Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:14 PM
· 5122 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL08.INT.DHA.01230 |
RPL08.Interior.DHA - OFE - Control Fault Domain 2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 2 | Not Started | 02/04/27 | 03/08/27 | 27.5 | 27.5 |
|
117.5 |
RPL08.INT.DHA.03540 |
RPL08.Interior.DHA - OFE - Control Fault Domain 2 (LV Side Aisle) | Control Fault Domain 2 | Not Started | 02/04/27 | 02/09/27 | 5.0 | 5.0 |
|
127.5 |
RPL08.INT.DHB.01260 |
RPL08.Interior.DHB - Control Fault Domain 1 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 02/04/27 | 03/04/27 | 25.0 | 25.0 |
|
122.5 |
RPL08.INT.DHB.01270 |
RPL08.Interior.DHB - Control Fault Domain 1 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 02/04/27 | 03/04/27 | 25.0 | 25.0 |
|
122.5 |
RPL08.INT.DHB.01280 |
RPL08.Interior.DHB - Control Fault Domain 1 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 02/04/27 | 03/04/27 | 25.0 | 25.0 |
|
110.0 |
RPL08.INT.DHB.02500 |
RPL08.Interior.DHB - OFE - Control Fault Domain 2 (Mech Side Aisle) | Control Fault Domain 2 | Not Started | 02/04/27 | 02/16/27 | 10.0 | 10.0 |
|
122.5 |
RPL08.INT.DHC.01050 |
RPL08.Interior.DHC - Priority - Install FA / Linear heat detection | OverHead | Not Started | 02/04/27 | 02/10/27 | 6.2 | 6.2 |
|
147.5 |
RPL08.INT.DHC.02150 |
RPL08.Interior.DHC - Priority - Install Electrical | OverHead | Not Started | 02/04/27 | 02/18/27 | 12.5 | 12.5 |
|
147.5 |
RPL08.INT.DHD.01110 |
RPL08.Interior.DHD - MES Skids Tie-ins (LOE) | DHD - MES Skids | Not Started | 02/04/27 | 03/16/27 | 35.0 | 35.0 |
|
267.5 |
RPL08.INT.DHD.01111 |
RPL08.Interior.DHD - MES Skids - Set & Anchor Interconnects | DHD - MES Skids | Not Started | 02/04/27 | 02/26/27 | 20.0 | 20.0 |
|
267.5 |
RPL08.INT.DHD.02170 |
RPL08.Interior.DHD - Priority - Install Security | OverHead | Not Started | 02/04/27 | 02/05/27 | 2.5 | 2.5 |
|
403.8 |
RPL08.INT.ENDC.1205 |
RPL08.Interior.End-Corridor - Balance Of Wall - (ERAD, Maintance, Network infra, Spoke, Bathroom, etc) - WBS Summary | Balance of Walls & Overhead | Not Started | 02/04/27 | 09/01/27 | 182.5 | 182.5 |
|
165.0 |
RPL08.INT.ENDC.1220 |
RPL08.Interior.End-Corridor - Frame Balance of Wall | Balance of Walls & Overhead | Not Started | 02/04/27 | 02/10/27 | 6.2 | 6.2 |
|
210.0 |
RPL08.INT.ENDC.6140 |
RPL08.Interior.End-Corridor - Early In-wall for Ancillary Skids (Room #3.6) | Priority Wall Grid Line 8-27 | Not Started | 02/04/27 | 02/08/27 | 3.8 | 3.8 |
|
282.5 |
RPL08.INT.SSB.01250 |
RPL08.Interior.SSB - Loading Dock and Storage - Install Security | Loading Dock and Storage | Not Started | 02/04/27 | 02/12/27 | 8.8 | 8.8 |
|
206.2 |
RPL08.INT.SSB.01470 |
RPL08.Interior.SSB - Loading Dock and Storage - Install Unit Heaters | Loading Dock and Storage | Not Started | 02/04/27 | 02/10/27 | 6.2 | 6.2 |
|
271.2 |
RPL08.INT.SSB.01760 |
RPL08.Interior.SSB - Loading Dock and Storage - Mechanical Tie-In | Loading Dock and Storage | Not Started | 02/04/27 | 02/10/27 | 6.2 | 6.2 |
|
271.2 |
RPL08.INT.SSB.01780 |
RPL08.Interior.SSB - Loading Dock and Storage - Install Split Systems/Humidifiers | Loading Dock and Storage | Not Started | 02/04/27 | 02/10/27 | 6.2 | 6.2 |
|
265.0 |
RPL08.INT.SSB.06060 |
RPL08.Interior.SSB LO #16 - Hang Exterior Wall Drywall | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 02/04/27 | 02/05/27 | 2.5 | 2.5 |
|
168.8 |
RPL08.INT.SSB.14340 |
RPL08.Interior.SSB LO #01 to #05 - MEPF Hard Lid Rough-In/ Close up Inspection | OH & Framing | Not Started | 02/04/27 | 02/09/27 | 5.0 | 5.0 |
|
172.5 |
RPL08.SKN.S.LO.01100 |
RPL08.SKIN.LO#17 - Close Exterior Leave Out #17 CC (South) WBS Summary | Build back Exterior Leave Out Walls #17 (CC - South) | Not Started | 02/04/27 | 03/01/27 | 21.2 | 21.2 |
|
162.5 |
RPL08.SKN.S.LO.03020 |
RPL08.SKIN.LO#17 - Pour back Stemwall | Build back Exterior Leave Out Walls #17 (CC - South) | Not Started | 02/04/27 | 02/05/27 | 2.5 | 2.5 |
|
162.5 |
RPL08.INT.DHD.01092 |
RPL08.Interior.DHD - LV Skids and TopHat - Maintenance and Reserve Busways | DHD - LV Skids and TopHat | Not Started | 02/05/27 | 02/23/27 | 15.0 | 15.0 |
|
280.0 |
RPL08.INT.ENDC.01160 |
RPL08.Interior.End-Corridor - OFE - DHC (1x GS.IDF) C2 | OFE/MOFE & CFCI | Not Started | 02/05/27 | 02/11/27 | 6.2 | 6.2 |
|
236.2 |
RPL08.INT.ENDC.01210 |
RPL08.Interior.End-Corridor - Install Fire Life Safety OH and In-wall | Fit out | Not Started | 02/05/27 | 02/19/27 | 12.5 | 12.5 |
|
247.5 |
RPL08.INT.ENDC.6260 |
RPL08.Interior.End-Corr - Priority GL8.27 - (P3) Tape Finish Paint (Both Sides) | Priority Wall Grid Line 8-27 | Not Started | 02/05/27 | 02/11/27 | 6.2 | 6.2 |
|
273.8 |
RPL08.INT.SSBC.4520 |
RPL08.Interior.SSBC LO #07 - Plumbing Trim Out | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 02/05/27 | 02/08/27 | 2.5 | 2.5 |
|
191.2 |
RPL08.INT.SSBC.4600 |
RPL08.Interior.SSBC LO #07 - Install Asset Tags | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 02/05/27 | 02/05/27 | 1.2 | 1.2 |
|
191.2 |
RPL08.INT.DHA.01115 |
RPL08.Interior.DHA - MES Skids - EPMS Tie-Ins ( 2 per day) | DHA - MES Skids | Not Started | 02/08/27 | 03/08/27 | 25.0 | 25.0 |
|
138.8 |
RPL08.INT.DHA.01300 |
RPL08.Interior.DHA - Tie-ins - Control Fault Domain 2 - WBS Summary | Control Fault Domain 2 | Not Started | 02/08/27 | 05/06/27 | 77.5 | 77.5 |
|
117.5 |
RPL08.INT.DHA.03800 |
RPL08.Interior.DHA - Control Fault Domain 2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 02/08/27 | 02/11/27 | 5.0 | 5.0 |
|
145.0 |
RPL08.INT.DHD.02190 |
RPL08.Interior.DHD - Priority - Install Controls / EPMS / BMS | OverHead | Not Started | 02/08/27 | 02/10/27 | 3.8 | 3.8 |
|
403.8 |
RPL08.INT.SBC.03400 |
RPL08.Interior.SSB-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall | Balance of Walls & Overhead | Not Started | 02/08/27 | 02/12/27 | 6.2 | 6.2 |
|
215.0 |
RPL08.INT.SBC.03480 |
RPL08.Interior.SSB-Corridor - BoW - Frame Hard Lid | Balance of Walls & Overhead | Not Started | 02/08/27 | 02/12/27 | 6.2 | 6.2 |
|
143.8 |
RPL08.INT.SSB.06080 |
RPL08.Interior.SSB LO #16 - Tape Finish Paint | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 02/08/27 | 02/12/27 | 6.2 | 6.2 |
|
168.8 |
RPL08.INT.SSBC.01230 |
RPL08.Interior.SSB-Corridor - Install Remaining Refrigerant Line | Fit out | Not Started | 02/08/27 | 02/12/27 | 6.2 | 6.2 |
|
228.8 |
RPL08.INT.SSBC.4540 |
RPL08.Interior.SSBC LO #07 - Fire Life Safety Trim Out | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 02/08/27 | 02/08/27 | 1.2 | 1.2 |
|
191.2 |
RPL08.INT.SSBC.4620 |
RPL08.Interior.SSBC LO #07 - Install Door (Verify with Trades before installation) | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 02/08/27 | 02/08/27 | 1.2 | 1.2 |
|
191.2 |
RPL08.SKN.S.LO.03040 |
RPL08.SKIN.LO#17 - Cure Stemwall | Build back Exterior Leave Out Walls #17 (CC - South) | Not Started | 02/08/27 | 02/17/27 | 8.8 | 8.8 |
|
162.5 |
RPL08.INT.ENDC.07060 |
RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Install Cement Board/ Drywall | Restrooms | Not Started | 02/09/27 | 02/16/27 | 6.2 | 6.2 |
|
260.0 |
RPL08.INT.ENDC.6160 |
RPL08.Interior.End-Corridor - Hang Early Drywall & DFH for Ancillary Skids (Room #3.6) | Priority Wall Grid Line 8-27 | Not Started | 02/09/27 | 02/10/27 | 2.5 | 2.5 |
|
282.5 |
RPL08.INT.SSBC.3660 |
RPL08.Interior.SSBC LO #06 - Mechanical L2 Checklist Completion | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 02/09/27 | 02/23/27 | 12.5 | 12.5 |
|
197.5 |
RPL08.INT.SSBC.4640 |
RPL08.Interior.SSBC LO #07 - Electrical L2 Checklist Completion | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 02/09/27 | 02/23/27 | 12.5 | 12.5 |
|
191.2 |
RPL08.INT.DHA.01350 |
RPL08.Interior.DHA - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 3 | Not Started | 02/10/27 | 03/22/27 | 35.0 | 35.0 |
|
131.2 |
RPL08.INT.DHA.01370 |
RPL08.Interior.DHA - Control Fault Domain 2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 02/10/27 | 02/16/27 | 5.0 | 5.0 |
|
153.8 |
RPL08.INT.DHA.03600 |
RPL08.Interior.DHA - OFE - Control Fault Domain 3 (LV Side Aisle) | Control Fault Domain 3 | Not Started | 02/10/27 | 02/16/27 | 5.0 | 5.0 |
|
135.0 |
RPL08.INT.SSB.01230 |
RPL08.Interior.SSB - BoW - Install Controls / EPMS / BMS OH and In-wall | Balance of Walls and OverHead | Not Started | 02/10/27 | 02/19/27 | 8.8 | 8.8 |
|
260.0 |
RPL08.INT.SSB.01310 |
RPL08.Interior.SSB - BoW - MEPF Hard Lid Rough-In | Balance of Walls and OverHead | Not Started | 02/10/27 | 02/17/27 | 6.2 | 6.2 |
|
186.2 |
RPL08.INT.SSB.01530 |
RPL08.Interior.SSB - Loading Dock and Storage - Install OverHead Doors | Loading Dock and Storage | Not Started | 02/10/27 | 02/24/27 | 12.5 | 12.5 |
|
212.5 |
RPL08.INT.SSB.02420 |
RPL08.Interior.SSB - Final Finishes & Fixtures - Fixture Install (Lights) | Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) | Not Started | 02/10/27 | 02/19/27 | 8.8 | 8.8 |
|
343.8 |
RPL08.INT.SSB.05780 |
RPL08.Interior.SSB - BoW - QC - Walls | Balance of Walls and OverHead | Not Started | 02/10/27 | 02/17/27 | 6.2 | 6.2 |
|
186.2 |
RPL08.INT.SSB.06740 |
RPL08.Interior.SSB - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (Post Drywall) | Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) | Not Started | 02/10/27 | 02/17/27 | 6.2 | 6.2 |
|
316.2 |
RPL08.INT.SSB.14360 |
RPL08.Interior.SSB LO #01 to #05 - Hang Drywall | OH & Framing | Not Started | 02/10/27 | 02/19/27 | 8.8 | 8.8 |
|
172.5 |
RPL08.INT.SSB.14500 |
RPL08.Interior.SSB LO #01 to #05 - Install DAS (Distribution Antenna System) | Finishes | Not Started | 02/10/27 | 02/17/27 | 6.2 | 6.2 |
|
186.2 |
RPL08.EY.DHB.01290 |
RPL08.EY.DHB - Install Sleeves MEPL | Hardscape and Landscape | Not Started | 02/11/27 | 02/18/27 | 6.2 | 6.2 |
|
261.2 |
RPL08.EY.DHB.01300 |
RPL08.EY.DHB - MV Loop - L2 Checklist Completion | Tie-ins | Not Started | 02/11/27 | 02/25/27 | 12.5 | 12.5 |
|
103.8 |
RPL08.EY.DHB.01320 |
RPL08.EY.DHB - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 02/11/27 | 04/16/27 | 56.2 | 56.2 |
|
396.2 |
RPL08.INT.CTRC.1300 |
RPL08.Interior.Center-Corridor - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 02/11/27 | 02/22/27 | 8.8 | 8.8 |
|
117.5 |
RPL08.INT.DHA.01380 |
RPL08.Interior.DHA - Control Fault Domain 2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 02/11/27 | 02/17/27 | 5.0 | 5.0 |
|
153.8 |
RPL08.INT.DHB.01300 |
RPL08.Interior.DHB - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 02/11/27 | 03/11/27 | 25.0 | 25.0 |
|
110.0 |
RPL08.INT.DHC.01060 |
RPL08.Interior.DHC - OFE - LV Skids and TopHat - Set / Place / Anchor | OFE/MOFE & CFCI | Not Started | 02/11/27 | 03/02/27 | 16.2 | 16.2 |
|
147.5 |
RPL08.INT.DHC.01070 |
RPL08.Interior.DHC - OFE - MES Skids - Set / Place / Anchor | OFE/MOFE & CFCI | Not Started | 02/11/27 | 03/02/27 | 16.2 | 16.2 |
|
147.5 |
RPL08.INT.DHC.01080 |
RPL08.Interior.DHC - OFE - WBS Summary | OFE/MOFE & CFCI | Not Started | 02/11/27 | 06/23/27 | 115.0 | 115.0 |
|
142.5 |
RPL08.INT.DHD.01120 |
RPL08.Interior.DHD - OFE - Control Fault Domain 1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 1 | Not Started | 02/11/27 | 04/21/27 | 60.0 | 60.0 |
|
158.8 |
RPL08.INT.DHD.02270 |
RPL08.Interior.DHD - OFE - Control Fault Domain 1 (LV Side Aisle) | Control Fault Domain 1 | Not Started | 02/11/27 | 02/18/27 | 6.2 | 6.2 |
|
190.0 |
RPL08.INT.ENDC.1240 |
RPL08.Interior.End-Corridor - BoW - Install Mechanical Piping/ Refrigerant Lowside OH and in-wall | Balance of Walls & Overhead | Not Started | 02/11/27 | 02/18/27 | 6.2 | 6.2 |
|
210.0 |
RPL08.INT.ENDC.1400 |
RPL08.Interior.End-Corridor - BoW - Install Door Frames | Balance of Walls & Overhead | Not Started | 02/11/27 | 02/18/27 | 6.2 | 6.2 |
|
293.8 |
RPL08.INT.ENDC.6180 |
RPL08.Interior.End-Corridor - Early Tape Finish Paint for Ancillary Skids (Room #3.6) | Priority Wall Grid Line 8-27 | Not Started | 02/11/27 | 02/18/27 | 6.2 | 6.2 |
|
282.5 |
DCC.B8.3245 |
[SSDCB3] CorpNet/Security/FacNet Ready [DHC] | Connectivity | Not Started | 02/12/27 | 02/12/27 | 0.0 | 0.0 |
|
416.2 |
DCC.B8.3255 |
[SSDCB3] CorpNet/Security/FacNet Ready [DHD] | Connectivity | Not Started | 02/12/27 | 02/12/27 | 0.0 | 0.0 |
|
416.2 |
RPL08.CON.WP2.06280 |
RPL08.Conn - GSIDF/DH B2 - Install & Test Network (FIM) | Network | Not Started | 02/12/27 | 02/17/27 | 3.8 | 3.8 |
|
416.2 |
RPL08.CON.WP2.06480 |
RPL08.Conn - GSIDF/DH A2 - Install & Test Network (FIM) | Network | Not Started | 02/12/27 | 02/17/27 | 3.8 | 3.8 |
|
416.2 |
RPL08.CON.WP2.06800 |
RPL08.Conn - GSIDF/DH C2 - WBS Summary | Int. IDF OFE/MOFE - GSIDF8C2 | Not Started | 02/12/27 | 03/09/27 | 21.2 | 21.2 |
|
430.0 |
RPL08.CON.WP2.06820 |
RPL08.Conn - GSIDF/DH C2 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 02/12/27 | 02/19/27 | 6.2 | 6.2 |
|
381.2 |
RPL08.INT.CTRC.1320 |
RPL08.Interior.Center-Corridor - BoW - Install Security Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 02/12/27 | 02/23/27 | 8.8 | 8.8 |
|
183.8 |
RPL08.INT.DHA.01430 |
RPL08.Interior.DHA - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary | Control Fault Domain 3 | Not Started | 02/12/27 | 05/13/27 | 78.8 | 78.8 |
|
191.2 |
RPL08.INT.DHA.03820 |
RPL08.Interior.DHA - Control Fault Domain 3 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 02/12/27 | 02/18/27 | 5.0 | 5.0 |
|
166.2 |
RPL08.INT.DHD.01093 |
RPL08.Interior.DHD - LV Skids and TopHat - Top Hat Busway | DHD - LV Skids and TopHat | Not Started | 02/12/27 | 03/02/27 | 15.0 | 15.0 |
|
280.0 |
RPL08.INT.DHD.01112 |
RPL08.Interior.DHD - MES Skids - Piping Tie-Ins & Inspections | DHD - MES Skids | Not Started | 02/12/27 | 03/08/27 | 20.0 | 20.0 |
|
267.5 |
RPL08.INT.ENDC.01190 |
RPL08.Interior.End-Corridor - OFE - DHD (1x GS.IDF) D2 | OFE/MOFE & CFCI | Not Started | 02/12/27 | 02/19/27 | 6.2 | 6.2 |
|
236.2 |
RPL08.INT.CTRC.1940 |
RPL08.Interior.Center-Corridor - BoW - Install Vertical Tube Steel Support for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 02/16/27 | 02/19/27 | 5.0 | 5.0 |
|
185.0 |
RPL08.INT.DHB.02540 |
RPL08.Interior.DHB - OFE - Control Fault Domain 3 (HAC) | Control Fault Domain 3 | Not Started | 02/16/27 | 03/01/27 | 12.5 | 12.5 |
|
136.2 |
RPL08.INT.DHC.01090 |
RPL08.Interior.DHC - LV Skids and TopHat Tie-ins (LOE) | DHC - LV Skids and TopHat | Not Started | 02/16/27 | 03/16/27 | 26.2 | 26.2 |
|
276.2 |
RPL08.INT.DHC.01091 |
RPL08.Interior.DHC - LV Skids and TopHat - Set & Anchor Interconnects | DHC - LV Skids and TopHat | Not Started | 02/16/27 | 03/04/27 | 16.2 | 16.2 |
|
276.2 |
RPL08.INT.DHC.01100 |
RPL08.Interior.DHC - Tie-ins - WBS Summary | Tie-Ins | Not Started | 02/16/27 | 08/13/27 | 157.5 | 157.5 |
|
253.8 |
RPL08.INT.DHD.01160 |
RPL08.Interior.DHD - Tie-ins - Control Fault Domain 1 - WBS Summary | Control Fault Domain 1 | Not Started | 02/16/27 | 06/10/27 | 101.2 | 101.2 |
|
191.2 |
RPL08.INT.DHD.02510 |
RPL08.Interior.DHD - Control Fault Domain 1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 02/16/27 | 02/22/27 | 6.2 | 6.2 |
|
242.5 |
RPL08.INT.SBC.03500 |
RPL08.Interior.SSB-Corridor - BoW - MEPF Hard Lid Rough-In/ Close of Inspection | Balance of Walls & Overhead | Not Started | 02/16/27 | 02/24/27 | 8.8 | 8.8 |
|
153.8 |
RPL08.INT.SBC.03520 |
RPL08.Interior.SSB-Corridor - BoW - Install Blocking/Steel support Assembly for Metal Canopy | Balance of Walls & Overhead | Not Started | 02/16/27 | 02/22/27 | 6.2 | 6.2 |
|
143.8 |
RPL08.INT.SSB.01270 |
RPL08.Interior.SSB - Loading Dock and Storage - Install Controls / EPMS / BMS | Loading Dock and Storage | Not Started | 02/16/27 | 02/19/27 | 5.0 | 5.0 |
|
206.2 |
RPL08.INT.SSB.06100 |
RPL08.Interior.SSB LO #16 - Install Mechanical Piping/ Refrigerant Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 02/16/27 | 02/22/27 | 6.2 | 6.2 |
|
171.2 |
RPL08.INT.SSB.06120 |
RPL08.Interior.SSB LO #16 - Install Electrical Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 02/16/27 | 02/24/27 | 8.8 | 8.8 |
|
172.5 |
RPL08.INT.SSB.06140 |
RPL08.Interior.SSB LO #16 - Install Plumbing Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 02/16/27 | 02/24/27 | 8.8 | 8.8 |
|
168.8 |
RPL08.INT.SSB.06160 |
RPL08.Interior.SSB LO #16 - Install Fire Life Safety Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 02/16/27 | 02/18/27 | 3.8 | 3.8 |
|
173.8 |
RPL08.INT.SSB.06180 |
RPL08.Interior.SSB LO #16 - Install Security Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 02/16/27 | 02/19/27 | 5.0 | 5.0 |
|
172.5 |
RPL08.INT.SSB.06200 |
RPL08.Interior.SSB LO #16 - Install Controls / EPMS / BMS OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 02/16/27 | 02/18/27 | 3.8 | 3.8 |
|
173.8 |
RPL08.INT.SSB.06220 |
RPL08.Interior.SSB LO #16 - Fire Safing OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 02/16/27 | 02/22/27 | 6.2 | 6.2 |
|
171.2 |
RPL08.INT.SSBC.01410 |
RPL08.Interior.SSB-Corridor - Battery Connection | Fit out | Not Started | 02/16/27 | 02/22/27 | 6.2 | 6.2 |
|
198.8 |
RPL08.INT.CTRC.01670 |
RPL08.Interior.Center-Corridor - MOFE - Ancillary Skids Qty2 (DH A) | OFE/MOFE & CFCI | Not Started | 02/17/27 | 03/02/27 | 12.5 | 12.5 |
|
190.0 |
RPL08.INT.CTRC.01690 |
RPL08.Interior.Center-Corridor - MOFE - Ancillary Skids Qty2 (DH B) | OFE/MOFE & CFCI | Not Started | 02/17/27 | 03/02/27 | 12.5 | 12.5 |
|
198.8 |