Schedule Viewer

Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:14 PM · 5122 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL08.WP4.012740 RPL08.Conn DHA.01.02 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 04/21/27 05/04/27 12.5 12.5
0%
201.2
RPL08.WP4.012760 RPL08.Conn DHA.02.06 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 04/21/27 05/04/27 12.5 12.5
0%
201.2
GCD.RPL08.3529 [RPL08] TC-C Ready : Production Cabling Start [DHB Rows 17-24] TC-C Ready: Production Cabling - DHB Not Started 04/22/27 04/22/27 0.0 0.0
0%
392.5
RPL08.CON.WP3B.01240 RPL08.Conn EF2<>DHB.15 - WBS Summary EF2<>DHB.15 Not Started 04/22/27 05/06/27 13.8 13.8
0%
203.8
RPL08.INT.CTRC.3580 RPL08.Interior.Center-Corridor LO #11 - Install Remaining Vertical Tube Steel Support for Cable Tray (IFP Add) Remaining of LO Wall #11 (Spoke Parts) Not Started 04/22/27 04/23/27 2.5 2.5
0%
157.5
RPL08.INT.CTRC.3600 RPL08.Interior.Center-Corridor LO #11 & #13 - Install Mechanical Piping Lowside OH Interior Leave Out Wall #11, #13 (DHA/CC) Not Started 04/22/27 04/26/27 3.8 3.8
0%
115.0
RPL08.INT.CTRC.8340 RPL08.Interior.Center-Corridor LO #11 - Frame Out All Walls Remaining of LO Wall #11 (Spoke Parts) Not Started 04/22/27 04/26/27 3.8 3.8
0%
122.5
RPL08.INT.DHD.01170 RPL08.Interior.DHD - Control Fault Domain 1 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 04/22/27 05/19/27 25.0 25.0
0%
203.8
RPL08.INT.DHD.01180 RPL08.Interior.DHD - Control Fault Domain 1 - Pull EMPS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 04/22/27 05/19/27 25.0 25.0
0%
203.8
RPL08.INT.DHD.01190 RPL08.Interior.DHD - Control Fault Domain 1 - Set UPS and Panel (2) Remaining Tie-ins post Mech Side Aisle install Not Started 04/22/27 05/19/27 25.0 25.0
0%
191.2
RPL08.INT.ENDC.06980 RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Final Punch Walk Restrooms Not Started 04/22/27 04/23/27 2.5 2.5
0%
260.0
RPL08.WP3B.012100 RPL08.Conn EF2<>DHB.15 Pull Pigtails (384F) P2&3 (LV) EF2<>DHB.15 Not Started 04/22/27 04/23/27 2.5 2.5
0%
193.8
RPL08.WP3B.016880 RPL08.Conn EF1<>DHA.02 Test Pigtails (384F) P1&4 (LV) EF1<>DHA.02 Not Started 04/22/27 04/23/27 2.5 2.5
0%
225.0
RPL08.WP4.013100 RPL08.Conn DHA.01.04<>03 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Jumpers Not Started 04/22/27 04/27/27 5.0 5.0
0%
230.0
RPL08.WP4.013120 RPL08.Conn DHA.02.08<>07 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 04/22/27 04/27/27 5.0 5.0
0%
230.0
RPL08.WP4.013140 RPL08.Conn DHB.14.14 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 04/22/27 05/05/27 12.5 12.5
0%
187.5
RPL08.WP4.013760 RPL08.Conn DHB.15 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 04/22/27 04/22/27 1.2 1.2
0%
213.8
RPL08.WP4.013780 RPL08.Conn DHB.16 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 04/22/27 04/22/27 1.2 1.2
0%
213.8
RPL08.WP4.014120 RPL08.Conn DHB.15.17 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 04/22/27 05/05/27 12.5 12.5
0%
175.0
RPL08.WP4.014140 RPL08.Conn DHB.16.21 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 04/22/27 05/05/27 12.5 12.5
0%
175.0
RPL08.WP4.014400 RPL08.Conn DHB.15 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 04/22/27 04/22/27 1.2 1.2
0%
203.8
RPL08.WP4.014420 RPL08.Conn DHB.16 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 04/22/27 04/22/27 1.2 1.2
0%
203.8
RPL08.WP4.015020 RPL08.Conn DHB.13.10 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 04/22/27 05/05/27 12.5 12.5
0%
187.5
RPL08.CON.WP4.03200 RPL08.Conn WP4 FENW DHA CFD2 Infrastructure Infrastructure Not Started 04/23/27 05/20/27 25.0 25.0
0%
213.8
RPL08.CX.DHA.01380 RPL08.CX.DHA - L3/L4 - Control Fault Domain 03 - FW Flush and Fill Control Fault Domain 3 Not Started 04/23/27 05/03/27 8.8 8.8
0%
157.5
RPL08.EY.SSB.01280 RPL08.EY.SSB - Install Curb and Gutter Hardscape and Landscape Not Started 04/23/27 05/06/27 12.5 12.5
0%
168.8
RPL08.INT.CTRC.01450 RPL08.Interior.Center-Corridor (N) - Install DAS (Distribution Antenna System) Fit out (North) Not Started 04/23/27 04/29/27 6.2 6.2
0%
148.8
RPL08.INT.CTRC.1760 RPL08.Interior.Center-Corridor - BoW - Install Flooring Tiles/Resinous Flooring in specific rooms Balance of Walls & Overhead Not Started 04/23/27 05/03/27 8.8 8.8
0%
147.5
RPL08.INT.CTRC.2980 RPL08.Interior.Center-Corridor LO #10 & #12 - Fire Safing OH Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 04/23/27 04/26/27 2.5 2.5
0%
147.5
RPL08.INT.DHA.01340 RPL08.Conn DHA - CFD2 - Set Passive Racks for WP#3b (16) Infrastructure Not Started 04/23/27 04/27/27 3.8 3.8
0%
182.5
RPL08.INT.DHA.01640 RPL08.Interior.DHA - Control Fault Domain 4 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 04/23/27 05/20/27 25.0 25.0
0%
157.5
RPL08.INT.DHA.01670 RPL08.Interior.DHA - Control Fault Domain 4 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) Remaining Tie-ins post Mech Side Aisle install Not Started 04/23/27 05/20/27 25.0 25.0
0%
138.8
RPL08.INT.DHA.03900 RPL08.Conn DHA - CFD2 - Set Passive Racks for PON (16) Infrastructure Not Started 04/23/27 04/27/27 3.8 3.8
0%
203.8
RPL08.INT.DHC.02310 RPL08.Interior.DHC - OFE - Control Fault Domain 1 (Mech Side Aisle) Control Fault Domain 1 Not Started 04/23/27 05/11/27 16.2 16.2
0%
150.0
RPL08.INT.SBC.03680 RPL08.Interior.SSB-Corridor - BoW - Install Door (Verify with Trades before installation) Balance of Walls & Overhead Not Started 04/23/27 05/03/27 8.8 8.8
0%
147.5
RPL08.INT.SSB.14680 RPL08.Interior.SSB LO #01 to #05 - Final Clean Finishes Not Started 04/23/27 04/28/27 5.0 5.0
0%
172.5
RPL08.INT.SSBC.01520 RPL08.Interior.SSB-Corridor - Remaining Mechanical DHA OFE TIe Ins Fit out Not Started 04/23/27 04/29/27 6.2 6.2
0%
213.8
RPL08.INT.SSBC.01540 RPL08.Interior.SSB-Corridor - Remaining Electrical DHA OFE TIe Ins Fit out Not Started 04/23/27 04/29/27 6.2 6.2
0%
213.8
RPL08.WP3B.017840 RPL08.Conn EF2<>DHB.14 Test Pigtails (384F) P2&3 (LV) EF2<>DHB.14 Not Started 04/23/27 04/26/27 2.5 2.5
0%
211.2
RPL08.WP4.013520 RPL08.Conn DHB.13.12<>11 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 04/23/27 04/28/27 5.0 5.0
0%
216.2
RPL08.WP4.013540 RPL08.Conn DHB.14.16<>15 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Jumpers Not Started 04/23/27 04/28/27 5.0 5.0
0%
216.2
RPL08.WP4.014160 RPL08.Conn DHB.15 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 04/23/27 04/23/27 1.2 1.2
0%
213.8
RPL08.WP4.014180 RPL08.Conn DHB.16 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 04/23/27 04/23/27 1.2 1.2
0%
213.8
RPL08.WP4.014800 RPL08.Conn DHB.15.17<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 04/23/27 04/27/27 3.8 3.8
0%
203.8
RPL08.WP4.014820 RPL08.Conn DHB.16.21<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 04/23/27 04/27/27 3.8 3.8
0%
203.8
RPL08.WP4.014840 RPL08.Conn DHB.15 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 04/23/27 04/27/27 3.8 3.8
0%
222.5
RPL08.WP4.014860 RPL08.Conn DHB.16 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 04/23/27 04/27/27 3.8 3.8
0%
222.5
RPL08.CON.WP2.11020 RPL08.Conn - GSMDF1(South)<>DH B - CFD1 Rack #01 Pull, Install & Test PON Trunks MDF1 <> DH B - Rack#01 MES side Not Started 04/26/27 04/28/27 3.8 3.8
0%
200.0
RPL08.CON.WP2.12020 RPL08.Conn - GSMDF2(North)<>DH B - CFD1 Rack #50 Pull, Install & Patch PON Trunks MDF2 <> DH B - Rack#50 LV side Not Started 04/26/27 04/30/27 6.2 6.2
0%
187.5
RPL08.CON.WP2.13020 RPL08.Conn - GSMDF1(South)<>DH A - CFD1 Rack #50 Pull, Install & Patch PON Trunks MDF1 <> DH A - Rack#50 LV side Not Started 04/26/27 04/30/27 6.2 6.2
0%
200.0
RPL08.CON.WP2.14020 RPL08.Conn - GSMDF2(North)<>DH A - CFD1 Rack #01 Pull, Install & Test PON Trunks MDF2 <> DH A - Rack#01 MES side Not Started 04/26/27 04/28/27 3.8 3.8
0%
212.5
RPL08.CON.WP3B.01220 RPL08.Conn EF2<>DHB.16 - WBS Summary EF2<>DHB.16 Not Started 04/26/27 05/10/27 13.8 13.8
0%
198.8
RPL08.INT.CTRC.3720 RPL08.Interior.Center-Corridor LO #11 - Install Remaining Horizontal Steel Supports for Cable Tray (IFP Add) Remaining of LO Wall #11 (Spoke Parts) Not Started 04/26/27 04/28/27 3.8 3.8
0%
157.5
RPL08.INT.CTRC.7960 RPL08.Interior.Center-Corridor LO #10 - Backing Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) Not Started 04/26/27 04/27/27 2.5 2.5
0%
150.0
RPL08.INT.DHD.02370 RPL08.Interior.DHD - OFE - Control Fault Domain 2 (Mech Side Aisle) Control Fault Domain 2 Not Started 04/26/27 05/05/27 10.0 10.0
0%
156.2
RPL08.INT.ENDC.06880 RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Electrical L2 Checklist Completion Restrooms Not Started 04/26/27 05/07/27 12.5 12.5
0%
260.0
RPL08.INT.SSB.02620 RPL08.Interior.SSB - BoW - ACT - Install ACT Tiles Balance of Walls and OverHead Not Started 04/26/27 04/30/27 6.2 6.2
0%
186.2
RPL08.INT.SSBC.01300 RPL08.Interior.SSB-Corridor - Install DAS (Distribution Antenna System) Fit out Not Started 04/26/27 04/30/27 6.2 6.2
0%
147.5
RPL08.INT.SSBC.01310 RPL08.Interior.SSB-Corridor - Install Lighting Fit out Not Started 04/26/27 05/04/27 8.8 8.8
0%
147.5
RPL08.WP3B.012120 RPL08.Conn EF2<>DHB.16 Pull Pigtails (384F) P2&3 (LV) EF2<>DHB.16 Not Started 04/26/27 04/27/27 2.5 2.5
0%
193.8
RPL08.WP3B.013540 RPL08.Conn EF2<>DHB.15 Install (A-End) Pigtails (384F) P2&3 (LV) EF2<>DHB.15 Not Started 04/26/27 04/26/27 1.2 1.2
0%
203.8
RPL08.WP4.014360 RPL08.Conn DHB.15 Pull Trunk (384F) [RSW<>FSW] Trunks Not Started 04/26/27 04/26/27 1.2 1.2
0%
213.8
RPL08.WP4.014380 RPL08.Conn DHB.16 Pull Trunk (384F) [RSW<>FSW] Trunks Not Started 04/26/27 04/26/27 1.2 1.2
0%
213.8
RPL08.CON.WP2.08500 RPL08.Conn - Ext. GSIDF8X04 - Install & Test Network (FIM) Network Not Started 04/27/27 04/29/27 3.8 3.8
0%
385.0
RPL08.CON.WP2.08780 RPL08.Conn - GSIDF/DH B1 - Install & Test Network (FIM) Network Not Started 04/27/27 04/29/27 3.8 3.8
0%
385.0
RPL08.EY.DHA.01470 RPL08.EY.DHA - Remaining L2 Checklist Completion Tie-ins Not Started 04/27/27 05/03/27 6.2 6.2
0%
207.5
RPL08.INT.CTRC.01750 RPL08.Interior.Center-Corridor (S) - Fire Life Safe Trim Fit out (South) Not Started 04/27/27 04/30/27 5.0 5.0
0%
122.5
RPL08.INT.CTRC.01970 RPL08.Interior.Center-Corridor (S) - Set Equipment / Interior Fit out (South) Not Started 04/27/27 05/03/27 6.2 6.2
0%
133.8
RPL08.INT.CTRC.3240 RPL08.Interior.Center-Corridor LO #10 & #12 - Duct Drops / Trim out Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 04/27/27 04/28/27 2.5 2.5
0%
152.5
RPL08.INT.CTRC.3280 RPL08.Interior.Center-Corridor LO #10 & #12 - Install DAS (Distribution Antenna System) Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 04/27/27 04/27/27 1.2 1.2
0%
147.5
RPL08.INT.CTRC.3360 RPL08.Interior.Center-Corridor LO #10 & #12 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 04/27/27 04/29/27 3.8 3.8
0%
156.2
RPL08.INT.CTRC.3500 RPL08.Interior.Center-Corridor LO #10 & #12 - Fire Safing / Wall Finishes Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 04/27/27 04/28/27 2.5 2.5
0%
151.2
RPL08.INT.CTRC.3620 RPL08.Interior.Center-Corridor LO #11 & #13 - Install Fire Life Safety Lowside OH Interior Leave Out Wall #11, #13 (DHA/CC) Not Started 04/27/27 04/29/27 3.8 3.8
0%
120.0
RPL08.INT.CTRC.3640 RPL08.Interior.Center-Corridor LO #11 & #13 - Install Plumbing Lowside OH Interior Leave Out Wall #11, #13 (DHA/CC) Not Started 04/27/27 04/29/27 3.8 3.8
0%
115.0
RPL08.INT.CTRC.8360 RPL08.Interior.Center-Corridor LO #11 - Install Security Lowside OH & In Wall Remaining of LO Wall #11 (Spoke Parts) Not Started 04/27/27 04/29/27 3.8 3.8
0%
138.8
RPL08.INT.CTRC.8380 RPL08.Interior.Center-Corridor LO #11 - Install Controls / EPMS / BMS OH & In Wall Remaining of LO Wall #11 (Spoke Parts) Not Started 04/27/27 04/29/27 3.8 3.8
0%
138.8
RPL08.INT.CTRC.8400 RPL08.Interior.Center-Corridor LO #11 - Install Fire Life Safety Lowside OH & In Wall Remaining of LO Wall #11 (Spoke Parts) Not Started 04/27/27 04/29/27 3.8 3.8
0%
138.8
RPL08.INT.CTRC.8420 RPL08.Interior.Center-Corridor LO #11 - Install Plumbing Lowside OH & In Wall Remaining of LO Wall #11 (Spoke Parts) Not Started 04/27/27 04/29/27 3.8 3.8
0%
138.8
RPL08.INT.CTRC.8440 RPL08.Interior.Center-Corridor LO #11 - Install Mechanical Piping Lowside OH & In Wall Remaining of LO Wall #11 (Spoke Parts) Not Started 04/27/27 04/29/27 3.8 3.8
0%
138.8
RPL08.INT.CTRC.8460 RPL08.Interior.Center-Corridor LO #11 - Install Electrical Lowside OH & In Wall Remaining of LO Wall #11 (Spoke Parts) Not Started 04/27/27 05/04/27 7.5 7.5
0%
135.0
RPL08.INT.DHA.01680 RPL08.Interior.DHA - Control Fault Domain 5 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 04/27/27 05/24/27 25.0 25.0
0%
142.5
RPL08.INT.DHA.01690 RPL08.Interior.DHA - Control Fault Domain 5 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 04/27/27 05/24/27 25.0 25.0
0%
150.0
RPL08.INT.DHA.01700 RPL08.Interior.DHA - Control Fault Domain 5 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 04/27/27 05/24/27 25.0 25.0
0%
142.5
RPL08.INT.DHA.02260 RPL08.Interior.DHA - Control Fault Domain 5 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 04/27/27 05/24/27 25.0 25.0
0%
142.5
RPL08.WP3B.014980 RPL08.Conn EF2<>DHB.15 Splice (A-End) Pigtails (384F) P2&3 (LV) EF2<>DHB.15 Not Started 04/27/27 05/04/27 7.5 7.5
0%
203.8
RPL08.WP3B.016420 RPL08.Conn EF2<>DHB.15 Install (Z-End) Pigtails (384F) P2&3 (LV) EF2<>DHB.15 Not Started 04/27/27 04/27/27 1.2 1.2
0%
203.8
GCD.RPL08.4105 [RPL08] TC-C Ready : Production Cabling Start [DHA Rows 09-16] TC-C Ready: Production Cabling - DHA Not Started 04/28/27 04/28/27 0.0 0.0
0%
387.5
RPL.08.D.83330.XR Pull and Term MV Skids - RPL08 DHC Receive Milestones (XREFs) Not Started 04/28/27 04/28/27 0.0 0.0
0%
210.0
RPL.08.D.83830.XR 100MW Cx Temp Power to MV Skids RPL08 DHC Available Receive Milestones (XREFs) Not Started 04/28/27 04/28/27 0.0 0.0
0%
210.0
RPL08.CON.WP3B.02000 RPL08.Conn EF1<>DHA.03 - WBS Summary EF1<>DHA.03 Not Started 04/28/27 05/12/27 13.8 13.8
0%
208.8
RPL08.EY.DHA.01480 RPL08.EY.DHA - Install Landscaping Hardscape and Landscape Not Started 04/28/27 05/11/27 12.5 12.5
0%
375.0
RPL08.INT.CTRC.3340 RPL08.Interior.Center-Corridor LO #10 & #12 - Install Remaining Lights Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 04/28/27 05/03/27 5.0 5.0
0%
147.5
RPL08.INT.CTRC.8280 RPL08.Interior.Center-Corridor LO #10 - Install Door Frame Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) Not Started 04/28/27 04/29/27 2.5 2.5
0%
150.0
RPL08.INT.DHB.01990 RPL08.Interior.DHB - Control Fault Domain 5 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 04/28/27 05/25/27 25.0 25.0
0%
148.8
RPL08.INT.ENDC.1560 RPL08.Interior.End-Corridor - BoW - Hang Drywall Balance of Walls & Overhead Not Started 04/28/27 05/06/27 8.8 8.8
0%
210.0
RPL08.INT.SBC.03980 RPL08.Interior.SSB-Corridor - BoW - Install Flooring Tiles/Resinous Flooring in specific rooms Balance of Walls & Overhead Not Started 04/28/27 05/06/27 8.8 8.8
0%
143.8
RPL08.INT.SSB.01600 RPL08.Interior.SSB - Loading Dock and Storage - Mechanical L2 Checklist Completion Loading Dock and Storage Not Started 04/28/27 05/11/27 12.5 12.5
0%
206.2
RPL08.WP3B.011140 RPL08.Conn EF1<>DHA.03 Pull Pigtails (384F) P1&4 (LV) EF1<>DHA.03 Not Started 04/28/27 04/29/27 2.5 2.5
0%
202.5
RPL08.WP3B.013560 RPL08.Conn EF2<>DHB.16 Install (A-End) Pigtails (384F) P2&3 (LV) EF2<>DHB.16 Not Started 04/28/27 04/28/27 1.2 1.2
0%
198.8
RPL08.WP4.013160 RPL08.Conn DHA.03 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 04/28/27 04/28/27 1.2 1.2
0%
220.0