
|
30.0 |
RPL10.WP2.01120 |
RPL10.Conn GSMDF Ready for ENS Buildout - GSMDF 1&2 | Supporting Services Building | Not Started | 05/18/26 | 05/18/26 | 0.0 | 0.0 |
|
202.5 |
RPL10.WP2.GSIDF.2080 |
RPL10.Conn GSIDFNX01 Install & Test Network (FIM) | Network | Not Started | 05/18/26 | 05/20/26 | 3.8 | 3.8 |
|
227.5 |
RPL10.WP2.GSIDF.2160 |
RPL10.Conn GSIDFNX02 Install & Test Network (FIM) | Network | Not Started | 05/18/26 | 05/20/26 | 3.8 | 3.8 |
|
227.5 |
RPL10.WP2.GSIDF.3280 |
RPL10.Conn GSIDFNX01 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 05/18/26 | 05/20/26 | 3.8 | 3.8 |
|
486.2 |
RPL10.WP2.GSIDF.3300 |
RPL10.Conn GSIDFNX02 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 05/18/26 | 05/20/26 | 3.8 | 3.8 |
|
486.2 |
RPL10.WP4.027480 |
RPL10.Conn NS1.CFD5.48<>16-20 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/18/26 | 05/21/26 | 5.0 | 5.0 |
|
148.8 |
RPL10.EY.EF1.01360 |
RPL10.EY.EF1 - Install BMS Tie-ins | Tie-ins | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
127.5 |
RPL10.EY.NS3.01220 |
RPL10.EY.NS3 - Install MV, RMUs & Electrical Panels (15) | OFE | Not Started | 05/19/26 | 06/16/26 | 25.0 | 25.0 |
|
101.2 |
RPL10.EY.NS3.01230 |
RPL10.EY.NS3 - OFE - MV - WBS Summary | OFE | Not Started | 05/19/26 | 07/08/26 | 43.8 | 43.8 |
|
108.8 |
RPL10.INT.ENDC.01050 |
RPL10.Interior.End-Corridor - BoW - Frame Balance of Wall | Balance of Walls & Overhead | Not Started | 05/19/26 | 05/22/26 | 5.0 | 5.0 |
|
148.8 |
RPL10.INT.ENDC.06820 |
RPL10.Interior.End-Corridor - BoW - Install Remaining Unistruts & Hangers | Balance of Walls & Overhead | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
148.8 |
RPL10.INT.NS2.01780 |
RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 05/19/26 | 05/22/26 | 5.0 | 5.0 |
|
86.2 |
RPL10.INT.NS2.02525 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 5 SQ2.2 (HAC) | OFE NS2 Control Fault Domain 5 | Not Started | 05/19/26 | 06/09/26 | 18.8 | 18.8 |
|
-27.5 |
RPL10.INT.NS4.01120 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 1 SQ7.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS4 Control Fault Domain 1 | Not Started | 05/19/26 | 08/31/26 | 91.2 | 91.2 |
|
37.5 |
RPL10.INT.NS4.02480 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 1 SQ7.1 (LV Side Aisle) | OFE NS4 Control Fault Domain 1 | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.SSBC.01400 |
RPL10.Interior.SSB-Corridor - BoW - Install Grounding | Balance of Walls & OverHead | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
42.5 |
RPL10.INT.SSBC.01410 |
RPL10.Interior.SSB-Corridor - BoW - Battery Connection | Balance of Walls & OverHead | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
42.5 |
RPL10.WP4.027280 |
RPL10.Conn NS1.CFD6.48<>16-20 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/19/26 | 05/22/26 | 5.0 | 5.0 |
|
147.5 |
DCC.B10.3245 |
[NWB] CorpNet/Security/FacNet Ready [NWS 3] | Connectivity | Not Started | 05/20/26 | 05/20/26 | 0.0 | 0.0 |
|
343.8 |
DCC.B10.3255 |
[NWB] CorpNet/Security/FacNet Ready [NWS 4] | Connectivity | Not Started | 05/20/26 | 05/20/26 | 0.0 | 0.0 |
|
343.8 |
RPL.CM.D.N5635.XR |
US 80 Turn Lane at Bypass Rd | Logistics - Off-Site Receive XREF Milsetones | Not Started | 05/20/26 | 05/20/26 | 0.0 | 0.0 |
|
128.8 |
RPL10.EY.NS2.01300 |
RPL10.EY.NS2 - Install Sleeves MEPL | Hardscape and Landscape | Not Started | 05/20/26 | 05/27/26 | 6.2 | 6.2 |
|
185.0 |
RPL10.EY.NS2.01310 |
RPL10.EY.NS2 - MV Loop 2 - L2 Checklist Completion | Tie-ins | Not Started | 05/20/26 | 06/03/26 | 12.5 | 12.5 |
|
66.2 |
RPL10.EY.NS2.01320 |
RPL10.EY.NS2 - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 05/20/26 | 11/19/26 | 160.0 | 160.0 |
|
327.5 |
RPL10.INT.EF1.01470 |
RPL10.Interior.EF1 - EF1 East - Set Passive Panels / Racks | East EF-1 | Not Started | 05/20/26 | 05/27/26 | 6.2 | 6.2 |
|
193.8 |
RPL10.INT.NS2.01800 |
RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 05/20/26 | 05/26/26 | 5.0 | 5.0 |
|
130.0 |
RPL10.INT.SSB.01350 |
RPL10.Interior.SSB - Loading Dock and Storage - Final Paint | Loading Dock and Storage | Not Started | 05/20/26 | 05/22/26 | 3.8 | 3.8 |
|
151.2 |
RPL10.WP2.GSIDF.2420 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) NS2 NX06 WBS Summary | GSIDFNX06 | Not Started | 05/20/26 | 06/08/26 | 16.2 | 16.2 |
|
471.2 |
RPL10.WP2.GSIDF.2440 |
RPL10.Conn GSIDFNX06 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 05/20/26 | 05/27/26 | 6.2 | 6.2 |
|
212.5 |
RPL10.WP2.GSIDF.2500 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) NS2 NX07 WBS Summary | GSIDFNX07 | Not Started | 05/20/26 | 06/08/26 | 16.2 | 16.2 |
|
471.2 |
RPL10.WP2.GSIDF.2520 |
RPL10.Conn GSIDFNX07 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 05/20/26 | 05/27/26 | 6.2 | 6.2 |
|
212.5 |
RPL10.Conn.MS.02210 |
FacNet Ready @ NS1-EY IDFs | Connectivity Milestones | Not Started | 05/21/26 | 05/21/26 | 0.0 | 0.0 |
|
226.2 |
RPL10.Conn.MS.02290 |
FacNet Ready @ MCUP IDFs | Connectivity Milestones | Not Started | 05/21/26 | 05/21/26 | 0.0 | 0.0 |
|
226.2 |
RPL10.INT.EF2.01240 |
RPL10.Interior.EF2 - North CRAH Gallery - Leak Detection / Heat Trace | North CRAH Gallery | Not Started | 05/21/26 | 05/28/26 | 6.2 | 6.2 |
|
136.2 |
RPL10.INT.NS1.01480 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/21/26 | 06/18/26 | 25.0 | 25.0 |
|
38.8 |
RPL10.INT.NS1.02560 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 4 SQ3.1 (Mech Side Aisle) | OFE NS1 Control Fault Domain 4 | Not Started | 05/21/26 | 06/09/26 | 16.2 | 16.2 |
|
-3.8 |
RPL10.INT.NS2.01820 |
RPL10.Interior.NS2 - Control Fault Domain 1 SQ6.2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 05/21/26 | 05/27/26 | 5.0 | 5.0 |
|
61.2 |
RPL10.INT.NS2.01850 |
RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 1 SQ6.2 - WBS Summary | Tie-Ins NS2 Control Fault Domain 1 | Not Started | 05/21/26 | 10/20/26 | 132.5 | 132.5 |
|
-8.8 |
RPL10.INT.NS4.01130 |
RPL10.Interior.NS4 - Control Fault Domain 1 SQ7.1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 05/21/26 | 05/28/26 | 6.2 | 6.2 |
|
122.5 |
RPL10.INT.NS4.01160 |
RPL10.Interior.NS4 - Tie-ins - Control Fault Domain 1 SQ7.1 - WBS Summary | Tie-Ins NS4 Control Fault Domain 1 | Not Started | 05/21/26 | 10/22/26 | 135.0 | 135.0 |
|
48.8 |
RPL10.WP4.028480 |
RPL10.Conn NS2.CFD6.48<>16-20 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/21/26 | 05/27/26 | 5.0 | 5.0 |
|
156.2 |
GCD.RPL10.1116 |
RPL10 EY Ready for Energization | Construction Milestones | Not Started | 05/22/26 | 05/22/26 | 0.0 | 0.0 |
|
182.5 |
GCD.RPL10.2051 |
MCUP Ready for Energization - (MCUPs Loop 1) | mCup | Not Started | 05/22/26 | 05/22/26 | 0.0 | 0.0 |
|
55.0 |
GCD.RPL10.3527 |
[RPL10] TC Ready: Production Cabling Pathways Complete [NS1 Rows 1-8] | TC Ready: Production Cabling - NS1 | Not Started | 05/22/26 | 05/22/26 | 0.0 | 0.0 |
|
42.5 |
RPL.10.D.X3910.XG |
GS.MDF / GS Cabling Completed for Campus FacNet Live Distribution (Aux Bldgs) | Give Milestones (XREFs) | Not Started | 05/22/26 | 05/22/26 | 0.0 | 0.0 |
|
1953.8 |
RPL.10.D.X3920.XG |
GS.MDF / GS Cabling Completed for Campus FacNet Live Distribution (AI Bldgs) | Give Milestones (XREFs) | Not Started | 05/22/26 | 05/22/26 | 0.0 | 0.0 |
|
1953.8 |
RPL10.Conn.MS.01490 |
Wifi Ready - mCUP Yard | Connectivity Milestones | Not Started | 05/22/26 | 05/22/26 | 0.0 | 0.0 |
|
483.8 |
RPL10.INT.EF2.01260 |
RPL10.Interior.EF2 - Tie-ins - South CRAH Gallery - WBS Summary | South CRAH Gallery | Not Started | 05/22/26 | 06/26/26 | 31.2 | 31.2 |
|
177.5 |
RPL10.INT.EF2.01410 |
RPL10.Interior.EF2 - EF2 East - Install Lower Trays | East EF-2 | Not Started | 05/22/26 | 05/29/26 | 6.2 | 6.2 |
|
37.5 |
RPL10.INT.EF2.01420 |
RPL10.Interior.EF2 - EF2 East - Install Lighting | East EF-2 | Not Started | 05/22/26 | 06/09/26 | 15.0 | 15.0 |
|
126.2 |
RPL10.INT.EF2.01750 |
RPL10.Interior.EF2 - South CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) | South CRAH Gallery | Not Started | 05/22/26 | 06/04/26 | 11.2 | 11.2 |
|
130.0 |
RPL10.INT.NS2.01115 |
RPL10.Interior.NS2 - MES Skids - EPMS Tie-Ins ( 2 per day) | NS2 - MES Skids | Not Started | 05/22/26 | 06/25/26 | 30.0 | 30.0 |
|
157.5 |
RPL10.INT.NS2.01240 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/22/26 | 06/19/26 | 25.0 | 25.0 |
|
16.2 |
RPL10.INT.NS2.02545 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 5 SQ2.2 (Mech Side Aisle) | OFE NS2 Control Fault Domain 5 | Not Started | 05/22/26 | 06/10/26 | 16.2 | 16.2 |
|
-17.5 |
RPL10.INT.NS3.01092 |
RPL10.Interior.NS3 - LV Skids and TopHat - Maintenance and Reserve Busways | NS3 - LV Skids and TopHat | Not Started | 05/22/26 | 06/12/26 | 18.8 | 18.8 |
|
171.2 |