Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:14 PM
· 5122 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL08.CON.WP2.06660 |
RPL08.Conn - GSIDF/DH D2 - Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 03/01/27 | 03/16/27 | 15.0 | 15.0 |
|
365.0 |
RPL08.INT.DHA.01780 |
RPL08.Interior.DHA - Control Fault Domain 5 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 03/01/27 | 03/04/27 | 5.0 | 5.0 |
|
226.2 |
RPL08.INT.DHC.01093 |
RPL08.Interior.DHC - LV Skids and TopHat - Top Hat Busway | DHC - LV Skids and TopHat | Not Started | 03/01/27 | 03/16/27 | 15.0 | 15.0 |
|
276.2 |
RPL08.INT.DHC.01112 |
RPL08.Interior.DHC - MES Skids - Piping Tie-Ins & Inspections | DHC - MES Skids | Not Started | 03/01/27 | 03/22/27 | 20.0 | 20.0 |
|
255.0 |
RPL08.INT.DHC.01120 |
RPL08.Interior.DHC - OFE - Control Fault Domain 1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 1 | Not Started | 03/01/27 | 05/11/27 | 63.8 | 63.8 |
|
150.0 |
RPL08.INT.DHC.02270 |
RPL08.Interior.DHC - OFE - Control Fault Domain 1 (LV Side Aisle) | Control Fault Domain 1 | Not Started | 03/01/27 | 03/05/27 | 6.2 | 6.2 |
|
185.0 |
RPL08.INT.DHD.01440 |
RPL08.Interior.DHD - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary | Control Fault Domain 3 | Not Started | 03/01/27 | 07/09/27 | 115.0 | 115.0 |
|
221.2 |
RPL08.INT.DHD.02550 |
RPL08.Interior.DHD - Control Fault Domain 3 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 03/01/27 | 03/04/27 | 5.0 | 5.0 |
|
276.2 |
RPL08.INT.SSB.01340 |
RPL08.Interior.SSB - BoW - Tape Finish Paint | Balance of Walls and OverHead | Not Started | 03/01/27 | 03/03/27 | 3.8 | 3.8 |
|
186.2 |
RPL08.INT.SSB.02480 |
RPL08.Interior.SSB - Final Finishes & Fixtures - MEP Trims | Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) | Not Started | 03/01/27 | 03/09/27 | 8.8 | 8.8 |
|
316.2 |
RPL08.CON.WP2.06880 |
RPL08.Conn - GSIDF/DH C2 - Install & Test Network (FIM) | Network | Not Started | 03/02/27 | 03/04/27 | 3.8 | 3.8 |
|
433.8 |
RPL08.EY.DHA.01290 |
RPL08.EY.DHA - MV Loop - L2 Checklist Completion | Tie-ins | Not Started | 03/02/27 | 03/15/27 | 12.5 | 12.5 |
|
101.2 |
RPL08.INT.CTRC.01160 |
RPL08.Interior.Center-Corridor (N) - Install Fitout (Spoke Parts, Tech, SCR etc.) - WBS Summary | Fit out (North) | Not Started | 03/02/27 | 07/09/27 | 113.8 | 113.8 |
|
158.8 |
RPL08.INT.CTRC.01380 |
RPL08.Interior.Center-Corridor (N) - Install Cable Tray - North (Early) | Fit out (North) | Not Started | 03/02/27 | 03/08/27 | 6.2 | 6.2 |
|
222.5 |
RPL08.INT.CTRC.01910 |
RPL08.Interior.Center-Corridor (S) - Install Cable Tray- South (Early) | Fit out (South) | Not Started | 03/02/27 | 03/08/27 | 6.2 | 6.2 |
|
241.2 |
RPL08.INT.CTRC.02030 |
RPL08.Interior.Center-Corridor (S) - Install Fitout (Spoke Parts, Tech, SCR etc.) - WBS Summary | Fit out (South) | Not Started | 03/02/27 | 06/30/27 | 106.2 | 106.2 |
|
141.2 |
RPL08.INT.CTRC.1380 |
RPL08.Interior.Center-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall | Balance of Walls & Overhead | Not Started | 03/02/27 | 03/08/27 | 6.2 | 6.2 |
|
196.2 |
RPL08.INT.CTRC.1460 |
RPL08.Interior.Center-Corridor - BoW - Frame Hard Lid | Balance of Walls & Overhead | Not Started | 03/02/27 | 03/08/27 | 6.2 | 6.2 |
|
117.5 |
RPL08.INT.DHA.01800 |
RPL08.Interior.DHA - Control Fault Domain 5 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 03/02/27 | 03/05/27 | 5.0 | 5.0 |
|
242.5 |
RPL08.INT.DHB.02600 |
RPL08.Interior.DHB - OFE - Control Fault Domain 4 (HAC) | Control Fault Domain 4 | Not Started | 03/02/27 | 03/15/27 | 12.5 | 12.5 |
|
143.8 |
RPL08.INT.SBC.05840 |
RPL08.Interior.SSB-Corridor - BoW - QC - Backings/Walls (Both side of Corridor Wall) | Balance of Walls & Overhead | Not Started | 03/02/27 | 03/08/27 | 6.2 | 6.2 |
|
143.8 |
RPL08.INT.CC.9000 |
RPL08.Interior.CC Ext. LO #17 - Close Exterior Leave Out #17 (CC - South) WBS Summary | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/03/27 | 04/13/27 | 36.2 | 36.2 |
|
171.2 |
RPL08.INT.CC.9280 |
RPL08.Interior.CC Ext. LO #17 - Install Mechanical Piping/ Refrigerant Lowside OH and in-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/03/27 | 03/05/27 | 3.8 | 3.8 |
|
147.5 |
RPL08.INT.CC.9560 |
RPL08.Interior.CC Ext. LO #17 - Tie In MEPF with IMP Wall buildback | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/03/27 | 03/04/27 | 2.5 | 2.5 |
|
158.8 |
RPL08.INT.CTRC.01850 |
RPL08.Interior.Center-Corridor (S) - Remaining Electrical OFE Tie In | Fit out (South) | Not Started | 03/03/27 | 03/09/27 | 6.2 | 6.2 |
|
190.0 |
RPL08.INT.DHC.01113 |
RPL08.Interior.DHC - MES Skids - CDU Tie-Ins | DHC - MES Skids | Not Started | 03/03/27 | 03/24/27 | 20.0 | 20.0 |
|
255.0 |
RPL08.INT.DHC.01160 |
RPL08.Interior.DHC - Tie-ins - Control Fault Domain 1 - WBS Summary | Control Fault Domain 1 | Not Started | 03/03/27 | 06/30/27 | 105.0 | 105.0 |
|
182.5 |
RPL08.INT.DHC.02510 |
RPL08.Interior.DHC - Control Fault Domain 1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 03/03/27 | 03/09/27 | 6.2 | 6.2 |
|
237.5 |
RPL08.INT.DHD.01490 |
RPL08.Interior.DHD - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 4 | Not Started | 03/03/27 | 06/03/27 | 81.2 | 81.2 |
|
151.2 |
RPL08.INT.DHD.01510 |
RPL08.Interior.DHD - Control Fault Domain 3 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 03/03/27 | 03/08/27 | 5.0 | 5.0 |
|
307.5 |
RPL08.INT.DHD.02450 |
RPL08.Interior.DHD - OFE - Control Fault Domain 4 (LV Side Aisle) | Control Fault Domain 4 | Not Started | 03/03/27 | 03/08/27 | 5.0 | 5.0 |
|
217.5 |
RPL08.INT.ENDC.01240 |
RPL08.Interior.End-Corridor - Tape Finish Paint | Fit out | Not Started | 03/03/27 | 03/05/27 | 3.8 | 3.8 |
|
247.5 |
RPL08.INT.SSB.01330 |
RPL08.Interior.SSB - Loading Dock and Storage - Hang Drywall | Loading Dock and Storage | Not Started | 03/03/27 | 03/16/27 | 12.5 | 12.5 |
|
206.2 |
RPL08.INT.SSB.01545 |
RPL08.Interior.SSB - BoW - Notify META of TV installation & Conf Sound (+25d for Install) | Balance of Walls and OverHead | Not Started | 03/03/27 | 03/03/27 | 0.0 | 0.0 |
|
230.0 |
RPL08.INT.SSB.14200 |
RPL08.Interior.SSB LO #01 to #05 - Mechanical Tie-In | Finishes | Not Started | 03/03/27 | 03/03/27 | 1.2 | 1.2 |
|
192.5 |
RPL08.INT.SSB.14300 |
RPL08.Interior.SSB LO #01 to #05 - Electrical Tie-In | Finishes | Not Started | 03/03/27 | 03/09/27 | 6.2 | 6.2 |
|
192.5 |
RPL08.INT.SSB.14760 |
RPL08.Interior.SSB LO #01 to #05 - Install Remaining Refrigerant Line | Finishes | Not Started | 03/03/27 | 03/09/27 | 6.2 | 6.2 |
|
198.8 |
RPL08.INT.SSBC.03540 |
RPL08.Interior.SSB-Corridor - Final Paint | Fit out | Not Started | 03/03/27 | 03/09/27 | 6.2 | 6.2 |
|
191.2 |
RPL.08.D.83740.XG |
RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHD | Give Milestones (XREFs) | Not Started | 03/04/27 | 03/04/27 | 0.0 | 0.0 |
|
433.8 |
RPL.08.D.84040.XG |
Ready for MV Cable Pull DH D (MVs - Qty 8)* | Give Milestones (XREFs) | Not Started | 03/04/27 | 03/04/27 | 0.0 | 0.0 |
|
433.8 |
RPL08.INT.DHA.01240 |
RPL08.Interior.DHA - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/04/27 | 04/01/27 | 25.0 | 25.0 |
|
105.0 |
RPL08.INT.DHD.01530 |
RPL08.Interior.DHD - Control Fault Domain 3 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 03/04/27 | 03/09/27 | 5.0 | 5.0 |
|
327.5 |
RPL08.INT.SSB.01280 |
RPL08.Interior.SSB - BoW - Duct Drops / Trim out | Balance of Walls and OverHead | Not Started | 03/04/27 | 03/10/27 | 6.2 | 6.2 |
|
250.0 |
RPL08.INT.SSB.01360 |
RPL08.Interior.SSB - BoW - Electrical Trim Out | Balance of Walls and OverHead | Not Started | 03/04/27 | 03/12/27 | 8.8 | 8.8 |
|
255.0 |
RPL08.INT.SSB.01380 |
RPL08.Interior.SSB - BoW - Security Trim Out | Balance of Walls and OverHead | Not Started | 03/04/27 | 03/12/27 | 8.8 | 8.8 |
|
255.0 |
RPL08.INT.SSB.01840 |
RPL08.Interior.SSB - Install Split Systems/Humidifiers | OFE/MOFE & CFCI | Not Started | 03/04/27 | 03/10/27 | 6.2 | 6.2 |
|
243.8 |
RPL08.INT.SSB.01860 |
RPL08.Interior.SSB - Final Finishes & Fixtures - Flooring | Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) | Not Started | 03/04/27 | 03/12/27 | 8.8 | 8.8 |
|
325.0 |
RPL08.INT.SSB.02520 |
RPL08.Interior.SSB - BoW - ACT - Set Wall Angle & Shoot Ceiling Wire | Balance of Walls and OverHead | Not Started | 03/04/27 | 03/12/27 | 8.8 | 8.8 |
|
186.2 |
RPL08.EY.DHA.01420 |
RPL08.EY.DHA - Install Condenser Units (Qty 4) | OFE | Not Started | 03/05/27 | 03/16/27 | 10.0 | 10.0 |
|
207.5 |
RPL08.EY.DHA.02060 |
RPL08.EY.DHA - Install reminder of Wall mounted ACs post LO buildback (Qty2) | OFE | Not Started | 03/05/27 | 03/10/27 | 5.0 | 5.0 |
|
232.5 |
RPL08.EY.DHD.01240 |
RPL08.EY.DHD - Install Generator including tie-ins (#2 of Qty 2) | OFE | Not Started | 03/05/27 | 03/11/27 | 6.2 | 6.2 |
|
215.0 |
RPL08.EY.DHD.01250 |
RPL08.EY.DHD - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 03/05/27 | 03/18/27 | 12.5 | 12.5 |
|
218.8 |
RPL08.EY.DHD.01260 |
RPL08.EY.DHD - Tie-ins - WBS Summary | Tie-ins | Not Started | 03/05/27 | 08/12/27 | 140.0 | 140.0 |
|
216.2 |
RPL08.INT.CTRC.8860 |
RPL08.Interior.Center-Corridor - BoW - Electrical Tie-In | Balance of Walls & Overhead | Not Started | 03/05/27 | 03/11/27 | 6.2 | 6.2 |
|
192.5 |
RPL08.INT.DHB.01450 |
RPL08.Interior.DHB - Control Fault Domain 2 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/05/27 | 04/02/27 | 25.0 | 25.0 |
|
122.5 |
RPL08.INT.DHB.01490 |
RPL08.Interior.DHB - Control Fault Domain 3 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/05/27 | 04/02/27 | 25.0 | 25.0 |
|
136.2 |
RPL08.INT.DHB.01500 |
RPL08.Interior.DHB - Control Fault Domain 3 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/05/27 | 04/02/27 | 25.0 | 25.0 |
|
142.5 |
RPL08.INT.DHB.01510 |
RPL08.Interior.DHB - Control Fault Domain 3 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/05/27 | 04/02/27 | 25.0 | 25.0 |
|
136.2 |
RPL08.INT.DHB.02240 |
RPL08.Interior.DHB - Control Fault Domain 3 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/05/27 | 04/02/27 | 25.0 | 25.0 |
|
136.2 |
RPL08.INT.DHB.02620 |
RPL08.Interior.DHB - OFE - Control Fault Domain 4 (Mech Side Aisle) | Control Fault Domain 4 | Not Started | 03/05/27 | 03/16/27 | 10.0 | 10.0 |
|
143.8 |
RPL08.INT.DHC.01114 |
RPL08.Interior.DHC - MES Skids - BMS Tie-Ins | DHC - MES Skids | Not Started | 03/05/27 | 03/29/27 | 20.0 | 20.0 |
|
255.0 |
RPL08.INT.DHC.01230 |
RPL08.Interior.DHC - Control Fault Domain 1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 03/05/27 | 03/11/27 | 6.2 | 6.2 |
|
246.2 |
RPL08.INT.DHD.01580 |
RPL08.Interior.DHD - Tie-ins - Control Fault Domain 4 - WBS Summary | Control Fault Domain 4 | Not Started | 03/05/27 | 07/23/27 | 122.5 | 122.5 |
|
213.8 |
RPL08.INT.DHD.02570 |
RPL08.Interior.DHD - Control Fault Domain 4 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 03/05/27 | 03/10/27 | 5.0 | 5.0 |
|
271.2 |
RPL08.INT.ENDC.07020 |
RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Fixture Install (Lights) | Restrooms | Not Started | 03/05/27 | 03/15/27 | 8.8 | 8.8 |
|
287.5 |
RPL08.INT.ENDC.07120 |
RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (Post | Restrooms | Not Started | 03/05/27 | 03/11/27 | 6.2 | 6.2 |
|
260.0 |
RPL08.INT.ENDC.1300 |
RPL08.Interior.End-Corridor - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 03/05/27 | 03/15/27 | 8.8 | 8.8 |
|
210.0 |
RPL08.INT.SSB.14420 |
RPL08.Interior.SSB LO #01 to #05 - Electrical Trim Out | Finishes | Not Started | 03/05/27 | 03/15/27 | 8.8 | 8.8 |
|
203.8 |
RPL08.INT.SSB.14440 |
RPL08.Interior.SSB LO #01 to #05 - Security Trim Out | Finishes | Not Started | 03/05/27 | 03/15/27 | 8.8 | 8.8 |
|
203.8 |
RPL08.INT.CC.9320 |
RPL08.Interior.CC Ext. LO #17 - Install Fire Life Safety Lowside OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/08/27 | 03/10/27 | 3.8 | 3.8 |
|
163.8 |
RPL08.INT.CC.9340 |
RPL08.Interior.CC Ext. LO #17 - Install Plumbing Lowside OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/08/27 | 03/10/27 | 3.8 | 3.8 |
|
147.5 |
RPL08.INT.DHA.03620 |
RPL08.Interior.DHA - OFE - Control Fault Domain 3 (HAC) | Control Fault Domain 3 | Not Started | 03/08/27 | 03/19/27 | 12.5 | 12.5 |
|
115.0 |
RPL08.INT.DHC.01210 |
RPL08.Interior.DHC - OFE - Control Fault Domain 2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 2 | Not Started | 03/08/27 | 05/25/27 | 70.0 | 70.0 |
|
147.5 |
RPL08.INT.DHC.01250 |
RPL08.Interior.DHC - Control Fault Domain 1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 03/08/27 | 03/12/27 | 6.2 | 6.2 |
|
246.2 |
RPL08.INT.DHC.02330 |
RPL08.Interior.DHC - OFE - Control Fault Domain 2 (LV Side Aisle) | Control Fault Domain 2 | Not Started | 03/08/27 | 03/11/27 | 5.0 | 5.0 |
|
197.5 |
RPL08.INT.ENDC.01250 |
RPL08.Interior.End-Corridor - Set Equipment / Interior ?? | Fit out | Not Started | 03/08/27 | 03/12/27 | 6.2 | 6.2 |
|
247.5 |
RPL08.INT.ENDC.01270 |
RPL08.Interior.End-Corridor - Install Tile | Fit out | Not Started | 03/08/27 | 03/16/27 | 8.8 | 8.8 |
|
253.8 |
RPL08.INT.ENDC.01420 |
RPL08.Interior.End-Corridor - Install Remaining Refrigerant Line | Fit out | Not Started | 03/08/27 | 03/12/27 | 6.2 | 6.2 |
|
302.5 |
RPL08.INT.ENDC.1320 |
RPL08.Interior.End-Corridor - BoW - Install Security Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 03/08/27 | 03/16/27 | 8.8 | 8.8 |
|
292.5 |
RPL08.INT.SSB.01390 |
RPL08.Interior.SSB - BoW - Plumbing Trim Out | Balance of Walls and OverHead | Not Started | 03/08/27 | 03/16/27 | 8.8 | 8.8 |
|
255.0 |
RPL08.INT.SSB.03120 |
RPL08.Interior.SSB - Loading Dock and Storage - Install Store Front Glazing | Loading Dock and Storage | Not Started | 03/08/27 | 03/09/27 | 2.5 | 2.5 |
|
212.5 |
RPL08.INT.SSB.06260 |
RPL08.Interior.SSB LO #16 - Fire Safing / Wall Finishes | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 03/08/27 | 03/08/27 | 1.2 | 1.2 |
|
168.8 |
DCC.B8.3035 |
[SSDCB3] Production Gear Delivered [DHB] Front End (SSW &FSW) | Connectivity | Not Started | 03/09/27 | 03/09/27 | 0.0 | 0.0 |
|
241.2 |
RPL07.CON.WP3B.0900 |
RPL08.Conn WP3B Pull/Install/Test Universal Fabric EF1(South)<>EF2 (North) | EF1 <> EF2 | Not Started | 03/09/27 | 03/15/27 | 6.2 | 6.2 |
|
255.0 |
RPL08.CON.WP2.06680 |
RPL08.Conn - GSIDF/DH D2 - Install & Test Network (FIM) | Network | Not Started | 03/09/27 | 03/11/27 | 3.8 | 3.8 |
|
427.5 |
RPL08.CX.MCUP.01070 |
RPL08.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - DHB & DHA (Phase2) | Fill and Flush | Not Started | 03/09/27 | 03/15/27 | 6.2 | 6.2 |
|
138.8 |
RPL08.EY.DHA.01300 |
RPL08.EY.DHA - Install Sleeves MEPL | Hardscape and Landscape | Not Started | 03/09/27 | 03/15/27 | 6.2 | 6.2 |
|
252.5 |
RPL08.EY.DHA.01320 |
RPL08.EY.DHA - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 03/09/27 | 05/11/27 | 56.2 | 56.2 |
|
375.0 |
RPL08.INT.CTRC.06780 |
RPL08.Interior.Center-Corridor - Final Finishes & Fixtures - Frame/Blocking Walls & Ceilings | Restrooms | Not Started | 03/09/27 | 03/22/27 | 12.5 | 12.5 |
|
117.5 |
RPL08.INT.CTRC.1480 |
RPL08.Interior.Center-Corridor - BoW - MEPF Hard Lid Rough-In/ Close of Inspection | Balance of Walls & Overhead | Not Started | 03/09/27 | 03/17/27 | 8.8 | 8.8 |
|
147.5 |
RPL08.INT.CTRC.1500 |
RPL08.Interior.Center-Corridor - BoW - Install Blocking/Steel support Assembly for Metal Canopy | Balance of Walls & Overhead | Not Started | 03/09/27 | 03/15/27 | 6.2 | 6.2 |
|
137.5 |
RPL08.INT.DHC.01115 |
RPL08.Interior.DHC - MES Skids - EPMS Tie-Ins | DHC - MES Skids | Not Started | 03/09/27 | 03/31/27 | 20.0 | 20.0 |
|
255.0 |
RPL08.INT.DHD.01650 |
RPL08.Interior.DHD - Control Fault Domain 4 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 03/09/27 | 03/12/27 | 5.0 | 5.0 |
|
322.5 |
RPL08.INT.SBC.03540 |
RPL08.Interior.SSB-Corridor - BoW - Hang Drywall (Both side of Corridor Wall) | Balance of Walls & Overhead | Not Started | 03/09/27 | 03/17/27 | 8.8 | 8.8 |
|
143.8 |
RPL08.INT.SSB.06280 |
RPL08.Interior.SSB LO #16 - Electrical Trim Out | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 03/09/27 | 03/10/27 | 2.5 | 2.5 |
|
168.8 |
RPL08.INT.SSB.06300 |
RPL08.Interior.SSB LO #16 - Plumbing Trim Out | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 03/09/27 | 03/10/27 | 2.5 | 2.5 |
|
170.0 |
RPL08.INT.SSB.06320 |
RPL08.Interior.SSB LO #16 - Security Trim Out | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 03/09/27 | 03/10/27 | 2.5 | 2.5 |
|
170.0 |
RPL08.INT.SSB.06340 |
RPL08.Interior.SSB LO #16 - Fire Life Safety Trim Out | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
171.2 |
RPL08.INT.SSB.06360 |
RPL08.Interior.SSB LO #16 - Install Asset Tags | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 03/09/27 | 03/11/27 | 3.8 | 3.8 |
|
168.8 |
RPL08.INT.SSB.14520 |
RPL08.Interior.SSB LO #01 to #05 - Plumbing Trim Out | Finishes | Not Started | 03/09/27 | 03/15/27 | 6.2 | 6.2 |
|
203.8 |