Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260412.xer
· Uploaded Apr 16, 2026 12:51 PM
· 8408 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
3
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.WP3A.EF.03000 |
RPL10.Conn EF1B Infrastructure - WBS Summary | Infrastructure & Cabling | Not Started | 06/09/26 | 07/21/26 | 37.5 | 37.5 |
|
183.8 |
RPL10.WP3A.EF.03020 |
RPL10.Conn EF1B Infrasturcture 1 (Racks & Vertical Cable Manager,Ladder Racks) | Infrastructure & Cabling | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
121.2 |
RPL10.WP3A.EF.04000 |
RPL10.Conn EF1B OSP Pathway - WBS Summary | Infrastructure & Cabling | Not Started | 06/09/26 | 07/21/26 | 37.5 | 37.5 |
|
183.8 |
RPL10.WP3A.EF.08300 |
RPL10.Conn EF1F Infrasturcture 2 (Waterfalls & VCM etc.) | EF1-F | Not Started | 06/09/26 | 06/22/26 | 12.5 | 12.5 |
|
121.2 |
RPL10.WP3A.EF.08800 |
RPL10.Conn EF1F Pull and Install OSP Cable for RPL01 | RPL-1 | Not Started | 06/09/26 | 06/22/26 | 12.5 | 12.5 |
|
158.8 |
RPL10.WP3A.EF.08820 |
RPL10.Conn EF1F Pull and Install OSP Cable for RPL06 | RPL-6 | Not Started | 06/09/26 | 06/22/26 | 12.5 | 12.5 |
|
208.8 |
RPL10.WP4.027560 |
RPL10.Conn NS1.CFD5.48<>36-40 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
148.8 |
RPL10.WP4.028540 |
RPL10.Conn NS2.CFD6.48<>31-35 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
156.2 |
RPL10.WP4.028640 |
RPL10.Conn NS2.CFD5.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
131.2 |
RPL10.WP4.NS1.01040 |
RPL10.Conn NS1.CFD6 Infrastructure - WBS Summary | Infrastructure | Not Started | 06/09/26 | 06/12/26 | 5.0 | 5.0 |
|
72.5 |
RPL10.WP4.NS1.01060 |
RPL10.Conn NS1.CFD6 Infrastructure | Infrastructure | Not Started | 06/09/26 | 06/12/26 | 5.0 | 5.0 |
|
72.5 |
RPL10.CFCI.5290 |
RPL10 - Fabricate / Deliver - Carpet Tile | (CFCI) Div. 09 - Carpet | Not Started | 06/10/26 | 07/08/26 | 25.0 | 25.0 |
|
146.2 |
RPL10.CX.MCUP.01070 |
RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - NS1&2 (Phase2) | Fill and Flush | Not Started | 06/10/26 | 06/16/26 | 6.2 | 6.2 |
|
30.0 |
RPL10.EY.NS4.01240 |
RPL10.EY.NS4 - Install GS.IDF Hut (1x GS.IDF) NX03 (05.29.26) | OFE | Not Started | 06/10/26 | 06/16/26 | 6.2 | 6.2 |
|
107.5 |
RPL10.EY.NS4.01250 |
RPL10.EY.NS4 - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 06/10/26 | 06/23/26 | 12.5 | 12.5 |
|
107.5 |
RPL10.EY.NS4.01260 |
RPL10.EY.NS4 - Tie-ins - WBS Summary | Tie-ins | Not Started | 06/10/26 | 07/29/26 | 43.8 | 43.8 |
|
165.0 |
RPL10.INT.EF2.01460 |
RPL10.Interior.EF2 - EF2 East - Set Passive Panels / Racks | East EF-2 | Not Started | 06/10/26 | 06/16/26 | 6.2 | 6.2 |
|
187.5 |
RPL10.INT.NS2.02585 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (HAC) | OFE NS2 Control Fault Domain 4 | Not Started | 06/10/26 | 06/30/26 | 18.8 | 18.8 |
|
-27.5 |
RPL10.INT.NS4.01550 |
RPL10.Interior.NS4 - Control Fault Domain 4 SQ10.1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/10/26 | 06/15/26 | 5.0 | 5.0 |
|
162.5 |
RPL10.INT.NS4.01580 |
RPL10.Interior.NS4 - Tie-ins - Control Fault Domain 4 SQ10.1 - WBS Summary | Tie-Ins NS4 Control Fault Domain 4 | Not Started | 06/10/26 | 11/20/26 | 143.8 | 143.8 |
|
72.5 |
RPL10.INT.SSB.01490 |
RPL10.Interior.SSB - BoW - Install Remaining Lighting | Balance of Walls and OverHead | Not Started | 06/10/26 | 06/18/26 | 8.8 | 8.8 |
|
113.8 |
RPL10.INT.SSB.01500 |
RPL10.Interior.SSB - BoW - Install Bathroom Fixtures | Balance of Walls and OverHead | Not Started | 06/10/26 | 06/18/26 | 8.8 | 8.8 |
|
113.8 |
RPL10.INT.SSBC.01420 |
RPL10.Interior.SSB-Corridor - BoW - Final Clean | Balance of Walls & OverHead | Not Started | 06/10/26 | 06/15/26 | 5.0 | 5.0 |
|
42.5 |
RPL10.WP4.027360 |
RPL10.Conn NS1.CFD6.48<>36-40 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/10/26 | 06/12/26 | 3.8 | 3.8 |
|
147.5 |
GCD.RPL10.3528 |
[RPL10] TC Ready: Production Cabling Pathways Complete [NS1 Rows 9-16] | TC Ready: Production Cabling - NS1 | Not Started | 06/11/26 | 06/11/26 | 0.0 | 0.0 |
|
33.8 |
RPL.GF.D.N0105.XG |
GS.EF2 Infrastructure Ready RPL10 | Give Milestones (XREFs) | Not Started | 06/11/26 | 06/11/26 | 0.0 | 0.0 |
|
1937.5 |
RPL.GF.D.N0290.XR |
Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to AI2 | Connectivity (XREFs) | Not Started | 06/11/26 | 06/11/26 | 0.0 | 0.0 |
|
156.2 |
RPL10.INT.NS3.01270 |
RPL10.Interior.NS3 - Control Fault Domain 2 SQ8.2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/11/26 | 06/16/26 | 5.0 | 5.0 |
|
135.0 |
RPL10.INT.NS3.01300 |
RPL10.Interior.NS3 - Tie-ins - Control Fault Domain 2 SQ8.2 - WBS Summary | Tie-Ins NS3 Control Fault Domain 2 | Not Started | 06/11/26 | 11/23/26 | 143.8 | 143.8 |
|
45.0 |
RPL10.INT.SSB.02740 |
RPL10.Interior.SSB - Kitchen & Office Spaces - Final Paint | Kitchen and Office Spaces | Not Started | 06/11/26 | 06/19/26 | 8.8 | 8.8 |
|
153.8 |
RPL10.WP4.027660 |
RPL10.Conn NS1.CFD4.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/11/26 | 06/17/26 | 6.2 | 6.2 |
|
121.2 |
RPL10.EY.EF1.01340 |
RPL10.EY.EF1 - Install RPL-1 FSP Final Roof (Standing Seam Panels) | Fiber Support Platform - RPL-1 | Not Started | 06/12/26 | 06/25/26 | 12.5 | 12.5 |
|
227.5 |
RPL10.INT.NS1.01420 |
RPL10.Conn NS1.CFD5 - Set Passive Racks for WP3B | Infrastructure | Not Started | 06/12/26 | 06/16/26 | 3.8 | 3.8 |
|
30.0 |
RPL10.INT.NS1.01530 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/12/26 | 07/10/26 | 25.0 | 25.0 |
|
30.0 |
RPL10.INT.NS1.01540 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/12/26 | 07/10/26 | 25.0 | 25.0 |
|
30.0 |
RPL10.INT.NS1.01550 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Set UPS and Panel (2) and GS.IDF N12 | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/12/26 | 07/10/26 | 25.0 | 25.0 |
|
23.8 |
RPL10.INT.NS1.02620 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 3 SQ4.1 (Mech Side Aisle) | OFE NS1 Control Fault Domain 3 | Not Started | 06/12/26 | 06/30/26 | 16.2 | 16.2 |
|
-6.2 |
RPL10.INT.NS1.02860 |
RPL10.Conn NS1.CFD5 - Set Passive Racks for PON | Infrastructure | Not Started | 06/12/26 | 06/16/26 | 3.8 | 3.8 |
|
146.2 |
RPL10.INT.NS4.01630 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 5 SQ11.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS4 Control Fault Domain 5 | Not Started | 06/12/26 | 10/27/26 | 120.0 | 120.0 |
|
60.0 |
RPL10.INT.NS4.01650 |
RPL10.Interior.NS4 - Control Fault Domain 4 SQ10.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
195.0 |
RPL10.INT.NS4.02720 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 5 SQ11.1 (LV Side Aisle) | OFE NS4 Control Fault Domain 5 | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
165.0 |
RPL10.WP4.01220 |
RPL10.Conn NS1.CFD5.09 Pull Duplex Jumper (LC<>LC) [MA<>JXSW] | Pull Duplex Jumper [MA<>JXSW] | Not Started | 06/12/26 | 06/16/26 | 3.8 | 3.8 |
|
143.8 |
RPL10.WP4.027580 |
RPL10.Conn NS1.CFD5.48<>41-44 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/12/26 | 06/15/26 | 2.5 | 2.5 |
|
148.8 |
RPL10.WP4.028560 |
RPL10.Conn NS2.CFD6.48<>36-40 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/12/26 | 06/16/26 | 3.8 | 3.8 |
|
156.2 |
RPL10.WP4.028660 |
RPL10.Conn NS2.CFD5.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/12/26 | 06/18/26 | 6.2 | 6.2 |
|
131.2 |
RPL10.WP4.NS1.02440 |
RPL10.Conn NS1.CFD5 Infrastructure - WBS Summary | Infrastructure | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
48.8 |
RPL10.WP4.NS1.02460 |
RPL10.Conn NS1.CFD5 Infrastructure | Infrastructure | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
48.8 |
GCD.RPL10.3985 |
MCUP Ready for Energization - (MCUPs Loop 2) | mCup | Not Started | 06/15/26 | 06/15/26 | 0.0 | 0.0 |
|
136.2 |
RPL.10.D.X38X1.XR |
100MW (40 MW Initial , 60 MW later) Cx Temp Power to MV Skids RPL10 mCUPs (South)Available | Power (XREFs) | Not Started | 06/15/26 | 06/15/26 | 0.0 | 0.0 |
|
130.0 |
RPL10.CTRC.BB.1840 |
RPL10.Int.Build Back.Center-Corr - LO #7,7B - Arch Finishes - Frame and Hang Drywall, Paint, Final Finishes | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 06/15/26 | 07/13/26 | 25.0 | 25.0 |
|
133.8 |
RPL10.INT.EF2.01230 |
RPL10.Interior.EF2 - North CRAH Gallery - Install Lower Trays | North CRAH Gallery | Not Started | 06/15/26 | 06/19/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF2.01270 |
RPL10.Interior.EF2 - South CRAH Gallery - Install Lower Trays | South CRAH Gallery | Not Started | 06/15/26 | 06/19/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF2.01500 |
RPL10.Interior.EF2 - EF2 West - Install Lower Trays | West EF-2 | Not Started | 06/15/26 | 06/19/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF2.01510 |
RPL10.Interior.EF2 - EF2 West - Install Lighting | West EF-2 | Not Started | 06/15/26 | 06/30/26 | 15.0 | 15.0 |
|
107.5 |
RPL10.INT.NS2.01310 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/15/26 | 07/13/26 | 25.0 | 25.0 |
|
13.8 |
RPL10.INT.NS2.01320 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/15/26 | 07/13/26 | 25.0 | 25.0 |
|
13.8 |
RPL10.INT.NS2.01330 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/15/26 | 07/13/26 | 25.0 | 25.0 |
|
1.2 |
RPL10.INT.NS2.02605 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (Mech Side Aisle) | OFE NS2 Control Fault Domain 4 | Not Started | 06/15/26 | 07/01/26 | 16.2 | 16.2 |
|
-20.0 |
RPL10.INT.NS3.01350 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 3 SQ9.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS3 Control Fault Domain 3 | Not Started | 06/15/26 | 10/21/26 | 113.8 | 113.8 |
|
47.5 |
RPL10.INT.NS3.01370 |
RPL10.Interior.NS3 - Control Fault Domain 2 SQ8.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/15/26 | 06/18/26 | 5.0 | 5.0 |
|
147.5 |
RPL10.INT.NS3.02620 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 3 SQ9.2 (LV Side Aisle) | OFE NS3 Control Fault Domain 3 | Not Started | 06/15/26 | 06/18/26 | 5.0 | 5.0 |
|
142.5 |
RPL10.INT.NS4.01670 |
RPL10.Interior.NS4 - Control Fault Domain 4 SQ10.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/15/26 | 06/18/26 | 5.0 | 5.0 |
|
195.0 |
RPL10.INT.SSB.01540 |
RPL10.Interior.SSB - Loading Dock and Storage - Fire Life Safety Trim Out / Fire Alarm Trim Out | Loading Dock and Storage | Not Started | 06/15/26 | 06/23/26 | 8.8 | 8.8 |
|
151.2 |
RPL10.WP2.GSIDF.2760 |
RPL10.Conn GSIDFNX10 Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 06/15/26 | 07/06/26 | 18.8 | 18.8 |
|
185.0 |
RPL10.WP4.027380 |
RPL10.Conn NS1.CFD6.48<>41-44 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/15/26 | 06/16/26 | 2.5 | 2.5 |
|
147.5 |
RPL10.WP4.NS1.01080 |
RPL10.Conn NS1.CFD6 Network - WBS Summary | Network | Not Started | 06/15/26 | 08/28/26 | 67.5 | 67.5 |
|
32.5 |
RPL10.WP4.NS1.01100 |
RPL10.Conn NS1.CFD6 Network Suite [JXSW<>MA] Trunks | Pre ORv3 Rack | Not Started | 06/15/26 | 06/17/26 | 3.8 | 3.8 |
|
72.5 |
ICM.B10.2510.1 |
[NWB] L3/4 Start - NWS1 | Commissioning | Not Started | 06/16/26 | 06/16/26 | 0.0 | 0.0 |
|
162.5 |
RPL.10.D.X3740.XG |
RMUs/MV Skids Set (Loop 1) - RPL10 NS3 | Give Milestones (XREFs) | Not Started | 06/16/26 | 06/16/26 | 0.0 | 0.0 |
|
1933.8 |
RPL.10.D.X3745.XG |
RMUs/MV Skids Set (Loop 2) - RPL10 NS3 | Give Milestones (XREFs) | Not Started | 06/16/26 | 06/16/26 | 0.0 | 0.0 |
|
1933.8 |
RPL10.CTRC.BB.1100 |
RPL10.Int.Build Back.Center-Corr - LO #6,8 - MEPF Trim Out | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 06/16/26 | 07/07/26 | 18.8 | 18.8 |
|
145.0 |
RPL10.CX.NS1.01030 |
RPL10.CX.NS1 - L3/L4 - House Power (for electrical) | NS1 HOUSE POWER | Not Started | 06/16/26 | 06/29/26 | 12.5 | 12.5 |
|
25.0 |
RPL10.EY.EF1.01350 |
RPL10.EY.EF1 - Install RPL-2 FSP Roofing Z Purlin | Fiber Support Platform - RPL-2 | Not Started | 06/16/26 | 06/25/26 | 10.0 | 10.0 |
|
215.0 |
RPL10.INT.CTRC.01500 |
RPL10.Interior.Center-Corridor - BoW - Mechanical L2 Checklist Completion | Balance of Walls & OverHead | Not Started | 06/16/26 | 06/29/26 | 12.5 | 12.5 |
|
110.0 |
RPL10.INT.ENDC.1540 |
RPL10.Interior.End-Corridor - BoW - QC BoW Backing/In-Wall | Balance of Walls & Overhead | Not Started | 06/16/26 | 06/22/26 | 6.2 | 6.2 |
|
148.8 |
RPL10.INT.NS3.01390 |
RPL10.Interior.NS3 - Control Fault Domain 2 SQ8.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/16/26 | 06/19/26 | 5.0 | 5.0 |
|
147.5 |
RPL10.INT.NS4.01690 |
RPL10.Interior.NS4 - Control Fault Domain 5 SQ11.1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/16/26 | 06/19/26 | 5.0 | 5.0 |
|
177.5 |
RPL10.INT.NS4.01720 |
RPL10.Interior.NS4 - Tie-ins - Control Fault Domain 5 SQ11.1 - WBS Summary | Tie-Ins NS4 Control Fault Domain 5 | Not Started | 06/16/26 | 01/05/27 | 173.8 | 173.8 |
|
53.8 |
RPL10.INT.SSB.03040 |
RPL10.SKIN.SSB - Install Metal Canopy | Glazing, Doors and Ext Devices | Not Started | 06/16/26 | 06/17/26 | 2.5 | 2.5 |
|
148.8 |
RPL10.INT.SSBC.01430 |
RPL10.Interior.SSB-Corridor - BoW - Final Punch Walk | Balance of Walls & OverHead | Not Started | 06/16/26 | 06/17/26 | 2.5 | 2.5 |
|
42.5 |
RPL10.OFCI.6900 |
OFCI - Delivery ROJ: FE Fiber for CFD NS1.2 (ROJ ) (RVCD ) | NS1 | Not Started | 06/16/26 | 07/07/26 | 18.8 | 18.8 |
|
92.5 |
RPL10.SKN.SSB.01060 |
RPL10.SKIN.SSB - Install Awning over Doors | Glazing, Doors and Ext Devices | Not Started | 06/16/26 | 06/22/26 | 6.2 | 6.2 |
|
125.0 |
RPL10.WP2.GSIDF.2400 |
RPL10.Conn GSIDFNX05 Install & Test Network (FIM) | Network | Not Started | 06/16/26 | 06/18/26 | 3.8 | 3.8 |
|
202.5 |
RPL10.WP2.GSIDF.3360 |
RPL10.Conn GSIDFNX05 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/16/26 | 06/18/26 | 3.8 | 3.8 |
|
461.2 |
RPL10.WP3A.EF.03040 |
RPL10.Conn EF1B Infrasturcture 2 (Tier1 & waterfalls etc.) | Infrastructure & Cabling | Not Started | 06/16/26 | 07/14/26 | 25.0 | 25.0 |
|
152.5 |
RPL10.WP4.027600 |
RPL10.Conn NS1.CFD5.48<>46-49 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/16/26 | 06/16/26 | 1.2 | 1.2 |
|
148.8 |
RPL.10.D.X33X5.XR |
Pull and Term mCUP Skids - RPL10 South | Power (XREFs) | Not Started | 06/17/26 | 06/17/26 | 0.0 | 0.0 |
|
127.5 |
RPL10.CX.MCUP.01190 |
RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup1 and Dry Coolers (MV Loop Needed) | Fill and Flush | Not Started | 06/17/26 | 06/24/26 | 7.5 | 7.5 |
|
55.0 |
RPL10.CX.MCUP.01210 |
RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup3 and Dry Coolers | Fill and Flush | Not Started | 06/17/26 | 06/24/26 | 7.5 | 7.5 |
|
55.0 |
RPL10.CX.MCUP.01230 |
RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup5 and Dry Coolers | Fill and Flush | Not Started | 06/17/26 | 06/24/26 | 7.5 | 7.5 |
|
55.0 |
RPL10.CX.MCUP.01250 |
RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup7 and Dry Coolers | Fill and Flush | Not Started | 06/17/26 | 06/24/26 | 7.5 | 7.5 |
|
55.0 |
RPL10.CX.NS1.01090 |
RPL10.CX.NS1 - L3/L4 - WBS Summary (Mechanical) | NS1 MECHANICAL | Not Started | 06/17/26 | 11/13/26 | 131.2 | 131.2 |
|
30.0 |
RPL10.CX.NS1.01260 |
RPL10.CX.NS1 - L3/L4 - Control Fault Domain 6 - FW Flush and Fill | NS1 Control Fault Domain 6 | Not Started | 06/17/26 | 06/25/26 | 8.8 | 8.8 |
|
30.0 |
RPL10.CX.NS2.01000 |
RPL10.CX.NS2 - L3, L4, IST - WBS Summary | NS2 | Not Started | 06/17/26 | 04/16/27 | 260.0 | 260.0 |
|
1661.2 |
RPL10.CX.NS2.01090 |
RPL10.CX.NS2 - L3/L4 - WBS Summary (Mechanical) | NS2 MECHANICAL | Not Started | 06/17/26 | 12/18/26 | 160.0 | 160.0 |
|
12.5 |
RPL10.CX.NS2.01260 |
RPL10.CX.NS2 - L3/L4 - Control Fault Domain 6 - FW Flush and Fill | NS2 Control Fault Domain 6 | Not Started | 06/17/26 | 06/25/26 | 8.8 | 8.8 |
|
30.0 |
RPL10.EY.NS3.01240 |
RPL10.EY.NS3 - Install GS.IDF Hut (1x GS.IDF) NX08 (06.04.26) | OFE | Not Started | 06/17/26 | 06/23/26 | 6.2 | 6.2 |
|
101.2 |
RPL10.EY.NS3.01250 |
RPL10.EY.NS3 - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 06/17/26 | 06/30/26 | 12.5 | 12.5 |
|
115.0 |
RPL10.EY.NS3.01260 |
RPL10.EY.NS3 - Tie-ins - WBS Summary | Tie-ins | Not Started | 06/17/26 | 08/05/26 | 43.8 | 43.8 |
|
172.5 |
RPL10.INT.NS3.01410 |
RPL10.Interior.NS3 - Control Fault Domain 3 SQ9.2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/17/26 | 06/22/26 | 5.0 | 5.0 |
|
148.8 |