Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260412.xer
· Uploaded Apr 16, 2026 12:51 PM
· 8408 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
4
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.WP3A.EF.06000 |
RPL10.Conn EF2F OSP Pathway - WBS Summary | Infrastructure & Cabling | Not Started | 06/23/26 | 08/04/26 | 37.5 | 37.5 |
|
171.2 |
RPL10.WP3A.EF1F.1000 |
RPL10.Conn EF1F(LIU)<>EF1F(MBOX) Pull/Install/Test OSP Cabling (for RPL01) - P1 | EF1F<>EF1F | Not Started | 06/23/26 | 06/26/26 | 5.0 | 5.0 |
|
218.8 |
RPL10.WP3A.EF1F.1040 |
RPL10.Conn EF1F(LIU)<>EF2F(MBOX) Pull/Install/Test OSP Cabling (for RPL01) - P1 | EF1F<>EF2F | Not Started | 06/23/26 | 07/02/26 | 10.0 | 10.0 |
|
178.8 |
RPL10.WP3A.EF1F.1080 |
RPL10.Conn EF1F(LIU)<>EF1B(MBOX) Pull/Install/Test OSP Cabling (for RPL01) - P1 | EF1F<>EF1B | Not Started | 06/23/26 | 06/30/26 | 7.5 | 7.5 |
|
198.8 |
RPL10.WP3A.EF1F.1120 |
RPL10.Conn EF1F(LIU)<>EF2B(MBOX) Pull/Install/Test OSP Cabling (for RPL01) - P1 | EB1F<>EF2B | Not Started | 06/23/26 | 07/07/26 | 12.5 | 12.5 |
|
158.8 |
RPL10.WP4.01160 |
RPL10.Conn NS1.CFD6.48<>36-40 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/23/26 | 06/25/26 | 3.8 | 3.8 |
|
161.2 |
RPL10.WP4.01540 |
RPL10.Conn NS1.CFD5.48<>41-44 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/23/26 | 06/24/26 | 2.5 | 2.5 |
|
165.0 |
RPL10.WP4.02940 |
RPL10.Conn NS2.CFD6.48<>16-20 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/23/26 | 06/29/26 | 6.2 | 6.2 |
|
160.0 |
RPL10.WP4.02960 |
RPL10.Conn NS2.CFD6.48<>21-25 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/23/26 | 06/29/26 | 6.2 | 6.2 |
|
162.5 |
RPL.10.D.X35X0.XR |
Substation Perm Power Cutover - RPL10 NS & mCUPs (Potential for remaining provisioning) | Power (XREFs) | Not Started | 06/24/26 | 06/24/26 | 0.0 | 0.0 |
|
301.2 |
RPL.GF.D.N0270.XR |
Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to RPL8 | Connectivity (XREFs) | Not Started | 06/24/26 | 06/24/26 | 0.0 | 0.0 |
|
202.5 |
RPL.GF.D.N0300.XR |
Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to AI3 | Connectivity (XREFs) | Not Started | 06/24/26 | 06/24/26 | 0.0 | 0.0 |
|
145.0 |
RPL10.EY.NS4.01270 |
RPL10.EY.NS4 - Install GS.IDF Hut (1x GS.IDF) NX04 (05.29.26) | OFE | Not Started | 06/24/26 | 06/30/26 | 6.2 | 6.2 |
|
101.2 |
RPL10.INT.SSB.01570 |
RPL10.Interior.SSB - Loading Dock and Storage - Electrical L2 Checklist Completion | Loading Dock and Storage | Not Started | 06/24/26 | 07/08/26 | 12.5 | 12.5 |
|
151.2 |
RPL10.WP4.01180 |
RPL10.Conn NS1.CFD6.48<>41-44 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/24/26 | 06/25/26 | 2.5 | 2.5 |
|
163.8 |
RPL10.WP4.01560 |
RPL10.Conn NS1.CFD5.48<>46-49 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/24/26 | 06/24/26 | 1.2 | 1.2 |
|
167.5 |
RPL10.WP4.027700 |
RPL10.Conn NS1.CFD4.48<>21-25 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/24/26 | 06/29/26 | 5.0 | 5.0 |
|
121.2 |
RPL10.WP4.02980 |
RPL10.Conn NS2.CFD6.48<>26-30 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/24/26 | 06/29/26 | 5.0 | 5.0 |
|
165.0 |
RPL10.WP4.03000 |
RPL10.Conn NS2.CFD6.48<>31-35 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/24/26 | 06/29/26 | 5.0 | 5.0 |
|
167.5 |
RPL.10.D.X33X4.XR |
Pull and Term MV Skids - RPL10 NS4 Loop 1 & 2 | Power (XREFs) | Not Started | 06/25/26 | 06/25/26 | 0.0 | 0.0 |
|
125.0 |
RPL10.CX.NS1.01060 |
RPL10.CX.NS1 - L3/L4 - UPS Start-up | NS1 ELECTRICAL | Not Started | 06/25/26 | 07/09/26 | 12.5 | 12.5 |
|
53.8 |
RPL10.INT.EF1.01580 |
RPL10.Interior.EF1 - Final Clean | Tie-Ins | Not Started | 06/25/26 | 06/30/26 | 5.0 | 5.0 |
|
168.8 |
RPL10.INT.NS3.01630 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 5 SQ11.2 (LV Side Aisle, HAC, Mech Side Aisle) | OFE NS3 Control Fault Domain 5 | Not Started | 06/25/26 | 11/19/26 | 128.8 | 128.8 |
|
62.5 |
RPL10.INT.NS3.01650 |
RPL10.Interior.NS3 - Control Fault Domain 4 SQ10.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/25/26 | 06/30/26 | 5.0 | 5.0 |
|
197.5 |
RPL10.INT.NS3.02740 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 5 SQ11.2 (LV Side Aisle) | OFE NS3 Control Fault Domain 5 | Not Started | 06/25/26 | 06/30/26 | 5.0 | 5.0 |
|
176.2 |
RPL10.INT.NS4.01920 |
RPL10.Interior.NS4 - Control Fault Domain 6 SQ12.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/25/26 | 06/30/26 | 5.0 | 5.0 |
|
223.8 |
RPL10.W3B.FE.011191 |
RPL10.Conn EF1B<>NS2.CFD6 (P2-3) Pull Fiber Trunk (384F) [EF<>SSW] | EF1B<>NS2.1 (P2-3) [EF<>SSW] | Not Started | 06/25/26 | 06/30/26 | 5.0 | 5.0 |
|
31.2 |
RPL10.W3B.FE.011311 |
RPL10.Conn EF2B<>NS2.CFD6 (P1-4) Pull Fiber Trunk (384F) [EF<>SSW] | EF2B<>NS2.1 (P1-4) [EF<>SSW] | Not Started | 06/25/26 | 06/29/26 | 3.8 | 3.8 |
|
28.8 |
RPL10.W3B.FE.011561 |
RPL10.Conn EF1F<>NS1.CFD6 (P2-3) Pull Fiber Trunk (384F) [EF<>SSW] | EF1F<>NS1.1 (P2-3) [EF<>SSW] | Not Started | 06/25/26 | 06/29/26 | 3.8 | 3.8 |
|
26.2 |
RPL10.W3B.FE.011681 |
RPL10.Conn EF2F<>NS1.CFD6 (P1-4) Pull Fiber Trunk (384F) [EF<>SSW] | EF2F<>NS1.1 (P1-4) [EF<>SSW] | Not Started | 06/25/26 | 06/29/26 | 3.8 | 3.8 |
|
18.8 |
RPL10.W3B.FE.012081 |
RPL10.Conn EF2B<>NS1.CFD6 (P1-4) Install Fiber Trunk (384F) [EF<>SSW] | EF2B<>NS1.1 (P1-4) [EF<>SSW] | Not Started | 06/25/26 | 06/26/26 | 2.5 | 2.5 |
|
22.5 |
RPL10.WP3B.FE.01110 |
RPL10.Conn EF2F<>NS1.CFD6 (P1-4) Pull/Install/Test - WBS Summary | EF2F<>NS1.1 (P1-4) [EF<>SSW] | Not Started | 06/25/26 | 07/06/26 | 8.8 | 8.8 |
|
41.2 |
RPL10.WP3B.FE.01120 |
RPL10.Conn EF1F<>NS1.CFD6 (P2-3) Pull/Install/Test - WBS Summary | EF1F<>NS1.1 (P2-3) [EF<>SSW] | Not Started | 06/25/26 | 07/10/26 | 13.8 | 13.8 |
|
41.2 |
RPL10.WP3B.FE.02000 |
RPL10.Conn NS2.CFD6 (FE) ISP Cabling - WBS Summary | FENW (Front End Network) | Not Started | 06/25/26 | 07/15/26 | 17.5 | 17.5 |
|
48.8 |
RPL10.WP3B.FE.02080 |
RPL10.Conn EF2B<>NS2.CFD6 (P1-4) Pull/Install/Test - WBS Summary | EF2B<>NS2.1 (P1-4) [EF<>SSW] | Not Started | 06/25/26 | 07/06/26 | 8.8 | 8.8 |
|
50.0 |
RPL10.WP3B.FE.02120 |
RPL10.Conn EF1B<>NS2.CFD6 (P2-3) Pull/Install/Test - WBS Summary | EF1B<>NS2.1 (P2-3) [EF<>SSW] | Not Started | 06/25/26 | 07/13/26 | 15.0 | 15.0 |
|
48.8 |
RPL10.WP4.01200 |
RPL10.Conn NS1.CFD6.48<>46-49 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/25/26 | 06/25/26 | 1.2 | 1.2 |
|
166.2 |
RPL10.WP4.01280 |
RPL10.Conn NS1.CFD5.12 Pull Duplex Jumper (LC<>LC) [MA<>JXSW] | Pull Duplex Jumper [MA<>JXSW] | Not Started | 06/25/26 | 06/29/26 | 3.8 | 3.8 |
|
143.8 |
RPL10.WP4.027820 |
RPL10.Conn NS1.CFD3.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/25/26 | 06/26/26 | 2.5 | 2.5 |
|
102.5 |
RPL10.WP4.028700 |
RPL10.Conn NS2.CFD5.48<>21-25 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/25/26 | 06/30/26 | 5.0 | 5.0 |
|
131.2 |
RPL10.WP4.03020 |
RPL10.Conn NS2.CFD6.48<>36-40 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/25/26 | 06/29/26 | 3.8 | 3.8 |
|
170.0 |
RPL10.WP4.NS1.02140 |
RPL10.Conn NS1.CFD3 Network - WBS Summary | Network | Not Started | 06/25/26 | 11/24/26 | 132.5 | 132.5 |
|
37.5 |
RPL.CM.D.C5820.XR |
Yoda Boss Road | Logistics - Onsite Receive XREF Milestones | Not Started | 06/26/26 | 06/26/26 | 0.0 | 0.0 |
|
1925.0 |
RPL.CM.D.C5900.XR |
Jedi Lane | Logistics - Onsite Receive XREF Milestones | Not Started | 06/26/26 | 06/26/26 | 0.0 | 0.0 |
|
1925.0 |
RPL10.CTRC.BB.3175 |
RPL10.Int.Build Back.Center-Corr - LO #12,13 - Final Punch Walk | Build Back Interior Leave Out Wall #12 #13 (Center Corr) | Not Started | 06/26/26 | 06/29/26 | 2.5 | 2.5 |
|
160.0 |
RPL10.CX.NS1.01320 |
RPL10.CX.NS1 - L3/L4 - Control Fault Domain 5 - FW Flush and Fill | NS1 Control Fault Domain 5 | Not Started | 06/26/26 | 07/07/26 | 8.8 | 8.8 |
|
36.2 |
RPL10.EY.EF1.01370 |
RPL10.EY.EF1 - Install RPL-2 FSP Final Roof (Standing Seam Panels) | Fiber Support Platform - RPL-2 | Not Started | 06/26/26 | 07/10/26 | 12.5 | 12.5 |
|
215.0 |
RPL10.EY.EF1.01380 |
RPL10.EY.EF1 - Install RPL-1 FSP Interior Hilti Support & Cable Trays | Fiber Support Platform - RPL-1 | Not Started | 06/26/26 | 07/14/26 | 15.0 | 15.0 |
|
227.5 |
RPL10.INT.NS1.01640 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/26/26 | 07/24/26 | 25.0 | 25.0 |
|
21.2 |
RPL10.INT.NS1.01650 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/26/26 | 07/24/26 | 25.0 | 25.0 |
|
15.0 |
RPL10.INT.NS1.01710 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/26/26 | 07/24/26 | 25.0 | 25.0 |
|
23.8 |
RPL10.INT.NS1.02260 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/26/26 | 07/24/26 | 25.0 | 25.0 |
|
15.0 |
RPL10.INT.NS1.02780 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/26/26 | 07/24/26 | 25.0 | 25.0 |
|
15.0 |
RPL10.INT.NS3.01670 |
RPL10.Interior.NS3 - Control Fault Domain 4 SQ10.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/26/26 | 07/01/26 | 5.0 | 5.0 |
|
197.5 |
RPL10.INT.NS4.01940 |
RPL10.Interior.NS4 - Control Fault Domain 6 SQ12.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/26/26 | 07/01/26 | 5.0 | 5.0 |
|
235.0 |
RPL10.INT.SSB.02380 |
RPL10.Interior.SSB - Kitchen & Office Spaces - Final Punch Walk | Kitchen and Office Spaces | Not Started | 06/26/26 | 06/29/26 | 2.5 | 2.5 |
|
153.8 |
RPL10.OFCI.7000 |
OFCI - Delivery ROJ: FE Fiber for CFD NS2.3 (ROJ ) (RVCD ) | NS2 | Not Started | 06/26/26 | 07/17/26 | 18.8 | 18.8 |
|
70.0 |
RPL10.OFCI.7020 |
OFCI - Delivery ROJ: FE Fiber for CFD NS2.2 (ROJ ) (RVCD ) | NS2 | Not Started | 06/26/26 | 07/17/26 | 18.8 | 18.8 |
|
93.8 |
RPL10.WP4.028820 |
RPL10.Conn NS2.CFD4.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/26/26 | 06/29/26 | 2.5 | 2.5 |
|
112.5 |
RPL10.WP4.03040 |
RPL10.Conn NS2.CFD6.48<>41-44 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/26/26 | 06/29/26 | 2.5 | 2.5 |
|
172.5 |
RPL10.WP4.NS2.01640 |
RPL10.Conn NS2.CFD4 Network - WBS Summary | Network | Not Started | 06/26/26 | 11/18/26 | 126.2 | 126.2 |
|
53.8 |
RPL10.CTRC.BB.1500 |
RPL10.Int.Build Back.Center-Corr - LO #7,7B - MEPF Trim Out | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 06/29/26 | 07/20/26 | 18.8 | 18.8 |
|
133.8 |
RPL10.ENDC.BB.4355 |
RPL10.Int.Build Back.End-Corr - Interior Leave Out (End Corridor) #14 WBS Summary | Build Back Interior Leave Out Wall #14 (End Corr) | Not Started | 06/29/26 | 08/18/26 | 45.0 | 45.0 |
|
230.0 |
RPL10.ENDC.BB.4375 |
RPL10.Int.Build Back.End-Corr - LO #14 - MEPF - In Wall, OH, Lowside, Lights | Build Back Interior Leave Out Wall #14 (End Corr) | Not Started | 06/29/26 | 07/27/26 | 25.0 | 25.0 |
|
230.0 |
RPL10.INT.NS2.01390 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/29/26 | 07/27/26 | 25.0 | 25.0 |
|
1.2 |
RPL10.INT.NS2.01410 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/29/26 | 07/27/26 | 25.0 | 25.0 |
|
5.0 |
RPL10.INT.NS2.01420 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/29/26 | 07/27/26 | 25.0 | 25.0 |
|
-1.2 |
RPL10.INT.NS2.02220 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/29/26 | 07/27/26 | 25.0 | 25.0 |
|
-1.2 |
RPL10.INT.NS2.02845 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/29/26 | 07/27/26 | 25.0 | 25.0 |
|
-1.2 |
RPL10.INT.NS3.01690 |
RPL10.Interior.NS3 - Control Fault Domain 5 SQ11.2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/29/26 | 07/02/26 | 5.0 | 5.0 |
|
178.8 |
RPL10.INT.NS3.01720 |
RPL10.Interior.NS3 - Tie-ins - Control Fault Domain 5 SQ11.2 - WBS Summary | Tie-Ins NS3 Control Fault Domain 5 | Not Started | 06/29/26 | 01/15/27 | 172.5 | 172.5 |
|
56.2 |
RPL10.W3B.FE.012881 |
RPL10.Conn EF2B<>NS1.CFD6 (P1-4) Test Fiber Trunk (384F) [EF<>SSW] | EF2B<>NS1.1 (P1-4) [EF<>SSW] | Not Started | 06/29/26 | 06/30/26 | 2.5 | 2.5 |
|
42.5 |
RPL10.WP3A.EF1F.1005 |
RPL10.Conn EF1F(LIU)<>EF1F(MBOX) Pull/Install/Test OSP Cabling (for RPL01) - P2 | EF1F<>EF1F | Not Started | 06/29/26 | 07/02/26 | 5.0 | 5.0 |
|
218.8 |
RPL10.WP4.027840 |
RPL10.Conn NS1.CFD3.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/29/26 | 07/01/26 | 3.8 | 3.8 |
|
102.5 |
RPL10.WP4.03060 |
RPL10.Conn NS2.CFD6.48<>46-49 Pull Duplex Jumper (LC<>LC) [RSW<>FSW] | Pull Duplex Jumper [RSW<>FSW] | Not Started | 06/29/26 | 06/29/26 | 1.2 | 1.2 |
|
175.0 |
RPL10.CX.CTRC.01000 |
RPL10.CX.Center COR - L3, L4, IST - WBS Summary | Center Corridor | Not Started | 06/30/26 | 09/09/26 | 62.5 | 62.5 |
|
110.0 |
RPL10.CX.CTRC.01010 |
RPL10.CX.Center COR - L3 | Center Corridor | Not Started | 06/30/26 | 08/11/26 | 37.5 | 37.5 |
|
110.0 |
RPL10.CX.NS1.01070 |
RPL10.CX.NS1 - L3/L4 - House Power (for mechainical) | NS1 HOUSE POWER | Not Started | 06/30/26 | 07/14/26 | 12.5 | 12.5 |
|
30.0 |
RPL10.EY.NS3.01200 |
RPL10.EY.NS3 - HAC Prefab prior to install | Tent and Temp Conditions | Not Started | 06/30/26 | 07/14/26 | 12.5 | 12.5 |
|
82.5 |
RPL10.INT.CTRC.01470 |
RPL10.Interior.Center-Corridor - BoW - Final Clean | Balance of Walls & OverHead | Not Started | 06/30/26 | 07/06/26 | 5.0 | 5.0 |
|
165.0 |
RPL10.INT.CTRC.01510 |
RPL10.Interior.Center-Corridor - BoW - Remaining L2 Checklist Completion | Balance of Walls & OverHead | Not Started | 06/30/26 | 07/07/26 | 6.2 | 6.2 |
|
147.5 |
RPL10.INT.ENDC.01480 |
RPL10.Interior.End-Corridor - BoW - Tape Finish Paint BoW | Balance of Walls & Overhead | Not Started | 06/30/26 | 07/07/26 | 6.2 | 6.2 |
|
148.8 |
RPL10.INT.NS1.02660 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 2 SQ5.1 (HAC) | OFE NS1 Control Fault Domain 2 | Not Started | 06/30/26 | 07/21/26 | 18.8 | 18.8 |
|
-11.2 |
RPL10.INT.SSB.02180 |
RPL10.Interior.SSB - Kitchen & Office Spaces - Electrical L2 Checklist Completion | Kitchen and Office Spaces | Not Started | 06/30/26 | 07/14/26 | 12.5 | 12.5 |
|
153.8 |
RPL10.INT.SSB.03140 |
RPL10.Interior.SSB - BoW - Install Door (Verify with Trades If Ready) | Balance of Walls and OverHead | Not Started | 06/30/26 | 07/09/26 | 8.8 | 8.8 |
|
113.8 |
RPL10.OFCI.6920 |
OFCI - Delivery ROJ: FE Fiber for CFD NS1.1 (ROJ ) (RVCD ) | NS1 | Not Started | 06/30/26 | 07/21/26 | 18.8 | 18.8 |
|
80.0 |
RPL10.SKN.EF12.01030 |
RPL10.SKIN.EF12 - Install Awning over Doors | Glazing, Doors and Ext Devices | Not Started | 06/30/26 | 07/07/26 | 6.2 | 6.2 |
|
228.8 |
RPL10.SKN.NS12.01040 |
RPL10.SKIN.NS12 - Install Louvers | Glazing, Doors and Ext Devices | Not Started | 06/30/26 | 07/07/26 | 6.2 | 6.2 |
|
125.0 |
RPL10.SKN.NS12.01110 |
RPL10.SKIN.NS12 - Install Scupper and Downspouts | Glazing, Doors and Ext Devices | Not Started | 06/30/26 | 07/07/26 | 6.2 | 6.2 |
|
132.5 |
RPL10.SKN.SSB.01170 |
RPL10.SKIN.SSB - QC | Glazing, Doors and Ext Devices | Not Started | 06/30/26 | 07/01/26 | 2.5 | 2.5 |
|
138.8 |
RPL10.W3B.FE.011001 |
RPL10.Conn EF1B<>NS1.CFD5 (P2-3) Pull Fiber Trunk (288F) [EF<>JXSW] | EF1B<>NS1.2 (P2-3) [EF<>JXSW] | Not Started | 06/30/26 | 07/06/26 | 5.0 | 5.0 |
|
35.0 |
RPL10.W3B.FE.011081 |
RPL10.Conn EF2B<>NS1.CFD5 (P1-4) Pull Fiber Trunk (288F) [EF<>JXSW] | EF2B<>NS1.2 (P1-4) [EF<>JXSW] | Not Started | 06/30/26 | 07/07/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.W3B.FE.011711 |
RPL10.Conn EF2F<>NS2.CFD6 (P1-4) Pull Fiber Trunk (384F) [EF<>SSW] | EF2F<>NS2.1 (P1-4) [EF<>SSW] | Not Started | 06/30/26 | 07/02/26 | 3.8 | 3.8 |
|
28.8 |
RPL10.W3B.FE.012111 |
RPL10.Conn EF2B<>NS2.CFD6 (P1-4) Install Fiber Trunk (384F) [EF<>SSW] | EF2B<>NS2.1 (P1-4) [EF<>SSW] | Not Started | 06/30/26 | 07/01/26 | 2.5 | 2.5 |
|
30.0 |
RPL10.W3B.FE.012481 |
RPL10.Conn EF2F<>NS1.CFD6 (P1-4) Install Fiber Trunk (384F) [EF<>SSW] | EF2F<>NS1.1 (P1-4) [EF<>SSW] | Not Started | 06/30/26 | 07/01/26 | 2.5 | 2.5 |
|
21.2 |
RPL10.WP3A.EF.05040 |
RPL10.Conn EF2F Infrasturcture 2 (Tier1 & waterfalls etc.) | Infrastructure & Cabling | Not Started | 06/30/26 | 07/28/26 | 25.0 | 25.0 |
|
127.5 |
RPL10.WP3B.FE.01040 |
RPL10.Conn NS1.CFD5 (FE) ISP Cabling - WBS Summary | FENW (Front End Network) | Not Started | 06/30/26 | 08/11/26 | 37.5 | 37.5 |
|
33.8 |
RPL10.WP3B.FE.01145 |
RPL10.Conn EF2B<>NS1.CFD5 (P1-4) Pull/Install/Test - WBS Summary* | EF2B<>NS1.2 (P1-4) [EF<>JXSW] | Not Started | 06/30/26 | 07/15/26 | 13.8 | 13.8 |
|
40.0 |
RPL10.WP3B.FE.01165 |
RPL10.Conn EF1B<>NS1.CFD5 (P2-3) Pull/Install/Test - WBS Summary | EF1B<>NS1.2 (P2-3) [EF<>JXSW] | Not Started | 06/30/26 | 07/31/26 | 28.8 | 28.8 |
|
35.0 |
RPL10.WP3B.FE.02060 |
RPL10.Conn EF2F<>NS2.CFD6 (P1-4) Pull/Install/Test - WBS Summary | EF2F<>NS2.1 (P1-4) [EF<>SSW] | Not Started | 06/30/26 | 07/09/26 | 8.8 | 8.8 |
|
48.8 |