Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL09 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:12 PM
· 5201 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
1
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL09.CON.WP3B.01920 |
RPL09.Conn EF1<>DHA.02 - WBS Summary | EF1<>DHA.02 | Not Started | 07/29/27 | 08/12/27 | 13.8 | 13.8 |
|
200.0 |
RPL09.CON.WP4.01400 |
RPL09.Conn WP4 FENW DHB CFD3 Infrastructure | Infrastructure | Not Started | 07/29/27 | 08/25/27 | 25.0 | 25.0 |
|
190.0 |
RPL09.CX.DHA.01320 |
RPL09.CX.DHA - L3/L4 - Control Fault Domain 02 - FW Flush and Fill | Control Fault Domain 2 | Not Started | 07/29/27 | 08/06/27 | 8.8 | 8.8 |
|
125.0 |
RPL09.CX.DHB.01560 |
RPL09.CX.DHB - L3/L4 - Control Fault Domain 04 - FW Flush and Fill | Control Fault Domain 4 | Not Started | 07/29/27 | 08/06/27 | 8.8 | 8.8 |
|
153.8 |
RPL09.INT.CTRC.01440 |
RPL09.Interior.Center-Corridor (N) - Plumbing Trim | Fit out (North) | Not Started | 07/29/27 | 08/03/27 | 5.0 | 5.0 |
|
131.2 |
RPL09.INT.CTRC.06980 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Install Tile/ Grout | Restrooms | Not Started | 07/29/27 | 08/11/27 | 12.5 | 12.5 |
|
122.5 |
RPL09.INT.CTRC.07000 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Install Fixtures, Partitions & Accessories | Restrooms | Not Started | 07/29/27 | 08/06/27 | 8.8 | 8.8 |
|
117.5 |
RPL09.INT.DHA.01480 |
RPL09.Interior.DHA - Control Fault Domain 2 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/29/27 | 08/25/27 | 25.0 | 25.0 |
|
92.5 |
RPL09.INT.DHA.01500 |
RPL09.Interior.DHA - Control Fault Domain 3 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/29/27 | 08/25/27 | 25.0 | 25.0 |
|
145.0 |
RPL09.INT.DHA.01530 |
RPL09.Interior.DHA - Control Fault Domain 3 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/29/27 | 08/25/27 | 25.0 | 25.0 |
|
106.2 |
RPL09.INT.DHA.01550 |
RPL09.Interior.DHA - Control Fault Domain 4 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/29/27 | 08/25/27 | 25.0 | 25.0 |
|
120.0 |
RPL09.INT.DHA.01560 |
RPL09.Interior.DHA - Control Fault Domain 4 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/29/27 | 08/25/27 | 25.0 | 25.0 |
|
113.8 |
RPL09.INT.DHA.02240 |
RPL09.Interior.DHA - Control Fault Domain 4 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/29/27 | 08/25/27 | 25.0 | 25.0 |
|
113.8 |
RPL09.INT.DHA.03780 |
RPL09.Interior.DHA - Control Fault Domain 4 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/29/27 | 08/25/27 | 25.0 | 25.0 |
|
113.8 |
RPL09.INT.DHB.01560 |
RPL09.Conn DHB - CFD3 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 07/29/27 | 08/02/27 | 3.8 | 3.8 |
|
158.8 |
RPL09.INT.DHB.02840 |
RPL09.Conn DHB - CFD3 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 07/29/27 | 08/02/27 | 3.8 | 3.8 |
|
186.2 |
RPL09.INT.SSB.02460 |
RPL09.Interior.SSB - BoW - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Balance of Walls and OverHead | Not Started | 07/29/27 | 08/04/27 | 6.2 | 6.2 |
|
188.8 |
RPL09.INT.SSB.06960 |
RPL09.Interior.SSB - BoW - QC | Balance of Walls and OverHead | Not Started | 07/29/27 | 08/04/27 | 6.2 | 6.2 |
|
188.8 |
RPL09.WP3B.011120 |
RPL09.Conn EF1<>DHA.02 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHA.02 | Not Started | 07/29/27 | 07/30/27 | 2.5 | 2.5 |
|
191.2 |
RPL09.WP3B.012540 |
RPL09.Conn EF1<>DHA.01 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.01 | Not Started | 07/29/27 | 07/29/27 | 1.2 | 1.2 |
|
202.5 |
RPL09.WP4.010680 |
RPL09.Conn DHB.11.01<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 07/29/27 | 07/29/27 | 1.2 | 1.2 |
|
211.2 |
RPL09.WP4.010700 |
RPL09.Conn DHB.12.05<>05 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 07/29/27 | 07/29/27 | 1.2 | 1.2 |
|
211.2 |
RPL09.WP4.011120 |
RPL09.Conn DHB.12.06<>05 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 07/29/27 | 07/29/27 | 1.2 | 1.2 |
|
208.8 |
RPL09.WP4.011360 |
RPL09.Conn DHA.01 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 07/29/27 | 07/30/27 | 2.5 | 2.5 |
|
213.8 |
RPL09.WP4.011380 |
RPL09.Conn DHA.02 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 07/29/27 | 07/30/27 | 2.5 | 2.5 |
|
213.8 |
RPL09.WP4.011780 |
RPL09.Conn DHB.12.07<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 07/29/27 | 07/29/27 | 1.2 | 1.2 |
|
212.5 |
RPL09.WP4.011800 |
RPL09.Conn DHB.11.02<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 07/29/27 | 07/29/27 | 1.2 | 1.2 |
|
208.8 |
RPL09.WP4.012340 |
RPL09.Conn DHB.11.04<>03 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 07/29/27 | 07/29/27 | 1.2 | 1.2 |
|
210.0 |
RPL09.WP4.012360 |
RPL09.Conn DHB.12.08<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 07/29/27 | 07/29/27 | 1.2 | 1.2 |
|
210.0 |
RPL09.WP4.012940 |
RPL09.Conn DHB.13.10<>09 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 07/29/27 | 08/03/27 | 5.0 | 5.0 |
|
200.0 |
RPL09.WP4.012960 |
RPL09.Conn DHB.14.14<>13 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 07/29/27 | 08/03/27 | 5.0 | 5.0 |
|
200.0 |
GCD.RPL09.4945 |
L3 Finish - DHD | DH | Not Started | 07/30/27 | 07/30/27 | 0.0 | 0.0 |
|
310.0 |
GCD.RPL09.5325 |
L3/L4 Start EY - DHC | EY | Not Started | 07/30/27 | 07/30/27 | 0.0 | 0.0 |
|
321.2 |
ICM.B9.2510.D |
[SSDCB4] L3/4 Start - DHD | Commissioning | Not Started | 07/30/27 | 07/30/27 | 0.0 | 0.0 |
|
310.0 |
RPL09.CX.DHC.01000 |
RPL09.CX.DHC - L3, L4, IST - WBS Summary | DHC | Not Started | 07/30/27 | 10/03/28 | 367.5 | 367.5 |
|
0.0 |
RPL09.CX.DHC.01010 |
RPL09.CX.DHC - L3 - WBS Summary (Electrical) | DHC ELECTRICAL | Not Started | 07/30/27 | 12/10/27 | 115.0 | 115.0 |
|
206.2 |
RPL09.CX.DHC.01020 |
RPL09.CX.DHC - L3/L4 - MV Skids (8) Loop | DHC ELECTRICAL | Not Started | 07/30/27 | 08/10/27 | 10.0 | 10.0 |
|
202.5 |
RPL09.CX.DHD.01020 |
RPL09.CX.DHD - L3/L4 - House Power (for electrical) | DHD HOUSE POWER | Not Started | 07/30/27 | 08/12/27 | 12.5 | 12.5 |
|
205.0 |
RPL09.INT.CTRC.7920 |
RPL09.Interior.Center-Corridor LO #10 - Hard Lid Rough-In | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 07/30/27 | 08/04/27 | 5.0 | 5.0 |
|
132.5 |
RPL09.INT.ENDC.1700 |
RPL09.Interior.End-Corridor - BoW - Plumbing Trim Out | Balance of Walls & Overhead | Not Started | 07/30/27 | 08/05/27 | 6.2 | 6.2 |
|
218.8 |
RPL09.INT.ENDC.1720 |
RPL09.Interior.End-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls & Overhead | Not Started | 07/30/27 | 08/09/27 | 8.8 | 8.8 |
|
218.8 |
RPL09.WP3B.013980 |
RPL09.Conn EF1<>DHA.01 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.01 | Not Started | 07/30/27 | 08/06/27 | 7.5 | 7.5 |
|
202.5 |
RPL09.WP3B.015420 |
RPL09.Conn EF1<>DHA.01 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.01 | Not Started | 07/30/27 | 07/30/27 | 1.2 | 1.2 |
|
202.5 |
RPL09.WP4.010840 |
RPL09.Conn DHB.11.03<>03 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 07/30/27 | 07/30/27 | 1.2 | 1.2 |
|
211.2 |
RPL09.WP4.014960 |
RPL09.Conn DHB.11.04 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/30/27 | 08/12/27 | 12.5 | 12.5 |
|
198.8 |
RPL09.WP4.014980 |
RPL09.Conn DHB.12.08 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/30/27 | 08/12/27 | 12.5 | 12.5 |
|
198.8 |
RPL09.INT.CTRC.1820 |
RPL09.Interior.Center-Corridor - BoW - Electrical L2 Checklist Completion | Balance of Walls & Overhead | Not Started | 08/02/27 | 08/13/27 | 12.5 | 12.5 |
|
141.2 |
RPL09.INT.CTRC.2780 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install Door Frames | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/02/27 | 08/03/27 | 2.5 | 2.5 |
|
130.0 |
RPL09.INT.DHA.03760 |
RPL09.Interior.DHA - OFE - Control Fault Domain 5 (Mech Side Aisle) | Control Fault Domain 5 | Not Started | 08/02/27 | 08/11/27 | 10.0 | 10.0 |
|
117.5 |
RPL09.INT.DHB.01860 |
RPL09.Interior.DHB - Control Fault Domain 5 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/02/27 | 08/27/27 | 25.0 | 25.0 |
|
131.2 |
RPL09.INT.DHB.01900 |
RPL09.Interior.DHB - Control Fault Domain 5 - Install copper from GS.IDF to BMS and EPMS panels (UG from Corr IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/02/27 | 08/27/27 | 25.0 | 25.0 |
|
132.5 |
RPL09.INT.DHD.02350 |
RPL09.Interior.DHD - OFE - Control Fault Domain 2 (HAC) | Control Fault Domain 2 | Not Started | 08/02/27 | 08/13/27 | 12.5 | 12.5 |
|
138.8 |
RPL09.INT.SSB.01630 |
RPL09.Interior.SSB - Loading Dock and Storage - Final Clean | Loading Dock and Storage | Not Started | 08/02/27 | 08/05/27 | 5.0 | 5.0 |
|
208.8 |
RPL09.INT.SSBC.01380 |
RPL09.Interior.SSB-Corridor - Install & QC Asset Tagging | Fit out | Not Started | 08/02/27 | 08/03/27 | 2.5 | 2.5 |
|
211.2 |
RPL09.INT.SSBC.01440 |
RPL09.Interior.SSB-Corridor - Electrical L2 Checklist Completion | Fit out | Not Started | 08/02/27 | 08/13/27 | 12.5 | 12.5 |
|
142.5 |
RPL09.WP3B.012560 |
RPL09.Conn EF1<>DHA.02 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.02 | Not Started | 08/02/27 | 08/02/27 | 1.2 | 1.2 |
|
200.0 |
RPL09.WP3B.017820 |
RPL09.Conn EF2<>DHB.13 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.13 | Not Started | 08/02/27 | 08/03/27 | 2.5 | 2.5 |
|
197.5 |
RPL09.WP4.012180 |
RPL09.Conn DHA.01.03<>03 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 08/02/27 | 08/04/27 | 3.8 | 3.8 |
|
205.0 |
RPL09.WP4.012200 |
RPL09.Conn DHA.02.07<>07 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/02/27 | 08/04/27 | 3.8 | 3.8 |
|
205.0 |
DCC.B9.3165 |
[SSDCB4] PortMaps Delivered : GS | Connectivity | Not Started | 08/03/27 | 08/03/27 | 0.0 | 0.0 |
|
377.5 |
DCC.B9.3170 |
[SSDCB4] PortMaps Delivered : Elevations & Cabling | Connectivity | Not Started | 08/03/27 | 08/03/27 | 0.0 | 0.0 |
|
377.5 |
DCC.B9.3175 |
[SSDCB4] PortMaps Delivered : Backbone | Connectivity | Not Started | 08/03/27 | 08/03/27 | 0.0 | 0.0 |
|
377.5 |
DCC.B9.3180 |
[SSDCB4] PortMaps Delivered : Front End | Connectivity | Not Started | 08/03/27 | 08/03/27 | 0.0 | 0.0 |
|
377.5 |
DCC.B9.3460 |
[SSDCB4] Production Dark Fiber Path 1 - Circuit Delivered **Pred?? only for RPL10?? | Connectivity | Not Started | 08/03/27 | 08/03/27 | 0.0 | 0.0 |
|
377.5 |
GCD.RPL09.3529 |
[RPL09] TC-C Ready : Production Cabling Start [DHB Rows 17-24] | TC-C Ready: Production Cabling - DHB | Not Started | 08/03/27 | 08/03/27 | 0.0 | 0.0 |
|
377.5 |
RPL09.CON.WP2.11060 |
RPL09.Conn - GSMDF1(South)<>DH B - CFD3 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH B - Rack#01 MES side | Not Started | 08/03/27 | 08/05/27 | 3.8 | 3.8 |
|
193.8 |
RPL09.CON.WP3B.01240 |
RPL09.Conn EF2<>DHB.15 - WBS Summary | EF2<>DHB.15 | Not Started | 08/03/27 | 08/17/27 | 13.8 | 13.8 |
|
187.5 |
RPL09.CX.DHA.01070 |
RPL09.CX.DHA - L3/L4 - House Power (for mechainical) | DHA HOUSE POWER | Not Started | 08/03/27 | 08/16/27 | 12.5 | 12.5 |
|
76.2 |
RPL09.EY.DHA.01480 |
RPL09.EY.DHA - Install Landscaping | Hardscape and Landscape | Not Started | 08/03/27 | 08/16/27 | 12.5 | 12.5 |
|
365.0 |
RPL09.INT.DHD.01170 |
RPL09.Interior.DHD - Control Fault Domain 1 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/03/27 | 08/30/27 | 25.0 | 25.0 |
|
190.0 |
RPL09.INT.DHD.01180 |
RPL09.Interior.DHD - Control Fault Domain 1 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/03/27 | 08/30/27 | 25.0 | 25.0 |
|
190.0 |
RPL09.INT.DHD.01190 |
RPL09.Interior.DHD - Control Fault Domain 1 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/03/27 | 08/30/27 | 25.0 | 25.0 |
|
177.5 |
RPL09.WP3B.012100 |
RPL09.Conn EF2<>DHB.15 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.15 | Not Started | 08/03/27 | 08/04/27 | 2.5 | 2.5 |
|
177.5 |
RPL09.WP3B.014000 |
RPL09.Conn EF1<>DHA.02 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.02 | Not Started | 08/03/27 | 08/10/27 | 7.5 | 7.5 |
|
200.0 |
RPL09.WP3B.015440 |
RPL09.Conn EF1<>DHA.02 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.02 | Not Started | 08/03/27 | 08/03/27 | 1.2 | 1.2 |
|
200.0 |
RPL09.WP4.012140 |
RPL09.Conn DHA.01.01<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 08/03/27 | 08/03/27 | 1.2 | 1.2 |
|
218.8 |
RPL09.WP4.012160 |
RPL09.Conn DHA.02.05<>05 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/03/27 | 08/03/27 | 1.2 | 1.2 |
|
218.8 |
RPL09.WP4.013140 |
RPL09.Conn DHB.14.14 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/03/27 | 08/16/27 | 12.5 | 12.5 |
|
171.2 |
RPL09.WP4.013760 |
RPL09.Conn DHB.15 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 08/03/27 | 08/03/27 | 1.2 | 1.2 |
|
197.5 |
RPL09.WP4.013780 |
RPL09.Conn DHB.16 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 08/03/27 | 08/03/27 | 1.2 | 1.2 |
|
197.5 |
RPL09.WP4.014120 |
RPL09.Conn DHB.15.17 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/03/27 | 08/16/27 | 12.5 | 12.5 |
|
158.8 |
RPL09.WP4.014140 |
RPL09.Conn DHB.16.21 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/03/27 | 08/16/27 | 12.5 | 12.5 |
|
158.8 |
RPL09.WP4.014400 |
RPL09.Conn DHB.15 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/03/27 | 08/03/27 | 1.2 | 1.2 |
|
187.5 |
RPL09.WP4.014420 |
RPL09.Conn DHB.16 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/03/27 | 08/03/27 | 1.2 | 1.2 |
|
187.5 |
RPL09.WP4.015020 |
RPL09.Conn DHB.13.10 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/03/27 | 08/16/27 | 12.5 | 12.5 |
|
171.2 |
RPL09.INT.CTRC.01450 |
RPL09.Interior.Center-Corridor (N) - Install DAS (Distribution Antenna System) | Fit out (North) | Not Started | 08/04/27 | 08/10/27 | 6.2 | 6.2 |
|
131.2 |
RPL09.INT.CTRC.2980 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Fire Safing OH | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/04/27 | 08/05/27 | 2.5 | 2.5 |
|
130.0 |
RPL09.INT.ENDC.1740 |
RPL09.Interior.End-Corridor - BoW - Install Remaining Lights | Balance of Walls & Overhead | Not Started | 08/04/27 | 08/17/27 | 12.5 | 12.5 |
|
231.2 |
RPL09.INT.ENDC.1800 |
RPL09.Interior.End-Corridor - BoW - Install Door (Verify with Trades before installation) | Balance of Walls & Overhead | Not Started | 08/04/27 | 08/12/27 | 8.8 | 8.8 |
|
237.5 |
RPL09.INT.SBC.04000 |
RPL09.Interior.SSB-Corridor - BoW - Electrical L2 Checklist Completion | Balance of Walls & Overhead | Not Started | 08/04/27 | 08/17/27 | 12.5 | 12.5 |
|
138.8 |
RPL09.INT.SSBC.01430 |
RPL09.Interior.SSB-Corridor - Final Punch Walk | Fit out | Not Started | 08/04/27 | 08/05/27 | 2.5 | 2.5 |
|
211.2 |
RPL09.WP3B.017840 |
RPL09.Conn EF2<>DHB.14 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.14 | Not Started | 08/04/27 | 08/05/27 | 2.5 | 2.5 |
|
195.0 |
RPL09.WP4.013520 |
RPL09.Conn DHB.13.12<>11 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/04/27 | 08/09/27 | 5.0 | 5.0 |
|
200.0 |
RPL09.WP4.013540 |
RPL09.Conn DHB.14.16<>15 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 08/04/27 | 08/09/27 | 5.0 | 5.0 |
|
200.0 |
RPL09.WP4.014160 |
RPL09.Conn DHB.15 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 08/04/27 | 08/04/27 | 1.2 | 1.2 |
|
197.5 |
RPL09.WP4.014180 |
RPL09.Conn DHB.16 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 08/04/27 | 08/04/27 | 1.2 | 1.2 |
|
197.5 |
RPL09.WP4.014800 |
RPL09.Conn DHB.15.17<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/04/27 | 08/06/27 | 3.8 | 3.8 |
|
187.5 |
RPL09.WP4.014820 |
RPL09.Conn DHB.16.21<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/04/27 | 08/06/27 | 3.8 | 3.8 |
|
187.5 |
RPL09.WP4.014840 |
RPL09.Conn DHB.15 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/04/27 | 08/06/27 | 3.8 | 3.8 |
|
206.2 |
RPL09.WP4.014860 |
RPL09.Conn DHB.16 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/04/27 | 08/06/27 | 3.8 | 3.8 |
|
206.2 |