Schedule Viewer

Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:14 PM · 5122 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL08.CON.WP2.06660 RPL08.Conn - GSIDF/DH D2 - Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 03/01/27 03/16/27 15.0 15.0
0%
365.0
RPL08.INT.DHA.01780 RPL08.Interior.DHA - Control Fault Domain 5 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 03/01/27 03/04/27 5.0 5.0
0%
226.2
RPL08.INT.DHC.01093 RPL08.Interior.DHC - LV Skids and TopHat - Top Hat Busway DHC - LV Skids and TopHat Not Started 03/01/27 03/16/27 15.0 15.0
0%
276.2
RPL08.INT.DHC.01112 RPL08.Interior.DHC - MES Skids - Piping Tie-Ins & Inspections DHC - MES Skids Not Started 03/01/27 03/22/27 20.0 20.0
0%
255.0
RPL08.INT.DHC.01120 RPL08.Interior.DHC - OFE - Control Fault Domain 1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 1 Not Started 03/01/27 05/11/27 63.8 63.8
0%
150.0
RPL08.INT.DHC.02270 RPL08.Interior.DHC - OFE - Control Fault Domain 1 (LV Side Aisle) Control Fault Domain 1 Not Started 03/01/27 03/05/27 6.2 6.2
0%
185.0
RPL08.INT.DHD.01440 RPL08.Interior.DHD - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary Control Fault Domain 3 Not Started 03/01/27 07/09/27 115.0 115.0
0%
221.2
RPL08.INT.DHD.02550 RPL08.Interior.DHD - Control Fault Domain 3 - Install Duct (LV Side) LV Side Tie-ins Not Started 03/01/27 03/04/27 5.0 5.0
0%
276.2
RPL08.INT.SSB.01340 RPL08.Interior.SSB - BoW - Tape Finish Paint Balance of Walls and OverHead Not Started 03/01/27 03/03/27 3.8 3.8
0%
186.2
RPL08.INT.SSB.02480 RPL08.Interior.SSB - Final Finishes & Fixtures - MEP Trims Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) Not Started 03/01/27 03/09/27 8.8 8.8
0%
316.2
RPL08.CON.WP2.06880 RPL08.Conn - GSIDF/DH C2 - Install & Test Network (FIM) Network Not Started 03/02/27 03/04/27 3.8 3.8
0%
433.8
RPL08.EY.DHA.01290 RPL08.EY.DHA - MV Loop - L2 Checklist Completion Tie-ins Not Started 03/02/27 03/15/27 12.5 12.5
0%
101.2
RPL08.INT.CTRC.01160 RPL08.Interior.Center-Corridor (N) - Install Fitout (Spoke Parts, Tech, SCR etc.) - WBS Summary Fit out (North) Not Started 03/02/27 07/09/27 113.8 113.8
0%
158.8
RPL08.INT.CTRC.01380 RPL08.Interior.Center-Corridor (N) - Install Cable Tray - North (Early) Fit out (North) Not Started 03/02/27 03/08/27 6.2 6.2
0%
222.5
RPL08.INT.CTRC.01910 RPL08.Interior.Center-Corridor (S) - Install Cable Tray- South (Early) Fit out (South) Not Started 03/02/27 03/08/27 6.2 6.2
0%
241.2
RPL08.INT.CTRC.02030 RPL08.Interior.Center-Corridor (S) - Install Fitout (Spoke Parts, Tech, SCR etc.) - WBS Summary Fit out (South) Not Started 03/02/27 06/30/27 106.2 106.2
0%
141.2
RPL08.INT.CTRC.1380 RPL08.Interior.Center-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall Balance of Walls & Overhead Not Started 03/02/27 03/08/27 6.2 6.2
0%
196.2
RPL08.INT.CTRC.1460 RPL08.Interior.Center-Corridor - BoW - Frame Hard Lid Balance of Walls & Overhead Not Started 03/02/27 03/08/27 6.2 6.2
0%
117.5
RPL08.INT.DHA.01800 RPL08.Interior.DHA - Control Fault Domain 5 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 03/02/27 03/05/27 5.0 5.0
0%
242.5
RPL08.INT.DHB.02600 RPL08.Interior.DHB - OFE - Control Fault Domain 4 (HAC) Control Fault Domain 4 Not Started 03/02/27 03/15/27 12.5 12.5
0%
143.8
RPL08.INT.SBC.05840 RPL08.Interior.SSB-Corridor - BoW - QC - Backings/Walls (Both side of Corridor Wall) Balance of Walls & Overhead Not Started 03/02/27 03/08/27 6.2 6.2
0%
143.8
RPL08.INT.CC.9000 RPL08.Interior.CC Ext. LO #17 - Close Exterior Leave Out #17 (CC - South) WBS Summary Exterior Leave Out Wall #17 (CC - South) Not Started 03/03/27 04/13/27 36.2 36.2
0%
171.2
RPL08.INT.CC.9280 RPL08.Interior.CC Ext. LO #17 - Install Mechanical Piping/ Refrigerant Lowside OH and in-wall Exterior Leave Out Wall #17 (CC - South) Not Started 03/03/27 03/05/27 3.8 3.8
0%
147.5
RPL08.INT.CC.9560 RPL08.Interior.CC Ext. LO #17 - Tie In MEPF with IMP Wall buildback Exterior Leave Out Wall #17 (CC - South) Not Started 03/03/27 03/04/27 2.5 2.5
0%
158.8
RPL08.INT.CTRC.01850 RPL08.Interior.Center-Corridor (S) - Remaining Electrical OFE Tie In Fit out (South) Not Started 03/03/27 03/09/27 6.2 6.2
0%
190.0
RPL08.INT.DHC.01113 RPL08.Interior.DHC - MES Skids - CDU Tie-Ins DHC - MES Skids Not Started 03/03/27 03/24/27 20.0 20.0
0%
255.0
RPL08.INT.DHC.01160 RPL08.Interior.DHC - Tie-ins - Control Fault Domain 1 - WBS Summary Control Fault Domain 1 Not Started 03/03/27 06/30/27 105.0 105.0
0%
182.5
RPL08.INT.DHC.02510 RPL08.Interior.DHC - Control Fault Domain 1 - Install Duct (LV Side) LV Side Tie-ins Not Started 03/03/27 03/09/27 6.2 6.2
0%
237.5
RPL08.INT.DHD.01490 RPL08.Interior.DHD - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 4 Not Started 03/03/27 06/03/27 81.2 81.2
0%
151.2
RPL08.INT.DHD.01510 RPL08.Interior.DHD - Control Fault Domain 3 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 03/03/27 03/08/27 5.0 5.0
0%
307.5
RPL08.INT.DHD.02450 RPL08.Interior.DHD - OFE - Control Fault Domain 4 (LV Side Aisle) Control Fault Domain 4 Not Started 03/03/27 03/08/27 5.0 5.0
0%
217.5
RPL08.INT.ENDC.01240 RPL08.Interior.End-Corridor - Tape Finish Paint Fit out Not Started 03/03/27 03/05/27 3.8 3.8
0%
247.5
RPL08.INT.SSB.01330 RPL08.Interior.SSB - Loading Dock and Storage - Hang Drywall Loading Dock and Storage Not Started 03/03/27 03/16/27 12.5 12.5
0%
206.2
RPL08.INT.SSB.01545 RPL08.Interior.SSB - BoW - Notify META of TV installation & Conf Sound (+25d for Install) Balance of Walls and OverHead Not Started 03/03/27 03/03/27 0.0 0.0
0%
230.0
RPL08.INT.SSB.14200 RPL08.Interior.SSB LO #01 to #05 - Mechanical Tie-In Finishes Not Started 03/03/27 03/03/27 1.2 1.2
0%
192.5
RPL08.INT.SSB.14300 RPL08.Interior.SSB LO #01 to #05 - Electrical Tie-In Finishes Not Started 03/03/27 03/09/27 6.2 6.2
0%
192.5
RPL08.INT.SSB.14760 RPL08.Interior.SSB LO #01 to #05 - Install Remaining Refrigerant Line Finishes Not Started 03/03/27 03/09/27 6.2 6.2
0%
198.8
RPL08.INT.SSBC.03540 RPL08.Interior.SSB-Corridor - Final Paint Fit out Not Started 03/03/27 03/09/27 6.2 6.2
0%
191.2
RPL.08.D.83740.XG RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHD Give Milestones (XREFs) Not Started 03/04/27 03/04/27 0.0 0.0
0%
433.8
RPL.08.D.84040.XG Ready for MV Cable Pull DH D (MVs - Qty 8)* Give Milestones (XREFs) Not Started 03/04/27 03/04/27 0.0 0.0
0%
433.8
RPL08.INT.DHA.01240 RPL08.Interior.DHA - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 03/04/27 04/01/27 25.0 25.0
0%
105.0
RPL08.INT.DHD.01530 RPL08.Interior.DHD - Control Fault Domain 3 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 03/04/27 03/09/27 5.0 5.0
0%
327.5
RPL08.INT.SSB.01280 RPL08.Interior.SSB - BoW - Duct Drops / Trim out Balance of Walls and OverHead Not Started 03/04/27 03/10/27 6.2 6.2
0%
250.0
RPL08.INT.SSB.01360 RPL08.Interior.SSB - BoW - Electrical Trim Out Balance of Walls and OverHead Not Started 03/04/27 03/12/27 8.8 8.8
0%
255.0
RPL08.INT.SSB.01380 RPL08.Interior.SSB - BoW - Security Trim Out Balance of Walls and OverHead Not Started 03/04/27 03/12/27 8.8 8.8
0%
255.0
RPL08.INT.SSB.01840 RPL08.Interior.SSB - Install Split Systems/Humidifiers OFE/MOFE & CFCI Not Started 03/04/27 03/10/27 6.2 6.2
0%
243.8
RPL08.INT.SSB.01860 RPL08.Interior.SSB - Final Finishes & Fixtures - Flooring Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) Not Started 03/04/27 03/12/27 8.8 8.8
0%
325.0
RPL08.INT.SSB.02520 RPL08.Interior.SSB - BoW - ACT - Set Wall Angle & Shoot Ceiling Wire Balance of Walls and OverHead Not Started 03/04/27 03/12/27 8.8 8.8
0%
186.2
RPL08.EY.DHA.01420 RPL08.EY.DHA - Install Condenser Units (Qty 4) OFE Not Started 03/05/27 03/16/27 10.0 10.0
0%
207.5
RPL08.EY.DHA.02060 RPL08.EY.DHA - Install reminder of Wall mounted ACs post LO buildback (Qty2) OFE Not Started 03/05/27 03/10/27 5.0 5.0
0%
232.5
RPL08.EY.DHD.01240 RPL08.EY.DHD - Install Generator including tie-ins (#2 of Qty 2) OFE Not Started 03/05/27 03/11/27 6.2 6.2
0%
215.0
RPL08.EY.DHD.01250 RPL08.EY.DHD - Install Electrical Tie-ins (include penetration detail) Tie-ins Not Started 03/05/27 03/18/27 12.5 12.5
0%
218.8
RPL08.EY.DHD.01260 RPL08.EY.DHD - Tie-ins - WBS Summary Tie-ins Not Started 03/05/27 08/12/27 140.0 140.0
0%
216.2
RPL08.INT.CTRC.8860 RPL08.Interior.Center-Corridor - BoW - Electrical Tie-In Balance of Walls & Overhead Not Started 03/05/27 03/11/27 6.2 6.2
0%
192.5
RPL08.INT.DHB.01450 RPL08.Interior.DHB - Control Fault Domain 2 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 03/05/27 04/02/27 25.0 25.0
0%
122.5
RPL08.INT.DHB.01490 RPL08.Interior.DHB - Control Fault Domain 3 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 03/05/27 04/02/27 25.0 25.0
0%
136.2
RPL08.INT.DHB.01500 RPL08.Interior.DHB - Control Fault Domain 3 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 03/05/27 04/02/27 25.0 25.0
0%
142.5
RPL08.INT.DHB.01510 RPL08.Interior.DHB - Control Fault Domain 3 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 03/05/27 04/02/27 25.0 25.0
0%
136.2
RPL08.INT.DHB.02240 RPL08.Interior.DHB - Control Fault Domain 3 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 03/05/27 04/02/27 25.0 25.0
0%
136.2
RPL08.INT.DHB.02620 RPL08.Interior.DHB - OFE - Control Fault Domain 4 (Mech Side Aisle) Control Fault Domain 4 Not Started 03/05/27 03/16/27 10.0 10.0
0%
143.8
RPL08.INT.DHC.01114 RPL08.Interior.DHC - MES Skids - BMS Tie-Ins DHC - MES Skids Not Started 03/05/27 03/29/27 20.0 20.0
0%
255.0
RPL08.INT.DHC.01230 RPL08.Interior.DHC - Control Fault Domain 1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 03/05/27 03/11/27 6.2 6.2
0%
246.2
RPL08.INT.DHD.01580 RPL08.Interior.DHD - Tie-ins - Control Fault Domain 4 - WBS Summary Control Fault Domain 4 Not Started 03/05/27 07/23/27 122.5 122.5
0%
213.8
RPL08.INT.DHD.02570 RPL08.Interior.DHD - Control Fault Domain 4 - Install Duct (LV Side) LV Side Tie-ins Not Started 03/05/27 03/10/27 5.0 5.0
0%
271.2
RPL08.INT.ENDC.07020 RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Fixture Install (Lights) Restrooms Not Started 03/05/27 03/15/27 8.8 8.8
0%
287.5
RPL08.INT.ENDC.07120 RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (Post Restrooms Not Started 03/05/27 03/11/27 6.2 6.2
0%
260.0
RPL08.INT.ENDC.1300 RPL08.Interior.End-Corridor - BoW - Install Plumbing Lowside OH and In-wall Balance of Walls & Overhead Not Started 03/05/27 03/15/27 8.8 8.8
0%
210.0
RPL08.INT.SSB.14420 RPL08.Interior.SSB LO #01 to #05 - Electrical Trim Out Finishes Not Started 03/05/27 03/15/27 8.8 8.8
0%
203.8
RPL08.INT.SSB.14440 RPL08.Interior.SSB LO #01 to #05 - Security Trim Out Finishes Not Started 03/05/27 03/15/27 8.8 8.8
0%
203.8
RPL08.INT.CC.9320 RPL08.Interior.CC Ext. LO #17 - Install Fire Life Safety Lowside OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 03/08/27 03/10/27 3.8 3.8
0%
163.8
RPL08.INT.CC.9340 RPL08.Interior.CC Ext. LO #17 - Install Plumbing Lowside OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 03/08/27 03/10/27 3.8 3.8
0%
147.5
RPL08.INT.DHA.03620 RPL08.Interior.DHA - OFE - Control Fault Domain 3 (HAC) Control Fault Domain 3 Not Started 03/08/27 03/19/27 12.5 12.5
0%
115.0
RPL08.INT.DHC.01210 RPL08.Interior.DHC - OFE - Control Fault Domain 2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 2 Not Started 03/08/27 05/25/27 70.0 70.0
0%
147.5
RPL08.INT.DHC.01250 RPL08.Interior.DHC - Control Fault Domain 1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 03/08/27 03/12/27 6.2 6.2
0%
246.2
RPL08.INT.DHC.02330 RPL08.Interior.DHC - OFE - Control Fault Domain 2 (LV Side Aisle) Control Fault Domain 2 Not Started 03/08/27 03/11/27 5.0 5.0
0%
197.5
RPL08.INT.ENDC.01250 RPL08.Interior.End-Corridor - Set Equipment / Interior ?? Fit out Not Started 03/08/27 03/12/27 6.2 6.2
0%
247.5
RPL08.INT.ENDC.01270 RPL08.Interior.End-Corridor - Install Tile Fit out Not Started 03/08/27 03/16/27 8.8 8.8
0%
253.8
RPL08.INT.ENDC.01420 RPL08.Interior.End-Corridor - Install Remaining Refrigerant Line Fit out Not Started 03/08/27 03/12/27 6.2 6.2
0%
302.5
RPL08.INT.ENDC.1320 RPL08.Interior.End-Corridor - BoW - Install Security Lowside OH and In-wall Balance of Walls & Overhead Not Started 03/08/27 03/16/27 8.8 8.8
0%
292.5
RPL08.INT.SSB.01390 RPL08.Interior.SSB - BoW - Plumbing Trim Out Balance of Walls and OverHead Not Started 03/08/27 03/16/27 8.8 8.8
0%
255.0
RPL08.INT.SSB.03120 RPL08.Interior.SSB - Loading Dock and Storage - Install Store Front Glazing Loading Dock and Storage Not Started 03/08/27 03/09/27 2.5 2.5
0%
212.5
RPL08.INT.SSB.06260 RPL08.Interior.SSB LO #16 - Fire Safing / Wall Finishes Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 03/08/27 03/08/27 1.2 1.2
0%
168.8
DCC.B8.3035 [SSDCB3] Production Gear Delivered [DHB] Front End (SSW &FSW) Connectivity Not Started 03/09/27 03/09/27 0.0 0.0
0%
241.2
RPL07.CON.WP3B.0900 RPL08.Conn WP3B Pull/Install/Test Universal Fabric EF1(South)<>EF2 (North) EF1 <> EF2 Not Started 03/09/27 03/15/27 6.2 6.2
0%
255.0
RPL08.CON.WP2.06680 RPL08.Conn - GSIDF/DH D2 - Install & Test Network (FIM) Network Not Started 03/09/27 03/11/27 3.8 3.8
0%
427.5
RPL08.CX.MCUP.01070 RPL08.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - DHB & DHA (Phase2) Fill and Flush Not Started 03/09/27 03/15/27 6.2 6.2
0%
138.8
RPL08.EY.DHA.01300 RPL08.EY.DHA - Install Sleeves MEPL Hardscape and Landscape Not Started 03/09/27 03/15/27 6.2 6.2
0%
252.5
RPL08.EY.DHA.01320 RPL08.EY.DHA - Install Hardscape and Landscape - WBS Summary Hardscape and Landscape Not Started 03/09/27 05/11/27 56.2 56.2
0%
375.0
RPL08.INT.CTRC.06780 RPL08.Interior.Center-Corridor - Final Finishes & Fixtures - Frame/Blocking Walls & Ceilings Restrooms Not Started 03/09/27 03/22/27 12.5 12.5
0%
117.5
RPL08.INT.CTRC.1480 RPL08.Interior.Center-Corridor - BoW - MEPF Hard Lid Rough-In/ Close of Inspection Balance of Walls & Overhead Not Started 03/09/27 03/17/27 8.8 8.8
0%
147.5
RPL08.INT.CTRC.1500 RPL08.Interior.Center-Corridor - BoW - Install Blocking/Steel support Assembly for Metal Canopy Balance of Walls & Overhead Not Started 03/09/27 03/15/27 6.2 6.2
0%
137.5
RPL08.INT.DHC.01115 RPL08.Interior.DHC - MES Skids - EPMS Tie-Ins DHC - MES Skids Not Started 03/09/27 03/31/27 20.0 20.0
0%
255.0
RPL08.INT.DHD.01650 RPL08.Interior.DHD - Control Fault Domain 4 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 03/09/27 03/12/27 5.0 5.0
0%
322.5
RPL08.INT.SBC.03540 RPL08.Interior.SSB-Corridor - BoW - Hang Drywall (Both side of Corridor Wall) Balance of Walls & Overhead Not Started 03/09/27 03/17/27 8.8 8.8
0%
143.8
RPL08.INT.SSB.06280 RPL08.Interior.SSB LO #16 - Electrical Trim Out Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 03/09/27 03/10/27 2.5 2.5
0%
168.8
RPL08.INT.SSB.06300 RPL08.Interior.SSB LO #16 - Plumbing Trim Out Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 03/09/27 03/10/27 2.5 2.5
0%
170.0
RPL08.INT.SSB.06320 RPL08.Interior.SSB LO #16 - Security Trim Out Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 03/09/27 03/10/27 2.5 2.5
0%
170.0
RPL08.INT.SSB.06340 RPL08.Interior.SSB LO #16 - Fire Life Safety Trim Out Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 03/09/27 03/09/27 1.2 1.2
0%
171.2
RPL08.INT.SSB.06360 RPL08.Interior.SSB LO #16 - Install Asset Tags Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 03/09/27 03/11/27 3.8 3.8
0%
168.8
RPL08.INT.SSB.14520 RPL08.Interior.SSB LO #01 to #05 - Plumbing Trim Out Finishes Not Started 03/09/27 03/15/27 6.2 6.2
0%
203.8