Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL09 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:12 PM
· 5201 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL09.INT.DHC.01420 |
RPL09.Interior.DHC - Control Fault Domain 3 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/29/27 | 10/26/27 | 25.0 | 25.0 |
|
181.2 |
RPL09.INT.DHC.01430 |
RPL09.Interior.DHC - Control Fault Domain 3 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/29/27 | 10/26/27 | 25.0 | 25.0 |
|
165.0 |
RPL09.INT.DHC.02030 |
RPL09.Interior.DHC - Control Fault Domain 3 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/29/27 | 10/26/27 | 25.0 | 25.0 |
|
165.0 |
RPL09.INT.DHC.02530 |
RPL09.Interior.DHC - Control Fault Domain 3 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/29/27 | 10/26/27 | 25.0 | 25.0 |
|
165.0 |
RPL09.INT.DHD.01340 |
RPL09.Conn DHD - CFD2 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 09/29/27 | 10/01/27 | 3.8 | 3.8 |
|
202.5 |
RPL09.INT.DHD.01640 |
RPL09.Interior.DHD - Control Fault Domain 4 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/29/27 | 10/26/27 | 25.0 | 25.0 |
|
177.5 |
RPL09.INT.DHD.01660 |
RPL09.Interior.DHD - Control Fault Domain 4 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/29/27 | 10/26/27 | 25.0 | 25.0 |
|
200.0 |
RPL09.INT.DHD.02610 |
RPL09.Conn DHD - CFD2 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 09/29/27 | 10/01/27 | 3.8 | 3.8 |
|
230.0 |
RPL09.INT.EC.8860 |
RPL09.Interior.ECr LO #14 - Frame Out All Walls | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 09/29/27 | 10/01/27 | 3.8 | 3.8 |
|
170.0 |
RPL09.INT.EC.LO.8920 |
RPL09.Interior.EC LO #14 - Install Mechanical Piping Lowside OH | Interior Leave Out Wall #14 DHD/EC for DHB&D HACs | Not Started | 09/29/27 | 10/01/27 | 3.8 | 3.8 |
|
151.2 |
RPL09.WP3B.017180 |
RPL09.Conn EF1<>DHB.17 Test Pigtails (384F) P1&4 (MES) | EF1<>DHB.17 | Not Started | 09/29/27 | 09/30/27 | 2.5 | 2.5 |
|
146.2 |
RPL09.WP4.014260 |
RPL09.Conn DHB.16 Install (A-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 09/29/27 | 09/30/27 | 2.5 | 2.5 |
|
148.8 |
RPL09.WP4.014540 |
RPL09.Conn DHB.16 Install (A-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 09/29/27 | 09/30/27 | 2.5 | 2.5 |
|
151.2 |
RPL09.WP4.014900 |
RPL09.Conn DHB.16 Install (A-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 09/29/27 | 10/04/27 | 5.0 | 5.0 |
|
151.2 |
RPL09.WP4.015980 |
RPL09.Conn DHB.16.21 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 09/30/27 | 2.5 | 2.5 |
|
158.8 |
RPL09.WP4.018120 |
RPL09.Conn DHB.16.22 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 09/30/27 | 2.5 | 2.5 |
|
158.8 |
RPL09.WP4.019660 |
RPL09.Conn DHA.03.12 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 10/12/27 | 12.5 | 12.5 |
|
157.5 |
RPL09.WP4.019680 |
RPL09.Conn DHA.04.16 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 10/12/27 | 12.5 | 12.5 |
|
157.5 |
RPL09.WP4.020100 |
RPL09.Conn DHA.05.19 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 10/12/27 | 12.5 | 12.5 |
|
145.0 |
RPL09.WP4.020120 |
RPL09.Conn DHA.06.23 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 10/12/27 | 12.5 | 12.5 |
|
145.0 |
RPL09.WP4.020240 |
RPL09.Conn DHB.16.23 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 09/30/27 | 2.5 | 2.5 |
|
158.8 |
RPL09.WP4.020820 |
RPL09.Conn DHA.07.26 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 10/12/27 | 12.5 | 12.5 |
|
132.5 |
RPL09.WP4.020840 |
RPL09.Conn DHA.08.30 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 10/12/27 | 12.5 | 12.5 |
|
132.5 |
RPL09.WP4.022200 |
RPL09.Conn DHB.15.20 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 09/30/27 | 2.5 | 2.5 |
|
158.8 |
RPL09.WP4.022220 |
RPL09.Conn DHB.16.24 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 09/30/27 | 2.5 | 2.5 |
|
158.8 |
RPL09.WP4.022840 |
RPL09.Conn DHB.17.28 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 10/12/27 | 12.5 | 12.5 |
|
146.2 |
RPL09.WP4.022860 |
RPL09.Conn DHB.18.32 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/29/27 | 10/12/27 | 12.5 | 12.5 |
|
146.2 |
RPL09.WP4.029960 |
RPL09.Conn DHB.15 Install (Z-End) Trunk (192F) [FSW<>SSW] | SSW<>JXSW | Not Started | 09/29/27 | 09/30/27 | 2.5 | 2.5 |
|
158.8 |
RPL09.WP4.047340 |
RPL09.Conn BE ISP DHA.CFD1 (RSL) FTSW > STSW - TR288f (DHB NC>DHB Passive Racks) | CFD1 (Control Fault Domain A.1; Rows 01-08) | Not Started | 09/29/27 | 10/01/27 | 3.8 | 3.8 |
|
218.8 |
DCC.B9.3541 |
[SSDCB4] ORv3N Rack Install Start : Front End Production ORv3N Rack Install [DHA] | Connectivity | Not Started | 09/30/27 | 09/30/27 | 0.0 | 0.0 |
|
167.5 |
RPL09.CON.WP3B.01860 |
RPL09.Conn EF2<>DHA.02 - WBS Summary | EF2<>DHA.02 | Not Started | 09/30/27 | 10/14/27 | 13.8 | 13.8 |
|
145.0 |
RPL09.CON.WP4.09540 |
RPL09.Conn B CFD2 - Deliver & Install - ORV3N (Loading at Night) | OFE- Passive In-row Racks, Racks (ORv3Ns, MCRs) & PON | Not Started | 09/30/27 | 10/11/27 | 10.0 | 10.0 |
|
110.0 |
RPL09.CON.WP4.09560 |
RPL09.Conn B CFD2 - Deliver & Assemble - PON | OFE- Passive In-row Racks, Racks (ORv3Ns, MCRs) & PON | Not Started | 09/30/27 | 10/11/27 | 10.0 | 10.0 |
|
145.0 |
RPL09.CON.WP4.09900 |
RPL09.Conn A CFD1 - Deliver & Install - ORV3N (Loading at Night) | OFE- Passive In-row Racks, Racks (ORv3Ns, MCRs) & PON | Not Started | 09/30/27 | 10/11/27 | 10.0 | 10.0 |
|
116.2 |
RPL09.CON.WP4.09920 |
RPL09.Conn A CFD1 - Deliver & Assemble - PON | OFE- Passive In-row Racks, Racks (ORv3Ns, MCRs) & PON | Not Started | 09/30/27 | 10/11/27 | 10.0 | 10.0 |
|
156.2 |
RPL09.INT.CTRC.8820 |
RPL09.Interior.Center-Corridor LO #11 - Electrical L2 Checklist Completion | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 09/30/27 | 09/30/27 | 1.2 | 1.2 |
|
110.0 |
RPL09.OFCI.C.4520 |
OFCI Delivery: BE Fiber for CFD A.3 (ROJ ) (RVCD ) | Data Hall A | Not Started | 09/30/27 | 10/06/27 | 6.2 | 6.2 |
|
218.8 |
RPL09.SKN.E.LO.02060 |
RPL09.SKIN.LO#18 - Install IMP Flashing | Build back Exterior Leave Out Walls #18 (EC - North) | Not Started | 09/30/27 | 10/01/27 | 2.5 | 2.5 |
|
138.8 |
RPL09.WP3B.011840 |
RPL09.Conn EF2<>DHA.02 Pull Pigtails (384F) P2&3 (MES) | EF2<>DHA.02 | Not Started | 09/30/27 | 10/01/27 | 2.5 | 2.5 |
|
131.2 |
RPL09.WP3B.013260 |
RPL09.Conn EF2<>DHA.01 Install (A-End) Pigtails (384F) P2&3 (MES) | EF2<>DHA.01 | Not Started | 09/30/27 | 09/30/27 | 1.2 | 1.2 |
|
147.5 |
RPL09.WP4.021080 |
RPL09.Conn DHA.07.26<>25 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/30/27 | 09/30/27 | 1.2 | 1.2 |
|
165.0 |
RPL09.WP4.021100 |
RPL09.Conn DHA.07.28<>27 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/30/27 | 10/05/27 | 5.0 | 5.0 |
|
161.2 |
RPL09.WP4.021120 |
RPL09.Conn DHA.08.30<>29 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/30/27 | 09/30/27 | 1.2 | 1.2 |
|
165.0 |
RPL09.WP4.021260 |
RPL09.Conn DHA.08.32<>31 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/30/27 | 10/05/27 | 5.0 | 5.0 |
|
161.2 |
RPL09.WP4.023600 |
RPL09.Conn DHB.11.02<>01 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/30/27 | 09/30/27 | 1.2 | 1.2 |
|
155.0 |
RPL09.WP4.023620 |
RPL09.Conn DHB.12.06<>05 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/30/27 | 09/30/27 | 1.2 | 1.2 |
|
155.0 |
RPL09.WP4.023760 |
RPL09.Conn DHB.11 Install (Z-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 09/30/27 | 10/01/27 | 2.5 | 2.5 |
|
150.0 |
RPL09.WP4.023780 |
RPL09.Conn DHB.12 Install (Z-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 09/30/27 | 10/01/27 | 2.5 | 2.5 |
|
150.0 |
RPL09.WP4.028400 |
RPL09.Conn DHD.29.04<>03 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/30/27 | 09/30/27 | 1.2 | 1.2 |
|
252.5 |
RPL09.WP4.028420 |
RPL09.Conn DHD.30.08<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/30/27 | 09/30/27 | 1.2 | 1.2 |
|
252.5 |
RPL09.WP4.047280 |
RPL09.Conn BE ISP DHB.CFD5 (RSL) FTSW > STSW EX384f [Across-Row] | Across-Row | Not Started | 09/30/27 | 10/04/27 | 3.8 | 3.8 |
|
225.0 |
GCD.RPL09.4645 |
L3/L4 Start - DHA Rows 09-16 | DH | Not Started | 10/01/27 | 10/01/27 | 0.0 | 0.0 |
|
153.8 |
RPL09.CON.WP2.13100 |
RPL09.Conn - GSMDF1(South)<>DH A - CFD5 Rack #50 Pull, Install & Patch PON Trunks | MDF1 <> DH A - Rack#50 LV side | Not Started | 10/01/27 | 10/07/27 | 6.2 | 6.2 |
|
157.5 |
RPL09.CON.WP2.14100 |
RPL09.Conn - GSMDF2(North)<>DH A - CFD5 Rack #01 Pull, Install & Test PON Trunks | MDF2 <> DH A - Rack#01 MES side | Not Started | 10/01/27 | 10/05/27 | 3.8 | 3.8 |
|
160.0 |
RPL09.CX.DHA.01080 |
RPL09.CX.DHA - L3/L4 - Elec. Domain 03/04 | DHA ELECTRICAL | Not Started | 10/01/27 | 10/06/27 | 5.0 | 5.0 |
|
62.5 |
RPL09.CX.DHA.01100 |
RPL09.CX.DHA - L3/L4 - Control Fault Domain 01 | Control Fault Domain 1 | Not Started | 10/01/27 | 11/04/27 | 31.2 | 31.2 |
|
36.2 |
RPL09.CX.DHA.01220 |
RPL09.CX.DHA - L3/L4 - Remaining Electrical Equipment | DHA ELECTRICAL | Not Started | 10/01/27 | 10/07/27 | 6.2 | 6.2 |
|
147.5 |
RPL09.CX.DHC.01280 |
RPL09.CX.DHC - L3/L4 - Control Fault Domain 01 - TW Flush and Fill | Control Fault Domain 1 | Not Started | 10/01/27 | 10/12/27 | 10.0 | 10.0 |
|
192.5 |
RPL09.Conn.FIM.01260 |
RPL09.Conn FIM - DH B - Control Fault Domain B.2 | DH B | Not Started | 10/01/27 | 10/28/27 | 25.0 | 25.0 |
|
140.0 |
RPL09.INT.CTRC.8840 |
RPL09.Interior.Center-Corridor LO #11 - Mechanical L2 Checklist Completion | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 10/01/27 | 10/01/27 | 1.2 | 1.2 |
|
110.0 |
RPL09.INT.DHC.02490 |
RPL09.Interior.DHC - OFE - Control Fault Domain 4 (Mech Side Aisle) | Control Fault Domain 4 | Not Started | 10/01/27 | 10/12/27 | 10.0 | 10.0 |
|
121.2 |
RPL09.INT.ENDC.4000 |
RPL09.Interior.EC Ext. Leave Out #18 - Close Exterior Leave Out #18 (EC - North) WBS Summary | Exterior Leave Out Wall #18 EC - North for DHB&D HACs | Not Started | 10/01/27 | 01/21/28 | 92.5 | 92.5 |
|
160.0 |
RPL09.INT.ENDC.5580 |
RPL09.Interior.EC Ext. Leave Out #18 - IMP In Wall MEP | Exterior Leave Out Wall #18 EC - North for DHB&D HACs | Not Started | 10/01/27 | 10/07/27 | 6.2 | 6.2 |
|
138.8 |
RPL09.WP3B.014700 |
RPL09.Conn EF2<>DHA.01 Splice (A-End) Pigtails (384F) P2&3 (MES) | EF2<>DHA.01 | Not Started | 10/01/27 | 10/08/27 | 7.5 | 7.5 |
|
147.5 |
RPL09.WP3B.016140 |
RPL09.Conn EF2<>DHA.01 Install (Z-End) Pigtails (384F) P2&3 (MES) | EF2<>DHA.01 | Not Started | 10/01/27 | 10/01/27 | 1.2 | 1.2 |
|
147.5 |
RPL09.WP3B.017200 |
RPL09.Conn EF1<>DHB.18 Test Pigtails (384F) P1&4 (MES) | EF1<>DHB.18 | Not Started | 10/01/27 | 10/04/27 | 2.5 | 2.5 |
|
143.8 |
RPL09.WP4.016980 |
RPL09.Conn DHB.17 Install (A-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 10/01/27 | 10/04/27 | 2.5 | 2.5 |
|
146.2 |
RPL09.WP4.017220 |
RPL09.Conn DHB.17 Install (A-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 10/01/27 | 10/04/27 | 2.5 | 2.5 |
|
148.8 |
RPL09.WP4.017480 |
RPL09.Conn DHB.17 Install (A-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 10/01/27 | 10/06/27 | 5.0 | 5.0 |
|
148.8 |
RPL09.WP4.018740 |
RPL09.Conn DHB.17.25 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/01/27 | 10/04/27 | 2.5 | 2.5 |
|
156.2 |
RPL09.WP4.020900 |
RPL09.Conn DHB.17.26 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/01/27 | 10/04/27 | 2.5 | 2.5 |
|
156.2 |
RPL09.WP4.021320 |
RPL09.Conn DHA.09 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 10/01/27 | 10/01/27 | 1.2 | 1.2 |
|
155.0 |
RPL09.WP4.021340 |
RPL09.Conn DHA.10 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 10/01/27 | 10/01/27 | 1.2 | 1.2 |
|
155.0 |
RPL09.WP4.021600 |
RPL09.Conn DHA.09.33 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/01/27 | 10/14/27 | 12.5 | 12.5 |
|
117.5 |
RPL09.WP4.021620 |
RPL09.Conn DHA.10.37 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/01/27 | 10/14/27 | 12.5 | 12.5 |
|
117.5 |
RPL09.WP4.022320 |
RPL09.Conn DHA.09 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 10/01/27 | 10/01/27 | 1.2 | 1.2 |
|
146.2 |
RPL09.WP4.022340 |
RPL09.Conn DHA.10 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 10/01/27 | 10/01/27 | 1.2 | 1.2 |
|
146.2 |
RPL09.WP4.022740 |
RPL09.Conn DHB.17.27 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/01/27 | 10/04/27 | 2.5 | 2.5 |
|
156.2 |
RPL09.WP4.023920 |
RPL09.Conn DHB.11.04<>03 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 10/01/27 | 10/01/27 | 1.2 | 1.2 |
|
155.0 |
RPL09.WP4.023940 |
RPL09.Conn DHB.12.08<>07 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 10/01/27 | 10/01/27 | 1.2 | 1.2 |
|
155.0 |
RPL09.WP4.024120 |
RPL09.Conn DHB.19.35 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/01/27 | 10/14/27 | 12.5 | 12.5 |
|
131.2 |
RPL09.WP4.024140 |
RPL09.Conn DHB.20.39 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/01/27 | 10/14/27 | 12.5 | 12.5 |
|
131.2 |
GCD.RPL09.3865 |
L3/L4 Start - DHB Rows 33-40 | DH | Not Started | 10/04/27 | 10/04/27 | 0.0 | 0.0 |
|
141.2 |
GCD.RPL09.4265 |
[RPL09] TC-C Ready : Production Cabling Start [DHD Rows 09-16] | TC-C Ready: Production Cabling - DHD | Not Started | 10/04/27 | 10/04/27 | 0.0 | 0.0 |
|
323.8 |
RPL09.CON.WP2.15040 |
RPL09.Conn - GSMDF1(South)<>DH D - CFD2 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH D - Rack#01 MES side | Not Started | 10/04/27 | 10/07/27 | 5.0 | 5.0 |
|
233.8 |
RPL09.CON.WP2.16040 |
RPL09.Conn - GSMDF2(North)<>DH D - CFD2 Rack #50 Pull, Install & Patch PON Trunks | MDF2 <> DH D - Rack#50 LV side | Not Started | 10/04/27 | 10/08/27 | 6.2 | 6.2 |
|
230.0 |
RPL09.CON.WP3B.01940 |
RPL09.Conn EF2<>DHA.03 - WBS Summary | EF2<>DHA.03 | Not Started | 10/04/27 | 10/18/27 | 13.8 | 13.8 |
|
142.5 |
RPL09.CON.WP3B.02760 |
RPL09.Conn EF2<>DHD.31 - WBS Summary | EF2<>DHD.31 | Not Started | 10/04/27 | 10/15/27 | 12.5 | 12.5 |
|
230.0 |
RPL09.CON.WP3B.02800 |
RPL09.Conn EF1<>DHD.31 - WBS Summary | EF1<>DHD.31 | Not Started | 10/04/27 | 10/18/27 | 13.8 | 13.8 |
|
228.8 |
RPL09.CX.DHB.01150 |
RPL09.CX.DHB - L3/L4 - Elec. Domain 09/10 | DHB ELECTRICAL | Not Started | 10/04/27 | 10/07/27 | 5.0 | 5.0 |
|
110.0 |
RPL09.EY.SSB.01340 |
RPL09.EY.SSB - Install Exterior Signage | Hardscape and Landscape | Not Started | 10/04/27 | 10/15/27 | 12.5 | 12.5 |
|
161.2 |
RPL09.EY.SSB.01350 |
RPL09.EY.SSB - Install Irrigation | Hardscape and Landscape | Not Started | 10/04/27 | 10/22/27 | 18.8 | 18.8 |
|
286.2 |
RPL09.INT.CTRC.1880 |
RPL09.Interior.Center-Corridor - BoW - Final Punch Walk | Balance of Walls & Overhead | Not Started | 10/04/27 | 10/05/27 | 2.5 | 2.5 |
|
110.0 |
RPL09.INT.DHA.01970 |
RPL09.Interior.DHA - Final Punch Walk | Tie-Ins | Not Started | 10/04/27 | 10/05/27 | 2.5 | 2.5 |
|
172.5 |
RPL09.INT.EC.8880 |
RPL09.Interior.ECr LO #14 - Install Security Lowside OH & In Wall | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 10/04/27 | 10/06/27 | 3.8 | 3.8 |
|
170.0 |
RPL09.INT.EC.8900 |
RPL09.Interior.ECr LO #14 - Install Controls / EPMS / BMS OH & In Wall | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 10/04/27 | 10/06/27 | 3.8 | 3.8 |
|
170.0 |
RPL09.INT.EC.8920 |
RPL09.Interior.ECr LO #14 - Install Fire Life Safety Lowside OH & In Wall | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 10/04/27 | 10/06/27 | 3.8 | 3.8 |
|
170.0 |
RPL09.INT.EC.8940 |
RPL09.Interior.ECr LO #14 - Install Plumbing Lowside OH & In Wall | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 10/04/27 | 10/06/27 | 3.8 | 3.8 |
|
170.0 |
RPL09.INT.EC.8960 |
RPL09.Interior.ECr LO #14 - Install Mechanical Piping Lowside OH & In Wall | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 10/04/27 | 10/06/27 | 3.8 | 3.8 |
|
170.0 |
RPL09.INT.EC.8980 |
RPL09.Interior.ECr LO #14 - Install Electrical Lowside OH & In Wall | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 10/04/27 | 10/06/27 | 3.8 | 3.8 |
|
170.0 |