Schedule Viewer

Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL09 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:12 PM · 5201 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL09.INT.CC.9200 RPL09.Interior.CC Ext. LO #17 - Fire Life Safety Trim Out Exterior Leave Out Wall #17 (CC - South) Not Started 07/09/27 07/09/27 1.2 1.2
0%
141.2
RPL09.INT.CTRC.8900 RPL09.Interior.Center-Corridor LO #10 & #12 - Install IMP Wall at Leave Out (DH D) Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 07/09/27 07/13/27 3.8 3.8
0%
130.0
RPL09.INT.DHC.01530 RPL09.Interior.DHC - Control Fault Domain 3 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 07/09/27 07/14/27 5.0 5.0
0%
295.0
RPL09.INT.SBC.03660 RPL09.Interior.SSB-Corridor - BoW - Install Horizontal Steel Supports for Cable Tray (IFP Add) Balance of Walls & Overhead Not Started 07/09/27 07/14/27 5.0 5.0
0%
138.8
GCD.RPL09.1735 Start FSHAC set in place - RPL09 - DHC&D Construction Milestones Not Started 07/12/27 07/12/27 0.0 0.0
0%
360.0
RPL.GF.D.N9100.XG Both GSEF Room Complete RPL 9 Give Milestones (XREFs) Not Started 07/12/27 07/12/27 0.0 0.0
0%
396.2
RPL09.INT.CC.9240 RPL09.Interior.CC Ext. LO #17 - Install Asset Tags Exterior Leave Out Wall #17 (CC - South) Not Started 07/12/27 07/12/27 1.2 1.2
0%
141.2
RPL09.INT.DHA.03680 RPL09.Interior.DHA - OFE - Control Fault Domain 4 (HAC) Control Fault Domain 4 Not Started 07/12/27 07/23/27 12.5 12.5
0%
90.0
RPL09.INT.DHD.02290 RPL09.Interior.DHD - OFE - Control Fault Domain 1 (HAC) Control Fault Domain 1 Not Started 07/12/27 07/30/27 18.8 18.8
0%
138.8
RPL09.INT.ENDC.06880 RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Electrical L2 Checklist Completion Restrooms Not Started 07/12/27 07/23/27 12.5 12.5
0%
268.8
RPL09.INT.SBC.03920 RPL09.Interior.SSB-Corridor - BoW - Install Asset Tags Balance of Walls & Overhead Not Started 07/12/27 07/20/27 8.8 8.8
0%
142.5
RPL09.INT.SSB.01570 RPL09.Interior.SSB - Loading Dock and Storage - Electrical L2 Checklist Completion Loading Dock and Storage Not Started 07/12/27 07/23/27 12.5 12.5
0%
208.8
RPL09.INT.SSB.06480 RPL09.Interior.SSB LO #16 - Final Clean Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 07/12/27 07/15/27 5.0 5.0
0%
161.2
GCD.RPL09.5885 RMU Loop Ready for Energization - DHC Loop EY Not Started 07/13/27 07/13/27 0.0 0.0
0%
218.8
RPL09.CON.WP2.07920 RPL09.Conn - EF2<>MDF2 Install Cabling (Pull, Splice & Terminate) OSP (MDF RPL10 <> MDF RPL09) Not Started 07/13/27 07/20/27 7.5 7.5
0%
322.5
RPL09.CON.WP2.08000 RPL09.Conn - EF1<>MDF1 Install Cabling (Pull, Splice & Terminate) OSP (MDF RPL10 <> MDF RPL09) Not Started 07/13/27 07/20/27 7.5 7.5
0%
322.5
RPL09.CX.DHB.01340 RPL09.CX.DHB - L3/L4 - Control Fault Domain 02 - TW Flush and Fill Control Fault Domain 2 Not Started 07/13/27 07/22/27 10.0 10.0
0%
137.5
RPL09.EY.DHA.01390 RPL09.EY.DHA - Install Remaining EY Paving Hardscape and Landscape Not Started 07/13/27 07/19/27 6.2 6.2
0%
240.0
RPL09.EY.DHC.01330 RPL09.EY.DHC - Install Early EY Paving Hardscape and Landscape Not Started 07/13/27 07/19/27 6.2 6.2
0%
333.8
RPL09.INT.CTRC.06900 RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Casework Restrooms Not Started 07/13/27 07/21/27 8.8 8.8
0%
117.5
RPL09.INT.CTRC.1360 RPL09.Interior.Center-Corridor - BoW - Install Split Systems/Humidifiers Balance of Walls & Overhead Not Started 07/13/27 07/19/27 6.2 6.2
0%
158.8
RPL09.INT.CTRC.1660 RPL09.Interior.Center-Corridor - BoW - Final Paint and Tube Steel Paint (IFP Add) Balance of Walls & Overhead Not Started 07/13/27 07/21/27 8.8 8.8
0%
141.2
RPL09.INT.CTRC.1800 RPL09.Interior.Center-Corridor - BoW - Install Door (Verify with Trades before installation) Balance of Walls & Overhead Not Started 07/13/27 07/21/27 8.8 8.8
0%
150.0
RPL09.OFCI.C.4040 OFCI Delivery: FE Fiber for CFD B.2 (ROJ ) (RVCD ) Data Hall B Not Started 07/13/27 07/19/27 6.2 6.2
0%
185.0
RPL09.EY.DHA.01570 RPL09.EY.DHC - Install BMS Tie-ins Build back Exterior Leave Out #17 (South) Not Started 07/14/27 07/27/27 12.5 12.5
0%
198.8
RPL09.INT.CTRC.2560 RPL09.Interior.Center-Corridor LO #10 - Install Vertical Tube Steel Support for Cable Tray (IFP Add) Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 07/14/27 07/15/27 2.5 2.5
0%
157.5
RPL09.INT.CTRC.2660 RPL09.Interior.Center-Corridor LO #10 & #12 - Install Mechanical Piping Lowside OH Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 07/14/27 07/16/27 3.8 3.8
0%
130.0
RPL09.INT.CTRC.7760 RPL09.Interior.Center-Corridor LO #10 - Frame Out All Walls Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 07/14/27 07/16/27 3.8 3.8
0%
131.2
RPL09.INT.ENDC.1560 RPL09.Interior.End-Corridor - BoW - Hang Drywall Balance of Walls & Overhead Not Started 07/14/27 07/22/27 8.8 8.8
0%
218.8
RPL09.CON.WP2.07280 RPL09.Conn - Ext. GSIDF9X01 - Install & Test Network (FIM) Network Not Started 07/15/27 07/19/27 3.8 3.8
0%
390.0
RPL09.CON.WP2.07480 RPL09.Conn - Ext. GSIDF9X02 - Install & Test Network (FIM) Network Not Started 07/15/27 07/19/27 3.8 3.8
0%
390.0
RPL09.CON.WP2.08440 RPL09.Conn - Ext. GSIDF9X03 - Install & Test Network (FIM) Network Not Started 07/15/27 07/19/27 3.8 3.8
0%
390.0
RPL09.CON.WP4.01200 RPL09.Conn WP4 FENW DHB CFD2 Infrastructure Infrastructure Not Started 07/15/27 08/11/27 25.0 25.0
0%
202.5
RPL09.CX.DHB.01380 RPL09.CX.DHB - L3/L4 - Control Fault Domain 03 - FW Flush and Fill Control Fault Domain 3 Not Started 07/15/27 07/23/27 8.8 8.8
0%
146.2
RPL09.INT.DHA.01360 RPL09.Interior.DHA - Control Fault Domain 2 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 07/15/27 08/11/27 25.0 25.0
0%
92.5
RPL09.INT.DHA.01410 RPL09.Interior.DHA - Control Fault Domain 3 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 07/15/27 08/11/27 25.0 25.0
0%
112.5
RPL09.INT.DHA.01420 RPL09.Interior.DHA - Control Fault Domain 3 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 07/15/27 08/11/27 25.0 25.0
0%
106.2
RPL09.INT.DHA.02220 RPL09.Interior.DHA - Control Fault Domain 3 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 07/15/27 08/11/27 25.0 25.0
0%
106.2
RPL09.INT.DHA.03700 RPL09.Interior.DHA - OFE - Control Fault Domain 4 (Mech Side Aisle) Control Fault Domain 4 Not Started 07/15/27 07/26/27 10.0 10.0
0%
113.8
RPL09.INT.DHA.03800 RPL09.Interior.DHA - Control Fault Domain 3 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 07/15/27 08/11/27 25.0 25.0
0%
106.2
RPL09.INT.DHB.01420 RPL09.Conn DHB - CFD2 - Set Passive Racks for WP#3b (16) Infrastructure Not Started 07/15/27 07/19/27 3.8 3.8
0%
171.2
RPL09.INT.DHB.01730 RPL09.Interior.DHB - Control Fault Domain 4 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 07/15/27 08/11/27 25.0 25.0
0%
146.2
RPL09.INT.DHB.01760 RPL09.Interior.DHB - Control Fault Domain 4 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) Remaining Tie-ins post Mech Side Aisle install Not Started 07/15/27 08/11/27 25.0 25.0
0%
127.5
RPL09.INT.DHB.02820 RPL09.Conn DHB - CFD2 - Set Passive Racks for PON (16) Infrastructure Not Started 07/15/27 07/19/27 3.8 3.8
0%
192.5
RPL09.INT.DHD.02310 RPL09.Interior.DHD - OFE - Control Fault Domain 1 (Mech Side Aisle) Control Fault Domain 1 Not Started 07/15/27 08/02/27 16.2 16.2
0%
146.2
RPL09.INT.SBC.03960 RPL09.Interior.SSB-Corridor - BoW - Final Paint and Tube Steel Paint (IFP Add) Balance of Walls & Overhead Not Started 07/15/27 07/23/27 8.8 8.8
0%
138.8
RPL09.INT.SSB.02620 RPL09.Interior.SSB - BoW - ACT - Install ACT Tiles Balance of Walls and OverHead Not Started 07/15/27 07/21/27 6.2 6.2
0%
188.8
RPL09.INT.SSBC.01290 RPL09.Interior.SSB-Corridor - Install Cable Tray Fit out Not Started 07/15/27 07/21/27 6.2 6.2
0%
142.5
RPL09.INT.SSBC.01490 RPL09.Interior.SSB-Corridor - Remaining Mechanical DHB OFE TIe Ins Fit out Not Started 07/15/27 07/21/27 6.2 6.2
0%
213.8
RPL09.INT.SSBC.01500 RPL09.Interior.SSB-Corridor - Remaining Electrical DHB OFE TIe Ins Fit out Not Started 07/15/27 07/21/27 6.2 6.2
0%
213.8
RPL09.INT.CTRC.2580 RPL09.Interior.Center-Corridor LO #10 - Install Horizontal Steel Supports for Cable Tray (IFP Add) Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 07/16/27 07/20/27 3.8 3.8
0%
157.5
RPL09.INT.DHC.01550 RPL09.Interior.DHC - Control Fault Domain 4 - Install Duct (LV Side) LV Side Tie-ins Not Started 07/16/27 07/21/27 5.0 5.0
0%
230.0
RPL09.INT.DHC.01580 RPL09.Interior.DHC - Tie-ins - Control Fault Domain 4 - WBS Summary Control Fault Domain 4 Not Started 07/16/27 12/03/27 121.2 121.2
0%
182.5
RPL09.INT.SSB.06485 RPL09.Interior.SSB LO #16 - Final Punch Walk Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 07/16/27 07/22/27 6.2 6.2
0%
161.2
RPL09.WP4.012820 RPL09.Conn DHB.11.03 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 07/16/27 07/29/27 12.5 12.5
0%
198.8
RPL09.WP4.012840 RPL09.Conn DHB.12.07 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 07/16/27 07/29/27 12.5 12.5
0%
198.8
GCD.RPL09.4565 L3/L4 Finish EY - DHA EY Not Started 07/19/27 07/19/27 0.0 0.0
0%
218.8
RPL09.CX.DHA.01280 RPL09.CX.DHA - L3/L4 - Control Fault Domain 01 - TW Flush and Fill Control Fault Domain 1 Not Started 07/19/27 07/28/27 10.0 10.0
0%
123.8
RPL09.Conn.MS.01220 CorpNet FacNet Available (mCUP) Connectivity Milestones Not Started 07/19/27 07/19/27 0.0 0.0
0%
390.0
RPL09.INT.CTRC.01390 RPL09.Interior.Center-Corridor (N) - Set Equipment / Interior Fit out (North) Not Started 07/19/27 07/23/27 6.2 6.2
0%
141.2
RPL09.INT.CTRC.01410 RPL09.Interior.Center-Corridor (N) - Fire Life Safe Trim Fit out (North) Not Started 07/19/27 07/22/27 5.0 5.0
0%
131.2
RPL09.INT.CTRC.2680 RPL09.Interior.Center-Corridor LO #10 & #12 - Install Fire Life Safety Lowside OH Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 07/19/27 07/21/27 3.8 3.8
0%
135.0
RPL09.INT.CTRC.2700 RPL09.Interior.Center-Corridor LO #10 & #12 - Install Plumbing Lowside OH Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 07/19/27 07/21/27 3.8 3.8
0%
130.0
RPL09.INT.CTRC.7800 RPL09.Interior.Center-Corridor LO #10 - Install Mechanical Piping Lowside OH & In Wall Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 07/19/27 07/21/27 3.8 3.8
0%
136.2
RPL09.INT.CTRC.7820 RPL09.Interior.Center-Corridor LO #10 - Install Fire Life Safety Lowside OH & In Wall Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 07/19/27 07/21/27 3.8 3.8
0%
136.2
RPL09.INT.CTRC.7840 RPL09.Interior.Center-Corridor LO #10 - Install Plumbing Lowside OH & In Wall Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 07/19/27 07/21/27 3.8 3.8
0%
136.2
RPL09.INT.CTRC.7860 RPL09.Interior.Center-Corridor LO #10 - Install Security Lowside OH & In Wall Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 07/19/27 07/21/27 3.8 3.8
0%
136.2
RPL09.INT.CTRC.7880 RPL09.Interior.Center-Corridor LO #10 - Install Controls / EPMS / BMS OH & In Wall Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 07/19/27 07/21/27 3.8 3.8
0%
136.2
RPL09.INT.CTRC.7900 RPL09.Interior.Center-Corridor LO #10 - Install Electrical Lowside OH & In Wall Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 07/19/27 07/26/27 7.5 7.5
0%
132.5
RPL09.INT.DHB.01770 RPL09.Interior.DHB - Control Fault Domain 5 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 07/19/27 08/13/27 25.0 25.0
0%
131.2
RPL09.INT.DHB.01780 RPL09.Interior.DHB - Control Fault Domain 5 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 07/19/27 08/13/27 25.0 25.0
0%
138.8
RPL09.INT.DHB.01790 RPL09.Interior.DHB - Control Fault Domain 5 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 07/19/27 08/13/27 25.0 25.0
0%
131.2
RPL09.INT.DHB.02280 RPL09.Interior.DHB - Control Fault Domain 5 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 07/19/27 08/13/27 25.0 25.0
0%
131.2
RPL09.INT.ENDC.06900 RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Mechanical L2 Checklist Completion Restrooms Not Started 07/19/27 07/30/27 12.5 12.5
0%
268.8
RPL09.INT.SSB.01600 RPL09.Interior.SSB - Loading Dock and Storage - Mechanical L2 Checklist Completion Loading Dock and Storage Not Started 07/19/27 07/30/27 12.5 12.5
0%
208.8
GCD.RPL09.3528 [RPL09] TC-C Ready : Production Cabling Start [DHB Rows 09-16] TC-C Ready: Production Cabling - DHB Not Started 07/20/27 07/20/27 0.0 0.0
0%
390.0
GCD.RPL09.4965 L3/L4 Start EY - DHD EY Not Started 07/20/27 07/20/27 0.0 0.0
0%
320.0
ICM.B9.2510.A [SSDCB4] L3/4 Start - DHA Commissioning Not Started 07/20/27 07/20/27 0.0 0.0
0%
218.8
RPL09.CON.WP3B.01160 RPL09.Conn EF2<>DHB13 - WBS Summary EF2<>DHB.13 Not Started 07/20/27 08/03/27 13.8 13.8
0%
197.5
RPL09.CX.DHA.01030 RPL09.CX.DHA - L3/L4 - House Power (for electrical) DHA HOUSE POWER Not Started 07/20/27 08/02/27 12.5 12.5
0%
76.2
RPL09.CX.DHB.01070 RPL09.CX.DHB - L3/L4 - House Power (for mechainical) DHB HOUSE POWER Not Started 07/20/27 08/02/27 12.5 12.5
0%
77.5
RPL09.CX.DHD.00000 RPL09.CX.DHD - L3, L4, IST - WBS Summary DHD Not Started 07/20/27 09/19/28 365.0 365.0
0%
12.5
RPL09.CX.DHD.01000 RPL09.CX.DHD - L3 - WBS Summary (Electrical) DHD ELECTRICAL Not Started 07/20/27 12/02/27 117.5 117.5
0%
202.5
RPL09.CX.DHD.01010 RPL09.CX.DHD - L3/L4 - MV Skids (8) Loop DHD ELECTRICAL Not Started 07/20/27 07/29/27 10.0 10.0
0%
202.5
RPL09.EY.DHA.01430 RPL09.EY.DHA - Install Irrigation Hardscape and Landscape Not Started 07/20/27 08/02/27 12.5 12.5
0%
365.0
RPL09.EY.DHA.01440 RPL09.EY.DHA - Install Exterior Signage Hardscape and Landscape Not Started 07/20/27 08/02/27 12.5 12.5
0%
240.0
RPL09.EY.DHB.01480 RPL09.EY.DHB - Install Landscaping Hardscape and Landscape Not Started 07/20/27 08/02/27 12.5 12.5
0%
377.5
RPL09.EY.DHC.01340 RPL09.EY.DHC - Install Lighting Hardscape and Landscape Not Started 07/20/27 08/02/27 12.5 12.5
0%
333.8
RPL09.INT.CTRC.1780 RPL09.Interior.Center-Corridor - BoW - Install Asset Tags Balance of Walls & Overhead Not Started 07/20/27 07/28/27 8.8 8.8
0%
143.8
RPL09.INT.DHC.01650 RPL09.Interior.DHC - Control Fault Domain 4 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 07/20/27 07/23/27 5.0 5.0
0%
287.5
RPL09.INT.SSB.14680 RPL09.Interior.SSB LO #01 to #05 - Final Clean Finishes Not Started 07/20/27 07/23/27 5.0 5.0
0%
168.8
RPL09.OFCI.C.4120 OFCI Delivery: FE Fiber for CFD A.1 (ROJ ) (RVCD ) Data Hall A Not Started 07/20/27 07/26/27 6.2 6.2
0%
191.2
RPL09.WP3B.012060 RPL09.Conn EF2<>DHB.13 Pull Pigtails (384F) P2&3 (LV) EF2<>DHB.13 Not Started 07/20/27 07/21/27 2.5 2.5
0%
185.0
RPL09.WP4.011480 RPL09.Conn DHB.13 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 07/20/27 07/20/27 1.2 1.2
0%
210.0
RPL09.WP4.011500 RPL09.Conn DHB.14 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 07/20/27 07/20/27 1.2 1.2
0%
210.0
RPL09.WP4.011680 RPL09.Conn DHB.14.13 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 07/20/27 08/02/27 12.5 12.5
0%
171.2
RPL09.WP4.012020 RPL09.Conn DHB.13 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 07/20/27 07/20/27 1.2 1.2
0%
200.0
RPL09.WP4.012040 RPL09.Conn DHB.14 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 07/20/27 07/20/27 1.2 1.2
0%
200.0
RPL09.WP4.013020 RPL09.Conn DHB.13.09 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 07/20/27 08/02/27 12.5 12.5
0%
171.2
RPL09.CON.WP2.07940 RPL09.Conn - GSMDF2 (North) Test Network (FIM) Network Not Started 07/21/27 07/23/27 3.8 3.8
0%
322.5