Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260412.xer
· Uploaded Apr 16, 2026 12:51 PM
· 8408 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
1
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
ICM.B10.1212 |
[NWB] Start Fill & Flush of Chilled Water System | Commissioning | Not Started | 06/03/26 | 06/03/26 | 0.0 | 0.0 |
|
67.5 |
RPL.10.D.X4210.XR |
FW Water Available for mCUP Flush/Fill - Utility connections | Water / Gas Available (XREFs) | Not Started | 06/03/26 | 06/03/26 | 0.0 | 0.0 |
|
30.0 |
RPL.10.D.X4410.XR |
Discharge Available for Fill/Flush Cx - Utility connections | Water / Gas Available (XREFs) | Not Started | 06/03/26 | 06/03/26 | 0.0 | 0.0 |
|
30.0 |
RPL10.CX.MCUP.01150 |
RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup Yard & FWM - Loop 1 (Phase 1) | Fill and Flush | Not Started | 06/03/26 | 06/09/26 | 6.2 | 6.2 |
|
30.0 |
RPL10.Conn.MS.02230 |
FacNet Ready @ NS2-EY IDFs | Connectivity Milestones | Not Started | 06/03/26 | 06/03/26 | 0.0 | 0.0 |
|
216.2 |
RPL10.INT.CTRC.01400 |
RPL10.Interior.Center-Corridor - BoW - Toilet Accessories | Balance of Walls & OverHead | Not Started | 06/03/26 | 06/05/26 | 3.8 | 3.8 |
|
180.0 |
RPL10.INT.NS3.01065 |
RPL10.Interior.NS3 - OFE - Electrical Panels (ATS,SB House,MCB,MLO, Transformer) - Set / Anchor | OFE | Not Started | 06/03/26 | 06/09/26 | 6.2 | 6.2 |
|
140.0 |
RPL10.INT.NS4.01390 |
RPL10.Interior.NS4 - Control Fault Domain 2 SQ8.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/03/26 | 06/08/26 | 5.0 | 5.0 |
|
146.2 |
RPL10.MCUP.LP2.1960 |
RPL10.MCUP.Loop 2 - Install Exterior Signage | Hardscape and Landscape | Not Started | 06/03/26 | 06/16/26 | 12.5 | 12.5 |
|
463.8 |
RPL10.WP4.028520 |
RPL10.Conn NS2.CFD6.48<>26-30 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/03/26 | 06/08/26 | 5.0 | 5.0 |
|
156.2 |
DCC.B10.3145 |
[NWB] GS Gear Delivered [NWS 3] | Connectivity | Not Started | 06/04/26 | 06/04/26 | 0.0 | 0.0 |
|
1945.0 |
GCD.RPL10.5825 |
RMU Loop Ready for Energization - NS2 Loop 2 | EY | Not Started | 06/04/26 | 06/04/26 | 0.0 | 0.0 |
|
66.2 |
ICM.B10.2530 |
[NWB] L3/L4 Start EY - NS1 | Commissioning | Not Started | 06/04/26 | 06/04/26 | 0.0 | 0.0 |
|
172.5 |
RPL10.CX.MCUP.01040 |
RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - FWM | mCup Loop 1 (mCup #1,#3,#5,#7) | Not Started | 06/04/26 | 06/17/26 | 12.5 | 12.5 |
|
32.5 |
RPL10.CX.NS1.01000 |
RPL10.CX.NS1 - L3, L4, IST - WBS Summary | NS1 | Not Started | 06/04/26 | 02/12/27 | 217.5 | 217.5 |
|
1715.0 |
RPL10.CX.NS1.01010 |
RPL10.CX.NS1 - L3/L4 - WBS Summary (Electrical) | NS1 ELECTRICAL | Not Started | 06/04/26 | 11/04/26 | 135.0 | 135.0 |
|
30.0 |
RPL10.CX.NS1.01020 |
RPL10.CX.NS1 - L3/L4 - MV Skids (8) Loop 2 | NS1 ELECTRICAL | Not Started | 06/04/26 | 06/15/26 | 10.0 | 10.0 |
|
15.0 |
RPL10.EY.NS2.01340 |
RPL10.EY.NS2 - Install Lighting | Hardscape and Landscape | Not Started | 06/04/26 | 06/17/26 | 12.5 | 12.5 |
|
185.0 |
RPL10.INT.CTRC.01070 |
RPL10.Interior.Center-Corridor - BoW - Install Doors (Verify with Trades Before Installation) | Balance of Walls & OverHead | Not Started | 06/04/26 | 06/08/26 | 3.8 | 3.8 |
|
183.8 |
RPL10.INT.CTRC.01100 |
RPL10.Interior.Center-Corridor - BoW - Security Trim Out (Both Side of Corridor Wall) | Balance of Walls & OverHead | Not Started | 06/04/26 | 06/05/26 | 2.5 | 2.5 |
|
180.0 |
RPL10.INT.CTRC.01410 |
RPL10.Interior.Center-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls & OverHead | Not Started | 06/04/26 | 06/09/26 | 5.0 | 5.0 |
|
182.5 |
RPL10.INT.NS3.01130 |
RPL10.Interior.NS3 - Control Fault Domain 1 SQ7.2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/04/26 | 06/10/26 | 6.2 | 6.2 |
|
133.8 |
RPL10.INT.NS3.01160 |
RPL10.Interior.NS3 - Tie-ins - Control Fault Domain 1 SQ7.2 - WBS Summary | Tie-Ins NS3 Control Fault Domain 1 | Not Started | 06/04/26 | 11/18/26 | 146.2 | 146.2 |
|
38.8 |
RPL10.INT.NS4.01410 |
RPL10.Interior.NS4 - Control Fault Domain 3 SQ9.1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/04/26 | 06/09/26 | 5.0 | 5.0 |
|
145.0 |
RPL10.INT.NS4.01440 |
RPL10.Interior.NS4 - Tie-ins - Control Fault Domain 3 SQ9.1 (including IDF) - WBS Summary | Tie-Ins NS4 Control Fault Domain 3 | Not Started | 06/04/26 | 11/18/26 | 146.2 | 146.2 |
|
51.2 |
RPL10.INT.SSB.01480 |
RPL10.Interior.SSB - Loading Dock and Storage - Security Trim Out | Loading Dock and Storage | Not Started | 06/04/26 | 06/12/26 | 8.8 | 8.8 |
|
151.2 |
RPL10.OFCI.6880 |
OFCI - Delivery ROJ: FE Fiber for CFD NS1.3 (ROJ ) (RVCD ) | NS1 | Not Started | 06/04/26 | 06/24/26 | 18.8 | 18.8 |
|
76.2 |
RPL10.SSB.BB.1960 |
RPL10.Ext.Build Back.SSB - LO #5 - Final Punch Walk | Build Back Exterior Leave Out Wall #5 (East SSB) | Not Started | 06/04/26 | 06/05/26 | 2.5 | 2.5 |
|
441.2 |
RPL10.WP2.GSIDF.2480 |
RPL10.Conn GSIDFNX06 Install & Test Network (FIM) | Network | Not Started | 06/04/26 | 06/08/26 | 3.8 | 3.8 |
|
212.5 |
RPL10.WP2.GSIDF.2550 |
RPL10.Conn GSIDFNX07 Install & Test Network (FIM) | Network | Not Started | 06/04/26 | 06/08/26 | 3.8 | 3.8 |
|
212.5 |
RPL10.WP2.GSIDF.3380 |
RPL10.Conn GSIDFNX06 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/04/26 | 06/08/26 | 3.8 | 3.8 |
|
471.2 |
RPL10.WP2.GSIDF.3400 |
RPL10.Conn GSIDFNX07 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/04/26 | 06/08/26 | 3.8 | 3.8 |
|
471.2 |
RPL10.WP4.027540 |
RPL10.Conn NS1.CFD5.48<>31-35 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/04/26 | 06/08/26 | 3.8 | 3.8 |
|
148.8 |
RPL10.WP4.027620 |
RPL10.Conn NS1.CFD4.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/04/26 | 06/05/26 | 2.5 | 2.5 |
|
121.2 |
RPL10.WP4.NS1.02720 |
RPL10.Conn NS1.CFD4 Network - WBS Summary | Network | Not Started | 06/04/26 | 11/20/26 | 148.8 | 148.8 |
|
40.0 |
RPL.10.D.X33X2.XR |
Pull and Term MV Skids - RPL10 NS2 Loop 1 & 2 | Power (XREFs) | Not Started | 06/05/26 | 06/05/26 | 0.0 | 0.0 |
|
23.8 |
RPL.10.D.X33X6.XR |
Cable Pull to Concrete Pad - RPL10 NS3 Loop 1 & 2 | Power (XREFs) | Not Started | 06/05/26 | 06/05/26 | 0.0 | 0.0 |
|
23.8 |
RPL10.INT.ENDC.01090 |
RPL10.Interior.End-Corridor - BoW - Install Security Lowside OH and In-Wall | Balance of Walls & Overhead | Not Started | 06/05/26 | 06/15/26 | 8.8 | 8.8 |
|
148.8 |
RPL10.INT.NS1.01500 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
30.0 |
RPL10.INT.NS1.01510 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
23.8 |
RPL10.INT.NS1.02240 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
23.8 |
RPL10.INT.NS1.02760 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
23.8 |
RPL10.INT.NS3.01094 |
RPL10.Interior.NS3 - Electrical Panels (ATS,SB House,MCB,MLO, Transformer) - Tie-Ins | NS3 - LV Skids and TopHat | Not Started | 06/05/26 | 06/25/26 | 18.8 | 18.8 |
|
140.0 |
RPL10.OFCI.6980 |
OFCI - Delivery ROJ: FE Fiber for CFD NS2.4 (ROJ ) (RVCD ) | NS2 | Not Started | 06/05/26 | 06/25/26 | 18.8 | 18.8 |
|
61.2 |
RPL10.WP4.027340 |
RPL10.Conn NS1.CFD6.48<>31-35 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/05/26 | 06/09/26 | 3.8 | 3.8 |
|
147.5 |
RPL10.WP4.028620 |
RPL10.Conn NS2.CFD5.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/05/26 | 06/08/26 | 2.5 | 2.5 |
|
131.2 |
RPL10.WP4.NS2.02220 |
RPL10.Conn NS2.CFD5 Network - WBS Summary | Network | Not Started | 06/05/26 | 11/16/26 | 142.5 | 142.5 |
|
56.2 |
RPL.GF.D.N0260.XR |
Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to RPL7 | Connectivity (XREFs) | Not Started | 06/08/26 | 06/08/26 | 0.0 | 0.0 |
|
217.5 |
RPL10.CTRC.BB.1940 |
RPL10.Int.Build Back.Center-Corr - Interior Leave Out (Center Corridor) #7, #9 WBS Summary | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 06/08/26 | 07/29/26 | 46.2 | 46.2 |
|
133.8 |
RPL10.CTRC.BB.1980 |
RPL10.Int.Build Back.Center-Corr - LO #7,7B - MEPF - In Wall, OH, Lowside, Lights | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 06/08/26 | 07/06/26 | 25.0 | 25.0 |
|
133.8 |
RPL10.CTRC.BB.3355 |
RPL10.Int.Build Back.Center-Corr - LO #9 - Arch Finishes - Hang IMP | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 06/08/26 | 06/10/26 | 3.8 | 3.8 |
|
146.2 |
RPL10.EY.ENDC.01200 |
RPL10.EY.End - L2 Checklist Completion | Tie-ins | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
263.8 |
RPL10.EY.ENDC.01210 |
RPL10.EY.End - Install Landscaping | Hardscape and Landscape | Not Started | 06/08/26 | 06/26/26 | 18.8 | 18.8 |
|
453.8 |
RPL10.INT.CTRC.01440 |
RPL10.Interior.Center-Corridor - BoW - Plumbing Trim Out (Both Side of Corridor Wall) | Balance of Walls & OverHead | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
180.0 |
RPL10.INT.EF2.01110 |
RPL10.Interior.EF2 - Priority OH - Controls / EPMS / BMS | OverHead | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
136.2 |
RPL10.INT.EF2.01180 |
RPL10.Interior.EF2 - North CRAH Gallery - Install Upper Trays | North CRAH Gallery | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF2.01220 |
RPL10.Interior.EF2 - South CRAH Gallery - Install Upper Trays | South CRAH Gallery | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF2.01480 |
RPL10.Interior.EF2 - EF2 West - Install Upper Trays | West EF-2 | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.ENDC.1440 |
RPL10.Interior.End-Corridor - BoW - Mechanical Tie-In | Balance of Walls & Overhead | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
222.5 |
RPL10.INT.NS2.01270 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/08/26 | 07/06/26 | 25.0 | 25.0 |
|
13.8 |
RPL10.INT.NS2.01280 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/08/26 | 07/06/26 | 25.0 | 25.0 |
|
1.2 |
RPL10.INT.NS2.01290 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/08/26 | 07/06/26 | 25.0 | 25.0 |
|
16.2 |
RPL10.INT.NS2.02200 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/08/26 | 07/06/26 | 25.0 | 25.0 |
|
1.2 |
RPL10.INT.NS2.02825 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/08/26 | 07/06/26 | 25.0 | 25.0 |
|
1.2 |
RPL10.INT.NS3.01230 |
RPL10.Interior.NS3 - Control Fault Domain 1 SQ7.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
143.8 |
RPL10.INT.NS4.01114 |
RPL10.Interior.NS4 - MES Skids - BMS Tie-Ins | NS4 - MES Skids | Not Started | 06/08/26 | 07/10/26 | 30.0 | 30.0 |
|
237.5 |
RPL10.INT.NS4.01490 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 4 SQ10.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS4 Control Fault Domain 4 | Not Started | 06/08/26 | 10/13/26 | 112.5 | 112.5 |
|
62.5 |
RPL10.INT.NS4.01510 |
RPL10.Interior.NS4 - Control Fault Domain 3 SQ9.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
176.2 |
RPL10.INT.NS4.02660 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 4 SQ10.1 (LV Side Aisle) | OFE NS4 Control Fault Domain 4 | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
157.5 |
RPL10.INT.SSB.02880 |
RPL10.Interior.SSB - Kitchen & Office Spaces - Install Acoustical Ceiling | Kitchen and Office Spaces | Not Started | 06/08/26 | 06/10/26 | 3.8 | 3.8 |
|
153.8 |
RPL10.WP2.GSIDF.2720 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) End NX10 WBS Summary | GSIDFNX10 | Not Started | 06/08/26 | 07/09/26 | 28.8 | 28.8 |
|
443.8 |
RPL10.WP2.GSIDF.2740 |
RPL10.Conn GSIDFNX10 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
185.0 |
RPL10.WP4.027640 |
RPL10.Conn NS1.CFD4.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/08/26 | 06/10/26 | 3.8 | 3.8 |
|
121.2 |
DCC.B10.3557 |
[NWB] Cabling Start : Front End Production Cabling [NWS 4] | Connectivity | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
1941.2 |
DCC.B10.3559 |
[NWB] Cabling Start : Back End Production Cabling [NWS 4] | Connectivity | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
1941.2 |
RPL.10.D.X3730.XG |
RMUs/MV Skids Set (Loop 1) - RPL10 NS4 | Give Milestones (XREFs) | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
1940.0 |
RPL.10.D.X3735.XG |
RMUs/MV Skids Set (Loop 2) - RPL10 NS4 | Give Milestones (XREFs) | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
1940.0 |
RPL10.INT.CTRC.01480 |
RPL10.Interior.Center-Corridor - BoW - Electrical L2 Checklist Completion | Balance of Walls & OverHead | Not Started | 06/09/26 | 06/22/26 | 12.5 | 12.5 |
|
110.0 |
RPL10.INT.EF1.01270 |
RPL10.Interior.EF1 - North CRAH Gallery - Pull EPMS / BMS from panel to devices | North CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01280 |
RPL10.Interior.EF1 - North CRAH Gallery - Fire Life Safety | North CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
177.5 |
RPL10.INT.EF1.01290 |
RPL10.Interior.EF1 - North CRAH Gallery - Install copper from GS.IDF to BMS and EPMS panels | North CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01340 |
RPL10.Interior.EF1 - South CRAH Gallery - Pull EPMS / BMS from panel to devices | South CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01350 |
RPL10.Interior.EF1 - South CRAH Gallery - Fire Life Safety | South CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
177.5 |
RPL10.INT.EF1.01360 |
RPL10.Interior.EF1 - South CRAH Gallery - Install copper from GS.IDF to BMS and EPMS panels | South CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01437 |
RPL10.Interior.EF1 - EF1 East - Install OH Tier1 Ladder Racks | East EF-1 | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
187.5 |
RPL10.INT.EF1.01520 |
RPL10.Interior.EF1 - EF1 West - Pull EPMS / BMS from panel to devices | West EF-1 | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01530 |
RPL10.Interior.EF1 - EF1 West - Install copper from GS.IDF to BMS and EPMS panels | West EF-1 | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01540 |
RPL10.Interior.EF1 - EF1 West - Fire Life Safety | West EF-1 | Not Started | 06/09/26 | 06/17/26 | 8.8 | 8.8 |
|
175.0 |
RPL10.INT.EF1.01610 |
RPL10.Interior.EF1 - North CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) | North CRAH Gallery | Not Started | 06/09/26 | 06/19/26 | 11.2 | 11.2 |
|
87.5 |
RPL10.INT.ENDC.01100 |
RPL10.Interior.End-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall | Balance of Walls & Overhead | Not Started | 06/09/26 | 06/12/26 | 5.0 | 5.0 |
|
225.0 |
RPL10.INT.NS1.02600 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 3 SQ4.1 (HAC) | OFE NS1 Control Fault Domain 3 | Not Started | 06/09/26 | 06/29/26 | 18.8 | 18.8 |
|
-11.2 |
RPL10.INT.NS3.01113 |
RPL10.Interior.NS3 - MES Skids - CDU Tie-Ins | NS3 - MES Skids | Not Started | 06/09/26 | 07/13/26 | 30.0 | 30.0 |
|
240.0 |
RPL10.INT.NS3.01210 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 2 SQ8.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS3 Control Fault Domain 2 | Not Started | 06/09/26 | 10/07/26 | 106.2 | 106.2 |
|
41.2 |
RPL10.INT.NS3.01250 |
RPL10.Interior.NS3 - Control Fault Domain 1 SQ7.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
143.8 |
RPL10.INT.NS3.02560 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 2 SQ8.2 (LV Side Aisle) | OFE NS3 Control Fault Domain 2 | Not Started | 06/09/26 | 06/12/26 | 5.0 | 5.0 |
|
132.5 |
RPL10.INT.NS4.01530 |
RPL10.Interior.NS4 - Control Fault Domain 3 SQ9.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/09/26 | 06/12/26 | 5.0 | 5.0 |
|
176.2 |
RPL10.WP2.GSIDF.2380 |
RPL10.Conn GSIDFNX05 Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
202.5 |
RPL10.WP3A.EF.01000 |
RPL10.Conn EF1F Infrastructure - WBS Summary | EF1-F | Not Started | 06/09/26 | 06/22/26 | 12.5 | 12.5 |
|
121.2 |
RPL10.WP3A.EF.02020 |
RPL10.Conn EF1F Install Infrasturcture 2 (Waterfalls & VCM etc.) | RPL-1 | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
165.0 |
RPL10.WP3A.EF.02140 |
RPL10.Conn EF1F Install Infrasturcture 2 ( Ladder rack, Waterfalls & VCM etc.) | RPL-6 | Not Started | 06/09/26 | 06/22/26 | 12.5 | 12.5 |
|
208.8 |