Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL09 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:12 PM
· 5201 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL09.INT.SSBC.4500 |
RPL09.Interior.SSBC LO #07 - Install DAS (Distribution Antenna System) | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/05/27 | 05/05/27 | 1.2 | 1.2 |
|
181.2 |
RPL09.INT.SSBC.4580 |
RPL09.Interior.SSBC LO #07 - Install Flooring Tiles/Resinous Flooring in specific rooms | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/05/27 | 05/07/27 | 3.8 | 3.8 |
|
185.0 |
RPL09.INT.SSBC.4720 |
RPL09.Interior.SSBC LO #07 - Fire Safing / Wall Finishes | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/05/27 | 05/06/27 | 2.5 | 2.5 |
|
181.2 |
RPL09.EY.ENDC.1930 |
RPL09.EY.DHD.T2 - HAC Prefab prior to install for DH A | Tent 2 | Not Started | 05/06/27 | 05/19/27 | 12.5 | 12.5 |
|
80.0 |
RPL09.INT.CTRC.1320 |
RPL09.Interior.Center-Corridor - BoW - Install Security Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 05/06/27 | 05/14/27 | 8.8 | 8.8 |
|
183.8 |
RPL09.INT.DHA.01093 |
RPL09.Interior.DHA - LV Skids and TopHat - Top Hat Busway | DHA - LV Skids and TopHat | Not Started | 05/06/27 | 05/24/27 | 16.2 | 16.2 |
|
140.0 |
RPL09.INT.DHA.01112 |
RPL09.Interior.DHA - MES Skids - Piping Tie-Ins & Inspections | DHA - MES Skids | Not Started | 05/06/27 | 06/03/27 | 25.0 | 25.0 |
|
108.8 |
RPL09.INT.DHB.01520 |
RPL09.Interior.DHB - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary | Control Fault Domain 3 | Not Started | 05/06/27 | 08/04/27 | 78.8 | 78.8 |
|
175.0 |
RPL09.INT.DHB.02740 |
RPL09.Interior.DHB - Control Fault Domain 3 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 05/06/27 | 05/11/27 | 5.0 | 5.0 |
|
155.0 |
RPL09.INT.DHD.01092 |
RPL09.Interior.DHD - LV Skids and TopHat - Maintenance and Reserve Busways | DHD - LV Skids and TopHat | Not Started | 05/06/27 | 05/21/27 | 15.0 | 15.0 |
|
277.5 |
RPL09.INT.ENDC.1260 |
RPL09.Interior.End-Corridor - BoW - Install Electrical Lowside OH and In-wall and Lights (Coordinate Lights location to | Balance of Walls & Overhead | Not Started | 05/06/27 | 05/19/27 | 12.5 | 12.5 |
|
218.8 |
RPL09.INT.SBC.03400 |
RPL09.Interior.SSB-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall | Balance of Walls & Overhead | Not Started | 05/06/27 | 05/12/27 | 6.2 | 6.2 |
|
210.0 |
RPL09.INT.SBC.03480 |
RPL09.Interior.SSB-Corridor - BoW - Frame Hard Lid | Balance of Walls & Overhead | Not Started | 05/06/27 | 05/12/27 | 6.2 | 6.2 |
|
138.8 |
RPL09.INT.SSB.01270 |
RPL09.Interior.SSB - Loading Dock and Storage - Install Controls / EPMS / BMS | Loading Dock and Storage | Not Started | 05/06/27 | 05/11/27 | 5.0 | 5.0 |
|
208.8 |
RPL09.INT.SSB.06060 |
RPL09.Interior.SSB LO #16 - Hang Exterior Wall Drywall | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 05/06/27 | 05/07/27 | 2.5 | 2.5 |
|
161.2 |
RPL09.INT.SSBC.3640 |
RPL09.Interior.SSBC LO #06 - Electrical L2 Checklist Completion | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 05/06/27 | 05/19/27 | 12.5 | 12.5 |
|
187.5 |
RPL09.INT.SSBC.4560 |
RPL09.Interior.SSBC LO #07 - Install Remaining Lights | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/06/27 | 05/10/27 | 3.8 | 3.8 |
|
181.2 |
DCC.B9.3145 |
[SSDCB4] GS Gear Delivered [DHC] | Connectivity | Not Started | 05/07/27 | 05/07/27 | 0.0 | 0.0 |
|
452.5 |
DCC.B9.3155 |
[SSDCB4] GS Gear Delivered [DHD] | Connectivity | Not Started | 05/07/27 | 05/07/27 | 0.0 | 0.0 |
|
452.5 |
RPL09.INT.CTRC.1940 |
RPL09.Interior.Center-Corridor - BoW - Install Vertical Tube Steel Support for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 05/07/27 | 05/12/27 | 5.0 | 5.0 |
|
185.0 |
RPL09.INT.DHB.01260 |
RPL09.Interior.DHB - Control Fault Domain 1 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/07/27 | 06/04/27 | 25.0 | 25.0 |
|
115.0 |
RPL09.INT.DHB.01270 |
RPL09.Interior.DHB - Control Fault Domain 1 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/07/27 | 06/04/27 | 25.0 | 25.0 |
|
115.0 |
RPL09.INT.DHB.01280 |
RPL09.Interior.DHB - Control Fault Domain 1 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/07/27 | 06/04/27 | 25.0 | 25.0 |
|
102.5 |
RPL09.INT.ENDC.01160 |
RPL09.Interior.End-Corridor - OFE - DHC (1x GS.IDF) C2 | OFE/MOFE & CFCI | Not Started | 05/07/27 | 05/13/27 | 6.2 | 6.2 |
|
232.5 |
RPL09.INT.ENDC.01220 |
RPL09.Interior.End-Corridor - Hang Drywall | Fit out | Not Started | 05/07/27 | 05/17/27 | 8.8 | 8.8 |
|
256.2 |
RPL09.INT.SSB.14360 |
RPL09.Interior.SSB LO #01 to #05 - Hang Drywall | OH & Framing | Not Started | 05/07/27 | 05/17/27 | 8.8 | 8.8 |
|
168.8 |
RPL09.INT.SSB.14500 |
RPL09.Interior.SSB LO #01 to #05 - Install DAS (Distribution Antenna System) | Finishes | Not Started | 05/07/27 | 05/13/27 | 6.2 | 6.2 |
|
182.5 |
RPL09.INT.SSBC.4420 |
RPL09.Interior.SSBC LO #07 - Electrical Trim Out | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/07/27 | 05/10/27 | 2.5 | 2.5 |
|
181.2 |
RPL09.INT.SSBC.4440 |
RPL09.Interior.SSBC LO #07 - Security Trim Out | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/07/27 | 05/10/27 | 2.5 | 2.5 |
|
181.2 |
RPL09.INT.DHA.01113 |
RPL09.Interior.DHA - MES Skids - CDU Tie-Ins ( 2 per day) | DHA - MES Skids | Not Started | 05/10/27 | 06/07/27 | 25.0 | 25.0 |
|
127.5 |
RPL09.INT.DHB.01580 |
RPL09.Interior.DHB - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 4 | Not Started | 05/10/27 | 06/25/27 | 42.5 | 42.5 |
|
127.5 |
RPL09.INT.DHB.01600 |
RPL09.Interior.DHB - Control Fault Domain 3 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 05/10/27 | 05/13/27 | 5.0 | 5.0 |
|
185.0 |
RPL09.INT.DHB.02580 |
RPL09.Interior.DHB - OFE - Control Fault Domain 4 (LV Side Aisle) | Control Fault Domain 4 | Not Started | 05/10/27 | 05/13/27 | 5.0 | 5.0 |
|
155.0 |
RPL09.INT.SSB.01320 |
RPL09.Interior.SSB - BoW - Hang Drywall | Balance of Walls and OverHead | Not Started | 05/10/27 | 05/18/27 | 8.8 | 8.8 |
|
188.8 |
RPL09.INT.SSB.06080 |
RPL09.Interior.SSB LO #16 - Tape Finish Paint | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 05/10/27 | 05/14/27 | 6.2 | 6.2 |
|
161.2 |
RPL09.INT.SSB.06720 |
RPL09.Interior.SSB - Final Finishes & Fixtures - Install Tile/ Grout | Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) | Not Started | 05/10/27 | 05/21/27 | 12.5 | 12.5 |
|
303.8 |
RPL09.INT.SSB.06760 |
RPL09.Interior.SSB - Final Finishes & Fixtures - Install Fixtures, Partitions & Accessories | Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) | Not Started | 05/10/27 | 05/18/27 | 8.8 | 8.8 |
|
295.0 |
RPL.09.D.93720.XG |
RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHB | Give Milestones (XREFs) | Not Started | 05/11/27 | 05/11/27 | 0.0 | 0.0 |
|
448.8 |
RPL.09.D.93960.XG |
Ready for MV Cable Pull DH B (MVs - Qty 10)* | Give Milestones (XREFs) | Not Started | 05/11/27 | 05/11/27 | 0.0 | 0.0 |
|
448.8 |
RPL09.INT.DHB.01610 |
RPL09.Interior.DHB - Control Fault Domain 3 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 05/11/27 | 05/14/27 | 5.0 | 5.0 |
|
245.0 |
RPL09.INT.ENDC.06960 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Casework | Restrooms | Not Started | 05/11/27 | 05/19/27 | 8.8 | 8.8 |
|
268.8 |
RPL09.INT.SSBC.4520 |
RPL09.Interior.SSBC LO #07 - Plumbing Trim Out | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/11/27 | 05/12/27 | 2.5 | 2.5 |
|
181.2 |
RPL09.INT.SSBC.4600 |
RPL09.Interior.SSBC LO #07 - Install Asset Tags | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/11/27 | 05/11/27 | 1.2 | 1.2 |
|
181.2 |
RPL09.EY.DHB.01250 |
RPL09.EY.DHB - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 05/12/27 | 05/25/27 | 12.5 | 12.5 |
|
82.5 |
RPL09.EY.DHB.01260 |
RPL09.EY.DHB - Tie-ins - WBS Summary | Tie-ins | Not Started | 05/12/27 | 07/06/27 | 47.5 | 47.5 |
|
212.5 |
RPL09.EY.DHB.01520 |
RPL09.EY.DHB - Install Generator including Tie-ins (#1 of Qty 2) | OFE | Not Started | 05/12/27 | 05/18/27 | 6.2 | 6.2 |
|
117.5 |
RPL09.INT.DHA.01114 |
RPL09.Interior.DHA - MES Skids - BMS Tie-Ins ( 2 per day) | DHA - MES Skids | Not Started | 05/12/27 | 06/09/27 | 25.0 | 25.0 |
|
127.5 |
RPL09.INT.DHB.01660 |
RPL09.Interior.DHB - Tie-ins - Control Fault Domain 4 - WBS Summary | Control Fault Domain 4 | Not Started | 05/12/27 | 08/18/27 | 86.2 | 86.2 |
|
167.5 |
RPL09.INT.DHB.02760 |
RPL09.Interior.DHB - Control Fault Domain 4 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 05/12/27 | 05/17/27 | 5.0 | 5.0 |
|
170.0 |
RPL09.INT.DHC.01060 |
RPL09.Interior.DHC - OFE - LV Skids and TopHat - Set / Place / Anchor | OFE/MOFE & CFCI | Not Started | 05/12/27 | 05/28/27 | 16.2 | 16.2 |
|
141.2 |
RPL09.INT.DHC.01070 |
RPL09.Interior.DHC - OFE - MES Skids - Set / Place / Anchor | OFE/MOFE & CFCI | Not Started | 05/12/27 | 05/28/27 | 16.2 | 16.2 |
|
141.2 |
RPL09.INT.DHC.01080 |
RPL09.Interior.DHC - OFE - WBS Summary | OFE/MOFE & CFCI | Not Started | 05/12/27 | 10/12/27 | 133.8 | 133.8 |
|
121.2 |
RPL09.INT.DHC.02210 |
RPL09.Interior.DHC - Priority - Install Temp Doors Frame Hardware | OverHead | Not Started | 05/12/27 | 05/14/27 | 3.8 | 3.8 |
|
402.5 |
RPL09.INT.ENDC.1280 |
RPL09.Interior.End-Corridor - BoW - Install Fire Life Safety Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 05/12/27 | 05/20/27 | 8.8 | 8.8 |
|
238.8 |
RPL09.INT.SSB.01300 |
RPL09.Interior.SSB - Loading Dock and Storage - Install Fire Life Safety | Loading Dock and Storage | Not Started | 05/12/27 | 05/20/27 | 8.8 | 8.8 |
|
208.8 |
RPL09.INT.SSBC.01230 |
RPL09.Interior.SSB-Corridor - Install Remaining Refrigerant Line | Fit out | Not Started | 05/12/27 | 05/18/27 | 6.2 | 6.2 |
|
218.8 |
RPL09.INT.SSBC.4540 |
RPL09.Interior.SSBC LO #07 - Fire Life Safety Trim Out | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/12/27 | 05/12/27 | 1.2 | 1.2 |
|
181.2 |
RPL09.INT.SSBC.4620 |
RPL09.Interior.SSBC LO #07 - Install Door (Verify with Trades before installation) | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/12/27 | 05/12/27 | 1.2 | 1.2 |
|
181.2 |
RPL09.SKN.S.LO.01100 |
RPL09.SKIN.LO#17 - Close Exterior Leave Out #17 CC (South) WBS Summary | Build back Exterior Leave Out Walls #17 (CC - South) | Not Started | 05/12/27 | 06/04/27 | 21.2 | 21.2 |
|
150.0 |
RPL09.SKN.S.LO.03020 |
RPL09.SKIN.LO#17 - Pour back Stemwall | Build back Exterior Leave Out Walls #17 (CC - South) | Not Started | 05/12/27 | 05/13/27 | 2.5 | 2.5 |
|
150.0 |
RPL09.INT.CTRC.01670 |
RPL09.Interior.Center-Corridor - MOFE - Ancillary Skids Qty2 (DH A) | OFE/MOFE & CFCI | Not Started | 05/13/27 | 05/26/27 | 12.5 | 12.5 |
|
186.2 |
RPL09.INT.CTRC.01690 |
RPL09.Interior.Center-Corridor - MOFE - Ancillary Skids Qty2 (DH B) | OFE/MOFE & CFCI | Not Started | 05/13/27 | 05/26/27 | 12.5 | 12.5 |
|
195.0 |
RPL09.INT.CTRC.1960 |
RPL09.Interior.Center-Corridor - BoW - Install Horizontal Steel Supports for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 05/13/27 | 05/20/27 | 7.5 | 7.5 |
|
185.0 |
RPL09.INT.DHB.02480 |
RPL09.Interior.DHB - OFE - Control Fault Domain 2 (HAC) | Control Fault Domain 2 | Not Started | 05/13/27 | 05/26/27 | 12.5 | 12.5 |
|
106.2 |
RPL09.INT.DHD.01093 |
RPL09.Interior.DHD - LV Skids and TopHat - Top Hat Busway | DHD - LV Skids and TopHat | Not Started | 05/13/27 | 05/28/27 | 15.0 | 15.0 |
|
277.5 |
RPL09.INT.DHD.01112 |
RPL09.Interior.DHD - MES Skids - Piping Tie-Ins & Inspections | DHD - MES Skids | Not Started | 05/13/27 | 06/04/27 | 20.0 | 20.0 |
|
265.0 |
RPL09.INT.SBC.03500 |
RPL09.Interior.SSB-Corridor - BoW - MEPF Hard Lid Rough-In/ Close of Inspection | Balance of Walls & Overhead | Not Started | 05/13/27 | 05/21/27 | 8.8 | 8.8 |
|
148.8 |
RPL09.INT.SBC.03520 |
RPL09.Interior.SSB-Corridor - BoW - Install Blocking/Steel support Assembly for Metal Canopy | Balance of Walls & Overhead | Not Started | 05/13/27 | 05/19/27 | 6.2 | 6.2 |
|
138.8 |
RPL09.INT.SSBC.3660 |
RPL09.Interior.SSBC LO #06 - Mechanical L2 Checklist Completion | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 05/13/27 | 05/26/27 | 12.5 | 12.5 |
|
187.5 |
RPL09.INT.SSBC.4640 |
RPL09.Interior.SSBC LO #07 - Electrical L2 Checklist Completion | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 05/13/27 | 05/26/27 | 12.5 | 12.5 |
|
181.2 |
RPL09.CON.WP2.06800 |
RPL09.Conn - GSIDF/DH C2 - WBS Summary | INT IDF OFE/MOFE - GSIDF9C2 | Not Started | 05/14/27 | 06/08/27 | 21.2 | 21.2 |
|
425.0 |
RPL09.CON.WP2.06820 |
RPL09.Conn - GSIDF/DH C2 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 05/14/27 | 05/20/27 | 6.2 | 6.2 |
|
378.8 |
RPL09.EY.DHB.01280 |
RPL09.EY.DHB - Install BMS/EPMS Tie-ins | Tie-ins | Not Started | 05/14/27 | 05/27/27 | 12.5 | 12.5 |
|
82.5 |
RPL09.INT.CTRC.1340 |
RPL09.Interior.Center-Corridor - BoW - Install VAV's/Duct Branches | Balance of Walls & Overhead | Not Started | 05/14/27 | 05/20/27 | 6.2 | 6.2 |
|
196.2 |
RPL09.INT.CTRC.1440 |
RPL09.Interior.Center-Corridor - BoW - Mechanical Tie-In | Balance of Walls & Overhead | Not Started | 05/14/27 | 05/20/27 | 6.2 | 6.2 |
|
117.5 |
RPL09.INT.DHA.01115 |
RPL09.Interior.DHA - MES Skids - EPMS Tie-Ins ( 2 per day) | DHA - MES Skids | Not Started | 05/14/27 | 06/11/27 | 25.0 | 25.0 |
|
127.5 |
RPL09.INT.DHB.01300 |
RPL09.Interior.DHB - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/14/27 | 06/11/27 | 25.0 | 25.0 |
|
102.5 |
RPL09.INT.DHB.01720 |
RPL09.Interior.DHB - OFE - Control Fault Domain 5 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 5 | Not Started | 05/14/27 | 07/14/27 | 52.5 | 52.5 |
|
131.2 |
RPL09.INT.DHB.01740 |
RPL09.Interior.DHB - Control Fault Domain 4 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 05/14/27 | 05/19/27 | 5.0 | 5.0 |
|
200.0 |
RPL09.INT.DHB.02640 |
RPL09.Interior.DHB - OFE - Control Fault Domain 5 (LV Side Aisle) | Control Fault Domain 5 | Not Started | 05/14/27 | 05/19/27 | 5.0 | 5.0 |
|
165.0 |
RPL09.INT.DHC.01090 |
RPL09.Interior.DHC - LV Skids and TopHat Tie-ins (LOE) | DHC - LV Skids and TopHat | Not Started | 05/14/27 | 06/14/27 | 26.2 | 26.2 |
|
272.5 |
RPL09.INT.DHC.01091 |
RPL09.Interior.DHC - LV Skids and TopHat - Set & Anchor Interconnects | DHC - LV Skids and TopHat | Not Started | 05/14/27 | 06/02/27 | 16.2 | 16.2 |
|
272.5 |
RPL09.INT.DHC.01100 |
RPL09.Interior.DHC - Tie-ins - WBS Summary | Tie-Ins | Not Started | 05/14/27 | 12/06/27 | 176.2 | 176.2 |
|
233.8 |
RPL09.INT.ENDC.01190 |
RPL09.Interior.End-Corridor - OFE - DHD (1x GS.IDF) D2 | OFE/MOFE & CFCI | Not Started | 05/14/27 | 05/20/27 | 6.2 | 6.2 |
|
232.5 |
RPL09.SKN.S.LO.03040 |
RPL09.SKIN.LO#17 - Cure Stemwall | Build back Exterior Leave Out Walls #17 (CC - South) | Not Started | 05/14/27 | 05/24/27 | 8.8 | 8.8 |
|
150.0 |
RPL09.INT.CTRC.1420 |
RPL09.Interior.Center-Corridor - BoW - Install Electrical - Lighitng Inverter Room (XX.S2.XX) | Balance of Walls & Overhead | Not Started | 05/17/27 | 05/25/27 | 8.8 | 8.8 |
|
183.8 |
RPL09.INT.DHB.01750 |
RPL09.Interior.DHB - Control Fault Domain 4 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 05/17/27 | 05/20/27 | 5.0 | 5.0 |
|
245.0 |
RPL09.INT.DHC.02170 |
RPL09.Interior.DHC - Priority - Install Security | OverHead | Not Started | 05/17/27 | 05/18/27 | 2.5 | 2.5 |
|
402.5 |
RPL09.INT.DHD.01113 |
RPL09.Interior.DHD - MES Skids - CDU Tie-Ins | DHD - MES Skids | Not Started | 05/17/27 | 06/08/27 | 20.0 | 20.0 |
|
265.0 |
RPL09.INT.SSB.01440 |
RPL09.Interior.SSB - Loading Dock and Storage - Install Store Front Frames | Loading Dock and Storage | Not Started | 05/17/27 | 05/25/27 | 8.8 | 8.8 |
|
215.0 |
RPL09.INT.SSB.06100 |
RPL09.Interior.SSB LO #16 - Install Mechanical Piping/ Refrigerant Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 05/17/27 | 05/21/27 | 6.2 | 6.2 |
|
163.8 |
RPL09.INT.SSB.06120 |
RPL09.Interior.SSB LO #16 - Install Electrical Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 05/17/27 | 05/25/27 | 8.8 | 8.8 |
|
165.0 |
RPL09.INT.SSB.06140 |
RPL09.Interior.SSB LO #16 - Install Plumbing Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 05/17/27 | 05/25/27 | 8.8 | 8.8 |
|
161.2 |
RPL09.INT.SSB.06160 |
RPL09.Interior.SSB LO #16 - Install Fire Life Safety Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 05/17/27 | 05/19/27 | 3.8 | 3.8 |
|
166.2 |
RPL09.INT.SSB.06180 |
RPL09.Interior.SSB LO #16 - Install Security Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 05/17/27 | 05/20/27 | 5.0 | 5.0 |
|
165.0 |
RPL09.INT.SSB.06200 |
RPL09.Interior.SSB LO #16 - Install Controls / EPMS / BMS OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 05/17/27 | 05/19/27 | 3.8 | 3.8 |
|
166.2 |
RPL09.INT.SSB.06220 |
RPL09.Interior.SSB LO #16 - Fire Safing OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 05/17/27 | 05/21/27 | 6.2 | 6.2 |
|
163.8 |
ICM.B9.1805 |
[SSDCB4] Delivery of Substation MSG Alpha (First Delivery) NOT DPR SCOPE | Construction | Not Started | 05/18/27 | 05/18/27 | 0.0 | 0.0 |
|
442.5 |
RPL.09.D.93350.XR |
Pull and Term mCUP Skids - RPL09 | Receive Milestones (XREFs) | Not Started | 05/18/27 | 05/18/27 | 0.0 | 0.0 |
|
97.5 |
RPL.09.D.93850.XR |
100MW Cx Temp Power to MV Skids RPL09 mCUPs Available | Receive Milestones (XREFs) | Not Started | 05/18/27 | 05/18/27 | 0.0 | 0.0 |
|
97.5 |