Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:14 PM · 5122 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL08.INT.DHB.02420 RPL08.Interior.DHB - OFE - Control Fault Domain 1 (HAC) Control Fault Domain 1 Not Started 01/08/27 01/29/27 18.8 18.8
0%
110.0
RPL08.INT.SSB.03060 RPL08.Interior.SSB - Final Finishes & Fixtures - Hang Tape Bed and Fire/Caulking Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) Not Started 01/08/27 01/14/27 6.2 6.2
0%
328.8
RPL08.INT.SSB.03080 RPL08.Interior.SSB - Loading Dock and Storage - Tape Finish Paint (Top Out) Loading Dock and Storage Not Started 01/08/27 01/20/27 10.0 10.0
0%
206.2
RPL08.INT.SSB.05860 RPL08.Interior.SSB - BoW - BoW - Install Mechanical Piping/ Refrigerant (Lowside OH space) Balance of Walls and OverHead Not Started 01/08/27 01/14/27 6.2 6.2
0%
186.2
RPL08.INT.SSB.06660 RPL08.Interior.SSB - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (Pre Drywall) Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) Not Started 01/08/27 01/14/27 6.2 6.2
0%
316.2
RPL08.INT.SSBC.3260 RPL08.Interior.SSBC LO #06 - Install Backing Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 01/08/27 01/08/27 1.2 1.2
0%
197.5
RPL08.INT.DHB.01204 RPL08.Interior.DHB - MES Skids - BMS Tie-Ins DHB - MES Skids Not Started 01/11/27 02/08/27 25.0 25.0
0%
160.0
RPL08.INT.DHB.01320 RPL08.Interior.DHB - OFE - Control Fault Domain 2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 2 Not Started 01/11/27 02/16/27 31.2 31.2
0%
122.5
RPL08.INT.DHB.01330 RPL08.Interior.DHB - Control Fault Domain 1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 01/11/27 01/15/27 6.2 6.2
0%
137.5
RPL08.INT.DHB.02460 RPL08.Interior.DHB - OFE - Control Fault Domain 2 (LV Side Aisle) Control Fault Domain 2 Not Started 01/11/27 01/14/27 5.0 5.0
0%
138.8
RPL08.INT.ENDC.01140 RPL08.Interior.End-Corridor - Install Doors Frame Hardware Fit out Not Started 01/11/27 01/15/27 6.2 6.2
0%
250.0
RPL08.INT.ENDC.01150 RPL08.Interior.End-Corridor - Install Electrical OH and In-wall Fit out Not Started 01/11/27 01/20/27 8.8 8.8
0%
247.5
RPL08.INT.ENDC.06940 RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Frame/Blocking Walls & Ceilings Restrooms Not Started 01/11/27 01/25/27 12.5 12.5
0%
260.0
RPL08.INT.SSBC.3280 RPL08.Interior.SSBC LO #06 - QC - Backings/Walls Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 01/11/27 01/12/27 2.5 2.5
0%
197.5
GCD.RPL08.1290 Interior fit-out Start RPL08 - DHC&D Construction Milestones Not Started 01/12/27 01/12/27 0.0 0.0
0%
440.0
RPL08.INT.CTRC.01070 RPL08.Interior.Center-Corridor - BoW - Early MEPF Inwall Rough-In for Ancillary Skid (Room #3.6) Priority Wall Grid Line 8-16 / 8-17 Not Started 01/12/27 01/14/27 3.8 3.8
0%
206.2
RPL08.INT.CTRC.01130 RPL08.Interior.Center-Corridor - OFE - DHB (1x GS.IDF) B2 OFE/MOFE & CFCI Not Started 01/12/27 01/19/27 6.2 6.2
0%
176.2
RPL08.INT.CTRC.01200 RPL08.Interior.Center-Corridor - OFE - DHA (1x GS.IDF) A2 OFE/MOFE & CFCI Not Started 01/12/27 01/19/27 6.2 6.2
0%
176.2
RPL08.INT.CTRC.8940 RPL08.Interior.Center-Corr - Priority - All MEP In-wall in Entry Fiber Rooms (Room #2.7) Priority Wall Grid Line 8-16 / 8-17 Not Started 01/12/27 01/21/27 8.8 8.8
0%
185.0
RPL08.INT.CTRC.9080 RPL08.Interior.Center-Corr - Priority GL8.16/8.17- (P2) Tape Finish Paint (Both Sides) Priority Wall Grid Line 8-16 / 8-17 Not Started 01/12/27 01/19/27 6.2 6.2
0%
118.8
RPL08.INT.DHC.02230 RPL08.Interior.DHC - Priority - Install Drywall at Exterior Walls OverHead Not Started 01/12/27 01/19/27 6.2 6.2
0%
158.8
RPL08.INT.ENDC.1080 RPL08.Interior.End-Corr - Priority - Tape Finish Paint Priority Soffit both sides (Top Out) & Draft Blanket Priority Walls & Overhead Not Started 01/12/27 01/21/27 8.8 8.8
0%
210.0
RPL08.INT.ENDC.1100 RPL08.Interior.End-Corr - Priority - Install Mechanical Piping/ Refrigerant (Highside OH space) Priority Walls & Overhead Not Started 01/12/27 01/19/27 6.2 6.2
0%
213.8
RPL08.INT.SBC.03300 RPL08.Interior.SSB-Corridor - BoW -Install Fire Life Safety Lowside OH and In-wall Balance of Walls & Overhead Not Started 01/12/27 01/21/27 8.8 8.8
0%
157.5
RPL08.SKN.W.LO.01395 RPL08.SKIN.LO#16 - Install IMP Flashing Build back Exterior Leave Out Walls #16 (SSB - North of Loading Dock) Not Started 01/12/27 01/19/27 6.2 6.2
0%
168.8
DCC.B8.3155 [SSDCB3] GS Gear Delivered [DHD] Connectivity Not Started 01/13/27 01/13/27 0.0 0.0
0%
477.5
RPL08.INT.CTRC.1120 RPL08.Interior.Center-Corridor - Priority - Install Plumbing (Highside OH space) Priority Walls & Overhead Not Started 01/13/27 01/20/27 6.2 6.2
0%
117.5
RPL08.INT.CTRC.1140 RPL08.Interior.Center-Corridor - Priority - Install FA/ VESDA/ hangers & Heat Trace (Highside OH space) Priority Walls & Overhead Not Started 01/13/27 01/20/27 6.2 6.2
0%
117.5
RPL08.INT.DHA.01060 RPL08.Interior.DHA - OFE - LV Skids and TopHat - Set / Place / Anchor OFE/MOFE & CFCI Not Started 01/13/27 02/03/27 18.8 18.8
0%
101.2
RPL08.INT.DHA.01070 RPL08.Interior.DHA - OFE - MES Skids - Set / Place / Anchor OFE/MOFE & CFCI Not Started 01/13/27 02/03/27 18.8 18.8
0%
120.0
RPL08.INT.DHA.01080 RPL08.Interior.DHA - OFE - WBS Summary OFE/MOFE & CFCI Not Started 01/13/27 04/22/27 86.2 86.2
0%
142.5
RPL08.INT.DHB.01205 RPL08.Interior.DHB - MES Skids - EPMS Tie-Ins DHB - MES Skids Not Started 01/13/27 02/10/27 25.0 25.0
0%
160.0
RPL08.INT.DHB.01380 RPL08.Interior.DHB - Tie-ins - Control Fault Domain 2 - WBS Summary Control Fault Domain 2 Not Started 01/13/27 04/16/27 81.2 81.2
0%
122.5
RPL08.INT.DHB.02440 RPL08.Interior.DHB - OFE - Control Fault Domain 1 (Mech Side Aisle) Control Fault Domain 1 Not Started 01/13/27 02/01/27 16.2 16.2
0%
110.0
RPL08.INT.DHB.02720 RPL08.Interior.DHB - Control Fault Domain 2 - Install Duct (LV Side) LV Side Tie-ins Not Started 01/13/27 01/19/27 5.0 5.0
0%
153.8
RPL08.INT.DHD.02130 RPL08.Interior.DHD - Priority - Install Mechanical Piping OverHead Not Started 01/13/27 01/29/27 15.0 15.0
0%
148.8
RPL08.INT.SSBC.3360 RPL08.Interior.SSBC LO #06 - Hang Drywall Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 01/13/27 01/14/27 2.5 2.5
0%
197.5
RPL08.EY.ENDC.1930 RPL08.EY.DHD.T1 - HAC Prefab prior to install for DH A Tent 2 Not Started 01/14/27 01/28/27 12.5 12.5
0%
105.0
RPL08.INT.SSBC.4220 RPL08.Interior.SSBC LO #07 - Fire Safing OH and In-wall Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 01/14/27 01/14/27 1.2 1.2
0%
191.2
RPL08.INT.CTRC.01090 RPL08.Interior.Center-Corridor - BoW - Early Install Drywall for Ancillary Skid (Room #3.6) Priority Wall Grid Line 8-16 / 8-17 Not Started 01/15/27 01/20/27 3.8 3.8
0%
206.2
RPL08.INT.DHA.01090 RPL08.Interior.DHA - LV Skids and TopHat Tie-ins (LOE) DHA - LV Skids and TopHat Not Started 01/15/27 02/17/27 27.5 27.5
0%
152.5
RPL08.INT.DHA.01091 RPL08.Interior.DHA - LV Skids and TopHat - Set & Anchor Interconnects DHA - LV Skids and TopHat Not Started 01/15/27 02/04/27 17.5 17.5
0%
152.5
RPL08.INT.DHA.01100 RPL08.Interior.DHA - Tie-ins - WBS Summary Tie-Ins Not Started 01/15/27 06/16/27 131.2 131.2
0%
197.5
RPL08.INT.DHB.01440 RPL08.Interior.DHB - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 3 Not Started 01/15/27 03/02/27 38.8 38.8
0%
136.2
RPL08.INT.DHB.01460 RPL08.Interior.DHB - Control Fault Domain 2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 01/15/27 01/21/27 5.0 5.0
0%
162.5
RPL08.INT.DHB.02520 RPL08.Interior.DHB - OFE - Control Fault Domain 3 (LV Side Aisle) Control Fault Domain 3 Not Started 01/15/27 01/21/27 5.0 5.0
0%
160.0
RPL08.INT.SSB.01260 RPL08.Interior.SSB - BoW - Install Fire Life Safety Lowside OH and In-wall Balance of Walls and OverHead Not Started 01/15/27 01/26/27 8.8 8.8
0%
192.5
RPL08.INT.SSB.01800 RPL08.Interior.SSB - BoW - Install Plumbing Lowside OH and In-wall Balance of Walls and OverHead Not Started 01/15/27 01/26/27 8.8 8.8
0%
186.2
RPL08.INT.SSB.06680 RPL08.Interior.SSB - Final Finishes & Fixtures - Install Cement Board/ Drywall Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) Not Started 01/15/27 01/22/27 6.2 6.2
0%
316.2
RPL08.INT.SSBC.3400 RPL08.Interior.SSBC LO #06 - Tape Finish Paint Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 01/15/27 01/22/27 6.2 6.2
0%
197.5
RPL08.INT.SSBC.4260 RPL08.Interior.SSBC LO #07 - Install Backing Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 01/15/27 01/15/27 1.2 1.2
0%
191.2
RPL08.INT.DHB.01470 RPL08.Interior.DHB - Control Fault Domain 2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 01/19/27 01/22/27 5.0 5.0
0%
162.5
RPL08.INT.SSB.14260 RPL08.Interior.SSB LO #01 to #05 - Install Backing OH & Framing Not Started 01/19/27 01/25/27 6.2 6.2
0%
172.5
RPL08.INT.SSBC.4280 RPL08.Interior.SSBC LO #07 - QC - Backings/Walls Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 01/19/27 01/20/27 2.5 2.5
0%
191.2
RPL08.CON.WP2.06000 RPL08.Conn - Interior GSIDFs - WBS Summary GS.IDF (Interior) Not Started 01/20/27 08/09/27 175.0 175.0
0%
297.5
RPL08.CON.WP2.06200 RPL08.Conn - GSIDF/DH B2 - WBS Summary Int. IDF OFE/MOFE - GSIDF8B2 Not Started 01/20/27 02/17/27 25.0 25.0
0%
416.2
RPL08.CON.WP2.06220 RPL08.Conn - GSIDF/DH B2 - Install Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 01/20/27 01/26/27 6.2 6.2
0%
282.5
RPL08.CON.WP2.06400 RPL08.Conn - GSIDF/DH A2 - WBS Summary Int. IDF OFE/MOFE - GSIDF8A2 Not Started 01/20/27 02/17/27 25.0 25.0
0%
416.2
RPL08.CON.WP2.06420 RPL08.Conn - GSIDF/DH A2 - Install Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 01/20/27 01/26/27 6.2 6.2
0%
295.0
RPL08.INT.DHB.01520 RPL08.Interior.DHB - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary Control Fault Domain 3 Not Started 01/20/27 04/23/27 82.5 82.5
0%
191.2
RPL08.INT.DHB.02740 RPL08.Interior.DHB - Control Fault Domain 3 - Install Duct (LV Side) LV Side Tie-ins Not Started 01/20/27 01/25/27 5.0 5.0
0%
175.0
RPL08.INT.DHC.02110 RPL08.Interior.DHC - Priority - Install Plumbing OverHead Not Started 01/20/27 01/26/27 6.2 6.2
0%
158.8
RPL08.INT.ENDC.1140 RPL08.Interior.End-Corr - Priority - Install Plumbing (Highside OH space) Priority Walls & Overhead Not Started 01/20/27 01/26/27 6.2 6.2
0%
213.8
RPL08.INT.ENDC.1160 RPL08.Interior.End-Corr - Priority - Install FA (Highside OH space) Priority Walls & Overhead Not Started 01/20/27 01/26/27 6.2 6.2
0%
213.8
RPL08.SKN.W.LO.01420 RPL08.SKIN.LO#16 - Install IMP Insulated Metal Panels Build back Exterior Leave Out Walls #16 (SSB - North of Loading Dock) Not Started 01/20/27 01/26/27 6.2 6.2
0%
168.8
RPL08.EY.DHA.01220 RPL08.EY.DHA - Install MV, RMUs & Electrical Panels (Qty 10) OFE Not Started 01/21/27 02/18/27 25.0 25.0
0%
101.2
RPL08.INT.CTRC.01110 RPL08.Interior.Center-Corridor - BoW - Early Tape Finish Paint for Ancillary Skid (Room #3.6) Priority Wall Grid Line 8-16 / 8-17 Not Started 01/21/27 01/27/27 6.2 6.2
0%
206.2
RPL08.INT.CTRC.1200 RPL08.Interior.Center-Corridor - Priority - Install Fire Safing/ Seal Penetrations through Soffit (Highside OH space) Priority Walls & Overhead Not Started 01/21/27 01/25/27 3.8 3.8
0%
117.5
RPL08.INT.CTRC.1220 RPL08.Interior.Center-Corridor - BoW - Frame Balance of Wall Balance of Walls & Overhead Not Started 01/21/27 01/27/27 6.2 6.2
0%
117.5
RPL08.INT.CTRC.1230 RPL08.Interior.Center-Corridor - BoW - Balance Of Wall (ERAD, Maintance, Network infra, Spoke, Bathroom, etc) - WBS Summ Balance of Walls & Overhead Not Started 01/21/27 07/07/27 145.0 145.0
0%
117.5
RPL08.INT.CTRC.2020 RPL08.Interior.Center-Corridor - Priority - Fixed Draft/Smoke Curtain Patching Priority Walls & Overhead Not Started 01/21/27 01/25/27 3.8 3.8
0%
117.5
RPL08.INT.DHA.01110 RPL08.Interior.DHA - MES Skids Tie-ins (LOE) DHA - MES Skids Not Started 01/21/27 03/08/27 40.0 40.0
0%
138.8
RPL08.INT.DHA.01111 RPL08.Interior.DHA - MES Skids - Set & Anchor Interconnects DHA - MES Skids Not Started 01/21/27 02/18/27 25.0 25.0
0%
120.0
RPL08.INT.DHA.02340 RPL08.Interior.DHA - Priority - Install Security OverHead Not Started 01/21/27 01/27/27 6.2 6.2
0%
313.8
RPL08.INT.DHD.01050 RPL08.Interior.DHD - Priority - Install FA / Linear heat detection OverHead Not Started 01/21/27 01/27/27 6.2 6.2
0%
147.5
RPL08.INT.DHD.02150 RPL08.Interior.DHD - Priority - Install Electrical OverHead Not Started 01/21/27 02/03/27 12.5 12.5
0%
147.5
RPL08.INT.ENDC.01170 RPL08.Interior.End-Corridor - Install Security OH and In-wall Fit out Not Started 01/21/27 01/29/27 8.8 8.8
0%
247.5
RPL08.INT.ENDC.01180 RPL08.Interior.End-Corridor - Install Plumbing OH and In-wall Fit out Not Started 01/21/27 02/02/27 11.2 11.2
0%
250.0
RPL08.INT.SBC.03320 RPL08.Interior.SSB-Corridor - BoW - Install Plumbing Lowside OH and In-wall Balance of Walls & Overhead Not Started 01/21/27 01/29/27 8.8 8.8
0%
143.8
RPL08.INT.SSB.01190 RPL08.Interior.SSB - Loading Dock and Storage - Install Electrical Rough-In Loading Dock and Storage Not Started 01/21/27 01/29/27 8.8 8.8
0%
210.0
RPL08.INT.SSB.01410 RPL08.Interior.SSB - Loading Dock and Storage - Install DAS (Distribution Antenna System) Loading Dock and Storage Not Started 01/21/27 01/27/27 6.2 6.2
0%
268.8
RPL08.INT.SSB.01510 RPL08.Interior.SSB - Loading Dock and Storage - Install Door Frames Loading Dock and Storage Not Started 01/21/27 01/27/27 6.2 6.2
0%
212.5
RPL08.INT.SSB.01740 RPL08.Interior.SSB - Loading Dock and Storage - Install VAV's/Duct Branches Loading Dock and Storage Not Started 01/21/27 02/03/27 12.5 12.5
0%
206.2
RPL08.INT.SSB.02940 RPL08.Interior.SSB - Loading Dock and Storage - Install Blocking/Steel support Assembly for Metal Canopy Loading Dock and Storage Not Started 01/21/27 01/27/27 6.2 6.2
0%
215.0
RPL08.INT.SSBC.4360 RPL08.Interior.SSBC LO #07 - Hang Drywall Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 01/21/27 01/22/27 2.5 2.5
0%
191.2
DCC.B8.3145 [SSDCB3] GS Gear Delivered [DHC] Connectivity Not Started 01/22/27 01/22/27 0.0 0.0
0%
470.0
RPL.08.D.70160.XR External Tie from RPL06 - Interior HAC Crew 2 Flow (RPL06.INT.DHC.02470) (2/2/27) Internal Milestones (XREFs) Not Started 01/22/27 01/22/27 0.0 0.0
0%
110.0
RPL08.INT.CTRC.8960 RPL08.Interior.Center-Corr - Priority - Hang Drywall Rock all Entry Fiber Rooms (Room #2.7) Priority Wall Grid Line 8-16 / 8-17 Not Started 01/22/27 01/27/27 5.0 5.0
0%
185.0
RPL08.INT.DHA.01092 RPL08.Interior.DHA - LV Skids and TopHat - Maintenance and Reserve Busways DHA - LV Skids and TopHat Not Started 01/22/27 02/09/27 16.2 16.2
0%
152.5
RPL08.INT.DHB.01580 RPL08.Interior.DHB - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 4 Not Started 01/22/27 03/16/27 46.2 46.2
0%
143.8
RPL08.INT.DHB.01600 RPL08.Interior.DHB - Control Fault Domain 3 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 01/22/27 01/27/27 5.0 5.0
0%
205.0
RPL08.INT.DHB.02580 RPL08.Interior.DHB - OFE - Control Fault Domain 4 (LV Side Aisle) Control Fault Domain 4 Not Started 01/22/27 01/27/27 5.0 5.0
0%
175.0
RPL08.INT.ENDC.1120 RPL08.Interior.End-Corr - Priority GL8.27 - (P3) Frame Walls (Incl. Ancillary Room #3.6) Priority Wall Grid Line 8-27 Not Started 01/22/27 01/28/27 6.2 6.2
0%
210.0
RPL08.INT.SBC.03340 RPL08.Interior.SSB-Corridor - BoW - Install Security Lowside OH and In-wall Balance of Walls & Overhead Not Started 01/22/27 02/01/27 8.8 8.8
0%
177.5
RPL.08.D.83720.XG RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHB Give Milestones (XREFs) Not Started 01/25/27 01/25/27 0.0 0.0
0%
467.5
RPL.08.D.83960.XG Ready for MV Cable Pull DH B (MVs - Qty 10)* Give Milestones (XREFs) Not Started 01/25/27 01/25/27 0.0 0.0
0%
467.5
RPL08.INT.DHB.01610 RPL08.Interior.DHB - Control Fault Domain 3 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 01/25/27 01/28/27 5.0 5.0
0%
265.0
RPL08.INT.SSB.06700 RPL08.Interior.SSB - Final Finishes & Fixtures - Water Proofing/ Tape Paint Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) Not Started 01/25/27 01/29/27 6.2 6.2
0%
316.2
RPL08.INT.SSBC.3500 RPL08.Interior.SSBC LO #06 - Install DAS (Distribution Antenna System) Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 01/25/27 01/25/27 1.2 1.2
0%
197.5
RPL08.INT.SSBC.3580 RPL08.Interior.SSBC LO #06 - Install Flooring Tiles/Resinous Flooring in specific rooms Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 01/25/27 01/27/27 3.8 3.8
0%
201.2