Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:14 PM
· 5122 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL08.INT.SSB.14540 |
RPL08.Interior.SSB LO #01 to #05 - Fire Life Safety Trim Out | Finishes | Not Started | 03/09/27 | 03/17/27 | 8.8 | 8.8 |
|
203.8 |
RPL08.EY.DHB.01450 |
RPL08.EY.DHB - Install Remaining Remaining Electrical Tie-ins | Tie-ins | Not Started | 03/10/27 | 03/19/27 | 10.0 | 10.0 |
|
226.2 |
RPL08.EY.DHB.01460 |
RPL08.EY.DHB - Install Remaining Mechanical/refrigerantTie-ins | Tie-ins | Not Started | 03/10/27 | 03/23/27 | 12.5 | 12.5 |
|
223.8 |
RPL08.INT.CTRC.01260 |
RPL08.Interior.Center-Corridor (N) - Remaining Electrical OFE Tie In | Fit out (North) | Not Started | 03/10/27 | 03/16/27 | 6.2 | 6.2 |
|
192.5 |
RPL08.INT.CTRC.01870 |
RPL08.Interior.Center-Corridor (S) - Remaining Mechanical OFE Tie In | Fit out (South) | Not Started | 03/10/27 | 03/12/27 | 3.8 | 3.8 |
|
190.0 |
RPL08.INT.DHC.01300 |
RPL08.Interior.DHC - Tie-ins - Control Fault Domain 2 - WBS Summary | Control Fault Domain 2 | Not Started | 03/10/27 | 07/22/27 | 117.5 | 117.5 |
|
183.8 |
RPL08.INT.DHC.02530 |
RPL08.Interior.DHC - Control Fault Domain 2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 03/10/27 | 03/15/27 | 5.0 | 5.0 |
|
251.2 |
RPL08.INT.DHD.01670 |
RPL08.Interior.DHD - Control Fault Domain 4 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 03/10/27 | 03/15/27 | 5.0 | 5.0 |
|
327.5 |
RPL08.INT.SSB.01400 |
RPL08.Interior.SSB - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls and OverHead | Not Started | 03/10/27 | 03/16/27 | 6.2 | 6.2 |
|
255.0 |
RPL08.INT.SSB.02880 |
RPL08.Interior.SSB - Final Finishes & Fixtures - Install Acoustical Ceiling | Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) | Not Started | 03/10/27 | 03/12/27 | 3.8 | 3.8 |
|
316.2 |
RPL08.INT.SSBC.01420 |
RPL08.Interior.SSB-Corridor - Final Clean | Fit out | Not Started | 03/10/27 | 03/15/27 | 5.0 | 5.0 |
|
191.2 |
RPL.08.D.70200.XR |
External Tie from RPL06 - Interior Cx Energization Crew Flow (RPL06.CX.DHC.01140) | Internal Milestones (XREFs) | Not Started | 03/11/27 | 03/11/27 | 0.0 | 0.0 |
|
83.8 |
RPL08.EY.DHA.02080 |
RPL08.EY.DHA - Install reminder of CSUs post LO buildback (Qty1) | OFE | Not Started | 03/11/27 | 03/12/27 | 2.5 | 2.5 |
|
232.5 |
RPL08.INT.CC.9380 |
RPL08.Interior.CC Ext. LO #17 - Install Security Lowside OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/11/27 | 03/12/27 | 2.5 | 2.5 |
|
163.8 |
RPL08.INT.CC.9400 |
RPL08.Interior.CC Ext. LO #17 - Install Controls / EPMS / BMS OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/11/27 | 03/12/27 | 2.5 | 2.5 |
|
148.8 |
RPL08.INT.CC.9420 |
RPL08.Interior.CC Ext. LO #17 - Mechanical Tie-In | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/11/27 | 03/15/27 | 3.8 | 3.8 |
|
147.5 |
RPL08.INT.CC.9440 |
RPL08.Interior.CC Ext. LO #17 - Electrical Tie-In | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/11/27 | 03/15/27 | 3.8 | 3.8 |
|
147.5 |
RPL08.INT.DHA.01250 |
RPL08.Interior.DHA - Control Fault Domain 1 - Install Copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/11/27 | 04/08/27 | 25.0 | 25.0 |
|
105.0 |
RPL08.INT.DHA.01260 |
RPL08.Interior.DHA - Control Fault Domain 2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/11/27 | 04/08/27 | 25.0 | 25.0 |
|
117.5 |
RPL08.INT.DHA.01270 |
RPL08.Interior.DHA - Control Fault Domain 2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/11/27 | 04/08/27 | 25.0 | 25.0 |
|
130.0 |
RPL08.INT.DHA.01280 |
RPL08.Interior.DHA - Control Fault Domain 2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/11/27 | 04/08/27 | 25.0 | 25.0 |
|
117.5 |
RPL08.INT.DHA.02200 |
RPL08.Interior.DHA - Control Fault Domain 2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/11/27 | 04/08/27 | 25.0 | 25.0 |
|
117.5 |
RPL08.INT.DHA.03640 |
RPL08.Interior.DHA - OFE - Control Fault Domain 3 (Mech Side Aisle) | Control Fault Domain 3 | Not Started | 03/11/27 | 03/22/27 | 10.0 | 10.0 |
|
131.2 |
RPL08.INT.SBC.06500 |
RPL08.Interior.SSB-Corridor - BoW - F/R/P Pads | Balance of Walls & Overhead | Not Started | 03/11/27 | 03/17/27 | 6.2 | 6.2 |
|
143.8 |
RPL08.INT.SSB.01700 |
RPL08.Interior.SSB - BoW - Install Balance of Refrigerant Line | Balance of Walls and OverHead | Not Started | 03/11/27 | 03/17/27 | 6.2 | 6.2 |
|
243.8 |
RPL08.CON.WP3B.01000 |
RPL08.Conn WP#3B - ISP - WBS Summary | WP#3B ISP - Updated | Not Started | 03/12/27 | 08/27/27 | 147.5 | 147.5 |
|
198.8 |
RPL08.CON.WP3B.01020 |
RPL08.Conn WP#3B - ISP DHB - WBS Summary | DH B | Not Started | 03/12/27 | 06/25/27 | 92.5 | 92.5 |
|
160.0 |
RPL08.CON.WP4.01000 |
RPL08.Conn - DH B Network - WBS Summary | DH B | Not Started | 03/12/27 | 08/06/27 | 128.8 | 128.8 |
|
133.8 |
RPL08.CON.WP4.01020 |
RPL08.Conn WP4 FENW DHB CFD1 Infrastructure | Infrastructure | Not Started | 03/12/27 | 04/09/27 | 25.0 | 25.0 |
|
237.5 |
RPL08.CX.MCUP.01010 |
RPL08.CX.mCup Loop 1 - L3/L4 - MV Skids | mCUP 1-4 | Not Started | 03/12/27 | 03/19/27 | 7.5 | 7.5 |
|
83.8 |
RPL08.EY.DHB.01390 |
RPL08.EY.DHB - Install Remaining EY Paving | Hardscape and Landscape | Not Started | 03/12/27 | 03/18/27 | 6.2 | 6.2 |
|
261.2 |
RPL08.EY.DHD.01280 |
RPL08.EY.DHD - Install BMS/EPMS Tie-ins | Tie-ins | Not Started | 03/12/27 | 03/25/27 | 12.5 | 12.5 |
|
215.0 |
RPL08.INT.DHB.01290 |
RPL08.Conn DHB - CFD1 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 03/12/27 | 03/16/27 | 3.8 | 3.8 |
|
206.2 |
RPL08.INT.DHB.01480 |
RPL08.Interior.DHB - Control Fault Domain 2 - Install copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/12/27 | 04/09/27 | 25.0 | 25.0 |
|
122.5 |
RPL08.INT.DHB.01530 |
RPL08.Interior.DHB - Control Fault Domain 3 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/12/27 | 04/09/27 | 25.0 | 25.0 |
|
142.5 |
RPL08.INT.DHB.01540 |
RPL08.Interior.DHB - Control Fault Domain 3 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/12/27 | 04/09/27 | 25.0 | 25.0 |
|
142.5 |
RPL08.INT.DHB.01550 |
RPL08.Interior.DHB - Control Fault Domain 3 - Set UPS and Panel (2) and GS.IDF B1 (Stick Build) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/12/27 | 04/09/27 | 25.0 | 25.0 |
|
136.2 |
RPL08.INT.DHB.02800 |
RPL08.Conn DHB - CFD1 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 03/12/27 | 03/16/27 | 3.8 | 3.8 |
|
221.2 |
RPL08.INT.DHC.01350 |
RPL08.Interior.DHC - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 3 | Not Started | 03/12/27 | 06/09/27 | 77.5 | 77.5 |
|
145.0 |
RPL08.INT.DHC.01370 |
RPL08.Interior.DHC - Control Fault Domain 2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 03/12/27 | 03/17/27 | 5.0 | 5.0 |
|
260.0 |
RPL08.INT.DHC.02390 |
RPL08.Interior.DHC - OFE - Control Fault Domain 3 (LV Side Aisle) | Control Fault Domain 3 | Not Started | 03/12/27 | 03/17/27 | 5.0 | 5.0 |
|
205.0 |
RPL08.INT.ENDC.07100 |
RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Install Tile/ Grout | Restrooms | Not Started | 03/12/27 | 03/25/27 | 12.5 | 12.5 |
|
268.8 |
RPL08.INT.ENDC.07140 |
RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Install Fixtures, Partitions & Accessories | Restrooms | Not Started | 03/12/27 | 03/22/27 | 8.8 | 8.8 |
|
260.0 |
RPL08.INT.SSB.06380 |
RPL08.Interior.SSB LO #16 - Install Flooring Tiles/Resinous Flooring in specific rooms | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 03/12/27 | 03/16/27 | 3.8 | 3.8 |
|
168.8 |
RPL08.INT.SSB.14600 |
RPL08.Interior.SSB LO #01 to #05 - Install Asset Tags | Finishes | Not Started | 03/12/27 | 03/22/27 | 8.8 | 8.8 |
|
172.5 |
RPL08.EY.DHA.01450 |
RPL08.EY.DHA - Install Remaining Electrical Tie-ins | Tie-ins | Not Started | 03/15/27 | 03/24/27 | 10.0 | 10.0 |
|
235.0 |
RPL08.INT.CC.9500 |
RPL08.Interior.CC Ext. LO #17 - Install Electrical Lowside OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/15/27 | 03/16/27 | 2.5 | 2.5 |
|
148.8 |
RPL08.INT.DHC.01390 |
RPL08.Interior.DHC - Control Fault Domain 2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 03/15/27 | 03/18/27 | 5.0 | 5.0 |
|
260.0 |
RPL08.INT.ENDC.01280 |
RPL08.Interior.End-Corridor - Duct Drops / Trim out | Fit out | Not Started | 03/15/27 | 03/22/27 | 7.5 | 7.5 |
|
247.5 |
RPL08.INT.ENDC.01290 |
RPL08.Interior.End-Corridor - Install Battery | Fit out | Not Started | 03/15/27 | 03/29/27 | 12.5 | 12.5 |
|
247.5 |
RPL08.INT.ENDC.01590 |
RPL08.Interior.End-Corridor - Install Electrical - DHD/DHC UPS Gallery | Fit out | Not Started | 03/15/27 | 03/19/27 | 6.2 | 6.2 |
|
253.8 |
RPL08.INT.SSB.02540 |
RPL08.Interior.SSB - BoW - ACT - Ceiling Grid | Balance of Walls and OverHead | Not Started | 03/15/27 | 03/19/27 | 6.2 | 6.2 |
|
186.2 |
RPL08.INT.SSB.02720 |
RPL08.Interior.SSB - BoW - Install Acoustic Baffle Ceiling Walls in specific rooms | Balance of Walls and OverHead | Not Started | 03/15/27 | 03/17/27 | 3.8 | 3.8 |
|
258.8 |
RPL08.INT.SSB.02740 |
RPL08.Interior.SSB - Final Finishes & Fixtures - Final Paint | Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) | Not Started | 03/15/27 | 03/23/27 | 8.8 | 8.8 |
|
316.2 |
GCD.RPL08.5805 |
RMU Loop Ready for Energization - DHA Loop | EY | Not Started | 03/16/27 | 03/16/27 | 0.0 | 0.0 |
|
101.2 |
RPL08.CX.DHB.01000 |
RPL08.CX.DHB - L3, L4, IST - WBS Summary | DHB | Not Started | 03/16/27 | 02/17/28 | 290.0 | 290.0 |
|
122.5 |
RPL08.CX.DHB.01090 |
RPL08.CX.DHB - L4 - WBS Summary (Mechanical) | DHB MECHANICAL | Not Started | 03/16/27 | 11/18/27 | 216.2 | 216.2 |
|
27.5 |
RPL08.CX.DHB.01260 |
RPL08.CX.DHB - L3/L4 - Control Fault Domain 01 - FW Flush and Fill | Control Fault Domain 1 | Not Started | 03/16/27 | 03/24/27 | 8.8 | 8.8 |
|
138.8 |
RPL08.EY.DHA.01330 |
RPL08.EY.DHA - Install Early EY Paving | Hardscape and Landscape | Not Started | 03/16/27 | 03/22/27 | 6.2 | 6.2 |
|
252.5 |
RPL08.EY.ENDC.1950 |
RPL08.EY.DHD.T1 - HAC Prefab prior to install for DH D | Tent 1 | Not Started | 03/16/27 | 03/30/27 | 12.5 | 12.5 |
|
151.2 |
RPL08.INT.CC.9480 |
RPL08.Interior.CC Ext. LO #17 - Fire Safing OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/16/27 | 03/17/27 | 2.5 | 2.5 |
|
147.5 |
RPL08.INT.CTRC.1520 |
RPL08.Interior.Center-Corridor - BoW - Install Backing at Exterior Wall | Balance of Walls & Overhead | Not Started | 03/16/27 | 03/22/27 | 6.2 | 6.2 |
|
137.5 |
RPL08.INT.DHB.02660 |
RPL08.Interior.DHB - OFE - Control Fault Domain 5 (HAC) | Control Fault Domain 5 | Not Started | 03/16/27 | 03/30/27 | 12.5 | 12.5 |
|
147.5 |
RPL08.INT.DHC.01440 |
RPL08.Interior.DHC - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary | Control Fault Domain 3 | Not Started | 03/16/27 | 07/29/27 | 118.8 | 118.8 |
|
207.5 |
RPL08.INT.DHC.02550 |
RPL08.Interior.DHC - Control Fault Domain 3 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 03/16/27 | 03/19/27 | 5.0 | 5.0 |
|
262.5 |
RPL08.INT.ENDC.1340 |
RPL08.Interior.End-Corridor - BoW - Install VAV's/Duct Branches | Balance of Walls & Overhead | Not Started | 03/16/27 | 03/22/27 | 6.2 | 6.2 |
|
210.0 |
RPL08.INT.ENDC.1360 |
RPL08.Interior.End-Corridor - BoW - Install Split Systems/Humidifiers | Balance of Walls & Overhead | Not Started | 03/16/27 | 03/22/27 | 6.2 | 6.2 |
|
210.0 |
DCC.B8.3527 |
[SSDCB3] Cabling Start : Front End Production Cabling [DHB] | Connectivity | Not Started | 03/17/27 | 03/17/27 | 0.0 | 0.0 |
|
423.8 |
GCD.RPL08.3527 |
[RPL08] TC-C Ready : Production Cabling Start [DHB Rows 01-08] | TC-C Ready: Production Cabling - DHB | Not Started | 03/17/27 | 03/17/27 | 0.0 | 0.0 |
|
423.8 |
RPL08.CON.WP3B.01080 |
RPL08.Conn EF2<>DHB.11 - WBS Summary | EF2<>DHB.11 | Not Started | 03/17/27 | 04/02/27 | 15.0 | 15.0 |
|
231.2 |
RPL08.EY.DHA.01460 |
RPL08.EY.DHA - Install Remaining Mechanical Tie-ins | Tie-ins | Not Started | 03/17/27 | 03/31/27 | 12.5 | 12.5 |
|
230.0 |
RPL08.EY.DHA.01520 |
RPL08.EY.DHA - Install Floor Mounted Outdoor Split AC Units (Qty 4) | OFE | Not Started | 03/17/27 | 03/29/27 | 10.0 | 10.0 |
|
207.5 |
RPL08.INT.CC.9580 |
RPL08.Interior.CC Ext. LO #17 - Install Door Frame Hardware | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/17/27 | 03/22/27 | 5.0 | 5.0 |
|
161.2 |
RPL08.INT.CTRC.01290 |
RPL08.Interior.Center-Corridor (N) - Remaining Mechanical OFE Tie In | Fit out (North) | Not Started | 03/17/27 | 03/19/27 | 3.8 | 3.8 |
|
192.5 |
RPL08.INT.ENDC.01320 |
RPL08.Interior.End-Corridor - Install Toilet Accessories | Fit out | Not Started | 03/17/27 | 03/25/27 | 8.8 | 8.8 |
|
253.8 |
RPL08.INT.SSB.01350 |
RPL08.Interior.SSB - Loading Dock and Storage - Tape Finish Paint | Loading Dock and Storage | Not Started | 03/17/27 | 03/19/27 | 3.8 | 3.8 |
|
206.2 |
RPL08.INT.SSB.06400 |
RPL08.Interior.SSB LO #16 - Electrical L2 Checklist Completion | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 03/17/27 | 03/31/27 | 12.5 | 12.5 |
|
168.8 |
RPL08.INT.SSB.06420 |
RPL08.Interior.SSB LO #16 - Mechanical L2 Checklist Completion | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 03/17/27 | 03/31/27 | 12.5 | 12.5 |
|
168.8 |
RPL08.WP3B.012020 |
RPL08.Conn EF2<>DHB.11 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.11 | Not Started | 03/17/27 | 03/18/27 | 2.5 | 2.5 |
|
215.0 |
RPL08.WP4.010080 |
RPL08.Conn DHB.11 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 03/17/27 | 03/17/27 | 1.2 | 1.2 |
|
245.0 |
RPL08.WP4.010100 |
RPL08.Conn DHB.12 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 03/17/27 | 03/17/27 | 1.2 | 1.2 |
|
245.0 |
RPL08.WP4.010200 |
RPL08.Conn DHB.11.01 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/17/27 | 03/31/27 | 12.5 | 12.5 |
|
206.2 |
RPL08.WP4.010220 |
RPL08.Conn DHB.12.05 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/17/27 | 03/31/27 | 12.5 | 12.5 |
|
206.2 |
RPL08.WP4.010440 |
RPL08.Conn DHB.11 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 03/17/27 | 03/17/27 | 1.2 | 1.2 |
|
235.0 |
RPL08.WP4.010460 |
RPL08.Conn DHB.12 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 03/17/27 | 03/17/27 | 1.2 | 1.2 |
|
235.0 |
RPL.08.D.83210.XR |
500kva Temp Power Skids Energized (First 10 MW or Gen) | Receive Milestones (XREFs) | Not Started | 03/18/27 | 03/18/27 | 0.0 | 0.0 |
|
86.2 |
RPL.08.D.83320.XR |
Pull and Term MV Skids - RPL08 DHB | Receive Milestones (XREFs) | Not Started | 03/18/27 | 03/18/27 | 0.0 | 0.0 |
|
86.2 |
RPL.08.D.83410.XR |
SS Power to RPL08 MSG 1B Numeric (Cx Temp) | Receive Milestones (XREFs) | Not Started | 03/18/27 | 03/18/27 | 0.0 | 0.0 |
|
86.2 |
RPL.08.D.83510.XR |
Substation Perm Power Cutover - RPL08 DH & mCUPs | Receive Milestones (XREFs) | Not Started | 03/18/27 | 03/18/27 | 0.0 | 0.0 |
|
86.2 |
RPL.08.D.83730.XG |
RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHC | Give Milestones (XREFs) | Not Started | 03/18/27 | 03/18/27 | 0.0 | 0.0 |
|
421.2 |
RPL.08.D.83820.XR |
100MW Cx Temp Power to MV Skids RPL08 DHB Available | Receive Milestones (XREFs) | Not Started | 03/18/27 | 03/18/27 | 0.0 | 0.0 |
|
86.2 |
RPL.08.D.84080.XG |
Ready for MV Cable Pull DH C (MVs - Qty 8)* | Give Milestones (XREFs) | Not Started | 03/18/27 | 03/18/27 | 0.0 | 0.0 |
|
421.2 |
RPL08.CX.DHA.01000 |
RPL08.CX.DHA - L3, L4, IST - WBS Summary | DHA | Not Started | 03/18/27 | 03/03/28 | 300.0 | 300.0 |
|
110.0 |
RPL08.CX.DHA.01090 |
RPL08.CX.DHA - L4 - WBS Summary (Mechanical) | DHA MECHANICAL | Not Started | 03/18/27 | 12/07/27 | 227.5 | 227.5 |
|
26.2 |
RPL08.CX.DHA.01260 |
RPL08.CX.DHA - L3/L4 - Control Fault Domain 01 - FW Flush and Fill | Control Fault Domain 1 | Not Started | 03/18/27 | 03/29/27 | 8.8 | 8.8 |
|
148.8 |
RPL08.INT.CC.9520 |
RPL08.Interior.CC Ext. LO #17 - Install Backing | Exterior Leave Out Wall #17 (CC - South) | Not Started | 03/18/27 | 03/19/27 | 2.5 | 2.5 |
|
147.5 |
RPL08.INT.DHA.01290 |
RPL08.Interior.DHA - Control Fault Domain 1 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/18/27 | 04/15/27 | 25.0 | 25.0 |
|
105.0 |
RPL08.INT.DHA.01310 |
RPL08.Interior.DHA - Control Fault Domain 2 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/18/27 | 04/15/27 | 25.0 | 25.0 |
|
130.0 |
RPL08.INT.DHA.01320 |
RPL08.Interior.DHA - Control Fault Domain 2 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/18/27 | 04/15/27 | 25.0 | 25.0 |
|
130.0 |
RPL08.INT.DHA.01330 |
RPL08.Interior.DHA - Control Fault Domain 2 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/18/27 | 04/15/27 | 25.0 | 25.0 |
|
117.5 |