Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:14 PM
· 5122 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL08.WP3B.016900 |
RPL08.Conn EF1<>DHA.03 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.03 | Not Started | 05/11/27 | 05/12/27 | 2.5 | 2.5 |
|
208.8 |
GCD.RPL08.4125 |
[RPL08] TC-C Ready : Production Cabling Start [DHA Rows 17-24] | TC-C Ready: Production Cabling - DHA | Not Started | 05/12/27 | 05/12/27 | 0.0 | 0.0 |
|
375.0 |
GCD.RPL08.5305 |
L3 Finish - DHC | DH | Not Started | 05/12/27 | 05/12/27 | 0.0 | 0.0 |
|
313.8 |
ICM.B8.2510.C |
[SSDCB3] L3/4 Start - DHC | Commissioning | Not Started | 05/12/27 | 05/12/27 | 0.0 | 0.0 |
|
313.8 |
RPL08.CON.WP2.13060 |
RPL08.Conn - GSMDF1(South)<>DH A - CFD3 Rack #50 Pull, Install & Patch PON Trunks | MDF1 <> DH A - Rack#50 LV side | Not Started | 05/12/27 | 05/18/27 | 6.2 | 6.2 |
|
197.5 |
RPL08.CON.WP2.14060 |
RPL08.Conn - GSMDF2(North)<>DH A - CFD3 Rack #01 Pull, Install & Test PON Trunks | MDF2 <> DH A - Rack#01 MES side | Not Started | 05/12/27 | 05/14/27 | 3.8 | 3.8 |
|
205.0 |
RPL08.CON.WP3B.02080 |
RPL08.Conn EF1<>DHA.05 - WBS Summary | EF1<>DHA.05 | Not Started | 05/12/27 | 05/25/27 | 12.5 | 12.5 |
|
197.5 |
RPL08.CX.DHC.01030 |
RPL08.CX.DHC - L3/L4 - House Power (for electrical) | DHC HOUSE POWER | Not Started | 05/12/27 | 05/25/27 | 12.5 | 12.5 |
|
207.5 |
RPL08.INT.DHC.01170 |
RPL08.Interior.DHC - Control Fault Domain 1 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/12/27 | 06/09/27 | 25.0 | 25.0 |
|
195.0 |
RPL08.INT.DHC.01180 |
RPL08.Interior.DHC - Control Fault Domain 1 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/12/27 | 06/09/27 | 25.0 | 25.0 |
|
195.0 |
RPL08.INT.DHC.01190 |
RPL08.Interior.DHC - Control Fault Domain 1 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/12/27 | 06/09/27 | 25.0 | 25.0 |
|
182.5 |
RPL08.INT.ENDC.1600 |
RPL08.Interior.End-Corridor - BoW - Electrical Trim Out | Balance of Walls & Overhead | Not Started | 05/12/27 | 05/20/27 | 8.8 | 8.8 |
|
210.0 |
RPL08.INT.ENDC.1620 |
RPL08.Interior.End-Corridor - BoW - Security Trim Out | Balance of Walls & Overhead | Not Started | 05/12/27 | 05/20/27 | 8.8 | 8.8 |
|
210.0 |
RPL08.INT.ENDC.1640 |
RPL08.Interior.End-Corridor - BoW - Duct Drops / Trim out | Balance of Walls & Overhead | Not Started | 05/12/27 | 05/18/27 | 6.2 | 6.2 |
|
210.0 |
RPL08.INT.ENDC.1680 |
RPL08.Interior.End-Corridor - BoW - Install DAS (Distribution Antenna System) | Balance of Walls & Overhead | Not Started | 05/12/27 | 05/18/27 | 6.2 | 6.2 |
|
215.0 |
RPL08.INT.ENDC.1980 |
RPL08.Interior.End-Corridor - BoW - Install Balance of Refrigerant Line | Balance of Walls & Overhead | Not Started | 05/12/27 | 05/18/27 | 6.2 | 6.2 |
|
237.5 |
RPL08.INT.SSB.01630 |
RPL08.Interior.SSB - Loading Dock and Storage - Final Clean | Loading Dock and Storage | Not Started | 05/12/27 | 05/17/27 | 5.0 | 5.0 |
|
206.2 |
RPL08.WP3B.011180 |
RPL08.Conn EF1<>DHA.05 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHA.05 | Not Started | 05/12/27 | 05/12/27 | 1.2 | 1.2 |
|
193.8 |
RPL08.WP3B.016920 |
RPL08.Conn EF1<>DHA.04 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.04 | Not Started | 05/12/27 | 05/13/27 | 2.5 | 2.5 |
|
207.5 |
RPL08.WP4.015360 |
RPL08.Conn DHA.03.10 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/12/27 | 05/25/27 | 12.5 | 12.5 |
|
182.5 |
RPL08.WP4.015380 |
RPL08.Conn DHA.04.14 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/12/27 | 05/25/27 | 12.5 | 12.5 |
|
182.5 |
RPL08.WP4.015400 |
RPL08.Conn DHA.05 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 05/12/27 | 05/12/27 | 1.2 | 1.2 |
|
207.5 |
RPL08.WP4.015420 |
RPL08.Conn DHA.06 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 05/12/27 | 05/12/27 | 1.2 | 1.2 |
|
207.5 |
RPL08.WP4.015800 |
RPL08.Conn DHA.05.17 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/12/27 | 05/25/27 | 12.5 | 12.5 |
|
170.0 |
RPL08.WP4.015820 |
RPL08.Conn DHA.06.21 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/12/27 | 05/25/27 | 12.5 | 12.5 |
|
170.0 |
RPL08.WP4.016160 |
RPL08.Conn DHA.05 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/12/27 | 05/12/27 | 1.2 | 1.2 |
|
198.8 |
RPL08.WP4.016180 |
RPL08.Conn DHA.06 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/12/27 | 05/12/27 | 1.2 | 1.2 |
|
198.8 |
RPL08.WP4.018140 |
RPL08.Conn DHB.17.27<>27 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/12/27 | 05/14/27 | 3.8 | 3.8 |
|
191.2 |
GCD.RPL08.2071 |
L3/L4 Finish mCUP [1-4] - RPL08 | mCup | Not Started | 05/13/27 | 05/13/27 | 0.0 | 0.0 |
|
225.0 |
RPL08.CON.WP3B.02060 |
RPL08.Conn EF1<>DHA.06 - WBS Summary | EF1<>DHA.06 | Not Started | 05/13/27 | 05/26/27 | 12.5 | 12.5 |
|
196.2 |
RPL08.CX.DHD.01080 |
RPL08.CX.DHD - L4 - WBS Summary (Mechanical) | DHD MECHANICAL | Not Started | 05/13/27 | 02/25/28 | 245.0 | 245.0 |
|
57.5 |
RPL08.CX.DHD.01260 |
RPL08.CX.DHD - L3/L4 - Control Fault Domain 01 - FW Flush and Fill | Control Fault Domain 1 | Not Started | 05/13/27 | 05/21/27 | 8.8 | 8.8 |
|
223.8 |
RPL08.INT.CTRC.01930 |
RPL08.Interior.Center-Corridor (S) - Install DAS (Distribution Antenna System) | Fit out (South) | Not Started | 05/13/27 | 05/19/27 | 6.2 | 6.2 |
|
122.5 |
RPL08.INT.CTRC.3740 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Fire Safing OH and | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/13/27 | 05/14/27 | 2.5 | 2.5 |
|
115.0 |
RPL08.INT.CTRC.8140 |
RPL08.Interior.Center-Corridor LO #10 - Install Door (Verify with Trades before installation) | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/13/27 | 05/14/27 | 2.5 | 2.5 |
|
157.5 |
RPL08.INT.DHD.01260 |
RPL08.Interior.DHD - Control Fault Domain 1 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/13/27 | 06/10/27 | 25.0 | 25.0 |
|
191.2 |
RPL08.INT.DHD.01310 |
RPL08.Interior.DHD - Control Fault Domain 2 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/13/27 | 06/10/27 | 25.0 | 25.0 |
|
205.0 |
RPL08.INT.DHD.01320 |
RPL08.Interior.DHD - Control Fault Domain 2 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/13/27 | 06/10/27 | 25.0 | 25.0 |
|
205.0 |
RPL08.INT.DHD.01330 |
RPL08.Interior.DHD - Control Fault Domain 2 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/13/27 | 06/10/27 | 25.0 | 25.0 |
|
192.5 |
RPL08.WP3B.011200 |
RPL08.Conn EF1<>DHA.06 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHA.06 | Not Started | 05/13/27 | 05/13/27 | 1.2 | 1.2 |
|
193.8 |
RPL08.WP3B.012620 |
RPL08.Conn EF1<>DHA.05 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.05 | Not Started | 05/13/27 | 05/13/27 | 1.2 | 1.2 |
|
197.5 |
RPL08.WP4.015840 |
RPL08.Conn DHA.05 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 05/13/27 | 05/13/27 | 1.2 | 1.2 |
|
207.5 |
RPL08.WP4.015860 |
RPL08.Conn DHA.06 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 05/13/27 | 05/13/27 | 1.2 | 1.2 |
|
207.5 |
RPL08.WP4.015920 |
RPL08.Conn DHA.03.10<>09 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/13/27 | 05/13/27 | 1.2 | 1.2 |
|
215.0 |
RPL08.WP4.015940 |
RPL08.Conn DHA.04.14<>13 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/13/27 | 05/13/27 | 1.2 | 1.2 |
|
215.0 |
RPL08.WP4.016080 |
RPL08.Conn DHA.03.12<>11 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/13/27 | 05/18/27 | 5.0 | 5.0 |
|
211.2 |
RPL08.WP4.016100 |
RPL08.Conn DHA.04.16<>15 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/13/27 | 05/18/27 | 5.0 | 5.0 |
|
211.2 |
RPL08.WP4.016400 |
RPL08.Conn DHA.05.17<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/13/27 | 05/17/27 | 3.8 | 3.8 |
|
198.8 |
RPL08.WP4.016420 |
RPL08.Conn DHA.06.21<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/13/27 | 05/17/27 | 3.8 | 3.8 |
|
198.8 |
RPL08.WP4.016440 |
RPL08.Conn DHA.05 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/13/27 | 05/17/27 | 3.8 | 3.8 |
|
217.5 |
RPL08.WP4.016460 |
RPL08.Conn DHA.06 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/13/27 | 05/17/27 | 3.8 | 3.8 |
|
217.5 |
RPL08.WP4.018260 |
RPL08.Conn DHB.18.32<>31 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/13/27 | 05/18/27 | 5.0 | 5.0 |
|
193.8 |
GCD.RPL08.3945 |
L3/L4 Start mCUP [5-6] - RPL08 | mCup | Not Started | 05/14/27 | 05/14/27 | 0.0 | 0.0 |
|
333.8 |
RPL08.CX.DHB.01520 |
RPL08.CX.DHB - L3/L4 - Control Fault Domain 05 - TW Flush and Fill | Control Fault Domain 5 | Not Started | 05/14/27 | 05/25/27 | 10.0 | 10.0 |
|
175.0 |
RPL08.CX.DHD.01050 |
RPL08.CX.DHD - L3/L4 - House Power (for mechainical) | DHD HOUSE POWER | Not Started | 05/14/27 | 05/27/27 | 12.5 | 12.5 |
|
208.8 |
RPL08.CX.MCUP.01080 |
RPL08.CX.mCup Loop 2 - L3/L4 - mCUP | mCUP 5-6 | Not Started | 05/14/27 | 06/22/27 | 33.8 | 33.8 |
|
287.5 |
RPL08.CX.MCUP.01090 |
RPL08.CX.mCup Loop 1 - L3/L4 - mCUP - IST System Testing | mCUP 1-4 | Not Started | 05/14/27 | 05/27/27 | 12.5 | 12.5 |
|
212.5 |
RPL08.INT.CTRC.1820 |
RPL08.Interior.Center-Corridor - BoW - Electrical L2 Checklist Completion | Balance of Walls & Overhead | Not Started | 05/14/27 | 05/27/27 | 12.5 | 12.5 |
|
137.5 |
RPL08.INT.CTRC.8040 |
RPL08.Interior.Center-Corridor LO #10 - Electrical Trim Out | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/14/27 | 05/18/27 | 3.8 | 3.8 |
|
152.5 |
RPL08.INT.CTRC.8060 |
RPL08.Interior.Center-Corridor LO #10 - Security Trim Out | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/14/27 | 05/18/27 | 3.8 | 3.8 |
|
152.5 |
RPL08.INT.CTRC.8160 |
RPL08.Interior.Center-Corridor LO #10 - Install Remaining Refrigerant Line | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/14/27 | 05/18/27 | 3.8 | 3.8 |
|
156.2 |
RPL08.INT.CTRC.8520 |
RPL08.Interior.Center-Corridor LO #11 - Backing | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 05/14/27 | 05/17/27 | 2.5 | 2.5 |
|
135.0 |
RPL08.INT.DHC.02370 |
RPL08.Interior.DHC - OFE - Control Fault Domain 2 (Mech Side Aisle) | Control Fault Domain 2 | Not Started | 05/14/27 | 05/25/27 | 10.0 | 10.0 |
|
147.5 |
RPL08.INT.ENDC.1700 |
RPL08.Interior.End-Corridor - BoW - Plumbing Trim Out | Balance of Walls & Overhead | Not Started | 05/14/27 | 05/20/27 | 6.2 | 6.2 |
|
210.0 |
RPL08.INT.ENDC.1720 |
RPL08.Interior.End-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls & Overhead | Not Started | 05/14/27 | 05/24/27 | 8.8 | 8.8 |
|
210.0 |
RPL08.INT.SBC.04020 |
RPL08.Interior.SSB-Corridor - BoW - Mechanical L2 Checklist Completion | Balance of Walls & Overhead | Not Started | 05/14/27 | 05/27/27 | 12.5 | 12.5 |
|
143.8 |
RPL08.WP3B.012640 |
RPL08.Conn EF1<>DHA.06 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.06 | Not Started | 05/14/27 | 05/14/27 | 1.2 | 1.2 |
|
196.2 |
RPL08.WP3B.014060 |
RPL08.Conn EF1<>DHA.05 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.05 | Not Started | 05/14/27 | 05/21/27 | 7.5 | 7.5 |
|
197.5 |
RPL08.WP3B.015500 |
RPL08.Conn EF1<>DHA.05 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.05 | Not Started | 05/14/27 | 05/14/27 | 1.2 | 1.2 |
|
197.5 |
RPL08.WP4.016200 |
RPL08.Conn DHA.05 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 05/14/27 | 05/17/27 | 2.5 | 2.5 |
|
207.5 |
RPL08.WP4.016220 |
RPL08.Conn DHA.06 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 05/14/27 | 05/17/27 | 2.5 | 2.5 |
|
207.5 |
RPL08.CON.WP2.08880 |
RPL08.Conn - GSIDF/DH A1 - Install & Test Network (FIM) | Network | Not Started | 05/17/27 | 05/19/27 | 3.8 | 3.8 |
|
367.5 |
RPL08.CON.WP2.12080 |
RPL08.Conn - GSMDF2(North)<>DH B - CFD4 Rack #50 Pull, Install & Patch PON Trunks | MDF2 <> DH B - Rack#50 LV side | Not Started | 05/17/27 | 05/21/27 | 6.2 | 6.2 |
|
187.5 |
RPL08.INT.CTRC.3980 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Duct Drops / Trim out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/17/27 | 05/18/27 | 2.5 | 2.5 |
|
116.2 |
RPL08.INT.CTRC.4020 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Install DAS (Distribution Antenna System) | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/17/27 | 05/17/27 | 1.2 | 1.2 |
|
115.0 |
RPL08.INT.CTRC.4100 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/17/27 | 05/19/27 | 3.8 | 3.8 |
|
123.8 |
RPL08.INT.CTRC.4240 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Fire Safing / Wall Finishes | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/17/27 | 05/18/27 | 2.5 | 2.5 |
|
115.0 |
RPL08.INT.SSB.01590 |
RPL08.Interior.SSB - BoW - Electrical L2 Checklist Completion | Balance of Walls and OverHead | Not Started | 05/17/27 | 05/26/27 | 10.0 | 10.0 |
|
186.2 |
RPL08.WP3B.014080 |
RPL08.Conn EF1<>DHA.06 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.06 | Not Started | 05/17/27 | 05/24/27 | 7.5 | 7.5 |
|
196.2 |
RPL08.WP3B.015520 |
RPL08.Conn EF1<>DHA.06 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.06 | Not Started | 05/17/27 | 05/17/27 | 1.2 | 1.2 |
|
196.2 |
RPL08.WP4.015120 |
RPL08.Conn DHB.15.17<>17 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/17/27 | 05/17/27 | 1.2 | 1.2 |
|
202.5 |
RPL08.WP4.015140 |
RPL08.Conn DHB.16.21<>21 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/17/27 | 05/17/27 | 1.2 | 1.2 |
|
202.5 |
RPL08.WP4.015480 |
RPL08.Conn DHB.15.19<>19 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/17/27 | 05/17/27 | 1.2 | 1.2 |
|
203.8 |
RPL08.WP4.015500 |
RPL08.Conn DHB.16.23<>23 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/17/27 | 05/17/27 | 1.2 | 1.2 |
|
203.8 |
RPL08.WP4.016600 |
RPL08.Conn DHB.15.18<>17 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/17/27 | 05/17/27 | 1.2 | 1.2 |
|
200.0 |
RPL08.WP4.016620 |
RPL08.Conn DHB.16.22<>21 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/17/27 | 05/17/27 | 1.2 | 1.2 |
|
200.0 |
RPL08.WP4.017520 |
RPL08.Conn DHB.15.20<>19 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/17/27 | 05/17/27 | 1.2 | 1.2 |
|
201.2 |
RPL08.WP4.017540 |
RPL08.Conn DHB.16.24<>23 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/17/27 | 05/17/27 | 1.2 | 1.2 |
|
201.2 |
RPL08.WP4.018860 |
RPL08.Conn DHB.17.26<>25 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/17/27 | 05/20/27 | 5.0 | 5.0 |
|
191.2 |
GCD.RPL08.3507 |
[RPL08] TC-C Ready : EF Pathways complete [DHB] | TC-C Ready: Production Cabling - DHB | Not Started | 05/18/27 | 05/18/27 | 0.0 | 0.0 |
|
368.8 |
GCD.RPL08.3825 |
[RPL08] TC-C Ready : Overhead cable tray complete [DHB] | TC-C Ready: Production Cabling - DHB | Not Started | 05/18/27 | 05/18/27 | 0.0 | 0.0 |
|
368.8 |
RPL08.CX.DHA.01580 |
RPL08.CX.DHA - L3/L4 - Control Fault Domain 04 - TW Flush and Fill | Control Fault Domain 4 | Not Started | 05/18/27 | 05/27/27 | 10.0 | 10.0 |
|
165.0 |
RPL08.INT.CTRC.01500 |
RPL08.Interior.Center-Corridor (N) - Mechanical L2 Checklist Completion | Fit out (North) | Not Started | 05/18/27 | 06/01/27 | 12.5 | 12.5 |
|
148.8 |
RPL08.INT.CTRC.02050 |
RPL08.Interior.Center-Corridor (S) - Final Paint and Tube Steel Paint (IFP Add) | Fit out (South) | Not Started | 05/18/27 | 06/01/27 | 12.5 | 12.5 |
|
141.2 |
RPL08.INT.CTRC.06960 |
RPL08.Interior.Center-Corridor - Final Finishes & Fixtures - MEP Trims | Restrooms | Not Started | 05/18/27 | 05/26/27 | 8.8 | 8.8 |
|
117.5 |
RPL08.INT.CTRC.4080 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Install Remaining Lights | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/18/27 | 05/21/27 | 5.0 | 5.0 |
|
115.0 |
RPL08.INT.CTRC.8080 |
RPL08.Interior.Center-Corridor LO #10 - Plumbing Trim Out | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/18/27 | 05/20/27 | 3.8 | 3.8 |
|
152.5 |
RPL08.INT.CTRC.8100 |
RPL08.Interior.Center-Corridor LO #10 - Fire Life Safety Trim Out | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/18/27 | 05/20/27 | 3.8 | 3.8 |
|
152.5 |
RPL08.INT.CTRC.8800 |
RPL08.Interior.Center-Corridor LO #11 - Install Door Frame | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 05/18/27 | 05/19/27 | 2.5 | 2.5 |
|
135.0 |
RPL08.INT.DHA.01900 |
RPL08.Interior.DHA - Control Fault Domain 5 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/18/27 | 06/15/27 | 25.0 | 25.0 |
|
143.8 |