Schedule Viewer

Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:14 PM · 5122 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL08.INT.SSB.14540 RPL08.Interior.SSB LO #01 to #05 - Fire Life Safety Trim Out Finishes Not Started 03/09/27 03/17/27 8.8 8.8
0%
203.8
RPL08.EY.DHB.01450 RPL08.EY.DHB - Install Remaining Remaining Electrical Tie-ins Tie-ins Not Started 03/10/27 03/19/27 10.0 10.0
0%
226.2
RPL08.EY.DHB.01460 RPL08.EY.DHB - Install Remaining Mechanical/refrigerantTie-ins Tie-ins Not Started 03/10/27 03/23/27 12.5 12.5
0%
223.8
RPL08.INT.CTRC.01260 RPL08.Interior.Center-Corridor (N) - Remaining Electrical OFE Tie In Fit out (North) Not Started 03/10/27 03/16/27 6.2 6.2
0%
192.5
RPL08.INT.CTRC.01870 RPL08.Interior.Center-Corridor (S) - Remaining Mechanical OFE Tie In Fit out (South) Not Started 03/10/27 03/12/27 3.8 3.8
0%
190.0
RPL08.INT.DHC.01300 RPL08.Interior.DHC - Tie-ins - Control Fault Domain 2 - WBS Summary Control Fault Domain 2 Not Started 03/10/27 07/22/27 117.5 117.5
0%
183.8
RPL08.INT.DHC.02530 RPL08.Interior.DHC - Control Fault Domain 2 - Install Duct (LV Side) LV Side Tie-ins Not Started 03/10/27 03/15/27 5.0 5.0
0%
251.2
RPL08.INT.DHD.01670 RPL08.Interior.DHD - Control Fault Domain 4 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 03/10/27 03/15/27 5.0 5.0
0%
327.5
RPL08.INT.SSB.01400 RPL08.Interior.SSB - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out Balance of Walls and OverHead Not Started 03/10/27 03/16/27 6.2 6.2
0%
255.0
RPL08.INT.SSB.02880 RPL08.Interior.SSB - Final Finishes & Fixtures - Install Acoustical Ceiling Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) Not Started 03/10/27 03/12/27 3.8 3.8
0%
316.2
RPL08.INT.SSBC.01420 RPL08.Interior.SSB-Corridor - Final Clean Fit out Not Started 03/10/27 03/15/27 5.0 5.0
0%
191.2
RPL.08.D.70200.XR External Tie from RPL06 - Interior Cx Energization Crew Flow (RPL06.CX.DHC.01140) Internal Milestones (XREFs) Not Started 03/11/27 03/11/27 0.0 0.0
0%
83.8
RPL08.EY.DHA.02080 RPL08.EY.DHA - Install reminder of CSUs post LO buildback (Qty1) OFE Not Started 03/11/27 03/12/27 2.5 2.5
0%
232.5
RPL08.INT.CC.9380 RPL08.Interior.CC Ext. LO #17 - Install Security Lowside OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 03/11/27 03/12/27 2.5 2.5
0%
163.8
RPL08.INT.CC.9400 RPL08.Interior.CC Ext. LO #17 - Install Controls / EPMS / BMS OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 03/11/27 03/12/27 2.5 2.5
0%
148.8
RPL08.INT.CC.9420 RPL08.Interior.CC Ext. LO #17 - Mechanical Tie-In Exterior Leave Out Wall #17 (CC - South) Not Started 03/11/27 03/15/27 3.8 3.8
0%
147.5
RPL08.INT.CC.9440 RPL08.Interior.CC Ext. LO #17 - Electrical Tie-In Exterior Leave Out Wall #17 (CC - South) Not Started 03/11/27 03/15/27 3.8 3.8
0%
147.5
RPL08.INT.DHA.01250 RPL08.Interior.DHA - Control Fault Domain 1 - Install Copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 03/11/27 04/08/27 25.0 25.0
0%
105.0
RPL08.INT.DHA.01260 RPL08.Interior.DHA - Control Fault Domain 2 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 03/11/27 04/08/27 25.0 25.0
0%
117.5
RPL08.INT.DHA.01270 RPL08.Interior.DHA - Control Fault Domain 2 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 03/11/27 04/08/27 25.0 25.0
0%
130.0
RPL08.INT.DHA.01280 RPL08.Interior.DHA - Control Fault Domain 2 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 03/11/27 04/08/27 25.0 25.0
0%
117.5
RPL08.INT.DHA.02200 RPL08.Interior.DHA - Control Fault Domain 2 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 03/11/27 04/08/27 25.0 25.0
0%
117.5
RPL08.INT.DHA.03640 RPL08.Interior.DHA - OFE - Control Fault Domain 3 (Mech Side Aisle) Control Fault Domain 3 Not Started 03/11/27 03/22/27 10.0 10.0
0%
131.2
RPL08.INT.SBC.06500 RPL08.Interior.SSB-Corridor - BoW - F/R/P Pads Balance of Walls & Overhead Not Started 03/11/27 03/17/27 6.2 6.2
0%
143.8
RPL08.INT.SSB.01700 RPL08.Interior.SSB - BoW - Install Balance of Refrigerant Line Balance of Walls and OverHead Not Started 03/11/27 03/17/27 6.2 6.2
0%
243.8
RPL08.CON.WP3B.01000 RPL08.Conn WP#3B - ISP - WBS Summary WP#3B ISP - Updated Not Started 03/12/27 08/27/27 147.5 147.5
0%
198.8
RPL08.CON.WP3B.01020 RPL08.Conn WP#3B - ISP DHB - WBS Summary DH B Not Started 03/12/27 06/25/27 92.5 92.5
0%
160.0
RPL08.CON.WP4.01000 RPL08.Conn - DH B Network - WBS Summary DH B Not Started 03/12/27 08/06/27 128.8 128.8
0%
133.8
RPL08.CON.WP4.01020 RPL08.Conn WP4 FENW DHB CFD1 Infrastructure Infrastructure Not Started 03/12/27 04/09/27 25.0 25.0
0%
237.5
RPL08.CX.MCUP.01010 RPL08.CX.mCup Loop 1 - L3/L4 - MV Skids mCUP 1-4 Not Started 03/12/27 03/19/27 7.5 7.5
0%
83.8
RPL08.EY.DHB.01390 RPL08.EY.DHB - Install Remaining EY Paving Hardscape and Landscape Not Started 03/12/27 03/18/27 6.2 6.2
0%
261.2
RPL08.EY.DHD.01280 RPL08.EY.DHD - Install BMS/EPMS Tie-ins Tie-ins Not Started 03/12/27 03/25/27 12.5 12.5
0%
215.0
RPL08.INT.DHB.01290 RPL08.Conn DHB - CFD1 - Set Passive Racks for WP#3b (16) Infrastructure Not Started 03/12/27 03/16/27 3.8 3.8
0%
206.2
RPL08.INT.DHB.01480 RPL08.Interior.DHB - Control Fault Domain 2 - Install copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 03/12/27 04/09/27 25.0 25.0
0%
122.5
RPL08.INT.DHB.01530 RPL08.Interior.DHB - Control Fault Domain 3 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 03/12/27 04/09/27 25.0 25.0
0%
142.5
RPL08.INT.DHB.01540 RPL08.Interior.DHB - Control Fault Domain 3 - Pull EMPS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 03/12/27 04/09/27 25.0 25.0
0%
142.5
RPL08.INT.DHB.01550 RPL08.Interior.DHB - Control Fault Domain 3 - Set UPS and Panel (2) and GS.IDF B1 (Stick Build) Remaining Tie-ins post Mech Side Aisle install Not Started 03/12/27 04/09/27 25.0 25.0
0%
136.2
RPL08.INT.DHB.02800 RPL08.Conn DHB - CFD1 - Set Passive Racks for PON (16) Infrastructure Not Started 03/12/27 03/16/27 3.8 3.8
0%
221.2
RPL08.INT.DHC.01350 RPL08.Interior.DHC - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 3 Not Started 03/12/27 06/09/27 77.5 77.5
0%
145.0
RPL08.INT.DHC.01370 RPL08.Interior.DHC - Control Fault Domain 2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 03/12/27 03/17/27 5.0 5.0
0%
260.0
RPL08.INT.DHC.02390 RPL08.Interior.DHC - OFE - Control Fault Domain 3 (LV Side Aisle) Control Fault Domain 3 Not Started 03/12/27 03/17/27 5.0 5.0
0%
205.0
RPL08.INT.ENDC.07100 RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Install Tile/ Grout Restrooms Not Started 03/12/27 03/25/27 12.5 12.5
0%
268.8
RPL08.INT.ENDC.07140 RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Install Fixtures, Partitions & Accessories Restrooms Not Started 03/12/27 03/22/27 8.8 8.8
0%
260.0
RPL08.INT.SSB.06380 RPL08.Interior.SSB LO #16 - Install Flooring Tiles/Resinous Flooring in specific rooms Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 03/12/27 03/16/27 3.8 3.8
0%
168.8
RPL08.INT.SSB.14600 RPL08.Interior.SSB LO #01 to #05 - Install Asset Tags Finishes Not Started 03/12/27 03/22/27 8.8 8.8
0%
172.5
RPL08.EY.DHA.01450 RPL08.EY.DHA - Install Remaining Electrical Tie-ins Tie-ins Not Started 03/15/27 03/24/27 10.0 10.0
0%
235.0
RPL08.INT.CC.9500 RPL08.Interior.CC Ext. LO #17 - Install Electrical Lowside OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 03/15/27 03/16/27 2.5 2.5
0%
148.8
RPL08.INT.DHC.01390 RPL08.Interior.DHC - Control Fault Domain 2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 03/15/27 03/18/27 5.0 5.0
0%
260.0
RPL08.INT.ENDC.01280 RPL08.Interior.End-Corridor - Duct Drops / Trim out Fit out Not Started 03/15/27 03/22/27 7.5 7.5
0%
247.5
RPL08.INT.ENDC.01290 RPL08.Interior.End-Corridor - Install Battery Fit out Not Started 03/15/27 03/29/27 12.5 12.5
0%
247.5
RPL08.INT.ENDC.01590 RPL08.Interior.End-Corridor - Install Electrical - DHD/DHC UPS Gallery Fit out Not Started 03/15/27 03/19/27 6.2 6.2
0%
253.8
RPL08.INT.SSB.02540 RPL08.Interior.SSB - BoW - ACT - Ceiling Grid Balance of Walls and OverHead Not Started 03/15/27 03/19/27 6.2 6.2
0%
186.2
RPL08.INT.SSB.02720 RPL08.Interior.SSB - BoW - Install Acoustic Baffle Ceiling Walls in specific rooms Balance of Walls and OverHead Not Started 03/15/27 03/17/27 3.8 3.8
0%
258.8
RPL08.INT.SSB.02740 RPL08.Interior.SSB - Final Finishes & Fixtures - Final Paint Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) Not Started 03/15/27 03/23/27 8.8 8.8
0%
316.2
GCD.RPL08.5805 RMU Loop Ready for Energization - DHA Loop EY Not Started 03/16/27 03/16/27 0.0 0.0
0%
101.2
RPL08.CX.DHB.01000 RPL08.CX.DHB - L3, L4, IST - WBS Summary DHB Not Started 03/16/27 02/17/28 290.0 290.0
0%
122.5
RPL08.CX.DHB.01090 RPL08.CX.DHB - L4 - WBS Summary (Mechanical) DHB MECHANICAL Not Started 03/16/27 11/18/27 216.2 216.2
0%
27.5
RPL08.CX.DHB.01260 RPL08.CX.DHB - L3/L4 - Control Fault Domain 01 - FW Flush and Fill Control Fault Domain 1 Not Started 03/16/27 03/24/27 8.8 8.8
0%
138.8
RPL08.EY.DHA.01330 RPL08.EY.DHA - Install Early EY Paving Hardscape and Landscape Not Started 03/16/27 03/22/27 6.2 6.2
0%
252.5
RPL08.EY.ENDC.1950 RPL08.EY.DHD.T1 - HAC Prefab prior to install for DH D Tent 1 Not Started 03/16/27 03/30/27 12.5 12.5
0%
151.2
RPL08.INT.CC.9480 RPL08.Interior.CC Ext. LO #17 - Fire Safing OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 03/16/27 03/17/27 2.5 2.5
0%
147.5
RPL08.INT.CTRC.1520 RPL08.Interior.Center-Corridor - BoW - Install Backing at Exterior Wall Balance of Walls & Overhead Not Started 03/16/27 03/22/27 6.2 6.2
0%
137.5
RPL08.INT.DHB.02660 RPL08.Interior.DHB - OFE - Control Fault Domain 5 (HAC) Control Fault Domain 5 Not Started 03/16/27 03/30/27 12.5 12.5
0%
147.5
RPL08.INT.DHC.01440 RPL08.Interior.DHC - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary Control Fault Domain 3 Not Started 03/16/27 07/29/27 118.8 118.8
0%
207.5
RPL08.INT.DHC.02550 RPL08.Interior.DHC - Control Fault Domain 3 - Install Duct (LV Side) LV Side Tie-ins Not Started 03/16/27 03/19/27 5.0 5.0
0%
262.5
RPL08.INT.ENDC.1340 RPL08.Interior.End-Corridor - BoW - Install VAV's/Duct Branches Balance of Walls & Overhead Not Started 03/16/27 03/22/27 6.2 6.2
0%
210.0
RPL08.INT.ENDC.1360 RPL08.Interior.End-Corridor - BoW - Install Split Systems/Humidifiers Balance of Walls & Overhead Not Started 03/16/27 03/22/27 6.2 6.2
0%
210.0
DCC.B8.3527 [SSDCB3] Cabling Start : Front End Production Cabling [DHB] Connectivity Not Started 03/17/27 03/17/27 0.0 0.0
0%
423.8
GCD.RPL08.3527 [RPL08] TC-C Ready : Production Cabling Start [DHB Rows 01-08] TC-C Ready: Production Cabling - DHB Not Started 03/17/27 03/17/27 0.0 0.0
0%
423.8
RPL08.CON.WP3B.01080 RPL08.Conn EF2<>DHB.11 - WBS Summary EF2<>DHB.11 Not Started 03/17/27 04/02/27 15.0 15.0
0%
231.2
RPL08.EY.DHA.01460 RPL08.EY.DHA - Install Remaining Mechanical Tie-ins Tie-ins Not Started 03/17/27 03/31/27 12.5 12.5
0%
230.0
RPL08.EY.DHA.01520 RPL08.EY.DHA - Install Floor Mounted Outdoor Split AC Units (Qty 4) OFE Not Started 03/17/27 03/29/27 10.0 10.0
0%
207.5
RPL08.INT.CC.9580 RPL08.Interior.CC Ext. LO #17 - Install Door Frame Hardware Exterior Leave Out Wall #17 (CC - South) Not Started 03/17/27 03/22/27 5.0 5.0
0%
161.2
RPL08.INT.CTRC.01290 RPL08.Interior.Center-Corridor (N) - Remaining Mechanical OFE Tie In Fit out (North) Not Started 03/17/27 03/19/27 3.8 3.8
0%
192.5
RPL08.INT.ENDC.01320 RPL08.Interior.End-Corridor - Install Toilet Accessories Fit out Not Started 03/17/27 03/25/27 8.8 8.8
0%
253.8
RPL08.INT.SSB.01350 RPL08.Interior.SSB - Loading Dock and Storage - Tape Finish Paint Loading Dock and Storage Not Started 03/17/27 03/19/27 3.8 3.8
0%
206.2
RPL08.INT.SSB.06400 RPL08.Interior.SSB LO #16 - Electrical L2 Checklist Completion Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 03/17/27 03/31/27 12.5 12.5
0%
168.8
RPL08.INT.SSB.06420 RPL08.Interior.SSB LO #16 - Mechanical L2 Checklist Completion Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 03/17/27 03/31/27 12.5 12.5
0%
168.8
RPL08.WP3B.012020 RPL08.Conn EF2<>DHB.11 Pull Pigtails (384F) P2&3 (LV) EF2<>DHB.11 Not Started 03/17/27 03/18/27 2.5 2.5
0%
215.0
RPL08.WP4.010080 RPL08.Conn DHB.11 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 03/17/27 03/17/27 1.2 1.2
0%
245.0
RPL08.WP4.010100 RPL08.Conn DHB.12 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 03/17/27 03/17/27 1.2 1.2
0%
245.0
RPL08.WP4.010200 RPL08.Conn DHB.11.01 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 03/17/27 03/31/27 12.5 12.5
0%
206.2
RPL08.WP4.010220 RPL08.Conn DHB.12.05 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 03/17/27 03/31/27 12.5 12.5
0%
206.2
RPL08.WP4.010440 RPL08.Conn DHB.11 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 03/17/27 03/17/27 1.2 1.2
0%
235.0
RPL08.WP4.010460 RPL08.Conn DHB.12 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 03/17/27 03/17/27 1.2 1.2
0%
235.0
RPL.08.D.83210.XR 500kva Temp Power Skids Energized (First 10 MW or Gen) Receive Milestones (XREFs) Not Started 03/18/27 03/18/27 0.0 0.0
0%
86.2
RPL.08.D.83320.XR Pull and Term MV Skids - RPL08 DHB Receive Milestones (XREFs) Not Started 03/18/27 03/18/27 0.0 0.0
0%
86.2
RPL.08.D.83410.XR SS Power to RPL08 MSG 1B Numeric (Cx Temp) Receive Milestones (XREFs) Not Started 03/18/27 03/18/27 0.0 0.0
0%
86.2
RPL.08.D.83510.XR Substation Perm Power Cutover - RPL08 DH & mCUPs Receive Milestones (XREFs) Not Started 03/18/27 03/18/27 0.0 0.0
0%
86.2
RPL.08.D.83730.XG RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHC Give Milestones (XREFs) Not Started 03/18/27 03/18/27 0.0 0.0
0%
421.2
RPL.08.D.83820.XR 100MW Cx Temp Power to MV Skids RPL08 DHB Available Receive Milestones (XREFs) Not Started 03/18/27 03/18/27 0.0 0.0
0%
86.2
RPL.08.D.84080.XG Ready for MV Cable Pull DH C (MVs - Qty 8)* Give Milestones (XREFs) Not Started 03/18/27 03/18/27 0.0 0.0
0%
421.2
RPL08.CX.DHA.01000 RPL08.CX.DHA - L3, L4, IST - WBS Summary DHA Not Started 03/18/27 03/03/28 300.0 300.0
0%
110.0
RPL08.CX.DHA.01090 RPL08.CX.DHA - L4 - WBS Summary (Mechanical) DHA MECHANICAL Not Started 03/18/27 12/07/27 227.5 227.5
0%
26.2
RPL08.CX.DHA.01260 RPL08.CX.DHA - L3/L4 - Control Fault Domain 01 - FW Flush and Fill Control Fault Domain 1 Not Started 03/18/27 03/29/27 8.8 8.8
0%
148.8
RPL08.INT.CC.9520 RPL08.Interior.CC Ext. LO #17 - Install Backing Exterior Leave Out Wall #17 (CC - South) Not Started 03/18/27 03/19/27 2.5 2.5
0%
147.5
RPL08.INT.DHA.01290 RPL08.Interior.DHA - Control Fault Domain 1 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 03/18/27 04/15/27 25.0 25.0
0%
105.0
RPL08.INT.DHA.01310 RPL08.Interior.DHA - Control Fault Domain 2 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 03/18/27 04/15/27 25.0 25.0
0%
130.0
RPL08.INT.DHA.01320 RPL08.Interior.DHA - Control Fault Domain 2 - Pull EMPS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 03/18/27 04/15/27 25.0 25.0
0%
130.0
RPL08.INT.DHA.01330 RPL08.Interior.DHA - Control Fault Domain 2 - Set UPS and Panel (2) Remaining Tie-ins post Mech Side Aisle install Not Started 03/18/27 04/15/27 25.0 25.0
0%
117.5