Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:14 PM
· 5122 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
GCD.RPL08.1655 |
Start MES Installation - RPL08 | Construction Milestones | Not Started | 12/17/26 | 12/17/26 | 0.0 | 0.0 |
|
147.5 |
GCD.RPL08.1700 |
Start LV Electrical Skid Set-In-Place - RPL08 | Construction Milestones | Not Started | 12/17/26 | 12/17/26 | 0.0 | 0.0 |
|
351.2 |
RPL08.CON.WP2.07900 |
RPL08.Conn -MDF1<>MDF2 Install Cabling (Pull, Splice & Terminate) | ISP (MDF RPL08 <> MDF RPL08) | Not Started | 12/17/26 | 12/22/26 | 5.0 | 5.0 |
|
422.5 |
RPL08.CON.WP2.07980 |
RPL08.Conn - MDF1<>MDF2 Install Cabling (Pull, Splice & Terminate) | ISP (MDF RPL08 <> MDF RPL08) | Not Started | 12/17/26 | 12/22/26 | 5.0 | 5.0 |
|
422.5 |
RPL08.CON.WP2.09260 |
RPL08.Conn - GSMDF1 (South) - Install Copper, WAPs, Security Camera & Access Control | ISP (MDF RPL08 <> MDF RPL08) | Not Started | 12/17/26 | 01/05/27 | 15.0 | 15.0 |
|
327.5 |
RPL08.INT.DHB.01120 |
RPL08.Interior.DHB - Priority - Install Security | OverHead | Not Started | 12/17/26 | 12/23/26 | 6.2 | 6.2 |
|
115.0 |
RPL08.INT.DHB.01140 |
RPL08.Interior.DHB - OFE - LV Skids and TopHat - Set / Place / Anchor | OFE/MOFE & CFCI | Not Started | 12/17/26 | 01/08/27 | 18.8 | 18.8 |
|
103.8 |
RPL08.INT.DHB.01150 |
RPL08.Interior.DHB - OFE - MES Skids - Set / Place / Anchor | OFE/MOFE & CFCI | Not Started | 12/17/26 | 01/08/27 | 18.8 | 18.8 |
|
141.2 |
RPL08.INT.DHB.01160 |
RPL08.Interior.DHB - OFE - WBS Summary | OFE/MOFE & CFCI | Not Started | 12/17/26 | 04/02/27 | 90.0 | 90.0 |
|
147.5 |
DCC.B8.3135 |
[SSDCB3] GS Gear Delivered [DHA] | Connectivity | Not Started | 12/18/26 | 12/18/26 | 0.0 | 0.0 |
|
497.5 |
RPL08.INT.DHD.01000 |
RPL08.Interior.DHD - Priority OH - WBS Summary | OverHead | Not Started | 12/18/26 | 02/10/27 | 45.0 | 45.0 |
|
403.8 |
RPL08.INT.DHD.01020 |
RPL08.Interior.DHD - Install Priority OH, Walls, OFE and Tie-ins - WBS Summary | DHD | Not Started | 12/18/26 | 07/26/27 | 187.5 | 187.5 |
|
261.2 |
RPL08.INT.DHD.01980 |
RPL08.Interior.DHD - Priority - Install Unistruts & Hangers (All Trades) Both side of Corridor Wall | OverHead | Not Started | 12/18/26 | 12/24/26 | 6.2 | 6.2 |
|
156.2 |
RPL08.INT.DHD.02250 |
RPL08.Interior.DHD - Priority - Install IMP Exterior Inwall Rough-In | OverHead | Not Started | 12/18/26 | 12/24/26 | 6.2 | 6.2 |
|
156.2 |
RPL08.INT.ENDC.01020 |
RPL08.Interior.End-Corridor - Install Priority OH, Walls, OFE and Fitout - WBS Summary | End Corridor | Not Started | 12/18/26 | 10/08/27 | 253.8 | 253.8 |
|
205.0 |
RPL08.INT.ENDC.03480 |
RPL08.Interior.End-Corr - Priority - WBS Summary | Priority Walls & Overhead | Not Started | 12/18/26 | 01/29/27 | 35.0 | 35.0 |
|
213.8 |
RPL08.INT.ENDC.1020 |
RPL08.Interior.End-Corr - Priority - Install Priority Soffit for Wall Tie-Ins/ Rock & HoW & Draft Blanket | Priority Walls & Overhead | Not Started | 12/18/26 | 12/24/26 | 6.2 | 6.2 |
|
210.0 |
RPL08.INT.SSBC.3140 |
RPL08.Interior.SSBC LO #06 - Install Security Lowside OH and In-wall | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 12/18/26 | 12/21/26 | 2.5 | 2.5 |
|
201.2 |
RPL08.INT.SSBC.3160 |
RPL08.Interior.SSBC LO #06 - Install Controls / EPMS / BMS OH and In-wall | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 12/18/26 | 12/21/26 | 2.5 | 2.5 |
|
197.5 |
RPL08.MCUP.LP2.1860 |
RPL08.MCUP.Loop 2 - Install Mcup Paving | Hardscape and Landscape | Not Started | 12/18/26 | 01/04/27 | 12.5 | 12.5 |
|
472.5 |
RPL08.STR.DHCD.01230 |
RPL08.Structure.DHCD - Install SOG Sealer and Cure | F/R/P | Not Started | 12/18/26 | 12/19/26 | 2.5 | 2.5 |
|
263.8 |
RPL08.INT.SSBC.4080 |
RPL08.Interior.SSBC LO #07 - Install Mechanical Piping Lowside OH and in-wall | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 12/21/26 | 12/22/26 | 2.5 | 2.5 |
|
191.2 |
RPL08.EY.SSB.01175 |
RPL08.EY.SSB - Install Mechanical/refrigerantTie-ins | Tie-ins | Not Started | 12/22/26 | 01/06/27 | 12.5 | 12.5 |
|
133.8 |
RPL08.INT.DHB.01180 |
RPL08.Interior.DHB - LV Skids and TopHat Tie-ins (LOE) | DHB - LV Skids and TopHat | Not Started | 12/22/26 | 01/25/27 | 27.5 | 27.5 |
|
160.0 |
RPL08.INT.DHB.01181 |
RPL08.Interior.DHB - LV Skids and TopHat - Set & Anchor Interconnects | DHB - LV Skids and TopHat | Not Started | 12/22/26 | 01/12/27 | 17.5 | 17.5 |
|
160.0 |
RPL08.INT.DHB.01190 |
RPL08.Interior.DHB - Tie-ins - WBS Summary | Tie-Ins | Not Started | 12/22/26 | 06/15/27 | 150.0 | 150.0 |
|
186.2 |
RPL08.INT.ENDC.6060 |
RPL08.Interior.End-Corr - Priority - Install IMP Exterior Inwall Rough-In | Priority Walls & Overhead | Not Started | 12/22/26 | 12/24/26 | 3.8 | 3.8 |
|
216.2 |
RPL08.INT.SSBC.3240 |
RPL08.Interior.SSBC LO #06 - Install Electrical Lowside OH and In-wall | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 12/22/26 | 12/24/26 | 3.8 | 3.8 |
|
197.5 |
RPL08.CON.WP2.09280 |
RPL08.Conn Misc P/S/T and R/S/P @ MDF2 | ISP (MDF RPL08 <> MDF RPL08) | Not Started | 12/23/26 | 12/29/26 | 5.0 | 5.0 |
|
422.5 |
RPL08.CON.WP2.09300 |
RPL08.Conn Misc P/S/T and R/S/P @ MDF2 | ISP (MDF RPL08 <> MDF RPL08) | Not Started | 12/23/26 | 12/29/26 | 5.0 | 5.0 |
|
422.5 |
RPL08.EY.ENDC.1910 |
RPL08.EY.DHD.T1 - HAC Prefab prior to install for DH B | Tent 1 | Not Started | 12/23/26 | 01/07/27 | 12.5 | 12.5 |
|
110.0 |
RPL08.INT.SBC.03420 |
RPL08.Interior.SSB-Corridor - BoW - Install Door Frames | Balance of Walls & Overhead | Not Started | 12/23/26 | 12/30/26 | 6.2 | 6.2 |
|
168.8 |
RPL08.INT.SBC.05800 |
RPL08.Interior.SSB-Corridor - BoW - Install Mechanical Piping/ Refrigerant Lowside OH and in-wall | Balance of Walls & Overhead | Not Started | 12/23/26 | 01/05/27 | 10.0 | 10.0 |
|
143.8 |
RPL08.INT.SSB.01180 |
RPL08.Interior.SSB - BoW - Install Door Frames | Balance of Walls and OverHead | Not Started | 12/23/26 | 12/30/26 | 6.2 | 6.2 |
|
207.5 |
RPL08.INT.SSB.01200 |
RPL08.Interior.SSB - Priority - Install Store Front Frames & Glass (Testing if Required) | Balance of Walls and OverHead | Not Started | 12/23/26 | 01/14/27 | 18.8 | 18.8 |
|
243.8 |
RPL08.INT.SSB.01210 |
RPL08.Interior.SSB - BoW - Install Electrical Lowside OH and In-wall and Lights(Coordinate Lights location to not affect | Balance of Walls and OverHead | Not Started | 12/23/26 | 01/07/27 | 12.5 | 12.5 |
|
186.2 |
RPL08.INT.SSB.02920 |
RPL08.Interior.SSB - Loading Dock and Storage - Install Headers and Top Out and Fire/Caulking | Loading Dock and Storage | Not Started | 12/23/26 | 01/07/27 | 12.5 | 12.5 |
|
206.2 |
RPL08.INT.SSB.14060 |
RPL08.Interior.SSB LO #01 to #05 - Install In-Wall Rough-in | OH & Framing | Not Started | 12/23/26 | 12/24/26 | 2.5 | 2.5 |
|
172.5 |
RPL08.INT.SSBC.4100 |
RPL08.Interior.SSBC LO #07 - Install Fire Life Safety Lowside OH and In-wall | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 12/23/26 | 12/24/26 | 2.5 | 2.5 |
|
195.0 |
RPL08.INT.SSBC.4120 |
RPL08.Interior.SSBC LO #07 - Install Plumbing Lowside OH and In-wall | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 12/23/26 | 12/24/26 | 2.5 | 2.5 |
|
191.2 |
RPL08.SKN.W.LO.01385 |
RPL08.SKIN.LO#16 - Cure Stemwall | Build back Exterior Leave Out Walls #16 (SSB - North of Loading Dock) | Not Started | 12/23/26 | 01/04/27 | 8.8 | 8.8 |
|
168.8 |
RPL08.EY.DHB.01220 |
RPL08.EY.DHB - Install MV, RMUs & Electrical Panels (Qty 10) | OFE | Not Started | 12/24/26 | 01/25/27 | 25.0 | 25.0 |
|
103.8 |
RPL08.EY.DHB.01230 |
RPL08.EY.DHB - OFE - MV - WBS Summary | OFE | Not Started | 12/24/26 | 03/09/27 | 62.5 | 62.5 |
|
223.8 |
RPL08.EY.SSB.01250 |
RPL08.EY.SSB - Install Sleeves MEPL | Hardscape and Landscape | Not Started | 12/24/26 | 12/31/26 | 6.2 | 6.2 |
|
263.8 |
RPL08.EY.SSB.01270 |
RPL08.EY.SSB - Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 12/24/26 | 08/16/27 | 201.2 | 201.2 |
|
291.2 |
RPL08.INT.CTRC.1160 |
RPL08.Interior.Center-Corr - Priority GL8.16/8.17 - (P2) Frame Walls (Incl. Entry Fiber Rooms #3.7, Ancillary Room #3.6) | Priority Wall Grid Line 8-16 / 8-17 | Not Started | 12/24/26 | 01/05/27 | 8.8 | 8.8 |
|
118.8 |
RPL08.INT.DHB.01130 |
RPL08.Interior.DHB - Priority - Install Controls / EPMS / BMS | OverHead | Not Started | 12/24/26 | 12/30/26 | 5.0 | 5.0 |
|
115.0 |
RPL08.INT.DHB.01200 |
RPL08.Interior.DHB - MES Skids Tie-ins (LOE) | DHB - MES Skids | Not Started | 12/24/26 | 02/10/27 | 40.0 | 40.0 |
|
160.0 |
RPL08.INT.DHB.01201 |
RPL08.Interior.DHB - MES Skids - Set & Anchor Interconnects | DHB - MES Skids | Not Started | 12/24/26 | 01/25/27 | 25.0 | 25.0 |
|
141.2 |
RPL08.INT.DHD.02230 |
RPL08.Interior.DHD - Priority - Install Drywall at Exterior Walls | OverHead | Not Started | 12/28/26 | 01/04/27 | 6.2 | 6.2 |
|
156.2 |
RPL08.INT.ENDC.1000 |
RPL08.Interior.End-Corr - Priority - Install Unistruts & Hangers (All Trades) Both side of Corridor Wall | Priority Walls & Overhead | Not Started | 12/28/26 | 01/04/27 | 6.2 | 6.2 |
|
210.0 |
RPL08.INT.SSB.14080 |
RPL08.Interior.SSB LO #01 to #05 - Install Mechanical Piping & Refrigerant Lowside OH and in-wall | OH & Framing | Not Started | 12/28/26 | 12/30/26 | 3.8 | 3.8 |
|
172.5 |
RPL08.INT.SSBC.3180 |
RPL08.Interior.SSBC LO #06 - Install Door Frames | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 12/28/26 | 12/29/26 | 2.5 | 2.5 |
|
197.5 |
RPL08.INT.SSBC.4140 |
RPL08.Interior.SSBC LO #07 - Install Security Lowside OH and In-wall | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 12/28/26 | 12/29/26 | 2.5 | 2.5 |
|
195.0 |
RPL08.INT.SSBC.4160 |
RPL08.Interior.SSBC LO #07 - Install Controls / EPMS / BMS OH and In-wall | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 12/28/26 | 12/29/26 | 2.5 | 2.5 |
|
191.2 |
RPL08.INT.DHA.01050 |
RPL08.Interior.DHA - Priority - Install FA / Linear heat detection | OverHead | Not Started | 12/29/26 | 01/05/27 | 6.2 | 6.2 |
|
107.5 |
RPL08.INT.DHA.02320 |
RPL08.Interior.DHA - Priority - Install Electrical | OverHead | Not Started | 12/29/26 | 01/20/27 | 18.8 | 18.8 |
|
107.5 |
RPL08.INT.DHB.01182 |
RPL08.Interior.DHB - LV Skids and TopHat - Maintenance and Reserve Busways | DHB - LV Skids and TopHat | Not Started | 12/29/26 | 01/15/27 | 16.2 | 16.2 |
|
160.0 |
DCC.B8.3225 |
[SSDCB3] CorpNet/Security/FacNet Ready [DHB] | Connectivity | Not Started | 12/30/26 | 12/30/26 | 0.0 | 0.0 |
|
422.5 |
RPL08.INT.SSBC.3200 |
RPL08.Interior.SSBC LO #06 - Mechanical Tie-In | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 12/30/26 | 12/31/26 | 2.5 | 2.5 |
|
197.5 |
RPL08.INT.SSBC.3300 |
RPL08.Interior.SSBC LO #06 - Electrical Tie-In | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 12/30/26 | 01/06/27 | 6.2 | 6.2 |
|
197.5 |
RPL08.INT.SSBC.4240 |
RPL08.Interior.SSBC LO #07 - Install Electrical Lowside OH and In-wall | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 12/30/26 | 01/04/27 | 3.8 | 3.8 |
|
191.2 |
RPL08.INT.SSB.02860 |
RPL08.Interior.SSB - Final Finishes & Fixtures - MEP Rough-In | Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) | Not Started | 12/31/26 | 01/07/27 | 6.2 | 6.2 |
|
316.2 |
RPL08.INT.SSB.14100 |
RPL08.Interior.SSB LO #01 to #05 - Install Fire Life Safety Lowside OH and In-wall | OH & Framing | Not Started | 12/31/26 | 12/31/26 | 1.2 | 1.2 |
|
195.0 |
RPL08.INT.SSB.14120 |
RPL08.Interior.SSB LO #01 to #05 - Install Plumbing Lowside OH and In-wall | OH & Framing | Not Started | 12/31/26 | 01/04/27 | 2.5 | 2.5 |
|
172.5 |
RPL08.EY.SSB.01290 |
RPL08.EY.SSB - Install Trash Enclosure (CMU) | Hardscape and Landscape | Not Started | 01/04/27 | 02/01/27 | 25.0 | 25.0 |
|
288.8 |
RPL08.INT.CTRC.9040 |
RPL08.Interior.Center-Corr - Priority GL8.16/8.17- (P2) Install MEP In-Wall/Backing | Priority Wall Grid Line 8-16 / 8-17 | Not Started | 01/04/27 | 01/07/27 | 5.0 | 5.0 |
|
118.8 |
RPL08.INT.DHB.01210 |
RPL08.Interior.DHB - OFE - Control Fault Domain 1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 1 | Not Started | 01/04/27 | 02/01/27 | 25.0 | 25.0 |
|
110.0 |
RPL08.INT.DHB.02400 |
RPL08.Interior.DHB - OFE - Control Fault Domain 1 (LV Side Aisle) | Control Fault Domain 1 | Not Started | 01/04/27 | 01/08/27 | 6.2 | 6.2 |
|
113.8 |
RPL08.INT.SSB.14140 |
RPL08.Interior.SSB LO #01 to #05 - Install Security Lowside OH and In-wall | OH & Framing | Not Started | 01/04/27 | 01/05/27 | 2.5 | 2.5 |
|
195.0 |
RPL08.INT.DHB.01202 |
RPL08.Interior.DHB - MES Skids - Piping Tie-Ins & Inspections | DHB - MES Skids | Not Started | 01/05/27 | 02/02/27 | 25.0 | 25.0 |
|
141.2 |
RPL08.INT.DHC.01000 |
RPL08.Interior.DHC - Priority OH - WBS Summary | OverHead | Not Started | 01/05/27 | 03/02/27 | 48.8 | 48.8 |
|
397.5 |
RPL08.INT.DHC.01020 |
RPL08.Interior.DHC - Install Priority OH, Walls, OFE and Tie-ins - WBS Summary | DHC | Not Started | 01/05/27 | 08/13/27 | 192.5 | 192.5 |
|
253.8 |
RPL08.INT.DHC.01980 |
RPL08.Interior.DHC - Priority - Install Unistruts & Hangers (All Trades) Both side of Corridor Wall | OverHead | Not Started | 01/05/27 | 01/11/27 | 6.2 | 6.2 |
|
158.8 |
RPL08.INT.DHC.02250 |
RPL08.Interior.DHC - Priority - Install IMP Exterior Inwall Rough-In | OverHead | Not Started | 01/05/27 | 01/11/27 | 6.2 | 6.2 |
|
158.8 |
RPL08.INT.ENDC.01120 |
RPL08.Interior.End-Corridor - Frame Remaining Walls | Fit out | Not Started | 01/05/27 | 01/08/27 | 5.0 | 5.0 |
|
247.5 |
RPL08.INT.ENDC.01130 |
RPL08.Interior.End-Corridor - Install Fitout (Restroom, Janitor, Fire Riser, Humidifier) - WBS Summary | Fit out | Not Started | 01/05/27 | 09/28/27 | 231.2 | 231.2 |
|
215.0 |
RPL08.INT.ENDC.1920 |
RPL08.Interior.End-Corr - Priority - Install Drywall at Exterior Walls | Priority Walls & Overhead | Not Started | 01/05/27 | 01/11/27 | 6.2 | 6.2 |
|
210.0 |
RPL08.INT.SSB.14160 |
RPL08.Interior.SSB LO #01 to #05 - Install Controls / EPMS / BMS OH and In-wall | OH & Framing | Not Started | 01/05/27 | 01/06/27 | 2.5 | 2.5 |
|
172.5 |
RPL08.INT.SSBC.4180 |
RPL08.Interior.SSBC LO #07 - Install Door Frames | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 01/05/27 | 01/06/27 | 2.5 | 2.5 |
|
191.2 |
RPL08.MCUP.LP2.1960 |
RPL08.MCUP.Loop 2 - Install Exterior Signage | Hardscape and Landscape | Not Started | 01/05/27 | 01/19/27 | 12.5 | 12.5 |
|
472.5 |
RPL08.SKN.W.LO.01390 |
RPL08.SKIN.LO#16 - Stemwall Water Proofing | Build back Exterior Leave Out Walls #16 (SSB - North of Loading Dock) | Not Started | 01/05/27 | 01/11/27 | 6.2 | 6.2 |
|
168.8 |
DCC.B8.3235 |
[SSDCB3] CorpNet/Security/FacNet Ready [DHA] | Connectivity | Not Started | 01/06/27 | 01/06/27 | 0.0 | 0.0 |
|
417.5 |
RPL08.INT.CTRC.1080 |
RPL08.Interior.Center-Corridor - Priority - Install Mechanical Piping/ Refrigerant (Highside OH space) | Priority Walls & Overhead | Not Started | 01/06/27 | 01/12/27 | 6.2 | 6.2 |
|
117.5 |
RPL08.INT.CTRC.9020 |
RPL08.Interior.Center-Corr - Priority GL8.16/8.17 - (P2) Install IMP Wall | Priority Wall Grid Line 8-16 / 8-17 | Not Started | 01/06/27 | 01/11/27 | 5.0 | 5.0 |
|
125.0 |
RPL08.INT.CTRC.9060 |
RPL08.Interior.Center-Corr - Priority GL8.16/8.17- (P2) Hang Drywall (Both Sides) | Priority Wall Grid Line 8-16 / 8-17 | Not Started | 01/06/27 | 01/11/27 | 5.0 | 5.0 |
|
118.8 |
RPL08.INT.DHA.02360 |
RPL08.Interior.DHA - Priority - Install Temp Doors Frame Hardware | OverHead | Not Started | 01/06/27 | 01/08/27 | 3.8 | 3.8 |
|
322.5 |
RPL08.INT.DHB.01183 |
RPL08.Interior.DHB - LV Skids and TopHat - Top Hat Busway | DHB - LV Skids and TopHat | Not Started | 01/06/27 | 01/25/27 | 16.2 | 16.2 |
|
160.0 |
RPL08.INT.DHB.01250 |
RPL08.Interior.DHB - Tie-ins - Control Fault Domain 1 - WBS Summary | Control Fault Domain 1 | Not Started | 01/06/27 | 03/25/27 | 68.8 | 68.8 |
|
110.0 |
RPL08.INT.DHB.02700 |
RPL08.Interior.DHB - Control Fault Domain 1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 01/06/27 | 01/12/27 | 6.2 | 6.2 |
|
128.8 |
RPL08.INT.SBC.03280 |
RPL08.Interior.SSB-Corridor - BoW -Install Electrical Lowside OH and In-wall and Lights (Coordinate Lights location to n | Balance of Walls & Overhead | Not Started | 01/06/27 | 01/20/27 | 12.5 | 12.5 |
|
143.8 |
RPL.08.D.70140.XR |
External Tie from RPL06 - Interior HAC Crew 1 Flow (RPL06.INT.DHD.02470) (1/19/27) | Internal Milestones (XREFs) | Not Started | 01/07/27 | 01/07/27 | 0.0 | 0.0 |
|
110.0 |
RPL08.EY.SSB.01260 |
RPL08.EY.SSB - L2 Checklist Completion | Tie-ins | Not Started | 01/07/27 | 01/21/27 | 12.5 | 12.5 |
|
133.8 |
RPL08.INT.DHB.01203 |
RPL08.Interior.DHB - MES Skids - CDU Tie-Ins | DHB - MES Skids | Not Started | 01/07/27 | 02/04/27 | 25.0 | 25.0 |
|
160.0 |
RPL08.INT.SSB.14240 |
RPL08.Interior.SSB LO #01 to #05 - Install Electrical Lowside OH and In-wall | OH & Framing | Not Started | 01/07/27 | 01/15/27 | 8.8 | 8.8 |
|
172.5 |
RPL08.INT.SSBC.3220 |
RPL08.Interior.SSBC LO #06 - Fire Safing OH and In-wall | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 01/07/27 | 01/07/27 | 1.2 | 1.2 |
|
197.5 |
RPL08.INT.SSBC.4200 |
RPL08.Interior.SSBC LO #07 - Mechanical Tie-In | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 01/07/27 | 01/08/27 | 2.5 | 2.5 |
|
191.2 |
RPL08.INT.SSBC.4300 |
RPL08.Interior.SSBC LO #07 - Electrical Tie-In | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 01/07/27 | 01/13/27 | 6.2 | 6.2 |
|
191.2 |
GCD.RPL08.1725 |
Start FSHAC set in place - RPL08 - DHA&B | Construction Milestones | Not Started | 01/08/27 | 01/08/27 | 0.0 | 0.0 |
|
333.8 |
RPL08.INT.DHB.01310 |
RPL08.Interior.DHB - Control Fault Domain 1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 01/08/27 | 01/14/27 | 6.2 | 6.2 |
|
137.5 |