| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL08.WP4.013180 |
RPL08.Conn DHA.04 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 04/28/27 | 04/28/27 | 1.2 | 1.2 |
|
220.0 |
RPL08.WP4.013280 |
RPL08.Conn DHA.03.09 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 04/28/27 | 05/11/27 | 12.5 | 12.5 |
|
182.5 |
RPL08.WP4.013300 |
RPL08.Conn DHA.04.13 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 04/28/27 | 05/11/27 | 12.5 | 12.5 |
|
182.5 |
RPL08.WP4.013560 |
RPL08.Conn DHA.03 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 04/28/27 | 04/28/27 | 1.2 | 1.2 |
|
211.2 |
RPL08.WP4.013580 |
RPL08.Conn DHA.04 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 04/28/27 | 04/28/27 | 1.2 | 1.2 |
|
211.2 |
RPL08.WP4.015200 |
RPL08.Conn DHB.15.19<>19 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 04/28/27 | 04/30/27 | 3.8 | 3.8 |
|
203.8 |
RPL08.WP4.015220 |
RPL08.Conn DHB.16.23<>23 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 04/28/27 | 04/30/27 | 3.8 | 3.8 |
|
203.8 |
GCD.RPL08.4925 |
L3/L4 Finish EY - DHD | EY | Not Started | 04/29/27 | 04/29/27 | 0.0 | 0.0 |
|
313.8 |
GCD.RPL08.5605 |
[RPL08] FacNet Live RPL08 - All Exterior IDF huts | TC-C Ready: FacNet Live | Not Started | 04/29/27 | 04/29/27 | 0.0 | 0.0 |
|
385.0 |
GCD.RPL08.5745 |
[RPL08] TC-C Ready : All General Services [RPL08-Exterior IDFs] | TC-C Ready: General Services | Not Started | 04/29/27 | 04/29/27 | 0.0 | 0.0 |
|
385.0 |
RPL08.CON.WP2.07940 |
RPL08.Conn - GSMDF2 (North) Test Network (FIM) | Network | Not Started | 04/29/27 | 05/03/27 | 3.8 | 3.8 |
|
320.0 |
RPL08.CON.WP2.08020 |
RPL08.Conn - GSMDF1 (South) Test Network (FIM) | Network | Not Started | 04/29/27 | 05/03/27 | 3.8 | 3.8 |
|
320.0 |
RPL08.CON.WP2.11040 |
RPL08.Conn - GSMDF1(South)<>DH B - CFD2 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH B - Rack#01 MES side | Not Started | 04/29/27 | 05/03/27 | 3.8 | 3.8 |
|
200.0 |
RPL08.CON.WP2.14040 |
RPL08.Conn - GSMDF2(North)<>DH A - CFD2 Rack #01 Pull, Install & Test PON Trunks | MDF2 <> DH A - Rack#01 MES side | Not Started | 04/29/27 | 05/03/27 | 3.8 | 3.8 |
|
212.5 |
RPL08.CX.DHB.01580 |
RPL08.CX.DHB - L3/L4 - Control Fault Domain 04 - TW Flush and Fill | Control Fault Domain 4 | Not Started | 04/29/27 | 05/10/27 | 10.0 | 10.0 |
|
168.8 |
RPL08.INT.CTRC.07180 |
RPL08.Interior.Center-Corridor (S) - Install Cable Tray - South (Remaining at LO) | Fit out (South) | Not Started | 04/29/27 | 05/05/27 | 6.2 | 6.2 |
|
168.8 |
RPL08.INT.CTRC.3200 |
RPL08.Interior.Center-Corridor LO #10 & #12 - Electrical Trim Out | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 04/29/27 | 04/29/27 | 1.2 | 1.2 |
|
151.2 |
RPL08.INT.CTRC.3220 |
RPL08.Interior.Center-Corridor LO #10 & #12 - Security Trim Out | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 04/29/27 | 04/29/27 | 1.2 | 1.2 |
|
151.2 |
RPL08.INT.DHD.01220 |
RPL08.Interior.DHD - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 04/29/27 | 05/26/27 | 25.0 | 25.0 |
|
191.2 |
RPL08.INT.SSB.14700 |
RPL08.Interior.SSB LO #01 to #05 - Final Punch Walk | Finishes | Not Started | 04/29/27 | 04/30/27 | 2.5 | 2.5 |
|
172.5 |
RPL08.WP3B.015000 |
RPL08.Conn EF2<>DHB.16 Splice (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.16 | Not Started | 04/29/27 | 05/06/27 | 7.5 | 7.5 |
|
198.8 |
RPL08.WP3B.016440 |
RPL08.Conn EF2<>DHB.16 Install (Z-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.16 | Not Started | 04/29/27 | 04/29/27 | 1.2 | 1.2 |
|
198.8 |
RPL08.WP4.013320 |
RPL08.Conn DHA.03 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 04/29/27 | 04/29/27 | 1.2 | 1.2 |
|
220.0 |
RPL08.WP4.013340 |
RPL08.Conn DHA.04 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 04/29/27 | 04/29/27 | 1.2 | 1.2 |
|
220.0 |
RPL08.WP4.013920 |
RPL08.Conn DHA.03.09<>09 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 04/29/27 | 05/03/27 | 3.8 | 3.8 |
|
211.2 |
RPL08.WP4.013940 |
RPL08.Conn DHA.04.13<>13 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 04/29/27 | 05/03/27 | 3.8 | 3.8 |
|
211.2 |
RPL08.WP4.013960 |
RPL08.Conn DHA.03 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 04/29/27 | 05/03/27 | 3.8 | 3.8 |
|
230.0 |
RPL08.WP4.013980 |
RPL08.Conn DHA.04 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 04/29/27 | 05/03/27 | 3.8 | 3.8 |
|
230.0 |
RPL08.WP4.014960 |
RPL08.Conn DHB.11.04 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 04/29/27 | 05/12/27 | 12.5 | 12.5 |
|
206.2 |
RPL08.WP4.014980 |
RPL08.Conn DHB.12.08 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 04/29/27 | 05/12/27 | 12.5 | 12.5 |
|
206.2 |
GCD.RPL08.4945 |
L3 Finish - DHD | DH | Not Started | 04/30/27 | 04/30/27 | 0.0 | 0.0 |
|
313.8 |
GCD.RPL08.5325 |
L3/L4 Start EY - DHC | EY | Not Started | 04/30/27 | 04/30/27 | 0.0 | 0.0 |
|
323.8 |
ICM.B8.2510.D |
[SSDCB3] L3/4 Start - DHD | Commissioning | Not Started | 04/30/27 | 04/30/27 | 0.0 | 0.0 |
|
313.8 |
RPL08.CON.WP2.08820 |
RPL08.Conn - GSIDF/DH A1 - WBS Summary | Int. IDF Stick Built - GSIDF8A1 | Not Started | 04/30/27 | 05/24/27 | 21.2 | 21.2 |
|
363.8 |
RPL08.CON.WP2.08840 |
RPL08.Conn - GSIDF/DH A1 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 04/30/27 | 05/06/27 | 6.2 | 6.2 |
|
207.5 |
RPL08.CON.WP3B.01980 |
RPL08.Conn EF1<>DHA.04 - WBS Summary | EF1<>DHA.04 | Not Started | 04/30/27 | 05/13/27 | 12.5 | 12.5 |
|
207.5 |
RPL08.CX.DHC.01000 |
RPL08.CX.DHC - L3, L4, IST - WBS Summary | DHC | Not Started | 04/30/27 | 07/11/28 | 372.5 | 372.5 |
|
0.0 |
RPL08.CX.DHC.01010 |
RPL08.CX.DHC - L3 - WBS Summary (Electrical) | DHC ELECTRICAL | Not Started | 04/30/27 | 09/14/27 | 118.8 | 118.8 |
|
205.0 |
RPL08.CX.DHC.01020 |
RPL08.CX.DHC - L3/L4 - MV Skids (8) Loop | DHC ELECTRICAL | Not Started | 04/30/27 | 05/11/27 | 10.0 | 10.0 |
|
207.5 |
RPL08.CX.DHD.01020 |
RPL08.CX.DHD - L3/L4 - House Power (for electrical) | DHD HOUSE POWER | Not Started | 04/30/27 | 05/13/27 | 12.5 | 12.5 |
|
208.8 |
RPL08.INT.CTRC.01460 |
RPL08.Interior.Center-Corridor (N) - Install Lighting | Fit out (North) | Not Started | 04/30/27 | 05/10/27 | 8.8 | 8.8 |
|
148.8 |
RPL08.INT.CTRC.06920 |
RPL08.Interior.Center-Corridor - Final Finishes & Fixtures - Fixture Install (Lights) | Restrooms | Not Started | 04/30/27 | 05/10/27 | 8.8 | 8.8 |
|
141.2 |
RPL08.INT.CTRC.06940 |
RPL08.Interior.Center-Corridor - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (P | Restrooms | Not Started | 04/30/27 | 05/06/27 | 6.2 | 6.2 |
|
117.5 |
RPL08.INT.CTRC.3660 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Install Security Lowside OH | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 04/30/27 | 05/04/27 | 3.8 | 3.8 |
|
120.0 |
RPL08.INT.CTRC.3680 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Install Controls / EPMS / BMS OH | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 04/30/27 | 05/04/27 | 3.8 | 3.8 |
|
115.0 |
RPL08.INT.CTRC.7980 |
RPL08.Interior.Center-Corridor LO #10 - QC | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 04/30/27 | 04/30/27 | 1.2 | 1.2 |
|
152.5 |
RPL08.INT.CTRC.8240 |
RPL08.Interior.Center-Corridor LO #10 - Fire Safing/ Wall Finishes | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 04/30/27 | 05/03/27 | 2.5 | 2.5 |
|
150.0 |
RPL08.INT.DHA.01760 |
RPL08.Interior.DHA - Control Fault Domain 4 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 04/30/27 | 05/27/27 | 25.0 | 25.0 |
|
138.8 |
RPL08.INT.SSBC.01550 |
RPL08.Interior.SSB-Corridor - Remaining DHA L2 Checklist Completion | Fit out | Not Started | 04/30/27 | 05/06/27 | 6.2 | 6.2 |
|
213.8 |
RPL08.WP3B.011160 |
RPL08.Conn EF1<>DHA.04 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHA.04 | Not Started | 04/30/27 | 04/30/27 | 1.2 | 1.2 |
|
202.5 |
RPL08.WP3B.012580 |
RPL08.Conn EF1<>DHA.03 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.03 | Not Started | 04/30/27 | 04/30/27 | 1.2 | 1.2 |
|
208.8 |
RPL08.WP4.013640 |
RPL08.Conn DHA.03 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 04/30/27 | 05/03/27 | 2.5 | 2.5 |
|
220.0 |
RPL08.WP4.013660 |
RPL08.Conn DHA.04 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 04/30/27 | 05/03/27 | 2.5 | 2.5 |
|
220.0 |
GCD.RPL08.3727 |
[RPL08] TC-C Ready : All General Services [RPL08-MDFs] | TC-C Ready: General Services | Not Started | 05/03/27 | 05/03/27 | 0.0 | 0.0 |
|
351.2 |
RPL08.CON.WP2.12040 |
RPL08.Conn - GSMDF2(North)<>DH B - CFD2 Rack #50 Pull, Install & Patch PON Trunks | MDF2 <> DH B - Rack#50 LV side | Not Started | 05/03/27 | 05/07/27 | 6.2 | 6.2 |
|
187.5 |
RPL08.CON.WP2.13040 |
RPL08.Conn - GSMDF1(South)<>DH A - CFD2 Rack #50 Pull, Install & Patch PON Trunks | MDF1 <> DH A - Rack#50 LV side | Not Started | 05/03/27 | 05/07/27 | 6.2 | 6.2 |
|
200.0 |
RPL08.CON.WP4.01600 |
RPL08.Conn WP4 FENW DHB CFD4 Infrastructure | Infrastructure | Not Started | 05/03/27 | 05/28/27 | 25.0 | 25.0 |
|
193.8 |
RPL08.INT.CTRC.01770 |
RPL08.Interior.Center-Corridor (S) - Electrical Trim | Fit out (South) | Not Started | 05/03/27 | 05/06/27 | 5.0 | 5.0 |
|
122.5 |
RPL08.INT.CTRC.3300 |
RPL08.Interior.Center-Corridor LO #10 & #12 - Plumbing Trim Out | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
151.2 |
RPL08.INT.CTRC.3320 |
RPL08.Interior.Center-Corridor LO #10 & #12 - Fire Life Safety Trim Out | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
151.2 |
RPL08.INT.CTRC.8000 |
RPL08.Interior.Center-Corridor LO #10 - Hang Drywall | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/03/27 | 05/06/27 | 5.0 | 5.0 |
|
152.5 |
RPL08.INT.DHB.01700 |
RPL08.Conn DHB - CFD4 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 05/03/27 | 05/05/27 | 3.8 | 3.8 |
|
162.5 |
RPL08.INT.DHB.02860 |
RPL08.Conn DHB - CFD4 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 05/03/27 | 05/05/27 | 3.8 | 3.8 |
|
191.2 |
RPL08.INT.ENDC.06900 |
RPL08.Interior.End-Corridor - Final Finishes & Fixtures - Mechanical L2 Checklist Completion | Restrooms | Not Started | 05/03/27 | 05/14/27 | 12.5 | 12.5 |
|
260.0 |
RPL08.INT.SSB.03160 |
RPL08.Interior.SSB - BoW - Final Paint | Balance of Walls and OverHead | Not Started | 05/03/27 | 05/07/27 | 6.2 | 6.2 |
|
186.2 |
RPL08.WP3B.012600 |
RPL08.Conn EF1<>DHA.04 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.04 | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
207.5 |
RPL08.WP3B.014020 |
RPL08.Conn EF1<>DHA.03 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.03 | Not Started | 05/03/27 | 05/10/27 | 7.5 | 7.5 |
|
208.8 |
RPL08.WP3B.015460 |
RPL08.Conn EF1<>DHA.03 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.03 | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
208.8 |
RPL08.WP4.010680 |
RPL08.Conn DHB.11.01<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
215.0 |
RPL08.WP4.010700 |
RPL08.Conn DHB.12.05<>05 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
215.0 |
RPL08.WP4.011120 |
RPL08.Conn DHB.12.06<>05 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
212.5 |
RPL08.WP4.011780 |
RPL08.Conn DHB.12.07<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
216.2 |
RPL08.WP4.011800 |
RPL08.Conn DHB.11.02<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
212.5 |
RPL08.WP4.012140 |
RPL08.Conn DHA.01.01<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
227.5 |
RPL08.WP4.012160 |
RPL08.Conn DHA.02.05<>05 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
227.5 |
RPL08.WP4.012340 |
RPL08.Conn DHB.11.04<>03 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
213.8 |
RPL08.WP4.012360 |
RPL08.Conn DHB.12.08<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
213.8 |
RPL08.WP4.012380 |
RPL08.Conn DHA.01.03<>03 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
228.8 |
RPL08.WP4.012400 |
RPL08.Conn DHA.02.07<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
228.8 |
RPL08.WP4.013040 |
RPL08.Conn DHA.01.02<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
225.0 |
RPL08.WP4.013060 |
RPL08.Conn DHA.02.06<>05 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
225.0 |
RPL08.WP4.013600 |
RPL08.Conn DHA.01.04<>03 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
226.2 |
RPL08.WP4.013620 |
RPL08.Conn DHA.02.08<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/03/27 | 05/03/27 | 1.2 | 1.2 |
|
226.2 |
RPL08.WP4.015640 |
RPL08.Conn DHB.15.18<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/03/27 | 05/06/27 | 5.0 | 5.0 |
|
203.8 |
RPL08.WP4.015660 |
RPL08.Conn DHB.16.22<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/03/27 | 05/06/27 | 5.0 | 5.0 |
|
203.8 |
RPL08.CON.WP2.08700 |
RPL08.Conn - CorpNet & FacNet Available (DH B) - All IDFs | WP#02 GS | Not Started | 05/04/27 | 05/04/27 | 0.0 | 0.0 |
|
381.2 |
RPL08.CON.WP2.11060 |
RPL08.Conn - GSMDF1(South)<>DH B - CFD3 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH B - Rack#01 MES side | Not Started | 05/04/27 | 05/06/27 | 3.8 | 3.8 |
|
200.0 |
RPL08.CX.DHA.01070 |
RPL08.CX.DHA - L3/L4 - House Power (for mechainical) | DHA HOUSE POWER | Not Started | 05/04/27 | 05/17/27 | 12.5 | 12.5 |
|
83.8 |
RPL08.CX.DHA.01400 |
RPL08.CX.DHA - L3/L4 - Control Fault Domain 03 - TW Flush and Fill | Control Fault Domain 3 | Not Started | 05/04/27 | 05/13/27 | 10.0 | 10.0 |
|
157.5 |
RPL08.Conn.MS.01000 |
RPL08.Conn Wifi Ready - DH B (Pred from RPL10 CorpNet needed?) | Connectivity Milestones | Not Started | 05/04/27 | 05/04/27 | 0.0 | 0.0 |
|
212.5 |
RPL08.INT.CTRC.01990 |
RPL08.Interior.Center-Corridor (S) - Install Battery | Fit out (South) | Not Started | 05/04/27 | 05/17/27 | 12.5 | 12.5 |
|
133.8 |
RPL08.INT.CTRC.3380 |
RPL08.Interior.Center-Corridor LO #10 & #12 - Install Asset Tags | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 05/04/27 | 05/06/27 | 3.8 | 3.8 |
|
147.5 |
RPL08.INT.CTRC.8200 |
RPL08.Interior.Center-Corridor LO #10 - Install DAS (Distribution Antenna System) | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/04/27 | 05/04/27 | 1.2 | 1.2 |
|
157.5 |
RPL08.INT.CTRC.8220 |
RPL08.Interior.Center-Corridor LO #10 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/04/27 | 05/06/27 | 3.8 | 3.8 |
|
150.0 |
RPL08.INT.DHA.01720 |
RPL08.Interior.DHA - Control Fault Domain 5 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/04/27 | 06/01/27 | 25.0 | 25.0 |
|
150.0 |
RPL08.INT.DHA.01730 |
RPL08.Interior.DHA - Control Fault Domain 5 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/04/27 | 06/01/27 | 25.0 | 25.0 |
|
150.0 |
RPL08.INT.DHA.01740 |
RPL08.Interior.DHA - Control Fault Domain 5 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/04/27 | 06/01/27 | 25.0 | 25.0 |
|
142.5 |
RPL08.PR.FE.0020 |
RPL08.PR.MDF R/S/P and Provisioning at GS.MDF 1&2 | MDFs & IDFs | Not Started | 05/04/27 | 06/08/27 | 31.2 | 31.2 |
|
320.0 |
RPL08.WP3B.014040 |
RPL08.Conn EF1<>DHA.04 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.04 | Not Started | 05/04/27 | 05/11/27 | 7.5 | 7.5 |
|
207.5 |
RPL08.WP3B.015480 |
RPL08.Conn EF1<>DHA.04 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.04 | Not Started | 05/04/27 | 05/04/27 | 1.2 | 1.2 |
|
207.5 |