Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL09 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:12 PM
· 5201 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL09.CON.WP2.12060 |
RPL09.Conn - GSMDF2(North)<>DH B - CFD3 Rack #50 Pull, Install & Patch PON Trunks | MDF2 <> DH B - Rack#50 LV side | Not Started | 08/05/27 | 08/11/27 | 6.2 | 6.2 |
|
183.8 |
RPL09.CON.WP3B.01220 |
RPL09.Conn EF2<>DHB.16 - WBS Summary | EF2<>DHB.16 | Not Started | 08/05/27 | 08/19/27 | 13.8 | 13.8 |
|
182.5 |
RPL09.INT.CTRC.2500 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Close Interior LO #11 & #13 DHA/CC (For HACs in DHA) WBS Summary | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 08/05/27 | 10/05/27 | 53.8 | 53.8 |
|
90.0 |
RPL09.INT.CTRC.3540 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Install IMP Wall at Leave Out (DH A) | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 08/05/27 | 08/09/27 | 3.8 | 3.8 |
|
90.0 |
RPL09.INT.CTRC.3560 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Tie In MEPF with IMP Wall buildback | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 08/05/27 | 08/10/27 | 5.0 | 5.0 |
|
90.0 |
RPL09.INT.CTRC.7960 |
RPL09.Interior.Center-Corridor LO #10 - Backing | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 08/05/27 | 08/06/27 | 2.5 | 2.5 |
|
132.5 |
RPL09.INT.DHA.01580 |
RPL09.Interior.DHA - Control Fault Domain 4 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/05/27 | 09/01/27 | 25.0 | 25.0 |
|
120.0 |
RPL09.INT.DHA.01590 |
RPL09.Interior.DHA - Control Fault Domain 4 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/05/27 | 09/01/27 | 25.0 | 25.0 |
|
120.0 |
RPL09.INT.DHA.01600 |
RPL09.Interior.DHA - Control Fault Domain 4 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/05/27 | 09/01/27 | 25.0 | 25.0 |
|
113.8 |
RPL09.INT.DHA.01620 |
RPL09.Interior.DHA - Control Fault Domain 3 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/05/27 | 09/01/27 | 25.0 | 25.0 |
|
106.2 |
RPL09.INT.DHD.02370 |
RPL09.Interior.DHD - OFE - Control Fault Domain 2 (Mech Side Aisle) | Control Fault Domain 2 | Not Started | 08/05/27 | 08/16/27 | 10.0 | 10.0 |
|
143.8 |
RPL09.INT.SSB.01590 |
RPL09.Interior.SSB - BoW - Electrical L2 Checklist Completion | Balance of Walls and OverHead | Not Started | 08/05/27 | 08/16/27 | 10.0 | 10.0 |
|
188.8 |
RPL09.WP3B.012120 |
RPL09.Conn EF2<>DHB.16 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.16 | Not Started | 08/05/27 | 08/06/27 | 2.5 | 2.5 |
|
177.5 |
RPL09.WP3B.013540 |
RPL09.Conn EF2<>DHB.15 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.15 | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
187.5 |
RPL09.WP4.012380 |
RPL09.Conn DHA.01.03<>03 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
217.5 |
RPL09.WP4.012400 |
RPL09.Conn DHA.02.07<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
217.5 |
RPL09.WP4.012420 |
RPL09.Conn DHB.13.09<>09 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
205.0 |
RPL09.WP4.012440 |
RPL09.Conn DHB.14.13<>13 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
205.0 |
RPL09.WP4.012580 |
RPL09.Conn DHA.01.02<>01 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 08/05/27 | 08/10/27 | 5.0 | 5.0 |
|
205.0 |
RPL09.WP4.012600 |
RPL09.Conn DHA.02.06<>05 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/05/27 | 08/10/27 | 5.0 | 5.0 |
|
205.0 |
RPL09.WP4.012860 |
RPL09.Conn DHB.13.11<>11 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
206.2 |
RPL09.WP4.012880 |
RPL09.Conn DHB.14.15<>15 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
206.2 |
RPL09.WP4.013400 |
RPL09.Conn DHB.13.10<>09 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
202.5 |
RPL09.WP4.013420 |
RPL09.Conn DHB.14.14<>13 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
202.5 |
RPL09.WP4.014360 |
RPL09.Conn DHB.15 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
197.5 |
RPL09.WP4.014380 |
RPL09.Conn DHB.16 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
197.5 |
RPL09.CON.WP2.08780 |
RPL09.Conn - GSIDF/DH B1 - Install & Test Network (FIM) | Network | Not Started | 08/06/27 | 08/10/27 | 3.8 | 3.8 |
|
370.0 |
RPL09.EY.SSB.01300 |
RPL09.EY.SSB - Install Temp Paving | Hardscape and Landscape | Not Started | 08/06/27 | 08/19/27 | 12.5 | 12.5 |
|
161.2 |
RPL09.INT.CTRC.3240 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Duct Drops / Trim out | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/06/27 | 08/09/27 | 2.5 | 2.5 |
|
135.0 |
RPL09.INT.CTRC.3280 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install DAS (Distribution Antenna System) | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/06/27 | 08/06/27 | 1.2 | 1.2 |
|
130.0 |
RPL09.INT.CTRC.3360 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/06/27 | 08/10/27 | 3.8 | 3.8 |
|
138.8 |
RPL09.INT.CTRC.3500 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Fire Safing / Wall Finishes | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/06/27 | 08/09/27 | 2.5 | 2.5 |
|
133.8 |
RPL09.INT.CTRC.8920 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Install IMP Wall at Leave Out (DH C) | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 08/06/27 | 08/10/27 | 3.8 | 3.8 |
|
90.0 |
RPL09.INT.SSB.01640 |
RPL09.Interior.SSB - Loading Dock and Storage - Final Punch Walk | Loading Dock and Storage | Not Started | 08/06/27 | 08/09/27 | 2.5 | 2.5 |
|
208.8 |
RPL09.WP3B.014980 |
RPL09.Conn EF2<>DHB.15 Splice (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.15 | Not Started | 08/06/27 | 08/13/27 | 7.5 | 7.5 |
|
187.5 |
RPL09.WP3B.016420 |
RPL09.Conn EF2<>DHB.15 Install (Z-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.15 | Not Started | 08/06/27 | 08/06/27 | 1.2 | 1.2 |
|
187.5 |
RPL09.CX.DHA.01340 |
RPL09.CX.DHA - L3/L4 - Control Fault Domain 02 - TW Flush and Fill | Control Fault Domain 2 | Not Started | 08/09/27 | 08/18/27 | 10.0 | 10.0 |
|
125.0 |
RPL09.CX.DHB.01580 |
RPL09.CX.DHB - L3/L4 - Control Fault Domain 04 - TW Flush and Fill | Control Fault Domain 4 | Not Started | 08/09/27 | 08/18/27 | 10.0 | 10.0 |
|
153.8 |
RPL09.INT.CTRC.06960 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - MEP Trims | Restrooms | Not Started | 08/09/27 | 08/17/27 | 8.8 | 8.8 |
|
117.5 |
RPL09.INT.CTRC.1840 |
RPL09.Interior.Center-Corridor - BoW - Mechanical L2 Checklist Completion | Balance of Walls & Overhead | Not Started | 08/09/27 | 08/20/27 | 12.5 | 12.5 |
|
141.2 |
RPL09.INT.CTRC.3340 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install Remaining Lights | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/09/27 | 08/12/27 | 5.0 | 5.0 |
|
130.0 |
RPL09.INT.CTRC.8280 |
RPL09.Interior.Center-Corridor LO #10 - Install Door Frame | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 08/09/27 | 08/10/27 | 2.5 | 2.5 |
|
132.5 |
RPL09.INT.DHB.01990 |
RPL09.Interior.DHB - Control Fault Domain 5 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/09/27 | 09/03/27 | 25.0 | 25.0 |
|
132.5 |
RPL09.INT.DHC.02290 |
RPL09.Interior.DHC - OFE - Control Fault Domain 1 (HAC) | Control Fault Domain 1 | Not Started | 08/09/27 | 08/27/27 | 18.8 | 18.8 |
|
121.2 |
RPL09.WP3B.013560 |
RPL09.Conn EF2<>DHB.16 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.16 | Not Started | 08/09/27 | 08/09/27 | 1.2 | 1.2 |
|
182.5 |
RPL09.WP3B.016860 |
RPL09.Conn EF1<>DHA.01 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.01 | Not Started | 08/09/27 | 08/10/27 | 2.5 | 2.5 |
|
202.5 |
RPL09.WP4.015200 |
RPL09.Conn DHB.15.19<>19 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/09/27 | 08/11/27 | 3.8 | 3.8 |
|
187.5 |
RPL09.WP4.015220 |
RPL09.Conn DHB.16.23<>23 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/09/27 | 08/11/27 | 3.8 | 3.8 |
|
187.5 |
GCD.RPL09.5285 |
L3/L4 Finish EY - DHC | EY | Not Started | 08/10/27 | 08/10/27 | 0.0 | 0.0 |
|
311.2 |
RPL09.INT.CTRC.3200 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Electrical Trim Out | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/10/27 | 08/10/27 | 1.2 | 1.2 |
|
133.8 |
RPL09.INT.CTRC.3220 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Security Trim Out | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/10/27 | 08/10/27 | 1.2 | 1.2 |
|
133.8 |
RPL09.INT.DHD.01220 |
RPL09.Interior.DHD - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/10/27 | 09/07/27 | 25.0 | 25.0 |
|
177.5 |
RPL09.INT.ENDC.1420 |
RPL09.Interior.End-Corridor - BoW - Install Vertical Tube Steel for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 08/10/27 | 08/13/27 | 5.0 | 5.0 |
|
218.8 |
RPL09.OFCI.C.4080 |
OFCI Delivery: FE Fiber for CFD B.4 (ROJ ) (RVCD ) | Data Hall B | Not Started | 08/10/27 | 08/16/27 | 6.2 | 6.2 |
|
170.0 |
RPL09.OFCI.C.4140 |
OFCI Delivery: FE Fiber for CFD A.2 (ROJ ) (RVCD ) | Data Hall A | Not Started | 08/10/27 | 08/16/27 | 6.2 | 6.2 |
|
177.5 |
RPL09.WP3B.015000 |
RPL09.Conn EF2<>DHB.16 Splice (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.16 | Not Started | 08/10/27 | 08/17/27 | 7.5 | 7.5 |
|
182.5 |
RPL09.WP3B.016440 |
RPL09.Conn EF2<>DHB.16 Install (Z-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.16 | Not Started | 08/10/27 | 08/10/27 | 1.2 | 1.2 |
|
182.5 |
RPL09.WP4.012740 |
RPL09.Conn DHA.01.02 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/10/27 | 08/23/27 | 12.5 | 12.5 |
|
176.2 |
RPL09.WP4.012760 |
RPL09.Conn DHA.02.06 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/10/27 | 08/23/27 | 12.5 | 12.5 |
|
176.2 |
RPL09.WP4.014440 |
RPL09.Conn DHB.13.12<>11 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/10/27 | 08/10/27 | 1.2 | 1.2 |
|
200.0 |
RPL09.WP4.014460 |
RPL09.Conn DHB.14.16<>15 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 08/10/27 | 08/10/27 | 1.2 | 1.2 |
|
200.0 |
GCD.RPL09.5305 |
L3 Finish - DHC | DH | Not Started | 08/11/27 | 08/11/27 | 0.0 | 0.0 |
|
311.2 |
ICM.B9.2510.C |
[SSDCB4] L3/4 Start - DHC | Commissioning | Not Started | 08/11/27 | 08/11/27 | 0.0 | 0.0 |
|
311.2 |
RPL09.CX.DHC.01030 |
RPL09.CX.DHC - L3/L4 - House Power (for electrical) | DHC HOUSE POWER | Not Started | 08/11/27 | 08/24/27 | 12.5 | 12.5 |
|
202.5 |
RPL09.INT.CTRC.01460 |
RPL09.Interior.Center-Corridor (N) - Install Lighting | Fit out (North) | Not Started | 08/11/27 | 08/19/27 | 8.8 | 8.8 |
|
131.2 |
RPL09.INT.CTRC.3580 |
RPL09.Interior.Center-Corridor LO #11 - Install Remaining Vertical Tube Steel Support for Cable Tray (IFP Add) | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 08/11/27 | 08/12/27 | 2.5 | 2.5 |
|
132.5 |
RPL09.INT.CTRC.3600 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Install Mechanical Piping Lowside OH | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 08/11/27 | 08/13/27 | 3.8 | 3.8 |
|
90.0 |
RPL09.INT.CTRC.7980 |
RPL09.Interior.Center-Corridor LO #10 - QC | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 08/11/27 | 08/11/27 | 1.2 | 1.2 |
|
135.0 |
RPL09.INT.CTRC.8240 |
RPL09.Interior.Center-Corridor LO #10 - Fire Safing/ Wall Finishes | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 08/11/27 | 08/12/27 | 2.5 | 2.5 |
|
132.5 |
RPL09.INT.CTRC.8340 |
RPL09.Interior.Center-Corridor LO #11 - Frame Out All Walls | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 08/11/27 | 08/13/27 | 3.8 | 3.8 |
|
97.5 |
RPL09.INT.SBC.04020 |
RPL09.Interior.SSB-Corridor - BoW - Mechanical L2 Checklist Completion | Balance of Walls & Overhead | Not Started | 08/11/27 | 08/24/27 | 12.5 | 12.5 |
|
138.8 |
RPL09.WP3B.016880 |
RPL09.Conn EF1<>DHA.02 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.02 | Not Started | 08/11/27 | 08/12/27 | 2.5 | 2.5 |
|
200.0 |
RPL09.WP4.013040 |
RPL09.Conn DHA.01.02<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 08/11/27 | 08/11/27 | 1.2 | 1.2 |
|
208.8 |
RPL09.WP4.013060 |
RPL09.Conn DHA.02.06<>05 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/11/27 | 08/11/27 | 1.2 | 1.2 |
|
208.8 |
RPL09.WP4.013100 |
RPL09.Conn DHA.01.04<>03 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 08/11/27 | 08/16/27 | 5.0 | 5.0 |
|
205.0 |
RPL09.WP4.013120 |
RPL09.Conn DHA.02.08<>07 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/11/27 | 08/16/27 | 5.0 | 5.0 |
|
205.0 |
GCD.RPL09.2071 |
L3/L4 Finish mCUP [1-4] - RPL09 | mCup | Not Started | 08/12/27 | 08/12/27 | 0.0 | 0.0 |
|
367.5 |
RPL09.CON.WP4.01600 |
RPL09.Conn WP4 FENW DHB CFD4 Infrastructure | Infrastructure | Not Started | 08/12/27 | 09/09/27 | 25.0 | 25.0 |
|
177.5 |
RPL09.CON.WP4.03200 |
RPL09.Conn WP4 FENW DHA CFD2 Infrastructure | Infrastructure | Not Started | 08/12/27 | 09/09/27 | 25.0 | 25.0 |
|
188.8 |
RPL09.CX.DHA.01380 |
RPL09.CX.DHA - L3/L4 - Control Fault Domain 03 - FW Flush and Fill | Control Fault Domain 3 | Not Started | 08/12/27 | 08/20/27 | 8.8 | 8.8 |
|
132.5 |
RPL09.INT.CTRC.07060 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Flooring | Restrooms | Not Started | 08/12/27 | 08/20/27 | 8.8 | 8.8 |
|
122.5 |
RPL09.INT.CTRC.3300 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Plumbing Trim Out | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/12/27 | 08/12/27 | 1.2 | 1.2 |
|
133.8 |
RPL09.INT.CTRC.3320 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Fire Life Safety Trim Out | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/12/27 | 08/12/27 | 1.2 | 1.2 |
|
133.8 |
RPL09.INT.CTRC.8000 |
RPL09.Interior.Center-Corridor LO #10 - Hang Drywall | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 08/12/27 | 08/17/27 | 5.0 | 5.0 |
|
135.0 |
RPL09.INT.DHA.01340 |
RPL09.Conn DHA - CFD2 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 08/12/27 | 08/16/27 | 3.8 | 3.8 |
|
157.5 |
RPL09.INT.DHA.01640 |
RPL09.Interior.DHA - Control Fault Domain 4 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/12/27 | 09/09/27 | 25.0 | 25.0 |
|
132.5 |
RPL09.INT.DHA.01670 |
RPL09.Interior.DHA - Control Fault Domain 4 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/12/27 | 09/09/27 | 25.0 | 25.0 |
|
113.8 |
RPL09.INT.DHA.03900 |
RPL09.Conn DHA - CFD2 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 08/12/27 | 08/16/27 | 3.8 | 3.8 |
|
178.8 |
RPL09.INT.DHB.01700 |
RPL09.Conn DHB - CFD4 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 08/12/27 | 08/16/27 | 3.8 | 3.8 |
|
146.2 |
RPL09.INT.DHB.02860 |
RPL09.Conn DHB - CFD4 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 08/12/27 | 08/16/27 | 3.8 | 3.8 |
|
175.0 |
RPL09.INT.DHC.02310 |
RPL09.Interior.DHC - OFE - Control Fault Domain 1 (Mech Side Aisle) | Control Fault Domain 1 | Not Started | 08/12/27 | 08/30/27 | 16.2 | 16.2 |
|
128.8 |
RPL09.INT.SSB.01620 |
RPL09.Interior.SSB - BoW - Mechanical L2 Checklist Completion | Balance of Walls and OverHead | Not Started | 08/12/27 | 08/23/27 | 10.0 | 10.0 |
|
188.8 |
RPL09.INT.SSBC.01520 |
RPL09.Interior.SSB-Corridor - Remaining Mechanical DHA OFE TIe Ins | Fit out | Not Started | 08/12/27 | 08/18/27 | 6.2 | 6.2 |
|
188.8 |
RPL09.INT.SSBC.01540 |
RPL09.Interior.SSB-Corridor - Remaining Electrical DHA OFE TIe Ins | Fit out | Not Started | 08/12/27 | 08/18/27 | 6.2 | 6.2 |
|
188.8 |
RPL09.OFCI.C.4100 |
OFCI Delivery: FE Fiber for CFD B.5 (ROJ ) (RVCD ) | Data Hall B | Not Started | 08/12/27 | 08/18/27 | 6.2 | 6.2 |
|
170.0 |
RPL09.WP4.015120 |
RPL09.Conn DHB.15.17<>17 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/12/27 | 08/12/27 | 1.2 | 1.2 |
|
198.8 |
RPL09.WP4.015140 |
RPL09.Conn DHB.16.21<>21 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/12/27 | 08/12/27 | 1.2 | 1.2 |
|
198.8 |
RPL09.WP4.015480 |
RPL09.Conn DHB.15.19<>19 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/12/27 | 08/12/27 | 1.2 | 1.2 |
|
200.0 |
RPL09.WP4.015500 |
RPL09.Conn DHB.16.23<>23 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/12/27 | 08/12/27 | 1.2 | 1.2 |
|
200.0 |
RPL09.WP4.015640 |
RPL09.Conn DHB.15.18<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/12/27 | 08/17/27 | 5.0 | 5.0 |
|
187.5 |