Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL09 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:12 PM
· 5201 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL09.INT.DHB.01590 |
RPL09.Interior.DHB - Control Fault Domain 3 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/30/27 | 07/28/27 | 25.0 | 25.0 |
|
158.8 |
RPL09.INT.DHB.01620 |
RPL09.Interior.DHB - Control Fault Domain 3 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/30/27 | 07/28/27 | 25.0 | 25.0 |
|
120.0 |
RPL09.INT.DHB.01630 |
RPL09.Interior.DHB - Control Fault Domain 4 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/30/27 | 07/28/27 | 25.0 | 25.0 |
|
127.5 |
RPL09.INT.DHB.01640 |
RPL09.Interior.DHB - Control Fault Domain 4 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/30/27 | 07/28/27 | 25.0 | 25.0 |
|
133.8 |
RPL09.INT.DHB.01650 |
RPL09.Interior.DHB - Control Fault Domain 4 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/30/27 | 07/28/27 | 25.0 | 25.0 |
|
127.5 |
RPL09.INT.DHB.02260 |
RPL09.Interior.DHB - Control Fault Domain 4 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/30/27 | 07/28/27 | 25.0 | 25.0 |
|
127.5 |
RPL09.INT.SSB.01540 |
RPL09.Interior.SSB - Loading Dock and Storage - Fire Life Safety Trim Out / Fire Alarm Trim Out | Loading Dock and Storage | Not Started | 06/30/27 | 07/09/27 | 8.8 | 8.8 |
|
208.8 |
RPL09.INT.SSB.03140 |
RPL09.Interior.SSB - BoW - Install Door (verify with trades if ready to install door) | Balance of Walls and OverHead | Not Started | 06/30/27 | 07/07/27 | 6.2 | 6.2 |
|
188.8 |
RPL09.INT.SSB.06440 |
RPL09.Interior.SSB LO #16 - Final Paint | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 06/30/27 | 07/09/27 | 8.8 | 8.8 |
|
161.2 |
RPL09.WP3B.014900 |
RPL09.Conn EF2<>DHB.11 Splice (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.11 | Not Started | 06/30/27 | 06/30/27 | 1.2 | 1.2 |
|
223.8 |
RPL09.CON.WP2.02000 |
RPL09.Conn - GS EF2 (North) - WBS Summary | GS.EF2 (North) | Not Started | 07/01/27 | 07/12/27 | 8.8 | 8.8 |
|
322.5 |
RPL09.CON.WP2.02200 |
RPL09.Conn - GS EF2 (North) Set Infrastructure (Wall mounting enclousres, Tier1 Basket Tray, Waterfalls etc.) | Infrastructure | Not Started | 07/01/27 | 07/06/27 | 3.8 | 3.8 |
|
322.5 |
RPL09.CON.WP2.03000 |
RPL09.Conn - GS EF1 (South) - WBS Summary | GS.EF1 (South) | Not Started | 07/01/27 | 07/12/27 | 8.8 | 8.8 |
|
322.5 |
RPL09.CON.WP2.07820 |
RPL09.Conn - GS EF1 (South) Set Infrastructure (Wall mounting enclousres, Tier1 Basket Tray, Waterfalls etc.) | Infrastructure | Not Started | 07/01/27 | 07/06/27 | 3.8 | 3.8 |
|
322.5 |
RPL09.INT.CC.9060 |
RPL09.Interior.CC Ext. LO #17 - Duct Drops / Trim out | Exterior Leave Out Wall #17 (CC - South) | Not Started | 07/01/27 | 07/02/27 | 2.5 | 2.5 |
|
143.8 |
RPL09.INT.CC.9080 |
RPL09.Interior.CC Ext. LO #17 - Install Remaining Refrigerant Line | Exterior Leave Out Wall #17 (CC - South) | Not Started | 07/01/27 | 07/01/27 | 1.2 | 1.2 |
|
172.5 |
RPL09.INT.CC.9100 |
RPL09.Interior.CC Ext. LO #17 - Install Remaining Lights | Exterior Leave Out Wall #17 (CC - South) | Not Started | 07/01/27 | 07/07/27 | 5.0 | 5.0 |
|
143.8 |
RPL09.INT.CC.9120 |
RPL09.Interior.CC Ext. LO #17 - Fire Safing / Wall Finishes | Exterior Leave Out Wall #17 (CC - South) | Not Started | 07/01/27 | 07/06/27 | 3.8 | 3.8 |
|
141.2 |
RPL09.INT.CC.9220 |
RPL09.Interior.CC Ext. LO #17 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Exterior Leave Out Wall #17 (CC - South) | Not Started | 07/01/27 | 07/06/27 | 3.8 | 3.8 |
|
145.0 |
RPL09.INT.DHC.01350 |
RPL09.Interior.DHC - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 3 | Not Started | 07/01/27 | 09/28/27 | 77.5 | 77.5 |
|
123.8 |
RPL09.INT.DHC.01370 |
RPL09.Interior.DHC - Control Fault Domain 2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 07/01/27 | 07/07/27 | 5.0 | 5.0 |
|
237.5 |
RPL09.INT.DHC.02390 |
RPL09.Interior.DHC - OFE - Control Fault Domain 3 (LV Side Aisle) | Control Fault Domain 3 | Not Started | 07/01/27 | 07/07/27 | 5.0 | 5.0 |
|
183.8 |
RPL09.INT.ENDC.01360 |
RPL09.Interior.End-Corridor - Install Lighting | Fit out | Not Started | 07/01/27 | 07/12/27 | 8.8 | 8.8 |
|
256.2 |
RPL09.INT.ENDC.07000 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Final Clean | Restrooms | Not Started | 07/01/27 | 07/07/27 | 5.0 | 5.0 |
|
268.8 |
RPL09.INT.SBC.03640 |
RPL09.Interior.SSB-Corridor - BoW - Install Vertical Tube Steel Support for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 07/01/27 | 07/08/27 | 6.2 | 6.2 |
|
138.8 |
RPL09.WP3B.017780 |
RPL09.Conn EF2<>DHB.11 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.11 | Not Started | 07/01/27 | 07/02/27 | 2.5 | 2.5 |
|
223.8 |
RPL09.WP4.010100 |
RPL09.Conn DHB.12 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 07/01/27 | 07/01/27 | 1.2 | 1.2 |
|
225.0 |
RPL09.WP4.011280 |
RPL09.Conn DHB.11.02 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/01/27 | 07/15/27 | 12.5 | 12.5 |
|
198.8 |
RPL09.WP4.011300 |
RPL09.Conn DHB.12.06 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/01/27 | 07/15/27 | 12.5 | 12.5 |
|
198.8 |
GCD.RPL09.2251 |
L3/L4 Finish EY - DHB | EY | Not Started | 07/02/27 | 07/02/27 | 0.0 | 0.0 |
|
220.0 |
RPL09.INT.DHB.02680 |
RPL09.Interior.DHB - OFE - Control Fault Domain 5 (Mech Side Aisle) | Control Fault Domain 5 | Not Started | 07/02/27 | 07/14/27 | 10.0 | 10.0 |
|
131.2 |
RPL09.INT.DHC.01390 |
RPL09.Interior.DHC - Control Fault Domain 2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 07/02/27 | 07/08/27 | 5.0 | 5.0 |
|
237.5 |
RPL09.WP3B.017800 |
RPL09.Conn EF2<>DHB.12 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.12 | Not Started | 07/02/27 | 07/06/27 | 2.5 | 2.5 |
|
222.5 |
RPL09.WP4.010260 |
RPL09.Conn DHB.12 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 07/02/27 | 07/02/27 | 1.2 | 1.2 |
|
225.0 |
RPL09.WP4.011900 |
RPL09.Conn DHB.11.04<>03 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 07/02/27 | 07/08/27 | 5.0 | 5.0 |
|
227.5 |
RPL09.WP4.011920 |
RPL09.Conn DHB.12.08<>07 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 07/02/27 | 07/08/27 | 5.0 | 5.0 |
|
227.5 |
GCD.RPL09.4605 |
L3/L4 Start EY - DHA | EY | Not Started | 07/06/27 | 07/06/27 | 0.0 | 0.0 |
|
231.2 |
GCD.RPL09.5845 |
RMU Loop Ready for Energization - DHD Loop | EY | Not Started | 07/06/27 | 07/06/27 | 0.0 | 0.0 |
|
215.0 |
ICM.B9.2510.B |
[SSDCB4] L3/4 Start - DHB | Commissioning | Not Started | 07/06/27 | 07/06/27 | 0.0 | 0.0 |
|
220.0 |
ICM.B9.2550 |
[SSDCB4] L3/L4 Start mCUP [1-4] - RPL09 | Commissioning | Not Started | 07/06/27 | 07/06/27 | 0.0 | 0.0 |
|
402.5 |
RPL09.CX.DHA.01000 |
RPL09.CX.DHA - L3, L4, IST - WBS Summary | DHA | Not Started | 07/06/27 | 05/24/28 | 277.5 | 277.5 |
|
112.5 |
RPL09.CX.DHA.01010 |
RPL09.CX.DHA - L3 - WBS Summary (Electrical) | DHA ELECTRICAL | Not Started | 07/06/27 | 10/22/27 | 97.5 | 97.5 |
|
133.8 |
RPL09.CX.DHA.01020 |
RPL09.CX.DHA - L3/L4 - MV Skids (10) Loop | DHA ELECTRICAL | Not Started | 07/06/27 | 07/19/27 | 12.5 | 12.5 |
|
76.2 |
RPL09.CX.DHB.01030 |
RPL09.CX.DHB - L3/L4 - House Power (for electrical) | DHB HOUSE POWER | Not Started | 07/06/27 | 07/19/27 | 12.5 | 12.5 |
|
77.5 |
RPL09.CX.MCUP.01050 |
RPL09.CX.mCup Loop 1 - L3/L4 - mCUP | mCUP 1-4 | Not Started | 07/06/27 | 08/12/27 | 35.0 | 35.0 |
|
82.5 |
RPL09.EY.DHB.01430 |
RPL09.EY.DHB - Install Irrigation | Hardscape and Landscape | Not Started | 07/06/27 | 07/19/27 | 12.5 | 12.5 |
|
377.5 |
RPL09.EY.DHB.01440 |
RPL09.EY.DHB - Install Exterior Signage | Hardscape and Landscape | Not Started | 07/06/27 | 07/19/27 | 12.5 | 12.5 |
|
240.0 |
RPL09.EY.DHC.01300 |
RPL09.EY.DHC - Install Sleeves MEPL | Hardscape and Landscape | Not Started | 07/06/27 | 07/12/27 | 6.2 | 6.2 |
|
333.8 |
RPL09.EY.DHC.01320 |
RPL09.EY.DHC - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 07/06/27 | 12/07/27 | 133.8 | 133.8 |
|
268.8 |
RPL09.EY.DHD.01340 |
RPL09.EY.DHD - Install Lighting | Hardscape and Landscape | Not Started | 07/06/27 | 07/19/27 | 12.5 | 12.5 |
|
333.8 |
RPL09.INT.CTRC.06880 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Water Proofing/ Tape Paint | Restrooms | Not Started | 07/06/27 | 07/12/27 | 6.2 | 6.2 |
|
117.5 |
RPL09.INT.CTRC.1240 |
RPL09.Interior.Center-Corridor - BoW - Install Mechanical Piping/ Refrigerant Lowside On-wall | Balance of Walls & Overhead | Not Started | 07/06/27 | 07/12/27 | 6.2 | 6.2 |
|
158.8 |
RPL09.INT.CTRC.1600 |
RPL09.Interior.Center-Corridor - BoW - Electrical Trim Out | Balance of Walls & Overhead | Not Started | 07/06/27 | 07/14/27 | 8.8 | 8.8 |
|
172.5 |
RPL09.INT.CTRC.1620 |
RPL09.Interior.Center-Corridor - BoW - Security Trim Out | Balance of Walls & Overhead | Not Started | 07/06/27 | 07/14/27 | 8.8 | 8.8 |
|
172.5 |
RPL09.INT.CTRC.1640 |
RPL09.Interior.Center-Corridor - BoW - Duct Drops / Trim out | Balance of Walls & Overhead | Not Started | 07/06/27 | 07/12/27 | 6.2 | 6.2 |
|
150.0 |
RPL09.INT.CTRC.1680 |
RPL09.Interior.Center-Corridor - BoW - Install DAS (Distribution Antenna System) | Balance of Walls & Overhead | Not Started | 07/06/27 | 07/12/27 | 6.2 | 6.2 |
|
143.8 |
RPL09.INT.CTRC.1740 |
RPL09.Interior.Center-Corridor - BoW - Install Remaining Lights | Balance of Walls & Overhead | Not Started | 07/06/27 | 07/19/27 | 12.5 | 12.5 |
|
143.8 |
RPL09.INT.DHC.01410 |
RPL09.Interior.DHC - Control Fault Domain 3 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 07/06/27 | 07/09/27 | 5.0 | 5.0 |
|
240.0 |
RPL09.INT.DHC.01440 |
RPL09.Interior.DHC - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary | Control Fault Domain 3 | Not Started | 07/06/27 | 11/17/27 | 118.8 | 118.8 |
|
185.0 |
RPL09.INT.SSB.14660 |
RPL09.Interior.SSB LO #01 to #05 - Mechanical L2 Checklist Completion | Finishes | Not Started | 07/06/27 | 07/19/27 | 12.5 | 12.5 |
|
168.8 |
RPL09.WP4.010420 |
RPL09.Conn DHB.12 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 07/06/27 | 07/06/27 | 1.2 | 1.2 |
|
225.0 |
DCC.B9.3300 |
[SSDCB4] Cabling Start : OSP Pathways - Primary GS | Connectivity | Not Started | 07/07/27 | 07/07/27 | 0.0 | 0.0 |
|
401.2 |
DCC.B9.3707 |
[SSDCB4] Cabling Start : General Services (GS) | Connectivity | Not Started | 07/07/27 | 07/07/27 | 0.0 | 0.0 |
|
401.2 |
RPL.09.D.93330.XR |
Pull and Term MV Skids - RPL09 DHC | Receive Milestones (XREFs) | Not Started | 07/07/27 | 07/07/27 | 0.0 | 0.0 |
|
223.8 |
RPL.09.D.93830.XR |
100MW Cx Temp Power to MV Skids RPL09 DHC Available | Receive Milestones (XREFs) | Not Started | 07/07/27 | 07/07/27 | 0.0 | 0.0 |
|
223.8 |
RPL.GF.D.N9140.XR |
Fiber Pulls, Test & Term to Prod EF1 Complete RPL 10 to RPL09 | Receive Milestones (XREFs) | Not Started | 07/07/27 | 07/07/27 | 0.0 | 0.0 |
|
322.5 |
RPL.GF.D.N9150.XR |
Fiber Pulls, Test & Term to Prod EF2 Complete RPL 10 to RPL09 | Receive Milestones (XREFs) | Not Started | 07/07/27 | 07/07/27 | 0.0 | 0.0 |
|
322.5 |
RPL09.CON.WP2.02400 |
RPL09.Conn - GS EF2 (North) Install Cabling (Pull, Splice & Terminate) | Cabling | Not Started | 07/07/27 | 07/12/27 | 5.0 | 5.0 |
|
322.5 |
RPL09.CON.WP2.07240 |
RPL09.Conn - Ext. GSIDF9X01 - Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 07/07/27 | 07/14/27 | 7.5 | 7.5 |
|
390.0 |
RPL09.CON.WP2.07440 |
RPL09.Conn - Ext. GSIDF9X02 - Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 07/07/27 | 07/14/27 | 7.5 | 7.5 |
|
390.0 |
RPL09.CON.WP2.07840 |
RPL09.Conn - GS EF1 (South) Install Cabling (Pull, Splice & Terminate) | Cabling | Not Started | 07/07/27 | 07/12/27 | 5.0 | 5.0 |
|
322.5 |
RPL09.CON.WP2.08420 |
RPL09.Conn - Ext. GSIDF9X03 - Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 07/07/27 | 07/14/27 | 7.5 | 7.5 |
|
390.0 |
RPL09.CON.WP2.08480 |
RPL09.Conn - Ext. GSIDF9X04 - Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 07/07/27 | 07/22/27 | 15.0 | 15.0 |
|
382.5 |
RPL09.CX.MCUP.01270 |
RPL09.CX.mCup Loop 2 - L3/L4 - mCUP - Flush and Fill - mCup5 and Dry Coolers | Fill and Flush | Not Started | 07/07/27 | 07/14/27 | 7.5 | 7.5 |
|
362.5 |
RPL09.CX.MCUP.01330 |
RPL09.CX.mCup Loop 2 - L3/L4 - mCUP - Flush and Fill - mCup6 and Dry Coolers | Fill and Flush | Not Started | 07/07/27 | 07/14/27 | 7.5 | 7.5 |
|
362.5 |
RPL09.EY.DHA.01610 |
RPL09.EY.DHC - Install Electrical Tie-ins | Build back Exterior Leave Out #17 (South) | Not Started | 07/07/27 | 07/13/27 | 6.2 | 6.2 |
|
198.8 |
RPL09.INT.CC.9140 |
RPL09.Interior.CC Ext. LO #17 - Electrical Trim Out | Exterior Leave Out Wall #17 (CC - South) | Not Started | 07/07/27 | 07/07/27 | 1.2 | 1.2 |
|
141.2 |
RPL09.INT.CC.9160 |
RPL09.Interior.CC Ext. LO #17 - Security Trim Out | Exterior Leave Out Wall #17 (CC - South) | Not Started | 07/07/27 | 07/07/27 | 1.2 | 1.2 |
|
141.2 |
RPL09.INT.ENDC.1540 |
RPL09.Interior.End-Corridor - BoW - QC - Backings/Walls | Balance of Walls & Overhead | Not Started | 07/07/27 | 07/13/27 | 6.2 | 6.2 |
|
218.8 |
RPL09.CX.DHA.01090 |
RPL09.CX.DHA - L4 - WBS Summary (Mechanical) | DHA MECHANICAL | Not Started | 07/08/27 | 02/11/28 | 186.2 | 186.2 |
|
42.5 |
RPL09.CX.DHA.01260 |
RPL09.CX.DHA - L3/L4 - Control Fault Domain 01 - FW Flush and Fill | Control Fault Domain 1 | Not Started | 07/08/27 | 07/16/27 | 8.8 | 8.8 |
|
123.8 |
RPL09.INT.CTRC.1700 |
RPL09.Interior.Center-Corridor - BoW - Plumbing Trim Out | Balance of Walls & Overhead | Not Started | 07/08/27 | 07/14/27 | 6.2 | 6.2 |
|
172.5 |
RPL09.INT.CTRC.1720 |
RPL09.Interior.Center-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls & Overhead | Not Started | 07/08/27 | 07/16/27 | 8.8 | 8.8 |
|
172.5 |
RPL09.INT.CTRC.2000 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Close Interior Leave Out #10 DHB/CC (For HACs in DHB) WBS Summary | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 07/08/27 | 08/19/27 | 38.8 | 38.8 |
|
130.0 |
RPL09.INT.CTRC.2520 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install IMP Wall at Leave Out (DH B) | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 07/08/27 | 07/12/27 | 3.8 | 3.8 |
|
130.0 |
RPL09.INT.CTRC.2540 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Tie In MEPF with IMP Wall buildback | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 07/08/27 | 07/13/27 | 5.0 | 5.0 |
|
130.0 |
RPL09.INT.DHA.01290 |
RPL09.Interior.DHA - Control Fault Domain 1 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/08/27 | 08/04/27 | 25.0 | 25.0 |
|
80.0 |
RPL09.INT.DHA.01310 |
RPL09.Interior.DHA - Control Fault Domain 2 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/08/27 | 08/04/27 | 25.0 | 25.0 |
|
105.0 |
RPL09.INT.DHA.01320 |
RPL09.Interior.DHA - Control Fault Domain 2 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/08/27 | 08/04/27 | 25.0 | 25.0 |
|
105.0 |
RPL09.INT.DHA.01330 |
RPL09.Interior.DHA - Control Fault Domain 2 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/08/27 | 08/04/27 | 25.0 | 25.0 |
|
92.5 |
RPL09.INT.DHB.01670 |
RPL09.Interior.DHB - Control Fault Domain 4 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/08/27 | 08/04/27 | 25.0 | 25.0 |
|
133.8 |
RPL09.INT.DHB.01680 |
RPL09.Interior.DHB - Control Fault Domain 4 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/08/27 | 08/04/27 | 25.0 | 25.0 |
|
133.8 |
RPL09.INT.DHB.01690 |
RPL09.Interior.DHB - Control Fault Domain 4 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/08/27 | 08/04/27 | 25.0 | 25.0 |
|
127.5 |
RPL09.INT.DHB.01710 |
RPL09.Interior.DHB - Control Fault Domain 3 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/08/27 | 08/04/27 | 25.0 | 25.0 |
|
120.0 |
RPL09.INT.DHC.01490 |
RPL09.Interior.DHC - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 4 | Not Started | 07/08/27 | 10/12/27 | 85.0 | 85.0 |
|
121.2 |
RPL09.INT.DHC.01510 |
RPL09.Interior.DHC - Control Fault Domain 3 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 07/08/27 | 07/13/27 | 5.0 | 5.0 |
|
280.0 |
RPL09.INT.DHC.02450 |
RPL09.Interior.DHC - OFE - Control Fault Domain 4 (LV Side Aisle) | Control Fault Domain 4 | Not Started | 07/08/27 | 07/13/27 | 5.0 | 5.0 |
|
191.2 |
RPL09.INT.ENDC.06980 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Final Punch Walk | Restrooms | Not Started | 07/08/27 | 07/09/27 | 2.5 | 2.5 |
|
268.8 |
RPL09.INT.SSB.02600 |
RPL09.Interior.SSB - BoW - ACT - Close Up Inspection | Balance of Walls and OverHead | Not Started | 07/08/27 | 07/14/27 | 6.2 | 6.2 |
|
188.8 |
RPL09.INT.CC.9180 |
RPL09.Interior.CC Ext. LO #17 - Plumbing Trim Out | Exterior Leave Out Wall #17 (CC - South) | Not Started | 07/09/27 | 07/09/27 | 1.2 | 1.2 |
|
141.2 |