| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL08.WP3B.016960 |
RPL08.Conn EF1<>DHA.06 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.06 | Not Started | 05/25/27 | 05/26/27 | 2.5 | 2.5 |
|
196.2 |
RPL08.WP4.019940 |
RPL08.Conn DHB.19 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 05/25/27 | 05/25/27 | 1.2 | 1.2 |
|
186.2 |
RPL08.WP4.019960 |
RPL08.Conn DHB.20 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 05/25/27 | 05/25/27 | 1.2 | 1.2 |
|
186.2 |
RPL08.WP4.020940 |
RPL08.Conn DHB.20.37<>37 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 05/25/27 | 05/27/27 | 3.8 | 3.8 |
|
176.2 |
RPL08.WP4.020960 |
RPL08.Conn DHB.19 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/25/27 | 05/27/27 | 3.8 | 3.8 |
|
195.0 |
RPL08.WP4.020980 |
RPL08.Conn DHB.20 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/25/27 | 05/27/27 | 3.8 | 3.8 |
|
195.0 |
RPL08.WP4.021000 |
RPL08.Conn DHB.19.34<>33 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/25/27 | 05/28/27 | 5.0 | 5.0 |
|
178.8 |
RPL08.WP4.033260 |
RPL08.Conn DHB.18.29<>29 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 05/25/27 | 05/25/27 | 1.2 | 1.2 |
|
196.2 |
RPL08.WP4.046820 |
RPL08.Conn BE ISP DHB.CFD1 Pull/Dress/Test FTSW (RSL) to STSW EX384f Typical Row Pair [In-Row] | In-Row | Not Started | 05/25/27 | 05/27/27 | 3.8 | 3.8 |
|
243.8 |
RPL08.WP4.047060 |
RPL08.Conn BE ISP DHB.CFD2 Install Trunks FTSW (RSL) to STSW | CFD2 (Control Fault Domain B.2; Rows 09-16) | Not Started | 05/25/27 | 05/27/27 | 3.8 | 3.8 |
|
240.0 |
GCD.RPL08.4145 |
[RPL08] TC-C Ready : Production Cabling Start [DHA Rows 25-32] | TC-C Ready: Production Cabling - DHA | Not Started | 05/26/27 | 05/26/27 | 0.0 | 0.0 |
|
362.5 |
RPL08.CON.WP2.13080 |
RPL08.Conn - GSMDF1(South)<>DH A - CFD4 Rack #50 Pull, Install & Patch PON Trunks | MDF1 <> DH A - Rack#50 LV side | Not Started | 05/26/27 | 06/02/27 | 6.2 | 6.2 |
|
191.2 |
RPL08.CON.WP2.14080 |
RPL08.Conn - GSMDF2(North)<>DH A - CFD4 Rack #01 Pull, Install & Test PON Trunks | MDF2 <> DH A - Rack#01 MES side | Not Started | 05/26/27 | 05/28/27 | 3.8 | 3.8 |
|
196.2 |
RPL08.CON.WP3A.01680 |
RPL08.Conn EF2 Install OSP Pathway (for RPL08) - P2 | Infrastructure | Not Started | 05/26/27 | 06/01/27 | 5.0 | 5.0 |
|
357.5 |
RPL08.CON.WP3A.01760 |
RPL08.Conn EF1 Infrastructure 2 (Waterfalls & VCM etc.) | Infrastructure | Not Started | 05/26/27 | 06/09/27 | 12.5 | 12.5 |
|
173.8 |
RPL08.CON.WP3B.02160 |
RPL08.Conn EF1<>DHA.07 - WBS Summary | EF1<>DHA.07 | Not Started | 05/26/27 | 06/09/27 | 12.5 | 12.5 |
|
185.0 |
RPL08.CX.DHC.01060 |
RPL08.CX.DHC - L3/L4 - House Power (for mechainical) | DHC HOUSE POWER | Not Started | 05/26/27 | 06/09/27 | 12.5 | 12.5 |
|
207.5 |
RPL08.INT.DHC.01240 |
RPL08.Interior.DHC - Control Fault Domain 1 - Install copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/26/27 | 06/23/27 | 25.0 | 25.0 |
|
182.5 |
RPL08.INT.DHC.01270 |
RPL08.Interior.DHC - Control Fault Domain 2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/26/27 | 06/23/27 | 25.0 | 25.0 |
|
183.8 |
RPL08.INT.DHC.01280 |
RPL08.Interior.DHC - Control Fault Domain 2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/26/27 | 06/23/27 | 25.0 | 25.0 |
|
196.2 |
RPL08.INT.DHC.01290 |
RPL08.Interior.DHC - Control Fault Domain 2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/26/27 | 06/23/27 | 25.0 | 25.0 |
|
183.8 |
RPL08.INT.DHC.02010 |
RPL08.Interior.DHC - Control Fault Domain 2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/26/27 | 06/23/27 | 25.0 | 25.0 |
|
183.8 |
RPL08.WP3B.011220 |
RPL08.Conn EF1<>DHA.07 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHA.07 | Not Started | 05/26/27 | 05/26/27 | 1.2 | 1.2 |
|
183.8 |
RPL08.WP3B.013640 |
RPL08.Conn EF2<>DHB.20 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.20 | Not Started | 05/26/27 | 05/26/27 | 1.2 | 1.2 |
|
173.8 |
RPL08.WP3B.014200 |
RPL08.Conn EF1<>DHB.12 Splice (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 05/26/27 | 06/03/27 | 7.5 | 7.5 |
|
175.0 |
RPL08.WP3B.015060 |
RPL08.Conn EF2<>DHB.19 Splice (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.19 | Not Started | 05/26/27 | 06/03/27 | 7.5 | 7.5 |
|
175.0 |
RPL08.WP3B.015640 |
RPL08.Conn EF1<>DHB.12 Install (Z-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 05/26/27 | 05/26/27 | 1.2 | 1.2 |
|
175.0 |
RPL08.WP3B.016500 |
RPL08.Conn EF2<>DHB.19 Install (Z-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.19 | Not Started | 05/26/27 | 05/26/27 | 1.2 | 1.2 |
|
175.0 |
RPL08.WP4.017680 |
RPL08.Conn DHA.03.11 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/26/27 | 06/09/27 | 12.5 | 12.5 |
|
182.5 |
RPL08.WP4.017700 |
RPL08.Conn DHA.04.15 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/26/27 | 06/09/27 | 12.5 | 12.5 |
|
182.5 |
RPL08.WP4.018040 |
RPL08.Conn DHA.05.18 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/26/27 | 06/09/27 | 12.5 | 12.5 |
|
170.0 |
RPL08.WP4.018060 |
RPL08.Conn DHA.06.22 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/26/27 | 06/09/27 | 12.5 | 12.5 |
|
170.0 |
RPL08.WP4.018280 |
RPL08.Conn DHA.07 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 05/26/27 | 05/26/27 | 1.2 | 1.2 |
|
195.0 |
RPL08.WP4.018300 |
RPL08.Conn DHA.08 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 05/26/27 | 05/26/27 | 1.2 | 1.2 |
|
195.0 |
RPL08.WP4.018600 |
RPL08.Conn DHA.07.25 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/26/27 | 06/09/27 | 12.5 | 12.5 |
|
157.5 |
RPL08.WP4.018620 |
RPL08.Conn DHA.08.29 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 05/26/27 | 06/09/27 | 12.5 | 12.5 |
|
157.5 |
RPL08.WP4.018920 |
RPL08.Conn DHA.07 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/26/27 | 05/26/27 | 1.2 | 1.2 |
|
186.2 |
RPL08.WP4.019160 |
RPL08.Conn DHA.08 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/26/27 | 05/26/27 | 1.2 | 1.2 |
|
186.2 |
RPL08.WP4.020140 |
RPL08.Conn DHB.19 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 05/26/27 | 05/26/27 | 1.2 | 1.2 |
|
186.2 |
RPL08.WP4.020160 |
RPL08.Conn DHB.20 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 05/26/27 | 05/26/27 | 1.2 | 1.2 |
|
186.2 |
DCC.B8.3055 |
[SSDCB3] Production Gear Delivered [DHD] Front End (SSW &FSW) | Connectivity | Not Started | 05/27/27 | 05/27/27 | 0.0 | 0.0 |
|
267.5 |
RPL08.CON.WP3B.01180 |
RPL08.Conn EF1<>DHB.14 - WBS Summary | EF1<>DHB.14 | Not Started | 05/27/27 | 06/11/27 | 13.8 | 13.8 |
|
170.0 |
RPL08.CON.WP3B.02140 |
RPL08.Conn EF1<>DHA.08 - WBS Summary | EF1<>DHA.08 | Not Started | 05/27/27 | 06/10/27 | 12.5 | 12.5 |
|
183.8 |
RPL08.CON.WP3B.04100 |
RPL08.Conn WP#3B - ISP DHD - WBS Summary | DH D | Not Started | 05/27/27 | 08/09/27 | 63.8 | 63.8 |
|
216.2 |
RPL08.CON.WP4.06000 |
RPL08.Conn - DH D Network - WBS Summary | DH D | Not Started | 05/27/27 | 10/12/27 | 120.0 | 120.0 |
|
172.5 |
RPL08.CON.WP4.06020 |
RPL08.Conn WP4 FENW DHD CFD1 Infrastructure | Infrastructure | Not Started | 05/27/27 | 06/24/27 | 25.0 | 25.0 |
|
267.5 |
RPL08.INT.CTRC.07040 |
RPL08.Interior.Center-Corridor - Final Finishes & Fixtures - Final Paint | Restrooms | Not Started | 05/27/27 | 06/07/27 | 8.8 | 8.8 |
|
117.5 |
RPL08.INT.CTRC.4140 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Install Door (Verify with Trades before installation) | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 05/27/27 | 05/28/27 | 2.5 | 2.5 |
|
115.0 |
RPL08.INT.CTRC.8580 |
RPL08.Interior.Center-Corridor LO #11 - Tape Finish Paint | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 05/27/27 | 06/03/27 | 6.2 | 6.2 |
|
135.0 |
RPL08.INT.DHD.01200 |
RPL08.Conn DHD - CFD1 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 05/27/27 | 06/01/27 | 3.8 | 3.8 |
|
236.2 |
RPL08.INT.DHD.01380 |
RPL08.Interior.DHD - Control Fault Domain 2 - Install copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/27/27 | 06/24/27 | 25.0 | 25.0 |
|
192.5 |
RPL08.INT.DHD.01450 |
RPL08.Interior.DHD - Control Fault Domain 3 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/27/27 | 06/24/27 | 25.0 | 25.0 |
|
212.5 |
RPL08.INT.DHD.01460 |
RPL08.Interior.DHD - Control Fault Domain 3 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/27/27 | 06/24/27 | 25.0 | 25.0 |
|
212.5 |
RPL08.INT.DHD.01470 |
RPL08.Interior.DHD - Control Fault Domain 3 - Set UPS and Panel (2) and GS.IDF D1 (Stick Build) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/27/27 | 06/24/27 | 25.0 | 25.0 |
|
205.0 |
RPL08.INT.DHD.02590 |
RPL08.Conn DHD - CFD1 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 05/27/27 | 06/01/27 | 3.8 | 3.8 |
|
257.5 |
RPL08.WP3B.011240 |
RPL08.Conn EF1<>DHA.08 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHA.08 | Not Started | 05/27/27 | 05/27/27 | 1.2 | 1.2 |
|
183.8 |
RPL08.WP3B.011360 |
RPL08.Conn EF1<>DHB.14 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.14 | Not Started | 05/27/27 | 05/28/27 | 2.5 | 2.5 |
|
157.5 |
RPL08.WP3B.012660 |
RPL08.Conn EF1<>DHA.07 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.07 | Not Started | 05/27/27 | 05/27/27 | 1.2 | 1.2 |
|
185.0 |
RPL08.WP3B.012780 |
RPL08.Conn EF1<>DHB.13 Install (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.13 | Not Started | 05/27/27 | 05/27/27 | 1.2 | 1.2 |
|
172.5 |
RPL08.WP3B.015080 |
RPL08.Conn EF2<>DHB.20 Splice (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.20 | Not Started | 05/27/27 | 06/04/27 | 7.5 | 7.5 |
|
173.8 |
RPL08.WP3B.016520 |
RPL08.Conn EF2<>DHB.20 Install (Z-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.20 | Not Started | 05/27/27 | 05/27/27 | 1.2 | 1.2 |
|
173.8 |
RPL08.WP4.018360 |
RPL08.Conn DHA.05.18<>17 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/27/27 | 05/27/27 | 1.2 | 1.2 |
|
202.5 |
RPL08.WP4.018380 |
RPL08.Conn DHA.06.22<>21 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/27/27 | 05/27/27 | 1.2 | 1.2 |
|
202.5 |
RPL08.WP4.018480 |
RPL08.Conn DHA.05.20<>19 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/27/27 | 06/02/27 | 5.0 | 5.0 |
|
198.8 |
RPL08.WP4.018500 |
RPL08.Conn DHA.06.24<>23 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/27/27 | 06/02/27 | 5.0 | 5.0 |
|
198.8 |
RPL08.WP4.018640 |
RPL08.Conn DHA.07 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 05/27/27 | 05/27/27 | 1.2 | 1.2 |
|
195.0 |
RPL08.WP4.018660 |
RPL08.Conn DHA.08 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 05/27/27 | 05/27/27 | 1.2 | 1.2 |
|
195.0 |
RPL08.WP4.019220 |
RPL08.Conn DHA.07.25<>25 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/27/27 | 06/01/27 | 3.8 | 3.8 |
|
186.2 |
RPL08.WP4.019260 |
RPL08.Conn DHA.07 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/27/27 | 06/01/27 | 3.8 | 3.8 |
|
205.0 |
RPL08.WP4.019340 |
RPL08.Conn DHA.08.29<>29 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/27/27 | 06/01/27 | 3.8 | 3.8 |
|
186.2 |
RPL08.WP4.019360 |
RPL08.Conn DHA.08 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 05/27/27 | 06/01/27 | 3.8 | 3.8 |
|
205.0 |
RPL08.WP4.020400 |
RPL08.Conn DHB.18.31<>31 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 05/27/27 | 05/27/27 | 1.2 | 1.2 |
|
193.8 |
RPL08.WP4.020420 |
RPL08.Conn DHB.17.28<>27 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 05/27/27 | 05/27/27 | 1.2 | 1.2 |
|
191.2 |
RPL08.INT.DHC.02430 |
RPL08.Interior.DHC - OFE - Control Fault Domain 3 (Mech Side Aisle) | Control Fault Domain 3 | Not Started | 05/28/27 | 06/09/27 | 10.0 | 10.0 |
|
145.0 |
RPL08.INT.SBC.04040 |
RPL08.Interior.SSB-Corridor - BoW - Final Clean | Balance of Walls & Overhead | Not Started | 05/28/27 | 06/03/27 | 5.0 | 5.0 |
|
143.8 |
RPL08.WP3B.012680 |
RPL08.Conn EF1<>DHA.08 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.08 | Not Started | 05/28/27 | 05/28/27 | 1.2 | 1.2 |
|
183.8 |
RPL08.WP3B.014100 |
RPL08.Conn EF1<>DHA.07 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.07 | Not Started | 05/28/27 | 06/07/27 | 7.5 | 7.5 |
|
185.0 |
RPL08.WP3B.014220 |
RPL08.Conn EF1<>DHB.13 Splice (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.13 | Not Started | 05/28/27 | 06/07/27 | 7.5 | 7.5 |
|
172.5 |
RPL08.WP3B.015540 |
RPL08.Conn EF1<>DHA.07 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.07 | Not Started | 05/28/27 | 05/28/27 | 1.2 | 1.2 |
|
185.0 |
RPL08.WP3B.015660 |
RPL08.Conn EF1<>DHB.13 Install (Z-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.13 | Not Started | 05/28/27 | 05/28/27 | 1.2 | 1.2 |
|
172.5 |
RPL08.WP4.018940 |
RPL08.Conn DHA.07 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 05/28/27 | 06/01/27 | 2.5 | 2.5 |
|
195.0 |
RPL08.WP4.018960 |
RPL08.Conn DHA.08 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 05/28/27 | 06/01/27 | 2.5 | 2.5 |
|
195.0 |
RPL08.WP4.021240 |
RPL08.Conn DHB.20.39<>39 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 05/28/27 | 06/02/27 | 3.8 | 3.8 |
|
176.2 |
RPL08.WP4.033760 |
RPL08.Conn DHB.18.31<>31 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 05/28/27 | 05/28/27 | 1.2 | 1.2 |
|
193.8 |
RPL08.WP4.046840 |
RPL08.Conn BE ISP DHB.CFD1 Pull/Dress/Test FTSW (RSL) to STSW EX384f [Across-Row] | Across-Row | Not Started | 05/28/27 | 06/02/27 | 3.8 | 3.8 |
|
243.8 |
RPL08.WP4.047080 |
RPL08.Conn BE ISP DHB.CFD2 Pull/Dress/Test FTSW (RSL) to STSW EX384f Typical Row Pair [In-Row] | In-Row | Not Started | 05/28/27 | 06/02/27 | 3.8 | 3.8 |
|
243.8 |
RPL08.WP4.047120 |
RPL08.Conn BE ISP DHB.CFD3 Install Trunks FTSW (RSL) to STSW | CFD3 (Control Fault Domain B.3; Rows 17-24) | Not Started | 05/28/27 | 06/02/27 | 3.8 | 3.8 |
|
240.0 |
DCC.B8.3531 |
[SSDCB3] ORv3N Rack Install Start : Front End Production ORv3N Rack Install [DHB] | Connectivity | Not Started | 06/01/27 | 06/01/27 | 0.0 | 0.0 |
|
190.0 |
RPL.GF.D.N8130.XG |
Prod EF2 Complete | Give Milestones (XREFs) | Not Started | 06/01/27 | 06/01/27 | 0.0 | 0.0 |
|
357.5 |
RPL08.CON.WP3B.01280 |
RPL08.Conn EF1<>DHB.15 - WBS Summary | EF1<>DHB.15 | Not Started | 06/01/27 | 06/15/27 | 13.8 | 13.8 |
|
170.0 |
RPL08.CON.WP4.01160 |
RPL08.Conn B CFD1 - Deliver & Install - ORV3N (Loading at Night) | OFE- Passive In-row Racks, Racks (ORv3Ns, MCRs) & PON | Not Started | 06/01/27 | 06/10/27 | 10.0 | 10.0 |
|
133.8 |
RPL08.CON.WP4.01180 |
RPL08.Conn B CFD1 - Deliver & Assemble - PON | OFE- Passive In-row Racks, Racks (ORv3Ns, MCRs) & PON | Not Started | 06/01/27 | 06/10/27 | 10.0 | 10.0 |
|
178.8 |
RPL08.INT.CTRC.01830 |
RPL08.Interior.Center-Corridor (S) - Electrical L2 Checklist Completion | Fit out (South) | Not Started | 06/01/27 | 06/14/27 | 12.5 | 12.5 |
|
122.5 |
RPL08.INT.CTRC.4160 |
RPL08.Interior.Center-Corridor LO #11 & #13 - Electrical L2 Checklist Completion | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 06/01/27 | 06/14/27 | 12.5 | 12.5 |
|
115.0 |
RPL08.INT.CTRC.8680 |
RPL08.Interior.Center-Corridor LO #11 - Install Asset Tags | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 06/01/27 | 06/02/27 | 2.5 | 2.5 |
|
140.0 |
RPL08.INT.ENDC.1960 |
RPL08.Interior.End-Corridor - BoW - Install Horizontal Steel for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 06/01/27 | 06/04/27 | 5.0 | 5.0 |
|
210.0 |
RPL08.WP3B.011380 |
RPL08.Conn EF1<>DHB.15 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.15 | Not Started | 06/01/27 | 06/02/27 | 2.5 | 2.5 |
|
157.5 |
RPL08.WP3B.012800 |
RPL08.Conn EF1<>DHB.14 Install (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.14 | Not Started | 06/01/27 | 06/01/27 | 1.2 | 1.2 |
|
170.0 |
RPL08.WP3B.014120 |
RPL08.Conn EF1<>DHA.08 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.08 | Not Started | 06/01/27 | 06/08/27 | 7.5 | 7.5 |
|
183.8 |
RPL08.WP3B.015560 |
RPL08.Conn EF1<>DHA.08 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.08 | Not Started | 06/01/27 | 06/01/27 | 1.2 | 1.2 |
|
183.8 |