Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL09 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:12 PM
· 5201 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL09.INT.CTRC.4100 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 09/03/27 | 09/08/27 | 3.8 | 3.8 |
|
98.8 |
RPL09.INT.CTRC.4240 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Fire Safing / Wall Finishes | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 09/03/27 | 09/07/27 | 2.5 | 2.5 |
|
90.0 |
RPL09.INT.DHB.02060 |
RPL09.Interior.DHB - Final Punch Walk | Tie-Ins | Not Started | 09/03/27 | 09/07/27 | 2.5 | 2.5 |
|
186.2 |
RPL09.OFCI.C.4220 |
OFCI Delivery: FE Fiber for CFD D.1 (ROJ ) (RVCD ) | Data Hall D | Not Started | 09/03/27 | 09/10/27 | 6.2 | 6.2 |
|
232.5 |
RPL09.WP3B.011340 |
RPL09.Conn EF1<>DHB.13 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.13 | Not Started | 09/03/27 | 09/07/27 | 2.5 | 2.5 |
|
141.2 |
RPL09.WP3B.012760 |
RPL09.Conn EF1<>DHB.12 Install (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 09/03/27 | 09/03/27 | 1.2 | 1.2 |
|
158.8 |
RPL09.WP3B.014080 |
RPL09.Conn EF1<>DHA.06 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.06 | Not Started | 09/03/27 | 09/13/27 | 7.5 | 7.5 |
|
171.2 |
RPL09.WP3B.015520 |
RPL09.Conn EF1<>DHA.06 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.06 | Not Started | 09/03/27 | 09/03/27 | 1.2 | 1.2 |
|
171.2 |
RPL09.WP4.019940 |
RPL09.Conn DHB.19 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 09/03/27 | 09/03/27 | 1.2 | 1.2 |
|
170.0 |
RPL09.WP4.019960 |
RPL09.Conn DHB.20 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 09/03/27 | 09/03/27 | 1.2 | 1.2 |
|
170.0 |
RPL09.WP4.020940 |
RPL09.Conn DHB.20.37<>37 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 09/03/27 | 09/08/27 | 3.8 | 3.8 |
|
160.0 |
RPL09.WP4.020960 |
RPL09.Conn DHB.19 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 09/03/27 | 09/08/27 | 3.8 | 3.8 |
|
178.8 |
RPL09.WP4.020980 |
RPL09.Conn DHB.20 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 09/03/27 | 09/08/27 | 3.8 | 3.8 |
|
178.8 |
RPL09.WP4.021000 |
RPL09.Conn DHB.19.34<>33 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/03/27 | 09/09/27 | 5.0 | 5.0 |
|
162.5 |
RPL09.WP4.033260 |
RPL09.Conn DHB.18.29<>29 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 09/03/27 | 09/03/27 | 1.2 | 1.2 |
|
180.0 |
RPL09.WP4.046820 |
RPL09.Conn BE ISP DHB.CFD1 (RSL) FTSW > STSW EX384f [In-Row] | In-Row | Not Started | 09/03/27 | 09/08/27 | 3.8 | 3.8 |
|
228.8 |
RPL09.WP4.047060 |
RPL09.Conn BE ISP DHB.CFD2 (RSL) FTSW > STSW - TR288f (DHB NC>DHB Passive Racks) | CFD2 (Control Fault Domain B.2; Rows 09-16) | Not Started | 09/03/27 | 09/08/27 | 3.8 | 3.8 |
|
225.0 |
GCD.RPL09.2605 |
L3/L4 Start - DHB Rows 01-08 | DH | Not Started | 09/07/27 | 09/07/27 | 0.0 | 0.0 |
|
165.0 |
RPL.09.D.70220.XR |
External Tie from RPL07 - Interior Cx Crew 1 Flow (RPL07.CX.DHD.01230) | Internal Milestones (XREFs) | Not Started | 09/07/27 | 09/07/27 | 0.0 | 0.0 |
|
38.8 |
RPL09.CON.WP3A.01680 |
RPL09.Conn EF2 Install OSP Pathway (for RPL09) - P2 | Infrastructure | Not Started | 09/07/27 | 09/10/27 | 5.0 | 5.0 |
|
342.5 |
RPL09.CX.DHA.01580 |
RPL09.CX.DHA - L3/L4 - Control Fault Domain 04 - TW Flush and Fill | Control Fault Domain 4 | Not Started | 09/07/27 | 09/16/27 | 10.0 | 10.0 |
|
140.0 |
RPL09.CX.DHB.01050 |
RPL09.CX.DHB - L3/L4 - Elec. Domain 01/02 | DHB ELECTRICAL | Not Started | 09/07/27 | 09/15/27 | 8.8 | 8.8 |
|
38.8 |
RPL09.INT.CTRC.02050 |
RPL09.Interior.Center-Corridor (S) - Final Paint and Tube Steel Paint (IFP Add) | Fit out (South) | Not Started | 09/07/27 | 09/20/27 | 12.5 | 12.5 |
|
116.2 |
RPL09.INT.CTRC.07120 |
RPL09.Interior.Center-Corridor - Final Finishes & Fixtures - Electrical L2 Checklist Completion | Restrooms | Not Started | 09/07/27 | 09/20/27 | 12.5 | 12.5 |
|
117.5 |
RPL09.INT.CTRC.4080 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Install Remaining Lights | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 09/07/27 | 09/10/27 | 5.0 | 5.0 |
|
90.0 |
RPL09.INT.CTRC.8800 |
RPL09.Interior.Center-Corridor LO #11 - Install Door Frame | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 09/07/27 | 09/08/27 | 2.5 | 2.5 |
|
110.0 |
RPL09.INT.DHA.01900 |
RPL09.Interior.DHA - Control Fault Domain 5 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/07/27 | 10/04/27 | 25.0 | 25.0 |
|
118.8 |
RPL09.OFCI.C.4440 |
OFCI Delivery: BE Fiber for CFD B.4 (ROJ ) (RVCD ) | Data Hall B | Not Started | 09/07/27 | 09/13/27 | 6.2 | 6.2 |
|
225.0 |
RPL09.WP3B.014200 |
RPL09.Conn EF1<>DHB.12 Splice (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 09/07/27 | 09/14/27 | 7.5 | 7.5 |
|
158.8 |
RPL09.WP3B.015640 |
RPL09.Conn EF1<>DHB.12 Install (Z-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 09/07/27 | 09/07/27 | 1.2 | 1.2 |
|
158.8 |
RPL09.WP4.017260 |
RPL09.Conn DHA.05.19<>19 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/07/27 | 09/09/27 | 3.8 | 3.8 |
|
173.8 |
RPL09.WP4.017280 |
RPL09.Conn DHA.06.23<>23 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/07/27 | 09/09/27 | 3.8 | 3.8 |
|
173.8 |
RPL09.WP4.020140 |
RPL09.Conn DHB.19 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 09/07/27 | 09/07/27 | 1.2 | 1.2 |
|
170.0 |
RPL09.WP4.020160 |
RPL09.Conn DHB.20 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 09/07/27 | 09/07/27 | 1.2 | 1.2 |
|
170.0 |
DCC.B9.3055 |
[SSDCB4] Production Gear Delivered [DHD] Front End (SSW &FSW) | Connectivity | Not Started | 09/08/27 | 09/08/27 | 0.0 | 0.0 |
|
252.5 |
RPL09.CON.WP3B.01180 |
RPL09.Conn EF1<>DHB14 - WBS Summary | EF1<>DHB.14 | Not Started | 09/08/27 | 09/22/27 | 13.8 | 13.8 |
|
153.8 |
RPL09.CON.WP3B.04100 |
RPL09.Conn WP#3B - ISP DHD - WBS Summary | DHD | Not Started | 09/08/27 | 11/18/27 | 63.8 | 63.8 |
|
201.2 |
RPL09.CON.WP4.06000 |
RPL09.Conn - DH D Network - WBS Summary | DH D | Not Started | 09/08/27 | 02/07/28 | 127.5 | 127.5 |
|
150.0 |
RPL09.CON.WP4.06020 |
RPL09.Conn WP4 FENW DHD CFD1 Infrastructure | Infrastructure | Not Started | 09/08/27 | 10/05/27 | 25.0 | 25.0 |
|
252.5 |
RPL09.INT.CTRC.3940 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Electrical Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 09/08/27 | 09/08/27 | 1.2 | 1.2 |
|
90.0 |
RPL09.INT.CTRC.3960 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Security Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 09/08/27 | 09/08/27 | 1.2 | 1.2 |
|
90.0 |
RPL09.INT.DHC.01220 |
RPL09.Interior.DHC - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/08/27 | 10/05/27 | 25.0 | 25.0 |
|
160.0 |
RPL09.INT.DHD.01200 |
RPL09.Conn DHD - CFD1 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 09/08/27 | 09/10/27 | 3.8 | 3.8 |
|
221.2 |
RPL09.INT.DHD.01380 |
RPL09.Interior.DHD - Control Fault Domain 2 - Install copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/08/27 | 10/05/27 | 25.0 | 25.0 |
|
178.8 |
RPL09.INT.DHD.01450 |
RPL09.Interior.DHD - Control Fault Domain 3 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/08/27 | 10/05/27 | 25.0 | 25.0 |
|
198.8 |
RPL09.INT.DHD.01460 |
RPL09.Interior.DHD - Control Fault Domain 3 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/08/27 | 10/05/27 | 25.0 | 25.0 |
|
198.8 |
RPL09.INT.DHD.01470 |
RPL09.Interior.DHD - Control Fault Domain 3 - Set UPS and Panel (2) and GS.IDF D1 (Stick Build) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/08/27 | 10/05/27 | 25.0 | 25.0 |
|
190.0 |
RPL09.INT.DHD.02590 |
RPL09.Conn DHD - CFD1 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 09/08/27 | 09/10/27 | 3.8 | 3.8 |
|
242.5 |
RPL09.OFCI.C.4180 |
OFCI Delivery: FE Fiber for CFD A.4 (ROJ ) (RVCD ) | Data Hall A | Not Started | 09/08/27 | 09/14/27 | 6.2 | 6.2 |
|
158.8 |
RPL09.WP3B.011360 |
RPL09.Conn EF1<>DHB.14 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.14 | Not Started | 09/08/27 | 09/09/27 | 2.5 | 2.5 |
|
141.2 |
RPL09.WP3B.012780 |
RPL09.Conn EF1<>DHB.13 Install (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.13 | Not Started | 09/08/27 | 09/08/27 | 1.2 | 1.2 |
|
156.2 |
RPL09.WP4.016520 |
RPL09.Conn DHA.01.04 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/08/27 | 09/21/27 | 12.5 | 12.5 |
|
176.2 |
RPL09.WP4.016540 |
RPL09.Conn DHA.02.08 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/08/27 | 09/21/27 | 12.5 | 12.5 |
|
176.2 |
RPL09.WP4.016920 |
RPL09.Conn DHA.03.12<>11 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/08/27 | 09/08/27 | 1.2 | 1.2 |
|
186.2 |
RPL09.WP4.016940 |
RPL09.Conn DHA.04.16<>15 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/08/27 | 09/08/27 | 1.2 | 1.2 |
|
186.2 |
RPL09.WP4.017120 |
RPL09.Conn DHA.05.17<>17 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/08/27 | 09/08/27 | 1.2 | 1.2 |
|
187.5 |
RPL09.WP4.017140 |
RPL09.Conn DHA.06.21<>21 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/08/27 | 09/08/27 | 1.2 | 1.2 |
|
187.5 |
RPL09.WP4.020400 |
RPL09.Conn DHB.18.31<>31 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/08/27 | 09/08/27 | 1.2 | 1.2 |
|
177.5 |
RPL09.WP4.020420 |
RPL09.Conn DHB.17.28<>27 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/08/27 | 09/08/27 | 1.2 | 1.2 |
|
175.0 |
RPL09.CX.DHB.01060 |
RPL09.CX.DHB - L3/L4 - UPS Start-up | DHB ELECTRICAL | Not Started | 09/09/27 | 09/22/27 | 12.5 | 12.5 |
|
103.8 |
RPL09.INT.CTRC.01950 |
RPL09.Interior.Center-Corridor (S) - Install Lighting | Fit out (South) | Not Started | 09/09/27 | 09/17/27 | 8.8 | 8.8 |
|
97.5 |
RPL09.INT.CTRC.8540 |
RPL09.Interior.Center-Corridor LO #11 - QC | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 09/09/27 | 09/09/27 | 1.2 | 1.2 |
|
110.0 |
RPL09.INT.CTRC.8780 |
RPL09.Interior.Center-Corridor LO #11 - Fire Safing/ Wall Finishes | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 09/09/27 | 09/10/27 | 2.5 | 2.5 |
|
115.0 |
RPL09.WP3B.014220 |
RPL09.Conn EF1<>DHB.13 Splice (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.13 | Not Started | 09/09/27 | 09/16/27 | 7.5 | 7.5 |
|
156.2 |
RPL09.WP3B.015660 |
RPL09.Conn EF1<>DHB.13 Install (Z-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.13 | Not Started | 09/09/27 | 09/09/27 | 1.2 | 1.2 |
|
156.2 |
RPL09.WP4.021240 |
RPL09.Conn DHB.20.39<>39 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 09/09/27 | 09/13/27 | 3.8 | 3.8 |
|
160.0 |
RPL09.WP4.033760 |
RPL09.Conn DHB.18.31<>31 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 09/09/27 | 09/09/27 | 1.2 | 1.2 |
|
177.5 |
RPL09.WP4.046840 |
RPL09.Conn BE ISP DHB.CFD1 (RSL) FTSW > STSW EX384f [Across-Row] | Across-Row | Not Started | 09/09/27 | 09/13/27 | 3.8 | 3.8 |
|
228.8 |
RPL09.WP4.047080 |
RPL09.Conn BE ISP DHB.CFD2 (RSL) FTSW > STSW EX384f [In-Row] | In-Row | Not Started | 09/09/27 | 09/13/27 | 3.8 | 3.8 |
|
228.8 |
RPL09.WP4.047120 |
RPL09.Conn BE ISP DHB.CFD3 (RSL) FTSW > STSW - TR288f (DHB NC>DHB Passive Racks) | CFD3 (Control Fault Domain B.3; Rows 17-24) | Not Started | 09/09/27 | 09/13/27 | 3.8 | 3.8 |
|
225.0 |
RPL.GF.D.N9130.XG |
Prod EF2 Complete | Give Milestones (XREFs) | Not Started | 09/10/27 | 09/10/27 | 0.0 | 0.0 |
|
342.5 |
RPL09.CON.WP3B.01280 |
RPL09.Conn EF1<>DHB.15 - WBS Summary | EF1<>DHB.15 | Not Started | 09/10/27 | 09/24/27 | 13.8 | 13.8 |
|
153.8 |
RPL09.CON.WP4.03600 |
RPL09.Conn WP4 FENW DHA CFD4 Infrastructure | Infrastructure | Not Started | 09/10/27 | 10/07/27 | 25.0 | 25.0 |
|
163.8 |
RPL09.INT.CTRC.4040 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Plumbing Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 09/10/27 | 09/10/27 | 1.2 | 1.2 |
|
90.0 |
RPL09.INT.CTRC.4060 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Fire Life Safety Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 09/10/27 | 09/10/27 | 1.2 | 1.2 |
|
90.0 |
RPL09.INT.CTRC.8560 |
RPL09.Interior.Center-Corridor LO #11 - Hang Drywall | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 09/10/27 | 09/15/27 | 5.0 | 5.0 |
|
110.0 |
RPL09.INT.DHA.01610 |
RPL09.Conn DHA - CFD4 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 09/10/27 | 09/14/27 | 3.8 | 3.8 |
|
132.5 |
RPL09.INT.DHA.03940 |
RPL09.Conn DHA - CFD4 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 09/10/27 | 09/14/27 | 3.8 | 3.8 |
|
161.2 |
RPL09.OFCI.C.4460 |
OFCI Delivery: BE Fiber for CFD B.5 (ROJ ) (RVCD ) | Data Hall B | Not Started | 09/10/27 | 09/16/27 | 6.2 | 6.2 |
|
225.0 |
RPL09.WP3B.011380 |
RPL09.Conn EF1<>DHB.15 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.15 | Not Started | 09/10/27 | 09/13/27 | 2.5 | 2.5 |
|
141.2 |
RPL09.WP3B.012800 |
RPL09.Conn EF1<>DHB.14 Install (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.14 | Not Started | 09/10/27 | 09/10/27 | 1.2 | 1.2 |
|
153.8 |
RPL09.WP4.017720 |
RPL09.Conn DHA.05.19<>19 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/10/27 | 09/10/27 | 1.2 | 1.2 |
|
186.2 |
RPL09.WP4.017740 |
RPL09.Conn DHA.06.23<>23 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/10/27 | 09/10/27 | 1.2 | 1.2 |
|
186.2 |
RPL09.WP4.017880 |
RPL09.Conn DHA.05.18<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/10/27 | 09/15/27 | 5.0 | 5.0 |
|
173.8 |
RPL09.WP4.017900 |
RPL09.Conn DHA.06.22<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/10/27 | 09/15/27 | 5.0 | 5.0 |
|
173.8 |
RPL09.WP4.021140 |
RPL09.Conn DHB.20.37<>37 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 09/10/27 | 09/10/27 | 1.2 | 1.2 |
|
173.8 |
RPL09.WP4.021360 |
RPL09.Conn DHB.19.34<>33 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/10/27 | 09/10/27 | 1.2 | 1.2 |
|
173.8 |
RPL09.WP4.021500 |
RPL09.Conn DHB.19.36<>35 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/10/27 | 09/15/27 | 5.0 | 5.0 |
|
162.5 |
DCC.B9.3557 |
[SSDCB4] Cabling Start : Front End Production Cabling [DHD] | Connectivity | Not Started | 09/13/27 | 09/13/27 | 0.0 | 0.0 |
|
285.0 |
GCD.RPL09.4225 |
[RPL09] TC-C Ready : Production Cabling Start [DHD Rows 01-08] | TC-C Ready: Production Cabling - DHD | Not Started | 09/13/27 | 09/13/27 | 0.0 | 0.0 |
|
285.0 |
RPL09.CON.WP2.09120 |
RPL09.Conn - CorpNet & FacNet Available (DH A) - All IDFs | WP#02 GS | Not Started | 09/13/27 | 09/13/27 | 0.0 | 0.0 |
|
341.2 |
RPL09.CON.WP2.15020 |
RPL09.Conn - GSMDF1(South)<>DH D - CFD1 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH D - Rack#01 MES side | Not Started | 09/13/27 | 09/16/27 | 5.0 | 5.0 |
|
247.5 |
RPL09.CON.WP2.16020 |
RPL09.Conn - GSMDF2(North)<>DH D - CFD1 Rack #50 Pull, Install & Patch PON Trunks | MDF2 <> DH D - Rack#50 LV side | Not Started | 09/13/27 | 09/17/27 | 6.2 | 6.2 |
|
242.5 |
RPL09.CON.WP3B.02660 |
RPL09.Conn EF2<>DHD.29 - WBS Summary | EF2<>DHD.29 | Not Started | 09/13/27 | 09/24/27 | 12.5 | 12.5 |
|
248.8 |
RPL09.CON.WP3B.02720 |
RPL09.Conn EF1<>DHD.29 - WBS Summary | EF1<>DHD.29 | Not Started | 09/13/27 | 09/24/27 | 12.5 | 12.5 |
|
248.8 |
RPL09.Conn.MS.01020 |
RPL09.Conn Wifi Ready - DH A (Pred from RPL10 CorpNet needed?) | Connectivity Milestones | Not Started | 09/13/27 | 09/13/27 | 0.0 | 0.0 |
|
182.5 |
RPL09.EY.SSB.01320 |
RPL09.EY.SSB - Milling of Temp Paving | Hardscape and Landscape | Not Started | 09/13/27 | 09/17/27 | 6.2 | 6.2 |
|
161.2 |
RPL09.INT.CTRC.01510 |
RPL09.Interior.Center-Corridor (N) - Remaining L2 Checklist Completion | Fit out (North) | Not Started | 09/13/27 | 09/17/27 | 6.2 | 6.2 |
|
168.8 |
RPL09.INT.CTRC.4120 |
RPL09.Interior.Center-Corridor LO #11 & #13 - Install Asset Tags | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 09/13/27 | 09/15/27 | 3.8 | 3.8 |
|
90.0 |
RPL09.INT.CTRC.8720 |
RPL09.Interior.Center-Corridor LO #11 - Install DAS (Distribution Antenna System) | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 09/13/27 | 09/13/27 | 1.2 | 1.2 |
|
115.0 |