| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL09.WP4.015660 |
RPL09.Conn DHB.16.22<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/12/27 | 08/17/27 | 5.0 | 5.0 |
|
187.5 |
GCD.RPL09.3945 |
L3/L4 Start mCUP [5-6] - RPL09 | mCup | Not Started | 08/13/27 | 08/13/27 | 0.0 | 0.0 |
|
367.5 |
RPL09.CON.WP2.08700 |
RPL09.Conn - CorpNet & FacNet Available (DH B) - All IDFs | WP#02 GS | Not Started | 08/13/27 | 08/13/27 | 0.0 | 0.0 |
|
366.2 |
RPL09.CX.DHD.01050 |
RPL09.CX.DHD - L3/L4 - House Power (for mechainical) | DHD HOUSE POWER | Not Started | 08/13/27 | 08/26/27 | 12.5 | 12.5 |
|
205.0 |
RPL09.CX.MCUP.01080 |
RPL09.CX.mCup Loop 2 - L3/L4 - mCUP | mCUP 5-6 | Not Started | 08/13/27 | 09/21/27 | 33.8 | 33.8 |
|
308.8 |
RPL09.CX.MCUP.01090 |
RPL09.CX.mCup Loop 1 - L3/L4 - mCUP - IST System Testing | mCUP 1-4 | Not Started | 08/13/27 | 08/26/27 | 12.5 | 12.5 |
|
355.0 |
RPL09.Conn.MS.01000 |
RPL09.Conn Wifi Ready - DH B (Pred from RPL10 CorpNet needed?) | Connectivity Milestones | Not Started | 08/13/27 | 08/13/27 | 0.0 | 0.0 |
|
196.2 |
RPL09.INT.CTRC.3380 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install Asset Tags | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/13/27 | 08/17/27 | 3.8 | 3.8 |
|
130.0 |
RPL09.INT.CTRC.3720 |
RPL09.Interior.Center-Corridor LO #11 - Install Remaining Horizontal Steel Supports for Cable Tray (IFP Add) | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 08/13/27 | 08/17/27 | 3.8 | 3.8 |
|
132.5 |
RPL09.INT.CTRC.8200 |
RPL09.Interior.Center-Corridor LO #10 - Install DAS (Distribution Antenna System) | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 08/13/27 | 08/13/27 | 1.2 | 1.2 |
|
140.0 |
RPL09.INT.CTRC.8220 |
RPL09.Interior.Center-Corridor LO #10 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 08/13/27 | 08/17/27 | 3.8 | 3.8 |
|
132.5 |
RPL09.CX.DHB.01500 |
RPL09.CX.DHB - L3/L4 - Control Fault Domain 05 - FW Flush and Fill | Control Fault Domain 5 | Not Started | 08/16/27 | 08/24/27 | 8.8 | 8.8 |
|
158.8 |
RPL09.INT.CTRC.01750 |
RPL09.Interior.Center-Corridor (S) - Fire Life Safe Trim | Fit out (South) | Not Started | 08/16/27 | 08/19/27 | 5.0 | 5.0 |
|
97.5 |
RPL09.INT.CTRC.01970 |
RPL09.Interior.Center-Corridor (S) - Set Equipment / Interior | Fit out (South) | Not Started | 08/16/27 | 08/20/27 | 6.2 | 6.2 |
|
108.8 |
RPL09.INT.CTRC.3620 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Install Fire Life Safety Lowside OH | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 08/16/27 | 08/18/27 | 3.8 | 3.8 |
|
95.0 |
RPL09.INT.CTRC.3640 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Install Plumbing Lowside OH | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 08/16/27 | 08/18/27 | 3.8 | 3.8 |
|
90.0 |
RPL09.INT.CTRC.8260 |
RPL09.Interior.Center-Corridor LO #10 - Install Remaining Lights | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 08/16/27 | 08/19/27 | 5.0 | 5.0 |
|
140.0 |
RPL09.INT.CTRC.8360 |
RPL09.Interior.Center-Corridor LO #11 - Install Security Lowside OH & In Wall | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 08/16/27 | 08/18/27 | 3.8 | 3.8 |
|
113.8 |
RPL09.INT.CTRC.8380 |
RPL09.Interior.Center-Corridor LO #11 - Install Controls / EPMS / BMS OH & In Wall | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 08/16/27 | 08/18/27 | 3.8 | 3.8 |
|
113.8 |
RPL09.INT.CTRC.8400 |
RPL09.Interior.Center-Corridor LO #11 - Install Fire Life Safety Lowside OH & In Wall | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 08/16/27 | 08/18/27 | 3.8 | 3.8 |
|
113.8 |
RPL09.INT.CTRC.8420 |
RPL09.Interior.Center-Corridor LO #11 - Install Plumbing Lowside OH & In Wall | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 08/16/27 | 08/18/27 | 3.8 | 3.8 |
|
113.8 |
RPL09.INT.CTRC.8440 |
RPL09.Interior.Center-Corridor LO #11 - Install Mechanical Piping Lowside OH & In Wall | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 08/16/27 | 08/18/27 | 3.8 | 3.8 |
|
113.8 |
RPL09.INT.CTRC.8460 |
RPL09.Interior.Center-Corridor LO #11 - Install Electrical Lowside OH & In Wall | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 08/16/27 | 08/23/27 | 7.5 | 7.5 |
|
110.0 |
RPL09.INT.DHA.01690 |
RPL09.Interior.DHA - Control Fault Domain 5 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/16/27 | 09/13/27 | 25.0 | 25.0 |
|
125.0 |
RPL09.INT.DHA.01700 |
RPL09.Interior.DHA - Control Fault Domain 5 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/16/27 | 09/13/27 | 25.0 | 25.0 |
|
117.5 |
RPL09.INT.DHA.02260 |
RPL09.Interior.DHA - Control Fault Domain 5 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/16/27 | 09/13/27 | 25.0 | 25.0 |
|
117.5 |
RPL09.INT.DHA.03860 |
RPL09.Interior.DHA - Control Fault Domain 5 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/16/27 | 09/13/27 | 25.0 | 25.0 |
|
117.5 |
RPL09.INT.DHD.02410 |
RPL09.Interior.DHD - OFE - Control Fault Domain 3 (HAC) | Control Fault Domain 3 | Not Started | 08/16/27 | 08/27/27 | 12.5 | 12.5 |
|
138.8 |
RPL09.INT.ENDC.1960 |
RPL09.Interior.End-Corridor - BoW - Install Horizontal Steel for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 08/16/27 | 08/19/27 | 5.0 | 5.0 |
|
218.8 |
RPL09.INT.SSBC.01470 |
RPL09.Interior.SSB-Corridor - Mechanical L2 Checklist Completion | Fit out | Not Started | 08/16/27 | 08/27/27 | 12.5 | 12.5 |
|
142.5 |
RPL09.WP3B.017860 |
RPL09.Conn EF2<>DHB.15 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.15 | Not Started | 08/16/27 | 08/17/27 | 2.5 | 2.5 |
|
187.5 |
GCD.RPL09.3530 |
[RPL09] TC-C Ready : Production Cabling Start [DHB Rows 25-32] | TC-C Ready: Production Cabling - DHB | Not Started | 08/17/27 | 08/17/27 | 0.0 | 0.0 |
|
365.0 |
GCD.RPL09.4105 |
[RPL09] TC-C Ready : Production Cabling Start [DHA Rows 09-16] | TC-C Ready: Production Cabling - DHA | Not Started | 08/17/27 | 08/17/27 | 0.0 | 0.0 |
|
365.0 |
RPL06.SUCC |
SUCC | Obsolete | Not Started | 08/17/27 | 08/17/27 | 0.0 | 0.0 |
|
0.0 |
RPL06.SUCC |
SUCC | Obsolete | Not Started | 08/17/27 | 08/17/27 | 0.0 | 0.0 |
|
0.0 |
RPL06.SUCC |
SUCC | Obsolete | Not Started | 08/17/27 | 08/17/27 | 0.0 | 0.0 |
|
0.0 |
RPL09.CON.WP2.11080 |
RPL09.Conn - GSMDF1(South)<>DH B - CFD4 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH B - Rack#01 MES side | Not Started | 08/17/27 | 08/19/27 | 3.8 | 3.8 |
|
185.0 |
RPL09.CON.WP2.12080 |
RPL09.Conn - GSMDF2(North)<>DH B - CFD4 Rack #50 Pull, Install & Patch PON Trunks | MDF2 <> DH B - Rack#50 LV side | Not Started | 08/17/27 | 08/23/27 | 6.2 | 6.2 |
|
180.0 |
RPL09.CON.WP2.13040 |
RPL09.Conn - GSMDF1(South)<>DH A - CFD2 Rack #50 Pull, Install & Patch PON Trunks | MDF1 <> DH A - Rack#50 LV side | Not Started | 08/17/27 | 08/23/27 | 6.2 | 6.2 |
|
178.8 |
RPL09.CON.WP2.14040 |
RPL09.Conn - GSMDF2(North)<>DH A - CFD2 Rack #01 Pull, Install & Test PON Trunks | MDF2 <> DH A - Rack#01 MES side | Not Started | 08/17/27 | 08/19/27 | 3.8 | 3.8 |
|
188.8 |
RPL09.CON.WP3A.01640 |
RPL09.Conn EF2 Infrastructure 2 (Waterfalls & VCM etc..) | Infrastructure | Not Started | 08/17/27 | 08/30/27 | 12.5 | 12.5 |
|
168.8 |
RPL09.CON.WP3B.01320 |
RPL09.Conn EF2<>DHB.17 - WBS Summary | EF2<>DHB.17 | Not Started | 08/17/27 | 08/30/27 | 12.5 | 12.5 |
|
173.8 |
RPL09.CON.WP3B.02000 |
RPL09.Conn EF1<>DHA.03 - WBS Summary | EF1<>DHA.03 | Not Started | 08/17/27 | 08/31/27 | 13.8 | 13.8 |
|
183.8 |
RPL09.INT.DHD.01240 |
RPL09.Interior.DHD - Control Fault Domain 1 - Install copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/17/27 | 09/14/27 | 25.0 | 25.0 |
|
177.5 |
RPL09.INT.DHD.01280 |
RPL09.Interior.DHD - Control Fault Domain 2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/17/27 | 09/14/27 | 25.0 | 25.0 |
|
191.2 |
RPL09.INT.DHD.01290 |
RPL09.Interior.DHD - Control Fault Domain 2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/17/27 | 09/14/27 | 25.0 | 25.0 |
|
178.8 |
RPL09.INT.DHD.02010 |
RPL09.Interior.DHD - Control Fault Domain 2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/17/27 | 09/14/27 | 25.0 | 25.0 |
|
178.8 |
RPL09.INT.DHD.02570 |
RPL09.Interior.DHD - Control Fault Domain 2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/17/27 | 08/20/27 | 5.0 | 5.0 |
|
178.8 |
RPL09.WP3B.011140 |
RPL09.Conn EF1<>DHA.03 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHA.03 | Not Started | 08/17/27 | 08/18/27 | 2.5 | 2.5 |
|
177.5 |
RPL09.WP3B.012140 |
RPL09.Conn EF2<>DHB.17 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.17 | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
170.0 |
RPL09.WP4.013160 |
RPL09.Conn DHA.03 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
195.0 |
RPL09.WP4.013180 |
RPL09.Conn DHA.04 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
195.0 |
RPL09.WP4.013280 |
RPL09.Conn DHA.03.09 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/17/27 | 08/30/27 | 12.5 | 12.5 |
|
157.5 |
RPL09.WP4.013300 |
RPL09.Conn DHA.04.13 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/17/27 | 08/30/27 | 12.5 | 12.5 |
|
157.5 |
RPL09.WP4.013560 |
RPL09.Conn DHA.03 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
186.2 |
RPL09.WP4.013580 |
RPL09.Conn DHA.04 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
186.2 |
RPL09.WP4.013600 |
RPL09.Conn DHA.01.04<>03 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
205.0 |
RPL09.WP4.013620 |
RPL09.Conn DHA.02.08<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
205.0 |
RPL09.WP4.015060 |
RPL09.Conn DHB.14.15 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/17/27 | 08/30/27 | 12.5 | 12.5 |
|
171.2 |
RPL09.WP4.016120 |
RPL09.Conn DHB.15.18 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/17/27 | 08/30/27 | 12.5 | 12.5 |
|
158.8 |
RPL09.WP4.016140 |
RPL09.Conn DHB.16.22 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/17/27 | 08/30/27 | 12.5 | 12.5 |
|
158.8 |
RPL09.WP4.016560 |
RPL09.Conn DHB.17 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
185.0 |
RPL09.WP4.016580 |
RPL09.Conn DHB.18 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
185.0 |
RPL09.WP4.016840 |
RPL09.Conn DHB.17.25 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/17/27 | 08/30/27 | 12.5 | 12.5 |
|
146.2 |
RPL09.WP4.016860 |
RPL09.Conn DHB.18.29 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/17/27 | 08/30/27 | 12.5 | 12.5 |
|
146.2 |
RPL09.WP4.017020 |
RPL09.Conn DHB.13.11 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/17/27 | 08/30/27 | 12.5 | 12.5 |
|
171.2 |
RPL09.WP4.017400 |
RPL09.Conn DHB.17 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
175.0 |
RPL09.WP4.017420 |
RPL09.Conn DHB.18 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/17/27 | 08/17/27 | 1.2 | 1.2 |
|
177.5 |
RPL09.CON.WP3B.01300 |
RPL09.Conn EF2<>DHB.18 - WBS Summary | EF2<>DHB.18 | Not Started | 08/18/27 | 08/31/27 | 12.5 | 12.5 |
|
172.5 |
RPL09.INT.CTRC.07040 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Final Paint | Restrooms | Not Started | 08/18/27 | 08/26/27 | 8.8 | 8.8 |
|
117.5 |
RPL09.INT.CTRC.3400 |
RPL09.Interior.Center-Corridor LO #10 & #12 - Install Door (Verify with Trades before installation) | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 08/18/27 | 08/19/27 | 2.5 | 2.5 |
|
130.0 |
RPL09.INT.CTRC.8020 |
RPL09.Interior.Center-Corridor LO #10 - Tape Finish Paint | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 08/18/27 | 08/24/27 | 6.2 | 6.2 |
|
135.0 |
RPL09.WP3B.012160 |
RPL09.Conn EF2<>DHB.18 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.18 | Not Started | 08/18/27 | 08/18/27 | 1.2 | 1.2 |
|
170.0 |
RPL09.WP3B.013580 |
RPL09.Conn EF2<>DHB.17 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.17 | Not Started | 08/18/27 | 08/18/27 | 1.2 | 1.2 |
|
173.8 |
RPL09.WP3B.017880 |
RPL09.Conn EF2<>DHB.16 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.16 | Not Started | 08/18/27 | 08/19/27 | 2.5 | 2.5 |
|
182.5 |
RPL09.WP4.013320 |
RPL09.Conn DHA.03 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 08/18/27 | 08/18/27 | 1.2 | 1.2 |
|
195.0 |
RPL09.WP4.013340 |
RPL09.Conn DHA.04 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 08/18/27 | 08/18/27 | 1.2 | 1.2 |
|
195.0 |
RPL09.WP4.013920 |
RPL09.Conn DHA.03.09<>09 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/18/27 | 08/20/27 | 3.8 | 3.8 |
|
186.2 |
RPL09.WP4.013940 |
RPL09.Conn DHA.04.13<>13 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/18/27 | 08/20/27 | 3.8 | 3.8 |
|
186.2 |
RPL09.WP4.013960 |
RPL09.Conn DHA.03 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/18/27 | 08/20/27 | 3.8 | 3.8 |
|
205.0 |
RPL09.WP4.013980 |
RPL09.Conn DHA.04 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/18/27 | 08/20/27 | 3.8 | 3.8 |
|
205.0 |
RPL09.WP4.016600 |
RPL09.Conn DHB.15.18<>17 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/18/27 | 08/18/27 | 1.2 | 1.2 |
|
191.2 |
RPL09.WP4.016620 |
RPL09.Conn DHB.16.22<>21 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/18/27 | 08/18/27 | 1.2 | 1.2 |
|
191.2 |
RPL09.WP4.016720 |
RPL09.Conn DHB.15.20<>19 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/18/27 | 08/23/27 | 5.0 | 5.0 |
|
187.5 |
RPL09.WP4.016740 |
RPL09.Conn DHB.16.24<>23 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/18/27 | 08/23/27 | 5.0 | 5.0 |
|
187.5 |
RPL09.WP4.016880 |
RPL09.Conn DHB.17 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 08/18/27 | 08/18/27 | 1.2 | 1.2 |
|
185.0 |
RPL09.WP4.016900 |
RPL09.Conn DHB.18 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 08/18/27 | 08/18/27 | 1.2 | 1.2 |
|
185.0 |
RPL09.WP4.017600 |
RPL09.Conn DHB.17.25<>25 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/18/27 | 08/20/27 | 3.8 | 3.8 |
|
175.0 |
RPL09.WP4.017620 |
RPL09.Conn DHB.17 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/18/27 | 08/20/27 | 3.8 | 3.8 |
|
193.8 |
RPL09.WP4.017640 |
RPL09.Conn DHB.18 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 08/18/27 | 08/20/27 | 3.8 | 3.8 |
|
193.8 |
RPL09.WP4.017660 |
RPL09.Conn DHB.18.30<>29 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/18/27 | 08/23/27 | 5.0 | 5.0 |
|
177.5 |
GCD.RPL09.4005 |
[RPL09] TC-C Ready : Production Cabling Start [DHB Rows 33-40] | TC-C Ready: Production Cabling - DHB | Not Started | 08/19/27 | 08/19/27 | 0.0 | 0.0 |
|
362.5 |
RPL09.CON.WP2.08820 |
RPL09.Conn - GSIDF/DH A1 - WBS Summary | INT IDF Stick Build - GSIDF9A1 | Not Started | 08/19/27 | 09/13/27 | 21.2 | 21.2 |
|
341.2 |
RPL09.CON.WP2.08840 |
RPL09.Conn - GSIDF/DH A1 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 08/19/27 | 08/25/27 | 6.2 | 6.2 |
|
182.5 |
RPL09.CON.WP3B.01400 |
RPL09.Conn EF2<>DHB.19 - WBS Summary | EF2<>DHB.19 | Not Started | 08/19/27 | 09/01/27 | 12.5 | 12.5 |
|
171.2 |
RPL09.CON.WP3B.01980 |
RPL09.Conn EF1<>DHA.04 - WBS Summary | EF1<>DHA.04 | Not Started | 08/19/27 | 09/01/27 | 12.5 | 12.5 |
|
182.5 |
RPL09.INT.CTRC.3660 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Install Security Lowside OH | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 08/19/27 | 08/23/27 | 3.8 | 3.8 |
|
95.0 |
RPL09.INT.CTRC.3680 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Install Controls / EPMS / BMS OH | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 08/19/27 | 08/23/27 | 3.8 | 3.8 |
|
90.0 |
RPL09.INT.DHA.01760 |
RPL09.Interior.DHA - Control Fault Domain 4 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/19/27 | 09/16/27 | 25.0 | 25.0 |
|
113.8 |
RPL09.INT.DHD.02430 |
RPL09.Interior.DHD - OFE - Control Fault Domain 3 (Mech Side Aisle) | Control Fault Domain 3 | Not Started | 08/19/27 | 08/30/27 | 10.0 | 10.0 |
|
141.2 |