Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL09 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:12 PM
· 5201 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL09.INT.CC.9200 |
RPL09.Interior.CC Ext. LO #17 - Fire Life Safety Trim Out | Exterior Leave Out Wall #17 (CC - South) | Not Started | 07/09/27 | 07/09/27 | 1.2 | 1.2 |
|
141.2 |
RPL09.INT.CTRC.8900 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install IMP Wall at Leave Out (DH D) | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 07/09/27 | 07/13/27 | 3.8 | 3.8 |
|
130.0 |
RPL09.INT.DHC.01530 |
RPL09.Interior.DHC - Control Fault Domain 3 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 07/09/27 | 07/14/27 | 5.0 | 5.0 |
|
295.0 |
RPL09.INT.SBC.03660 |
RPL09.Interior.SSB-Corridor - BoW - Install Horizontal Steel Supports for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 07/09/27 | 07/14/27 | 5.0 | 5.0 |
|
138.8 |
GCD.RPL09.1735 |
Start FSHAC set in place - RPL09 - DHC&D | Construction Milestones | Not Started | 07/12/27 | 07/12/27 | 0.0 | 0.0 |
|
360.0 |
RPL.GF.D.N9100.XG |
Both GSEF Room Complete RPL 9 | Give Milestones (XREFs) | Not Started | 07/12/27 | 07/12/27 | 0.0 | 0.0 |
|
396.2 |
RPL09.INT.CC.9240 |
RPL09.Interior.CC Ext. LO #17 - Install Asset Tags | Exterior Leave Out Wall #17 (CC - South) | Not Started | 07/12/27 | 07/12/27 | 1.2 | 1.2 |
|
141.2 |
RPL09.INT.DHA.03680 |
RPL09.Interior.DHA - OFE - Control Fault Domain 4 (HAC) | Control Fault Domain 4 | Not Started | 07/12/27 | 07/23/27 | 12.5 | 12.5 |
|
90.0 |
RPL09.INT.DHD.02290 |
RPL09.Interior.DHD - OFE - Control Fault Domain 1 (HAC) | Control Fault Domain 1 | Not Started | 07/12/27 | 07/30/27 | 18.8 | 18.8 |
|
138.8 |
RPL09.INT.ENDC.06880 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Electrical L2 Checklist Completion | Restrooms | Not Started | 07/12/27 | 07/23/27 | 12.5 | 12.5 |
|
268.8 |
RPL09.INT.SBC.03920 |
RPL09.Interior.SSB-Corridor - BoW - Install Asset Tags | Balance of Walls & Overhead | Not Started | 07/12/27 | 07/20/27 | 8.8 | 8.8 |
|
142.5 |
RPL09.INT.SSB.01570 |
RPL09.Interior.SSB - Loading Dock and Storage - Electrical L2 Checklist Completion | Loading Dock and Storage | Not Started | 07/12/27 | 07/23/27 | 12.5 | 12.5 |
|
208.8 |
RPL09.INT.SSB.06480 |
RPL09.Interior.SSB LO #16 - Final Clean | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 07/12/27 | 07/15/27 | 5.0 | 5.0 |
|
161.2 |
GCD.RPL09.5885 |
RMU Loop Ready for Energization - DHC Loop | EY | Not Started | 07/13/27 | 07/13/27 | 0.0 | 0.0 |
|
218.8 |
RPL09.CON.WP2.07920 |
RPL09.Conn - EF2<>MDF2 Install Cabling (Pull, Splice & Terminate) | OSP (MDF RPL10 <> MDF RPL09) | Not Started | 07/13/27 | 07/20/27 | 7.5 | 7.5 |
|
322.5 |
RPL09.CON.WP2.08000 |
RPL09.Conn - EF1<>MDF1 Install Cabling (Pull, Splice & Terminate) | OSP (MDF RPL10 <> MDF RPL09) | Not Started | 07/13/27 | 07/20/27 | 7.5 | 7.5 |
|
322.5 |
RPL09.CX.DHB.01340 |
RPL09.CX.DHB - L3/L4 - Control Fault Domain 02 - TW Flush and Fill | Control Fault Domain 2 | Not Started | 07/13/27 | 07/22/27 | 10.0 | 10.0 |
|
137.5 |
RPL09.EY.DHA.01390 |
RPL09.EY.DHA - Install Remaining EY Paving | Hardscape and Landscape | Not Started | 07/13/27 | 07/19/27 | 6.2 | 6.2 |
|
240.0 |
RPL09.EY.DHC.01330 |
RPL09.EY.DHC - Install Early EY Paving | Hardscape and Landscape | Not Started | 07/13/27 | 07/19/27 | 6.2 | 6.2 |
|
333.8 |
RPL09.INT.CTRC.06900 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Casework | Restrooms | Not Started | 07/13/27 | 07/21/27 | 8.8 | 8.8 |
|
117.5 |
RPL09.INT.CTRC.1360 |
RPL09.Interior.Center-Corridor - BoW - Install Split Systems/Humidifiers | Balance of Walls & Overhead | Not Started | 07/13/27 | 07/19/27 | 6.2 | 6.2 |
|
158.8 |
RPL09.INT.CTRC.1660 |
RPL09.Interior.Center-Corridor - BoW - Final Paint and Tube Steel Paint (IFP Add) | Balance of Walls & Overhead | Not Started | 07/13/27 | 07/21/27 | 8.8 | 8.8 |
|
141.2 |
RPL09.INT.CTRC.1800 |
RPL09.Interior.Center-Corridor - BoW - Install Door (Verify with Trades before installation) | Balance of Walls & Overhead | Not Started | 07/13/27 | 07/21/27 | 8.8 | 8.8 |
|
150.0 |
RPL09.OFCI.C.4040 |
OFCI Delivery: FE Fiber for CFD B.2 (ROJ ) (RVCD ) | Data Hall B | Not Started | 07/13/27 | 07/19/27 | 6.2 | 6.2 |
|
185.0 |
RPL09.EY.DHA.01570 |
RPL09.EY.DHC - Install BMS Tie-ins | Build back Exterior Leave Out #17 (South) | Not Started | 07/14/27 | 07/27/27 | 12.5 | 12.5 |
|
198.8 |
RPL09.INT.CTRC.2560 |
RPL09.Interior.Center-Corridor LO #10 - Install Vertical Tube Steel Support for Cable Tray (IFP Add) | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 07/14/27 | 07/15/27 | 2.5 | 2.5 |
|
157.5 |
RPL09.INT.CTRC.2660 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install Mechanical Piping Lowside OH | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 07/14/27 | 07/16/27 | 3.8 | 3.8 |
|
130.0 |
RPL09.INT.CTRC.7760 |
RPL09.Interior.Center-Corridor LO #10 - Frame Out All Walls | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 07/14/27 | 07/16/27 | 3.8 | 3.8 |
|
131.2 |
RPL09.INT.ENDC.1560 |
RPL09.Interior.End-Corridor - BoW - Hang Drywall | Balance of Walls & Overhead | Not Started | 07/14/27 | 07/22/27 | 8.8 | 8.8 |
|
218.8 |
RPL09.CON.WP2.07280 |
RPL09.Conn - Ext. GSIDF9X01 - Install & Test Network (FIM) | Network | Not Started | 07/15/27 | 07/19/27 | 3.8 | 3.8 |
|
390.0 |
RPL09.CON.WP2.07480 |
RPL09.Conn - Ext. GSIDF9X02 - Install & Test Network (FIM) | Network | Not Started | 07/15/27 | 07/19/27 | 3.8 | 3.8 |
|
390.0 |
RPL09.CON.WP2.08440 |
RPL09.Conn - Ext. GSIDF9X03 - Install & Test Network (FIM) | Network | Not Started | 07/15/27 | 07/19/27 | 3.8 | 3.8 |
|
390.0 |
RPL09.CON.WP4.01200 |
RPL09.Conn WP4 FENW DHB CFD2 Infrastructure | Infrastructure | Not Started | 07/15/27 | 08/11/27 | 25.0 | 25.0 |
|
202.5 |
RPL09.CX.DHB.01380 |
RPL09.CX.DHB - L3/L4 - Control Fault Domain 03 - FW Flush and Fill | Control Fault Domain 3 | Not Started | 07/15/27 | 07/23/27 | 8.8 | 8.8 |
|
146.2 |
RPL09.INT.DHA.01360 |
RPL09.Interior.DHA - Control Fault Domain 2 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/15/27 | 08/11/27 | 25.0 | 25.0 |
|
92.5 |
RPL09.INT.DHA.01410 |
RPL09.Interior.DHA - Control Fault Domain 3 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/15/27 | 08/11/27 | 25.0 | 25.0 |
|
112.5 |
RPL09.INT.DHA.01420 |
RPL09.Interior.DHA - Control Fault Domain 3 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/15/27 | 08/11/27 | 25.0 | 25.0 |
|
106.2 |
RPL09.INT.DHA.02220 |
RPL09.Interior.DHA - Control Fault Domain 3 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/15/27 | 08/11/27 | 25.0 | 25.0 |
|
106.2 |
RPL09.INT.DHA.03700 |
RPL09.Interior.DHA - OFE - Control Fault Domain 4 (Mech Side Aisle) | Control Fault Domain 4 | Not Started | 07/15/27 | 07/26/27 | 10.0 | 10.0 |
|
113.8 |
RPL09.INT.DHA.03800 |
RPL09.Interior.DHA - Control Fault Domain 3 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/15/27 | 08/11/27 | 25.0 | 25.0 |
|
106.2 |
RPL09.INT.DHB.01420 |
RPL09.Conn DHB - CFD2 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 07/15/27 | 07/19/27 | 3.8 | 3.8 |
|
171.2 |
RPL09.INT.DHB.01730 |
RPL09.Interior.DHB - Control Fault Domain 4 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/15/27 | 08/11/27 | 25.0 | 25.0 |
|
146.2 |
RPL09.INT.DHB.01760 |
RPL09.Interior.DHB - Control Fault Domain 4 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/15/27 | 08/11/27 | 25.0 | 25.0 |
|
127.5 |
RPL09.INT.DHB.02820 |
RPL09.Conn DHB - CFD2 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 07/15/27 | 07/19/27 | 3.8 | 3.8 |
|
192.5 |
RPL09.INT.DHD.02310 |
RPL09.Interior.DHD - OFE - Control Fault Domain 1 (Mech Side Aisle) | Control Fault Domain 1 | Not Started | 07/15/27 | 08/02/27 | 16.2 | 16.2 |
|
146.2 |
RPL09.INT.SBC.03960 |
RPL09.Interior.SSB-Corridor - BoW - Final Paint and Tube Steel Paint (IFP Add) | Balance of Walls & Overhead | Not Started | 07/15/27 | 07/23/27 | 8.8 | 8.8 |
|
138.8 |
RPL09.INT.SSB.02620 |
RPL09.Interior.SSB - BoW - ACT - Install ACT Tiles | Balance of Walls and OverHead | Not Started | 07/15/27 | 07/21/27 | 6.2 | 6.2 |
|
188.8 |
RPL09.INT.SSBC.01290 |
RPL09.Interior.SSB-Corridor - Install Cable Tray | Fit out | Not Started | 07/15/27 | 07/21/27 | 6.2 | 6.2 |
|
142.5 |
RPL09.INT.SSBC.01490 |
RPL09.Interior.SSB-Corridor - Remaining Mechanical DHB OFE TIe Ins | Fit out | Not Started | 07/15/27 | 07/21/27 | 6.2 | 6.2 |
|
213.8 |
RPL09.INT.SSBC.01500 |
RPL09.Interior.SSB-Corridor - Remaining Electrical DHB OFE TIe Ins | Fit out | Not Started | 07/15/27 | 07/21/27 | 6.2 | 6.2 |
|
213.8 |
RPL09.INT.CTRC.2580 |
RPL09.Interior.Center-Corridor LO #10 - Install Horizontal Steel Supports for Cable Tray (IFP Add) | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 07/16/27 | 07/20/27 | 3.8 | 3.8 |
|
157.5 |
RPL09.INT.DHC.01550 |
RPL09.Interior.DHC - Control Fault Domain 4 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 07/16/27 | 07/21/27 | 5.0 | 5.0 |
|
230.0 |
RPL09.INT.DHC.01580 |
RPL09.Interior.DHC - Tie-ins - Control Fault Domain 4 - WBS Summary | Control Fault Domain 4 | Not Started | 07/16/27 | 12/03/27 | 121.2 | 121.2 |
|
182.5 |
RPL09.INT.SSB.06485 |
RPL09.Interior.SSB LO #16 - Final Punch Walk | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 07/16/27 | 07/22/27 | 6.2 | 6.2 |
|
161.2 |
RPL09.WP4.012820 |
RPL09.Conn DHB.11.03 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/16/27 | 07/29/27 | 12.5 | 12.5 |
|
198.8 |
RPL09.WP4.012840 |
RPL09.Conn DHB.12.07 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/16/27 | 07/29/27 | 12.5 | 12.5 |
|
198.8 |
GCD.RPL09.4565 |
L3/L4 Finish EY - DHA | EY | Not Started | 07/19/27 | 07/19/27 | 0.0 | 0.0 |
|
218.8 |
RPL09.CX.DHA.01280 |
RPL09.CX.DHA - L3/L4 - Control Fault Domain 01 - TW Flush and Fill | Control Fault Domain 1 | Not Started | 07/19/27 | 07/28/27 | 10.0 | 10.0 |
|
123.8 |
RPL09.Conn.MS.01220 |
CorpNet FacNet Available (mCUP) | Connectivity Milestones | Not Started | 07/19/27 | 07/19/27 | 0.0 | 0.0 |
|
390.0 |
RPL09.INT.CTRC.01390 |
RPL09.Interior.Center-Corridor (N) - Set Equipment / Interior | Fit out (North) | Not Started | 07/19/27 | 07/23/27 | 6.2 | 6.2 |
|
141.2 |
RPL09.INT.CTRC.01410 |
RPL09.Interior.Center-Corridor (N) - Fire Life Safe Trim | Fit out (North) | Not Started | 07/19/27 | 07/22/27 | 5.0 | 5.0 |
|
131.2 |
RPL09.INT.CTRC.2680 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install Fire Life Safety Lowside OH | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 07/19/27 | 07/21/27 | 3.8 | 3.8 |
|
135.0 |
RPL09.INT.CTRC.2700 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install Plumbing Lowside OH | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 07/19/27 | 07/21/27 | 3.8 | 3.8 |
|
130.0 |
RPL09.INT.CTRC.7800 |
RPL09.Interior.Center-Corridor LO #10 - Install Mechanical Piping Lowside OH & In Wall | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 07/19/27 | 07/21/27 | 3.8 | 3.8 |
|
136.2 |
RPL09.INT.CTRC.7820 |
RPL09.Interior.Center-Corridor LO #10 - Install Fire Life Safety Lowside OH & In Wall | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 07/19/27 | 07/21/27 | 3.8 | 3.8 |
|
136.2 |
RPL09.INT.CTRC.7840 |
RPL09.Interior.Center-Corridor LO #10 - Install Plumbing Lowside OH & In Wall | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 07/19/27 | 07/21/27 | 3.8 | 3.8 |
|
136.2 |
RPL09.INT.CTRC.7860 |
RPL09.Interior.Center-Corridor LO #10 - Install Security Lowside OH & In Wall | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 07/19/27 | 07/21/27 | 3.8 | 3.8 |
|
136.2 |
RPL09.INT.CTRC.7880 |
RPL09.Interior.Center-Corridor LO #10 - Install Controls / EPMS / BMS OH & In Wall | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 07/19/27 | 07/21/27 | 3.8 | 3.8 |
|
136.2 |
RPL09.INT.CTRC.7900 |
RPL09.Interior.Center-Corridor LO #10 - Install Electrical Lowside OH & In Wall | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 07/19/27 | 07/26/27 | 7.5 | 7.5 |
|
132.5 |
RPL09.INT.DHB.01770 |
RPL09.Interior.DHB - Control Fault Domain 5 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/19/27 | 08/13/27 | 25.0 | 25.0 |
|
131.2 |
RPL09.INT.DHB.01780 |
RPL09.Interior.DHB - Control Fault Domain 5 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/19/27 | 08/13/27 | 25.0 | 25.0 |
|
138.8 |
RPL09.INT.DHB.01790 |
RPL09.Interior.DHB - Control Fault Domain 5 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/19/27 | 08/13/27 | 25.0 | 25.0 |
|
131.2 |
RPL09.INT.DHB.02280 |
RPL09.Interior.DHB - Control Fault Domain 5 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/19/27 | 08/13/27 | 25.0 | 25.0 |
|
131.2 |
RPL09.INT.ENDC.06900 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Mechanical L2 Checklist Completion | Restrooms | Not Started | 07/19/27 | 07/30/27 | 12.5 | 12.5 |
|
268.8 |
RPL09.INT.SSB.01600 |
RPL09.Interior.SSB - Loading Dock and Storage - Mechanical L2 Checklist Completion | Loading Dock and Storage | Not Started | 07/19/27 | 07/30/27 | 12.5 | 12.5 |
|
208.8 |
GCD.RPL09.3528 |
[RPL09] TC-C Ready : Production Cabling Start [DHB Rows 09-16] | TC-C Ready: Production Cabling - DHB | Not Started | 07/20/27 | 07/20/27 | 0.0 | 0.0 |
|
390.0 |
GCD.RPL09.4965 |
L3/L4 Start EY - DHD | EY | Not Started | 07/20/27 | 07/20/27 | 0.0 | 0.0 |
|
320.0 |
ICM.B9.2510.A |
[SSDCB4] L3/4 Start - DHA | Commissioning | Not Started | 07/20/27 | 07/20/27 | 0.0 | 0.0 |
|
218.8 |
RPL09.CON.WP3B.01160 |
RPL09.Conn EF2<>DHB13 - WBS Summary | EF2<>DHB.13 | Not Started | 07/20/27 | 08/03/27 | 13.8 | 13.8 |
|
197.5 |
RPL09.CX.DHA.01030 |
RPL09.CX.DHA - L3/L4 - House Power (for electrical) | DHA HOUSE POWER | Not Started | 07/20/27 | 08/02/27 | 12.5 | 12.5 |
|
76.2 |
RPL09.CX.DHB.01070 |
RPL09.CX.DHB - L3/L4 - House Power (for mechainical) | DHB HOUSE POWER | Not Started | 07/20/27 | 08/02/27 | 12.5 | 12.5 |
|
77.5 |
RPL09.CX.DHD.00000 |
RPL09.CX.DHD - L3, L4, IST - WBS Summary | DHD | Not Started | 07/20/27 | 09/19/28 | 365.0 | 365.0 |
|
12.5 |
RPL09.CX.DHD.01000 |
RPL09.CX.DHD - L3 - WBS Summary (Electrical) | DHD ELECTRICAL | Not Started | 07/20/27 | 12/02/27 | 117.5 | 117.5 |
|
202.5 |
RPL09.CX.DHD.01010 |
RPL09.CX.DHD - L3/L4 - MV Skids (8) Loop | DHD ELECTRICAL | Not Started | 07/20/27 | 07/29/27 | 10.0 | 10.0 |
|
202.5 |
RPL09.EY.DHA.01430 |
RPL09.EY.DHA - Install Irrigation | Hardscape and Landscape | Not Started | 07/20/27 | 08/02/27 | 12.5 | 12.5 |
|
365.0 |
RPL09.EY.DHA.01440 |
RPL09.EY.DHA - Install Exterior Signage | Hardscape and Landscape | Not Started | 07/20/27 | 08/02/27 | 12.5 | 12.5 |
|
240.0 |
RPL09.EY.DHB.01480 |
RPL09.EY.DHB - Install Landscaping | Hardscape and Landscape | Not Started | 07/20/27 | 08/02/27 | 12.5 | 12.5 |
|
377.5 |
RPL09.EY.DHC.01340 |
RPL09.EY.DHC - Install Lighting | Hardscape and Landscape | Not Started | 07/20/27 | 08/02/27 | 12.5 | 12.5 |
|
333.8 |
RPL09.INT.CTRC.1780 |
RPL09.Interior.Center-Corridor - BoW - Install Asset Tags | Balance of Walls & Overhead | Not Started | 07/20/27 | 07/28/27 | 8.8 | 8.8 |
|
143.8 |
RPL09.INT.DHC.01650 |
RPL09.Interior.DHC - Control Fault Domain 4 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 07/20/27 | 07/23/27 | 5.0 | 5.0 |
|
287.5 |
RPL09.INT.SSB.14680 |
RPL09.Interior.SSB LO #01 to #05 - Final Clean | Finishes | Not Started | 07/20/27 | 07/23/27 | 5.0 | 5.0 |
|
168.8 |
RPL09.OFCI.C.4120 |
OFCI Delivery: FE Fiber for CFD A.1 (ROJ ) (RVCD ) | Data Hall A | Not Started | 07/20/27 | 07/26/27 | 6.2 | 6.2 |
|
191.2 |
RPL09.WP3B.012060 |
RPL09.Conn EF2<>DHB.13 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.13 | Not Started | 07/20/27 | 07/21/27 | 2.5 | 2.5 |
|
185.0 |
RPL09.WP4.011480 |
RPL09.Conn DHB.13 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 07/20/27 | 07/20/27 | 1.2 | 1.2 |
|
210.0 |
RPL09.WP4.011500 |
RPL09.Conn DHB.14 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 07/20/27 | 07/20/27 | 1.2 | 1.2 |
|
210.0 |
RPL09.WP4.011680 |
RPL09.Conn DHB.14.13 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/20/27 | 08/02/27 | 12.5 | 12.5 |
|
171.2 |
RPL09.WP4.012020 |
RPL09.Conn DHB.13 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 07/20/27 | 07/20/27 | 1.2 | 1.2 |
|
200.0 |
RPL09.WP4.012040 |
RPL09.Conn DHB.14 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 07/20/27 | 07/20/27 | 1.2 | 1.2 |
|
200.0 |
RPL09.WP4.013020 |
RPL09.Conn DHB.13.09 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/20/27 | 08/02/27 | 12.5 | 12.5 |
|
171.2 |
RPL09.CON.WP2.07940 |
RPL09.Conn - GSMDF2 (North) Test Network (FIM) | Network | Not Started | 07/21/27 | 07/23/27 | 3.8 | 3.8 |
|
322.5 |