Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260412.xer
· Uploaded Apr 16, 2026 12:51 PM
· 8408 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.INT.NS4.01093 |
RPL10.Interior.NS4 - LV Skids and TopHat - Top Hat Busway | NS4 - LV Skids and TopHat | Not Started | 05/22/26 | 06/12/26 | 18.8 | 18.8 |
|
165.0 |
RPL10.WP2.01060 |
RPL10.Conn CorpNet & FacNet Live | WP2 (GS/CARRIER/SFZ - INF, CAB [ISP/OSP], NET) | Not Started | 05/22/26 | 05/22/26 | 0.0 | 0.0 |
|
68.8 |
RPL10.WP4.027500 |
RPL10.Conn NS1.CFD5.48<>21-25 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/22/26 | 05/28/26 | 5.0 | 5.0 |
|
148.8 |
JCL.C.1400 |
RPL10 - Cost Risk LOE-19 Connectivity Package 3B - Front End Cabling (ISP) | Cost LOEs | Not Started | 05/26/26 | 04/07/27 | 271.2 | 271.2 |
|
52.5 |
RPL10.CTRC.BB.1000 |
RPL10.Int.Build Back.Center-Corr - Interior Leave Out (Center Corridor) #6, #8 WBS Summary | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 05/26/26 | 07/16/26 | 46.2 | 46.2 |
|
145.0 |
RPL10.CTRC.BB.1020 |
RPL10.Int.Build Back.Center-Corr - LO #6,8 - MEPF - In Wall, OH, Lowside, Lights | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 05/26/26 | 06/22/26 | 25.0 | 25.0 |
|
145.0 |
RPL10.CTRC.BB.3375 |
RPL10.Int.Build Back.Center-Corr - LO #8 - Arch Finishes - Hang IMP | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 05/26/26 | 05/28/26 | 3.8 | 3.8 |
|
157.5 |
RPL10.INT.CTRC.01350 |
RPL10.Interior.Center-Corridor - BoW - Final Paint | Balance of Walls & OverHead | Not Started | 05/26/26 | 05/28/26 | 3.8 | 3.8 |
|
120.0 |
RPL10.INT.CTRC.01420 |
RPL10.Interior.Center-Corridor - BoW - Install Battery | Balance of Walls & OverHead | Not Started | 05/26/26 | 06/08/26 | 12.5 | 12.5 |
|
110.0 |
RPL10.INT.EF1.01110 |
RPL10.Interior.EF1 - Priority OH - Controls / EPMS / BMS *EPMS Separate Activty | OverHead | Not Started | 05/26/26 | 05/29/26 | 5.0 | 5.0 |
|
136.2 |
RPL10.INT.EF1.01180 |
RPL10.Interior.EF1 - North CRAH Gallery - Install Upper Trays | North CRAH Gallery | Not Started | 05/26/26 | 06/01/26 | 6.2 | 6.2 |
|
30.0 |
RPL10.INT.EF1.01200 |
RPL10.Interior.EF1 - Tie-ins - North CRAH Gallery - WBS Summary | North CRAH Gallery | Not Started | 05/26/26 | 06/26/26 | 30.0 | 30.0 |
|
166.2 |
RPL10.INT.EF1.01250 |
RPL10.Interior.EF1 - South CRAH Gallery - Install Upper Trays | South CRAH Gallery | Not Started | 05/26/26 | 06/01/26 | 6.2 | 6.2 |
|
30.0 |
RPL10.INT.EF1.01260 |
RPL10.Interior.EF1 - Tie-ins - South CRAH Gallery - WBS Summary | South CRAH Gallery | Not Started | 05/26/26 | 07/10/26 | 41.2 | 41.2 |
|
155.0 |
RPL10.INT.EF1.01480 |
RPL10.Interior.EF1 - EF1 West - Install Upper Trays | West EF-1 | Not Started | 05/26/26 | 06/01/26 | 6.2 | 6.2 |
|
30.0 |
RPL10.INT.EF1.01650 |
RPL10.Interior.EF1 - North CRAH Gallery - Install Duct work | North CRAH Gallery | Not Started | 05/26/26 | 06/01/26 | 6.2 | 6.2 |
|
87.5 |
RPL10.INT.EF1.01690 |
RPL10.Interior.EF1 - South CRAH Gallery - Install Duct work | South CRAH Gallery | Not Started | 05/26/26 | 06/01/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.ENDC.1400 |
RPL10.Interior.End-Corridor - BoW - Install Door Frames | Balance of Walls & Overhead | Not Started | 05/26/26 | 06/01/26 | 6.2 | 6.2 |
|
152.5 |
RPL10.INT.ENDC.1520 |
RPL10.Interior.End-Corridor - BoW - Install Backing and In-Wall BoW | Balance of Walls & Overhead | Not Started | 05/26/26 | 06/01/26 | 6.2 | 6.2 |
|
161.2 |
RPL10.INT.NS1.01290 |
RPL10.Conn NS1.CFD6 - Set Passive Racks for WP3B | Infrastructure | Not Started | 05/26/26 | 05/28/26 | 3.8 | 3.8 |
|
38.8 |
RPL10.INT.NS1.02840 |
RPL10.Conn NS1.CFD6 - Set Passive Racks for PON | Infrastructure | Not Started | 05/26/26 | 05/28/26 | 3.8 | 3.8 |
|
160.0 |
RPL10.INT.NS2.01920 |
RPL10.Interior.NS2 - Control Fault Domain 1 SQ6.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 05/26/26 | 05/29/26 | 5.0 | 5.0 |
|
91.2 |
RPL10.INT.NS3.01112 |
RPL10.Interior.NS3 - MES Skids - Piping Tie-Ins & Inspections | NS3 - MES Skids | Not Started | 05/26/26 | 06/26/26 | 30.0 | 30.0 |
|
123.8 |
RPL10.INT.NS4.01230 |
RPL10.Interior.NS4 - Control Fault Domain 1 SQ7.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 05/26/26 | 06/01/26 | 6.2 | 6.2 |
|
142.5 |
RPL10.INT.SSB.01430 |
RPL10.Interior.SSB - Loading Dock and Storage - Electrical Trim Out | Loading Dock and Storage | Not Started | 05/26/26 | 06/03/26 | 8.8 | 8.8 |
|
151.2 |
RPL10.INT.SSB.01460 |
RPL10.Interior.SSB - Loading Dock and Storage - Install Lighting and Devices | Loading Dock and Storage | Not Started | 05/26/26 | 06/03/26 | 8.8 | 8.8 |
|
168.8 |
RPL10.INT.SSB.06040 |
RPL10.Interior.SSB - Loading Dock Area - Electrical Panels | Loading Dock and Storage | Not Started | 05/26/26 | 06/03/26 | 8.8 | 8.8 |
|
151.2 |
RPL10.SSBC.BB.1180 |
RPL10.Int.Build Back.SSB-Corr - LO #2,3,4 - Final Clean | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Not Started | 05/26/26 | 05/29/26 | 5.0 | 5.0 |
|
183.8 |
RPL10.WP4.027300 |
RPL10.Conn NS1.CFD6.48<>21-25 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/26/26 | 05/29/26 | 5.0 | 5.0 |
|
147.5 |
RPL10.WP4.08800 |
RPL10.Conn NS1.CFD6 Pull/Install Ext. Trunk (384F) [JXSW<>MA] | [MA<>JXSW] | Not Started | 05/26/26 | 06/02/26 | 7.5 | 7.5 |
|
190.0 |
RPL10.WP4.NS1.01760 |
RPL10.Conn NS1.CFD6 Infrastructure - WBS Summary | Infrastructure | Not Started | 05/26/26 | 06/08/26 | 12.5 | 12.5 |
|
72.5 |
RPL10.WP4.NS1.01780 |
RPL10.Conn NS1.CFD6 Infrastructure | Infrastructure | Not Started | 05/26/26 | 06/08/26 | 12.5 | 12.5 |
|
72.5 |
GCD.RPL10.2001 |
Cx Power Available (Temp) | CX Milestones | Not Started | 05/27/26 | 05/27/26 | 0.0 | 0.0 |
|
15.0 |
RPL.10.D.X3810.XR |
100MW (40 MW Initial , 60 MW later) Cx Temp Power to MV Skids RPL10 NS1 Available (DPR Want 05.20.25) | Power (XREFs) | Not Started | 05/27/26 | 05/27/26 | 0.0 | 0.0 |
|
22.5 |
RPL.10.D.X38X0.XR |
100MW (40 MW Initial , 60 MW later) Cx Temp Power to MV Skids RPL10 mCUPs (North)Available (DPR Want 05.06.25) | Power (XREFs) | Not Started | 05/27/26 | 05/27/26 | 0.0 | 0.0 |
|
15.0 |
RPL10.CX.MCUP.01010 |
RPL10.CX.mCup Loop 1 - L3/L4 - MV Skids | mCup Loop 1 (mCup #1,#3,#5,#7) | Not Started | 05/27/26 | 06/03/26 | 7.5 | 7.5 |
|
15.0 |
RPL10.EY.EF1.01400 |
RPL10.EY.EF1 - L2 Checklist Completion | Tie-ins | Not Started | 05/27/26 | 06/09/26 | 12.5 | 12.5 |
|
127.5 |
RPL10.INT.ENDC.01080 |
RPL10.Interior.End-Corridor - BoW - Install Electrical Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 05/27/26 | 06/04/26 | 8.8 | 8.8 |
|
148.8 |
RPL10.INT.ENDC.01110 |
RPL10.Interior.End-Corridor - BoW - Install Fire Life Safety Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 05/27/26 | 06/04/26 | 8.8 | 8.8 |
|
148.8 |
RPL10.INT.ENDC.1300 |
RPL10.Interior.End-Corridor - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 05/27/26 | 06/05/26 | 10.0 | 10.0 |
|
156.2 |
RPL10.INT.NS2.01930 |
RPL10.Interior.NS2 - Control Fault Domain 1 SQ6.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 05/27/26 | 06/01/26 | 5.0 | 5.0 |
|
115.0 |
RPL10.INT.NS4.01065 |
RPL10.Interior.NS4 - OFE - Electrical Panels (ATS,SB House,MCB,MLO, Transformer) - Set / Anchor | OFE | Not Started | 05/27/26 | 06/02/26 | 6.2 | 6.2 |
|
133.8 |
RPL10.INT.NS4.01113 |
RPL10.Interior.NS4 - MES Skids - CDU Tie-Ins | NS4 - MES Skids | Not Started | 05/27/26 | 06/29/26 | 30.0 | 30.0 |
|
237.5 |
RPL10.INT.NS4.01210 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 2 SQ8.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS4 Control Fault Domain 2 | Not Started | 05/27/26 | 09/15/26 | 97.5 | 97.5 |
|
40.0 |
RPL10.INT.NS4.01250 |
RPL10.Interior.NS4 - Control Fault Domain 1 SQ7.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 05/27/26 | 06/02/26 | 6.2 | 6.2 |
|
142.5 |
RPL10.INT.NS4.02540 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 2 SQ8.1 (LV Side Aisle) | OFE NS4 Control Fault Domain 2 | Not Started | 05/27/26 | 06/01/26 | 5.0 | 5.0 |
|
122.5 |
RPL10.INT.SSBC.01440 |
RPL10.Interior.SSB-Corridor - BoW - Electrical L2 Checklist Completion | Balance of Walls & OverHead | Not Started | 05/27/26 | 06/09/26 | 12.5 | 12.5 |
|
42.5 |
RPL10.INT.SSBC.01470 |
RPL10.Interior.SSB-Corridor - BoW - Mechanical L2 Checklist Completion | Balance of Walls & OverHead | Not Started | 05/27/26 | 06/09/26 | 12.5 | 12.5 |
|
42.5 |
RPL10.MCUP.LP2.2400 |
RPL10.MCUP.Loop 2 - Install Bollards | Hardscape and Landscape | Not Started | 05/27/26 | 06/04/26 | 8.8 | 8.8 |
|
473.8 |
GCD.RPL10.5805 |
RMU Loop Ready for Energization - NS2 Loop 1 | EY | Not Started | 05/28/26 | 05/28/26 | 0.0 | 0.0 |
|
31.2 |
RPL10.EY.EF2.01650 |
RPL10.EY.EF2 - Remaining L2 Checklist Completion | Tie-ins | Not Started | 05/28/26 | 06/03/26 | 6.2 | 6.2 |
|
176.2 |
RPL10.EY.NS2.01330 |
RPL10.EY.NS2 - Install Early EY Paving | Hardscape and Landscape | Not Started | 05/28/26 | 06/03/26 | 6.2 | 6.2 |
|
185.0 |
RPL10.INT.SSB.02420 |
RPL10.Interior.SSB - Kitchen & Office Spaces - Fixture Install | Kitchen and Office Spaces | Not Started | 05/28/26 | 06/05/26 | 8.8 | 8.8 |
|
166.2 |
RPL10.INT.SSB.02480 |
RPL10.Interior.SSB - Kitchen & Office Spaces - MEP Trims | Kitchen and Office Spaces | Not Started | 05/28/26 | 06/05/26 | 8.8 | 8.8 |
|
153.8 |
RPL10.WP2.GSIDF.2460 |
RPL10.Conn GSIDFNX06 Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 05/28/26 | 06/03/26 | 6.2 | 6.2 |
|
212.5 |
RPL10.WP2.GSIDF.2540 |
RPL10.Conn GSIDFNX07 Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 05/28/26 | 06/03/26 | 6.2 | 6.2 |
|
212.5 |
RPL10.WP4.028500 |
RPL10.Conn NS2.CFD6.48<>21-25 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/28/26 | 06/02/26 | 5.0 | 5.0 |
|
156.2 |
DCC.B10.3155 |
[NWB] GS Gear Delivered [NWS 4] | Connectivity | Not Started | 05/29/26 | 05/29/26 | 0.0 | 0.0 |
|
1950.0 |
RPL.GF.D.N0100.XG |
GS.EF1 Infrastructure Ready RPL10 | Give Milestones (XREFs) | Not Started | 05/29/26 | 05/29/26 | 0.0 | 0.0 |
|
1948.8 |
RPL10.INT.CTRC.01360 |
RPL10.Interior.Center-Corridor - BoW - Install Flooring Tiles / Resinous Flooring in specific rooms | Balance of Walls & OverHead | Not Started | 05/29/26 | 06/02/26 | 3.8 | 3.8 |
|
180.0 |
RPL10.INT.CTRC.01370 |
RPL10.Interior.Center-Corridor - BoW - Install Duct Drop Trim Out | Balance of Walls & OverHead | Not Started | 05/29/26 | 06/03/26 | 5.0 | 5.0 |
|
120.0 |
RPL10.INT.EF2.01280 |
RPL10.Interior.EF2 - South CRAH Gallery - Leak Detection / Heat Trace | South CRAH Gallery | Not Started | 05/29/26 | 06/04/26 | 6.2 | 6.2 |
|
130.0 |
RPL10.INT.NS1.01570 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/29/26 | 06/25/26 | 25.0 | 25.0 |
|
38.8 |
RPL10.INT.NS4.01094 |
RPL10.Interior.NS4 - Electrical Panels (ATS,SB House,MCB,MLO, Transformer) - Tie-Ins | NS4 - LV Skids and TopHat | Not Started | 05/29/26 | 06/18/26 | 18.8 | 18.8 |
|
133.8 |
RPL10.INT.NS4.01270 |
RPL10.Interior.NS4 - Control Fault Domain 2 SQ8.1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 05/29/26 | 06/03/26 | 5.0 | 5.0 |
|
125.0 |
RPL10.INT.NS4.01300 |
RPL10.Interior.NS4 - Tie-ins - Control Fault Domain 2 SQ8.1 - WBS Summary | Tie-Ins NS4 Control Fault Domain 2 | Not Started | 05/29/26 | 10/29/26 | 135.0 | 135.0 |
|
52.5 |
RPL10.SSB.BB.1920 |
RPL10.Ext.Build Back.SSB - LO #5 - Final Clean | Build Back Exterior Leave Out Wall #5 (East SSB) | Not Started | 05/29/26 | 06/03/26 | 5.0 | 5.0 |
|
441.2 |
RPL10.WP2.GSIDF.1740 |
RPL10.Conn GSIDFN43 Install & Test Network (FIM) | Network | Not Started | 05/29/26 | 06/02/26 | 3.8 | 3.8 |
|
217.5 |
RPL10.WP2.GSIDF.1980 |
RPL10.Conn GSIDFN33 Install & Test Network (FIM) | Network | Not Started | 05/29/26 | 06/02/26 | 3.8 | 3.8 |
|
217.5 |
RPL10.WP2.GSIDF.3200 |
RPL10.Conn GSIDFN43 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 05/29/26 | 06/15/26 | 15.0 | 15.0 |
|
465.0 |
RPL10.WP2.GSIDF.3260 |
RPL10.Conn GSIDFN33 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 05/29/26 | 06/15/26 | 15.0 | 15.0 |
|
465.0 |
RPL10.WP4.027520 |
RPL10.Conn NS1.CFD5.48<>26-30 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/29/26 | 06/03/26 | 5.0 | 5.0 |
|
148.8 |
RPL.CM.D.C5480.XR |
Leia Lane | Logistics - Onsite Receive XREF Milestones | Not Started | 06/01/26 | 06/01/26 | 0.0 | 0.0 |
|
1948.8 |
RPL10.CTRC.BB.3155 |
RPL10.Int.Build Back.Center-Corr - LO #12,13 - MEPF Trim Out | Build Back Interior Leave Out Wall #12 #13 (Center Corr) | Not Started | 06/01/26 | 06/19/26 | 18.8 | 18.8 |
|
160.0 |
RPL10.INT.EF2.01430 |
RPL10.Interior.EF2 - EF2 East - Pull EPMS / BMS from panel to devices | East EF-2 | Not Started | 06/01/26 | 06/05/26 | 6.2 | 6.2 |
|
128.8 |
RPL10.INT.EF2.01440 |
RPL10.Interior.EF2 - EF2 East - Install copper from GS.IDF to BMS and EPMS panels | East EF-2 | Not Started | 06/01/26 | 06/05/26 | 6.2 | 6.2 |
|
128.8 |
RPL10.INT.EF2.01450 |
RPL10.Interior.EF2 - EF2 East - Fire Life Safety | East EF-2 | Not Started | 06/01/26 | 06/09/26 | 8.8 | 8.8 |
|
193.8 |
RPL10.INT.NS2.01250 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/01/26 | 06/26/26 | 25.0 | 25.0 |
|
16.2 |
RPL10.INT.NS3.01093 |
RPL10.Interior.NS3 - LV Skids and TopHat - Top Hat Busway | NS3 - LV Skids and TopHat | Not Started | 06/01/26 | 06/19/26 | 18.8 | 18.8 |
|
171.2 |
RPL10.MCUP.LP2.2060 |
RPL10.MCUP.Loop 2 - Tie-in - Electrical L2 Checklist Completion | Tie-Ins Electrical | Not Started | 06/01/26 | 06/12/26 | 12.5 | 12.5 |
|
130.0 |
RPL10.SSBC.BB.1160 |
RPL10.Int.Build Back.SSB-Corr - LO #2,3,4 - Final Punch Walk | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Not Started | 06/01/26 | 06/02/26 | 2.5 | 2.5 |
|
183.8 |
RPL10.WP4.027320 |
RPL10.Conn NS1.CFD6.48<>26-30 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/01/26 | 06/04/26 | 5.0 | 5.0 |
|
147.5 |
RPL10.CTRC.BB.1060 |
RPL10.Int.Build Back.Center-Corr - LO #6,8 - Arch Finishes - Frame, Hang Drywall, Paint, Final Finishes | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 06/02/26 | 06/29/26 | 25.0 | 25.0 |
|
145.0 |
RPL10.EY.EF1.01310 |
RPL10.EY.EF1 - Install RPL-1 FSP Roofing Z Purlin | Fiber Support Platform - RPL-1 | Not Started | 06/02/26 | 06/11/26 | 10.0 | 10.0 |
|
227.5 |
RPL10.EY.EF1.01320 |
RPL10.EY.EF1 - Install RPL-2 FSP Floor Grating | Fiber Support Platform - RPL-2 | Not Started | 06/02/26 | 06/15/26 | 12.5 | 12.5 |
|
215.0 |
RPL10.EY.EF2.01210 |
RPL10.EY.EF2 - Install RPL-3 FSP Road Closure For Steel Erection | Fiber Support Platform - RPL-3 | Not Started | 06/02/26 | 06/15/26 | 12.5 | 12.5 |
|
202.5 |
RPL10.INT.EF1.01220 |
RPL10.Interior.EF1 - North CRAH Gallery - Install Lower Trays | North CRAH Gallery | Not Started | 06/02/26 | 06/08/26 | 6.2 | 6.2 |
|
30.0 |
RPL10.INT.EF1.01300 |
RPL10.Interior.EF1 - South CRAH Gallery - Install Lower Trays | South CRAH Gallery | Not Started | 06/02/26 | 06/08/26 | 6.2 | 6.2 |
|
30.0 |
RPL10.INT.EF1.01500 |
RPL10.Interior.EF1 - EF1 West - Install Lower Trays | West EF-1 | Not Started | 06/02/26 | 06/08/26 | 6.2 | 6.2 |
|
30.0 |
RPL10.INT.EF1.01510 |
RPL10.Interior.EF1 - EF1 West - Install Lighting | West EF-1 | Not Started | 06/02/26 | 06/17/26 | 15.0 | 15.0 |
|
107.5 |
RPL10.INT.EF1.01670 |
RPL10.Interior.EF1 - North CRAH Gallery - Install Duct Drops & GRD's | North CRAH Gallery | Not Started | 06/02/26 | 06/08/26 | 6.2 | 6.2 |
|
87.5 |
RPL10.INT.EF1.01710 |
RPL10.Interior.EF1 - South CRAH Gallery - Install Duct Drops & GRD's | South CRAH Gallery | Not Started | 06/02/26 | 06/08/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.ENDC.1340 |
RPL10.Interior.End-Corridor - BoW - Install VAV's/Duct Branches | Balance of Walls & Overhead | Not Started | 06/02/26 | 06/08/26 | 6.2 | 6.2 |
|
225.0 |
RPL10.INT.NS3.01120 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 1 SQ7.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS3 Control Fault Domain 1 | Not Started | 06/02/26 | 09/23/26 | 100.0 | 100.0 |
|
37.5 |
RPL10.INT.NS3.02500 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 1 SQ7.2 (LV Side Aisle) | OFE NS3 Control Fault Domain 1 | Not Started | 06/02/26 | 06/08/26 | 6.2 | 6.2 |
|
118.8 |
RPL10.INT.NS4.01350 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 3 SQ9.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS4 Control Fault Domain 3 | Not Started | 06/02/26 | 09/29/26 | 105.0 | 105.0 |
|
42.5 |
RPL10.INT.NS4.01370 |
RPL10.Interior.NS4 - Control Fault Domain 2 SQ8.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/02/26 | 06/05/26 | 5.0 | 5.0 |
|
146.2 |
RPL10.INT.NS4.02600 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 3 SQ9.1 (LV Side Aisle) | OFE NS4 Control Fault Domain 3 | Not Started | 06/02/26 | 06/05/26 | 5.0 | 5.0 |
|
128.8 |
RPL10.WP2.GSIDF.2340 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) SSB NX05 WBS Summary | GSIDFNX05 | Not Started | 06/02/26 | 06/18/26 | 16.2 | 16.2 |
|
461.2 |
RPL10.WP2.GSIDF.2360 |
RPL10.Conn GSIDFNX05 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 06/02/26 | 06/08/26 | 6.2 | 6.2 |
|
202.5 |