Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:14 PM
· 5122 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL08.INT.SSB.01640 |
RPL08.Interior.SSB - Loading Dock and Storage - Final Punch Walk | Loading Dock and Storage | Not Started | 05/18/27 | 05/19/27 | 2.5 | 2.5 |
|
206.2 |
RPL08.WP3B.017900 |
RPL08.Conn EF2<>DHB.17 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.17 | Not Started | 05/18/27 | 05/19/27 | 2.5 | 2.5 |
|
190.0 |
RPL08.WP4.017260 |
RPL08.Conn DHA.05.19<>19 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/18/27 | 05/20/27 | 3.8 | 3.8 |
|
198.8 |
RPL08.WP4.017280 |
RPL08.Conn DHA.06.23<>23 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/18/27 | 05/20/27 | 3.8 | 3.8 |
|
198.8 |
RPL08.CON.WP2.11100 |
RPL08.Conn - GSMDF1(South)<>DH B - CFD5 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH B - Rack#01 MES side | Not Started | 05/19/27 | 05/21/27 | 3.8 | 3.8 |
|
193.8 |
RPL08.CON.WP3B.01120 |
RPL08.Conn EF1<>DHB.11 - WBS Summary | EF1<>DHB.11 | Not Started | 05/19/27 | 06/03/27 | 13.8 | 13.8 |
|
177.5 |
RPL08.CON.WP4.01800 |
RPL08.Conn WP4 FENW DHB CFD5 Infrastructure | Infrastructure | Not Started | 05/19/27 | 06/16/27 | 25.0 | 25.0 |
|
178.8 |
RPL08.INT.CTRC.3940 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Electrical Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/19/27 | 05/19/27 | 1.2 | 1.2 |
|
115.0 |
RPL08.INT.CTRC.3960 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Security Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/19/27 | 05/19/27 | 1.2 | 1.2 |
|
115.0 |
RPL08.INT.DHB.01840 |
RPL08.Conn DHB - CFD5 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 05/19/27 | 05/21/27 | 3.8 | 3.8 |
|
147.5 |
RPL08.INT.DHB.02050 |
RPL08.Interior.DHB - Final Clean | Tie-Ins | Not Started | 05/19/27 | 05/24/27 | 5.0 | 5.0 |
|
202.5 |
RPL08.INT.DHB.02880 |
RPL08.Conn DHB - CFD5 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 05/19/27 | 05/21/27 | 3.8 | 3.8 |
|
176.2 |
RPL08.INT.DHC.01220 |
RPL08.Interior.DHC - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/19/27 | 06/16/27 | 25.0 | 25.0 |
|
182.5 |
RPL08.INT.DHD.02470 |
RPL08.Interior.DHD - OFE - Control Fault Domain 4 (HAC) | Control Fault Domain 4 | Not Started | 05/19/27 | 06/02/27 | 12.5 | 12.5 |
|
151.2 |
RPL08.INT.ENDC.1740 |
RPL08.Interior.End-Corridor - BoW - Install Remaining Lights | Balance of Walls & Overhead | Not Started | 05/19/27 | 06/02/27 | 12.5 | 12.5 |
|
222.5 |
RPL08.INT.ENDC.1800 |
RPL08.Interior.End-Corridor - BoW - Install Door (Verify with Trades before installation) | Balance of Walls & Overhead | Not Started | 05/19/27 | 05/27/27 | 8.8 | 8.8 |
|
216.2 |
RPL08.INT.SSBC.01470 |
RPL08.Interior.SSB-Corridor - Mechanical L2 Checklist Completion | Fit out | Not Started | 05/19/27 | 06/02/27 | 12.5 | 12.5 |
|
147.5 |
RPL08.WP3B.011300 |
RPL08.Conn EF1<>DHB.11 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.11 | Not Started | 05/19/27 | 05/20/27 | 2.5 | 2.5 |
|
157.5 |
RPL08.WP3B.017920 |
RPL08.Conn EF2<>DHB.18 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.18 | Not Started | 05/19/27 | 05/20/27 | 2.5 | 2.5 |
|
188.8 |
RPL08.WP4.016520 |
RPL08.Conn DHA.01.04 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/19/27 | 06/02/27 | 12.5 | 12.5 |
|
201.2 |
RPL08.WP4.016540 |
RPL08.Conn DHA.02.08 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/19/27 | 06/02/27 | 12.5 | 12.5 |
|
201.2 |
RPL08.WP4.016920 |
RPL08.Conn DHA.03.12<>11 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/19/27 | 05/19/27 | 1.2 | 1.2 |
|
211.2 |
RPL08.WP4.016940 |
RPL08.Conn DHA.04.16<>15 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/19/27 | 05/19/27 | 1.2 | 1.2 |
|
211.2 |
RPL08.WP4.017120 |
RPL08.Conn DHA.05.17<>17 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/19/27 | 05/19/27 | 1.2 | 1.2 |
|
212.5 |
RPL08.WP4.017140 |
RPL08.Conn DHA.06.21<>21 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/19/27 | 05/19/27 | 1.2 | 1.2 |
|
212.5 |
RPL08.WP4.019240 |
RPL08.Conn DHB.18.29<>29 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/19/27 | 05/21/27 | 3.8 | 3.8 |
|
193.8 |
RPL08.CON.WP3A.01660 |
RPL08.Conn EF2 Install OSP Pathway (for RPL08) - P1 | Infrastructure | Not Started | 05/20/27 | 05/25/27 | 5.0 | 5.0 |
|
357.5 |
RPL08.CON.WP3A.01780 |
RPL08.Conn EF2 Pull, Terminate, Install, & Test OSP Cable for RPL10<>RPL08 | Cabling | Not Started | 05/20/27 | 05/25/27 | 5.0 | 5.0 |
|
191.2 |
RPL08.INT.CTRC.01950 |
RPL08.Interior.Center-Corridor (S) - Install Lighting | Fit out (South) | Not Started | 05/20/27 | 05/28/27 | 8.8 | 8.8 |
|
122.5 |
RPL08.INT.CTRC.8540 |
RPL08.Interior.Center-Corridor LO #11 - QC | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 05/20/27 | 05/20/27 | 1.2 | 1.2 |
|
135.0 |
RPL08.INT.CTRC.8780 |
RPL08.Interior.Center-Corridor LO #11 - Fire Safing/ Wall Finishes | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 05/20/27 | 05/21/27 | 2.5 | 2.5 |
|
140.0 |
RPL08.INT.DHD.01360 |
RPL08.Interior.DHD - Control Fault Domain 2 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/20/27 | 06/17/27 | 25.0 | 25.0 |
|
192.5 |
RPL08.INT.DHD.01410 |
RPL08.Interior.DHD - Control Fault Domain 3 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/20/27 | 06/17/27 | 25.0 | 25.0 |
|
205.0 |
RPL08.INT.DHD.01420 |
RPL08.Interior.DHD - Control Fault Domain 3 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/20/27 | 06/17/27 | 25.0 | 25.0 |
|
212.5 |
RPL08.INT.DHD.01430 |
RPL08.Interior.DHD - Control Fault Domain 3 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/20/27 | 06/17/27 | 25.0 | 25.0 |
|
205.0 |
RPL08.INT.DHD.02030 |
RPL08.Interior.DHD - Control Fault Domain 3 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/20/27 | 06/17/27 | 25.0 | 25.0 |
|
205.0 |
RPL08.WP4.017380 |
RPL08.Conn DHB.14.16 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/20/27 | 06/03/27 | 12.5 | 12.5 |
|
187.5 |
RPL08.WP4.018160 |
RPL08.Conn DHB.15.19 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/20/27 | 06/03/27 | 12.5 | 12.5 |
|
175.0 |
RPL08.WP4.018180 |
RPL08.Conn DHB.16.23 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/20/27 | 06/03/27 | 12.5 | 12.5 |
|
175.0 |
RPL08.WP4.018880 |
RPL08.Conn DHB.17.26 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/20/27 | 06/03/27 | 12.5 | 12.5 |
|
162.5 |
RPL08.WP4.018900 |
RPL08.Conn DHB.18.30 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/20/27 | 06/03/27 | 12.5 | 12.5 |
|
162.5 |
RPL08.WP4.019140 |
RPL08.Conn DHB.13.12 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/20/27 | 06/03/27 | 12.5 | 12.5 |
|
187.5 |
RPL08.WP4.046800 |
RPL08.Conn BE ISP DHB.CFD1 Install Trunks FTSW (RSL) to STSW | CFD1 (Control Fault Domain B.1; Rows 01-08) | Not Started | 05/20/27 | 05/24/27 | 3.8 | 3.8 |
|
240.0 |
RPL08.CON.WP3B.01100 |
RPL08.Conn EF1<>DHB.12 - WBS Summary | EF1<>DHB.12 | Not Started | 05/21/27 | 06/07/27 | 13.8 | 13.8 |
|
175.0 |
RPL08.CON.WP4.03600 |
RPL08.Conn WP4 FENW DHA CFD4 Infrastructure | Infrastructure | Not Started | 05/21/27 | 06/18/27 | 25.0 | 25.0 |
|
188.8 |
RPL08.EY.SSB.01310 |
RPL08.EY.SSB - Install Lighting | Hardscape and Landscape | Not Started | 05/21/27 | 06/11/27 | 18.8 | 18.8 |
|
168.8 |
RPL08.INT.CTRC.07060 |
RPL08.Interior.Center-Corridor - Final Finishes & Fixtures - Flooring | Restrooms | Not Started | 05/21/27 | 06/01/27 | 8.8 | 8.8 |
|
122.5 |
RPL08.INT.CTRC.1840 |
RPL08.Interior.Center-Corridor - BoW - Mechanical L2 Checklist Completion | Balance of Walls & Overhead | Not Started | 05/21/27 | 06/04/27 | 12.5 | 12.5 |
|
137.5 |
RPL08.INT.CTRC.4040 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Plumbing Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/21/27 | 05/21/27 | 1.2 | 1.2 |
|
115.0 |
RPL08.INT.CTRC.4060 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Fire Life Safety Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/21/27 | 05/21/27 | 1.2 | 1.2 |
|
115.0 |
RPL08.INT.CTRC.8300 |
RPL08.Interior.Center-Corridor LO #10 - Electrical L2 Checklist Completion | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/21/27 | 05/21/27 | 1.2 | 1.2 |
|
152.5 |
RPL08.INT.CTRC.8560 |
RPL08.Interior.Center-Corridor LO #11 - Hang Drywall | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 05/21/27 | 05/26/27 | 5.0 | 5.0 |
|
135.0 |
RPL08.INT.DHA.01610 |
RPL08.Conn DHA - CFD4 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 05/21/27 | 05/25/27 | 3.8 | 3.8 |
|
157.5 |
RPL08.INT.DHA.03940 |
RPL08.Conn DHA - CFD4 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 05/21/27 | 05/25/27 | 3.8 | 3.8 |
|
186.2 |
RPL08.WP3B.011320 |
RPL08.Conn EF1<>DHB.12 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 05/21/27 | 05/24/27 | 2.5 | 2.5 |
|
157.5 |
RPL08.WP3B.012740 |
RPL08.Conn EF1<>DHB.11 Install (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.11 | Not Started | 05/21/27 | 05/21/27 | 1.2 | 1.2 |
|
177.5 |
RPL08.WP4.017720 |
RPL08.Conn DHA.05.19<>19 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/21/27 | 05/21/27 | 1.2 | 1.2 |
|
211.2 |
RPL08.WP4.017740 |
RPL08.Conn DHA.06.23<>23 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/21/27 | 05/21/27 | 1.2 | 1.2 |
|
211.2 |
RPL08.WP4.017880 |
RPL08.Conn DHA.05.18<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/21/27 | 05/26/27 | 5.0 | 5.0 |
|
198.8 |
RPL08.WP4.017900 |
RPL08.Conn DHA.06.22<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/21/27 | 05/26/27 | 5.0 | 5.0 |
|
198.8 |
RPL08.WP4.019560 |
RPL08.Conn DHB.17.28<>27 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/21/27 | 05/26/27 | 5.0 | 5.0 |
|
191.2 |
GCD.RPL08.4005 |
[RPL08] TC-C Ready : Production Cabling Start [DHB Rows 33-40] | TC-C Ready: Production Cabling - DHB | Not Started | 05/24/27 | 05/24/27 | 0.0 | 0.0 |
|
365.0 |
RPL08.CON.WP2.09120 |
RPL08.Conn - CorpNet & FacNet Available (DH A) - All IDFs | WP#02 GS | Not Started | 05/24/27 | 05/24/27 | 0.0 | 0.0 |
|
363.8 |
RPL08.CON.WP2.12100 |
RPL08.Conn - GSMDF2(North)<>DH B - CFD5 Rack #50 Pull, Install & Patch PON Trunks | MDF2 <> DH B - Rack#50 LV side | Not Started | 05/24/27 | 05/28/27 | 6.2 | 6.2 |
|
187.5 |
RPL08.CON.WP3B.01400 |
RPL08.Conn EF2<>DHB.19 - WBS Summary | EF2<>DHB.19 | Not Started | 05/24/27 | 06/07/27 | 12.5 | 12.5 |
|
175.0 |
RPL08.CX.DHD.01280 |
RPL08.CX.DHD - L3/L4 - Control Fault Domain 01 - TW Flush and Fill | Control Fault Domain 1 | Not Started | 05/24/27 | 06/03/27 | 10.0 | 10.0 |
|
223.8 |
RPL08.Conn.MS.01020 |
RPL08.Conn Wifi Ready - DH A (Pred from RPL10 CorpNet needed?) | Connectivity Milestones | Not Started | 05/24/27 | 05/24/27 | 0.0 | 0.0 |
|
207.5 |
RPL08.INT.CTRC.4120 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Install Asset Tags | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/24/27 | 05/26/27 | 3.8 | 3.8 |
|
115.0 |
RPL08.INT.CTRC.8320 |
RPL08.Interior.Center-Corridor LO #10 - Mechanical L2 Checklist Completion | Remaining of LO Wall #10 ((Spoke Parts & Spoke Tech) | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
152.5 |
RPL08.INT.CTRC.8720 |
RPL08.Interior.Center-Corridor LO #11 - Install DAS (Distribution Antenna System) | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
140.0 |
RPL08.INT.CTRC.8760 |
RPL08.Interior.Center-Corridor LO #11 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 05/24/27 | 05/26/27 | 3.8 | 3.8 |
|
141.2 |
RPL08.INT.DHD.02490 |
RPL08.Interior.DHD - OFE - Control Fault Domain 4 (Mech Side Aisle) | Control Fault Domain 4 | Not Started | 05/24/27 | 06/03/27 | 10.0 | 10.0 |
|
151.2 |
RPL08.INT.SSB.01620 |
RPL08.Interior.SSB - BoW - Mechanical L2 Checklist Completion | Balance of Walls and OverHead | Not Started | 05/24/27 | 06/03/27 | 10.0 | 10.0 |
|
186.2 |
RPL08.WP3B.012180 |
RPL08.Conn EF2<>DHB.19 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.19 | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
173.8 |
RPL08.WP3B.014180 |
RPL08.Conn EF1<>DHB.11 Splice (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.11 | Not Started | 05/24/27 | 06/01/27 | 7.5 | 7.5 |
|
177.5 |
RPL08.WP3B.015620 |
RPL08.Conn EF1<>DHB.11 Install (Z-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.11 | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
177.5 |
RPL08.WP3B.016940 |
RPL08.Conn EF1<>DHA.05 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.05 | Not Started | 05/24/27 | 05/25/27 | 2.5 | 2.5 |
|
197.5 |
RPL08.WP4.018080 |
RPL08.Conn DHB.17.25<>25 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
196.2 |
RPL08.WP4.018200 |
RPL08.Conn DHB.18.30<>29 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
196.2 |
RPL08.WP4.018700 |
RPL08.Conn DHB.17.27<>27 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
197.5 |
RPL08.WP4.019180 |
RPL08.Conn DHB.18.32<>31 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
197.5 |
RPL08.WP4.019420 |
RPL08.Conn DHB.17.26<>25 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
193.8 |
RPL08.WP4.019700 |
RPL08.Conn DHB.19 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
186.2 |
RPL08.WP4.019720 |
RPL08.Conn DHB.20 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
186.2 |
RPL08.WP4.019760 |
RPL08.Conn DHB.18.29<>29 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
196.2 |
RPL08.WP4.019840 |
RPL08.Conn DHB.18.31<>31 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/24/27 | 05/26/27 | 3.8 | 3.8 |
|
193.8 |
RPL08.WP4.019900 |
RPL08.Conn DHB.19.33 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/24/27 | 06/07/27 | 12.5 | 12.5 |
|
147.5 |
RPL08.WP4.019920 |
RPL08.Conn DHB.20.37 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/24/27 | 06/07/27 | 12.5 | 12.5 |
|
147.5 |
RPL08.WP4.020660 |
RPL08.Conn DHB.19 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
178.8 |
RPL08.WP4.020680 |
RPL08.Conn DHB.20 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/24/27 | 05/24/27 | 1.2 | 1.2 |
|
176.2 |
RPL08.CON.WP3B.01200 |
RPL08.Conn EF1<>DHB.13 - WBS Summary | EF1<>DHB.13 | Not Started | 05/25/27 | 06/09/27 | 13.8 | 13.8 |
|
172.5 |
RPL08.CON.WP3B.01380 |
RPL08.Conn EF2<>DHB.20 - WBS Summary | EF2<>DHB.20 | Not Started | 05/25/27 | 06/08/27 | 12.5 | 12.5 |
|
173.8 |
RPL08.CX.DHA.01500 |
RPL08.CX.DHA - L3/L4 - Control Fault Domain 05 - FW Flush and Fill | Control Fault Domain 5 | Not Started | 05/25/27 | 06/03/27 | 8.8 | 8.8 |
|
170.0 |
RPL08.INT.CTRC.8740 |
RPL08.Interior.Center-Corridor LO #11 - Install Remaining Lights | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 05/25/27 | 05/28/27 | 5.0 | 5.0 |
|
140.0 |
RPL08.INT.DHC.02410 |
RPL08.Interior.DHC - OFE - Control Fault Domain 3 (HAC) | Control Fault Domain 3 | Not Started | 05/25/27 | 06/08/27 | 12.5 | 12.5 |
|
142.5 |
RPL08.INT.ENDC.1420 |
RPL08.Interior.End-Corridor - BoW - Install Vertical Tube Steel for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 05/25/27 | 05/28/27 | 5.0 | 5.0 |
|
210.0 |
RPL08.WP3B.011340 |
RPL08.Conn EF1<>DHB.13 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.13 | Not Started | 05/25/27 | 05/26/27 | 2.5 | 2.5 |
|
157.5 |
RPL08.WP3B.012200 |
RPL08.Conn EF2<>DHB.20 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.20 | Not Started | 05/25/27 | 05/25/27 | 1.2 | 1.2 |
|
173.8 |
RPL08.WP3B.012760 |
RPL08.Conn EF1<>DHB.12 Install (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 05/25/27 | 05/25/27 | 1.2 | 1.2 |
|
175.0 |
RPL08.WP3B.013620 |
RPL08.Conn EF2<>DHB.19 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.19 | Not Started | 05/25/27 | 05/25/27 | 1.2 | 1.2 |
|
175.0 |