Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:14 PM
· 5122 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL08.INT.EC.9480 |
RPL08.Interior.EC LO #15 - Install Mechanical Piping Lowside OH & In Wall | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 07/14/27 | 07/16/27 | 3.8 | 3.8 |
|
171.2 |
RPL08.INT.EC.9500 |
RPL08.Interior.EC LO #15 - Install Electrical Lowside OH & In Wall | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 07/14/27 | 07/16/27 | 3.8 | 3.8 |
|
171.2 |
RPL08.INT.EC.LO.9080 |
RPL08.Interior.EC LO #14 - Duct Drops / Trim out | Interior Leave Out Wall #14 DHD/EC for DHB&D HACs | Not Started | 07/14/27 | 07/15/27 | 2.5 | 2.5 |
|
166.2 |
RPL08.INT.EC.LO.9100 |
RPL08.Interior.EC LO #14 - Install DAS (Distribution Antenna System) | Interior Leave Out Wall #14 DHD/EC for DHB&D HACs | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
165.0 |
RPL08.INT.EC.LO.9120 |
RPL08.Interior.EC LO #14 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Interior Leave Out Wall #14 DHD/EC for DHB&D HACs | Not Started | 07/14/27 | 07/16/27 | 3.8 | 3.8 |
|
171.2 |
RPL08.INT.EC.LO.9140 |
RPL08.Interior.EC LO #14 - Fire Safing / Wall Finishes | Interior Leave Out Wall #14 DHD/EC for DHB&D HACs | Not Started | 07/14/27 | 07/15/27 | 2.5 | 2.5 |
|
165.0 |
RPL08.INT.EC.LO.9360 |
RPL08.Interior.EC LO #15 - Install Fire Life Safety Lowside OH | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 07/14/27 | 07/16/27 | 3.8 | 3.8 |
|
166.2 |
RPL08.INT.EC.LO.9380 |
RPL08.Interior.EC LO #15 - Install Plumbing Lowside OH | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 07/14/27 | 07/16/27 | 3.8 | 3.8 |
|
161.2 |
RPL08.SKN.E.LO.04100 |
RPL08.SKIN.LO#19 - Install IMP Insulated Metal Panels | Build back Exterior Leave Out Walls #19 (EC - South) | Not Started | 07/14/27 | 07/15/27 | 2.5 | 2.5 |
|
142.5 |
RPL08.WP3B.011540 |
RPL08.Conn EF1<>DHC.23 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHC.23 | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
220.0 |
RPL08.WP3B.012260 |
RPL08.Conn EF2<>DHC.23 Pull Pigtails (384F) P2&3 (MES) | EF2<>DHC.23 | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
216.2 |
RPL08.WP3B.013200 |
RPL08.Conn EF1<>DHD.34 Install (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHD.34 | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
228.8 |
RPL08.WP3B.013920 |
RPL08.Conn EF2<>DHD.34 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHD.34 | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
228.8 |
RPL08.WP4.021740 |
RPL08.Conn DHA.10 Install (A-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 07/14/27 | 07/15/27 | 2.5 | 2.5 |
|
156.2 |
RPL08.WP4.021980 |
RPL08.Conn DHA.10 Install (A-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 07/14/27 | 07/15/27 | 2.5 | 2.5 |
|
158.8 |
RPL08.WP4.022460 |
RPL08.Conn DHA.10 Install (A-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 07/14/27 | 07/19/27 | 5.0 | 5.0 |
|
158.8 |
RPL08.WP4.023660 |
RPL08.Conn DHA.10.37 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/14/27 | 07/15/27 | 2.5 | 2.5 |
|
166.2 |
RPL08.WP4.027100 |
RPL08.Conn DHA.10.38 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/14/27 | 07/15/27 | 2.5 | 2.5 |
|
166.2 |
RPL08.WP4.027760 |
RPL08.Conn DHC.23 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
238.8 |
RPL08.WP4.027780 |
RPL08.Conn DHC.24 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
238.8 |
RPL08.WP4.028240 |
RPL08.Conn DHC.23.09 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/14/27 | 07/27/27 | 12.5 | 12.5 |
|
200.0 |
RPL08.WP4.028260 |
RPL08.Conn DHC.24.13 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/14/27 | 07/27/27 | 12.5 | 12.5 |
|
200.0 |
RPL08.WP4.029600 |
RPL08.Conn DHC.23 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
231.2 |
RPL08.WP4.030240 |
RPL08.Conn DHC.24 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
231.2 |
RPL08.WP4.032280 |
RPL08.Conn DHD.33.19<>19 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 07/14/27 | 07/16/27 | 3.8 | 3.8 |
|
236.2 |
RPL08.WP4.032820 |
RPL08.Conn DHD.34.23<>23 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 07/14/27 | 07/16/27 | 3.8 | 3.8 |
|
236.2 |
RPL08.WP4.034060 |
RPL08.Conn DHA.05.17<>17 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
166.2 |
RPL08.WP4.034080 |
RPL08.Conn DHA.06.21<>21 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 07/14/27 | 07/14/27 | 1.2 | 1.2 |
|
166.2 |
RPL08.WP4.034380 |
RPL08.Conn DHA.05 Install (Z-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 07/14/27 | 07/15/27 | 2.5 | 2.5 |
|
161.2 |
RPL08.WP4.034400 |
RPL08.Conn DHA.06 Install (Z-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 07/14/27 | 07/15/27 | 2.5 | 2.5 |
|
161.2 |
GCD.RPL08.2606 |
L3/L4 Start - DHB Rows 09-16 | DH | Not Started | 07/15/27 | 07/15/27 | 0.0 | 0.0 |
|
138.8 |
RPL08.CON.WP3B.03540 |
RPL08.Conn EF2<>DHC.24 - WBS Summary | EF2<>DHC.24 | Not Started | 07/15/27 | 07/28/27 | 12.5 | 12.5 |
|
226.2 |
RPL08.CON.WP3B.03580 |
RPL08.Conn EF1<>DHC.24 - WBS Summary | EF1<>DHC.24 | Not Started | 07/15/27 | 07/28/27 | 12.5 | 12.5 |
|
226.2 |
RPL08.CX.DHB.01080 |
RPL08.CX.DHB - L3/L4 - Elec. Domain 03/04 | DHB ELECTRICAL | Not Started | 07/15/27 | 07/20/27 | 5.0 | 5.0 |
|
47.5 |
RPL08.CX.DHB.01100 |
RPL08.CX.DHB - L3/L4 - Control Fault Domain 01 | Control Fault Domain 1 | Not Started | 07/15/27 | 08/18/27 | 31.2 | 31.2 |
|
21.2 |
RPL08.CX.DHB.01200 |
RPL08.CX.DHB - L3/L4 - Remaining Electrical Equipment | DHB ELECTRICAL | Not Started | 07/15/27 | 07/21/27 | 6.2 | 6.2 |
|
132.5 |
RPL08.INT.EC.9120 |
RPL08.Interior.ECr LO #14 - Hang Drywall | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 07/15/27 | 07/20/27 | 5.0 | 5.0 |
|
183.8 |
RPL08.INT.EC.LO.9160 |
RPL08.Interior.EC LO #14 - Install Remaining Lights | Interior Leave Out Wall #14 DHD/EC for DHB&D HACs | Not Started | 07/15/27 | 07/20/27 | 5.0 | 5.0 |
|
165.0 |
RPL08.WP3B.011560 |
RPL08.Conn EF1<>DHC.24 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHC.24 | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
220.0 |
RPL08.WP3B.012280 |
RPL08.Conn EF2<>DHC.24 Pull Pigtails (384F) P2&3 (MES) | EF2<>DHC.24 | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
216.2 |
RPL08.WP3B.012980 |
RPL08.Conn EF1<>DHC.23 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHC.23 | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
227.5 |
RPL08.WP3B.013700 |
RPL08.Conn EF2<>DHC.23 Install (A-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.23 | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
227.5 |
RPL08.WP3B.014640 |
RPL08.Conn EF1<>DHD.34 Splice (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHD.34 | Not Started | 07/15/27 | 07/22/27 | 7.5 | 7.5 |
|
228.8 |
RPL08.WP3B.015360 |
RPL08.Conn EF2<>DHD.34 Splice (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHD.34 | Not Started | 07/15/27 | 07/22/27 | 7.5 | 7.5 |
|
228.8 |
RPL08.WP3B.016080 |
RPL08.Conn EF1<>DHD.34 Install (Z-End) Pigtails (384F) P1&4 (MES) | EF1<>DHD.34 | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
228.8 |
RPL08.WP3B.016800 |
RPL08.Conn EF2<>DHD.34 Install (Z-End) Pigtails (384F) P2&3 (LV) | EF2<>DHD.34 | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
228.8 |
RPL08.WP4.028280 |
RPL08.Conn DHC.23 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
238.8 |
RPL08.WP4.028300 |
RPL08.Conn DHC.24 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
238.8 |
RPL08.WP4.030440 |
RPL08.Conn DHC.23.09<>09 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 07/15/27 | 07/19/27 | 3.8 | 3.8 |
|
231.2 |
RPL08.WP4.030480 |
RPL08.Conn DHC.23 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 07/15/27 | 07/19/27 | 3.8 | 3.8 |
|
247.5 |
RPL08.WP4.030920 |
RPL08.Conn DHC.24.13<>13 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 07/15/27 | 07/19/27 | 3.8 | 3.8 |
|
231.2 |
RPL08.WP4.030960 |
RPL08.Conn DHC.24 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 07/15/27 | 07/19/27 | 3.8 | 3.8 |
|
247.5 |
RPL08.WP4.032000 |
RPL08.Conn DHD.33.17<>17 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
247.5 |
RPL08.WP4.032580 |
RPL08.Conn DHD.34.21<>21 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
247.5 |
RPL08.WP4.034180 |
RPL08.Conn DHD.29.03 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/15/27 | 07/16/27 | 2.5 | 2.5 |
|
248.8 |
RPL08.WP4.034200 |
RPL08.Conn DHD.30.07 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/15/27 | 07/16/27 | 2.5 | 2.5 |
|
248.8 |
RPL08.WP4.034620 |
RPL08.Conn DHD.29.04 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/15/27 | 07/28/27 | 12.5 | 12.5 |
|
236.2 |
RPL08.WP4.034640 |
RPL08.Conn DHD.30.08 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 07/15/27 | 07/28/27 | 12.5 | 12.5 |
|
236.2 |
RPL08.WP4.034700 |
RPL08.Conn DHA.05.19<>19 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
166.2 |
RPL08.WP4.034720 |
RPL08.Conn DHA.06.23<>23 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 07/15/27 | 07/15/27 | 1.2 | 1.2 |
|
166.2 |
GCD.RPL08.4205 |
[RPL08] TC-C Ready : EF Pathways complete [DHD] | TC-C Ready: Production Cabling - DHD | Not Started | 07/16/27 | 07/16/27 | 0.0 | 0.0 |
|
317.5 |
GCD.RPL08.4245 |
[RPL08] TC-C Ready : Overhead cable tray complete [DHD] | TC-C Ready: Production Cabling - DHD | Not Started | 07/16/27 | 07/16/27 | 0.0 | 0.0 |
|
317.5 |
RPL08.CON.WP2.09020 |
RPL08.Conn - GSIDF/DH C1 - WBS Summary | Int. IDF Stick Built - GSIDF8C1 | Not Started | 07/16/27 | 08/09/27 | 21.2 | 21.2 |
|
297.5 |
RPL08.CON.WP2.09040 |
RPL08.Conn - GSIDF/DH C1 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 07/16/27 | 07/22/27 | 6.2 | 6.2 |
|
248.8 |
RPL08.CON.WP4.09660 |
RPL08.Conn B CFD5 - Deliver & Install - ORV3N (Loading at Night) | OFE- Passive In-row Racks, Racks (ORv3Ns, MCRs) & PON | Not Started | 07/16/27 | 07/27/27 | 10.0 | 10.0 |
|
133.8 |
RPL08.CON.WP4.09680 |
RPL08.Conn B CFD5 - Deliver & Assemble - PON | OFE- Passive In-row Racks, Racks (ORv3Ns, MCRs) & PON | Not Started | 07/16/27 | 07/27/27 | 10.0 | 10.0 |
|
138.8 |
RPL08.INT.DHC.01680 |
RPL08.Interior.DHC - Control Fault Domain 4 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 07/16/27 | 08/12/27 | 25.0 | 25.0 |
|
205.0 |
RPL08.INT.EC.9140 |
RPL08.Interior.ECr LO #14 - Install DAS (Distribution Antenna System) | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
183.8 |
RPL08.INT.EC.9160 |
RPL08.Interior.ECr LO #14 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 07/16/27 | 07/20/27 | 3.8 | 3.8 |
|
190.0 |
RPL08.INT.EC.LO.9180 |
RPL08.Interior.EC LO #14 - Electrical Trim Out | Interior Leave Out Wall #14 DHD/EC for DHB&D HACs | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
165.0 |
RPL08.INT.EC.LO.9200 |
RPL08.Interior.EC LO #14 - Security Trim Out | Interior Leave Out Wall #14 DHD/EC for DHB&D HACs | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
165.0 |
RPL08.INT.ENDC.5000 |
RPL08.Interior.EC Ext. Leave Out #19 - Close Exterior Leave Out #19 (CC - South) WBS Summary | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 07/16/27 | 10/08/27 | 75.0 | 75.0 |
|
170.0 |
RPL08.INT.ENDC.5020 |
RPL08.Interior.EC Ext. Leave Out #19 - IMP In Wall MEP | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 07/16/27 | 07/19/27 | 2.5 | 2.5 |
|
142.5 |
RPL08.INT.ENDC.5640 |
RPL08.Interior.EC Ext. Leave Out #18 - Tape Finish Paint | Exterior Leave Out Wall #18 EC - North for DHB&D HACs | Not Started | 07/16/27 | 07/22/27 | 6.2 | 6.2 |
|
152.5 |
RPL08.SKN.E.LO.04120 |
RPL08.SKIN.LO#19 - Install IMP Flashing & Caulking | Build back Exterior Leave Out Walls #19 (EC - South) | Not Started | 07/16/27 | 07/19/27 | 2.5 | 2.5 |
|
142.5 |
RPL08.WP3B.013000 |
RPL08.Conn EF1<>DHC.24 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHC.24 | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
226.2 |
RPL08.WP3B.013720 |
RPL08.Conn EF2<>DHC.24 Install (A-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.24 | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
226.2 |
RPL08.WP3B.014420 |
RPL08.Conn EF1<>DHC.23 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHC.23 | Not Started | 07/16/27 | 07/23/27 | 7.5 | 7.5 |
|
227.5 |
RPL08.WP3B.015140 |
RPL08.Conn EF2<>DHC.23 Splice (A-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.23 | Not Started | 07/16/27 | 07/23/27 | 7.5 | 7.5 |
|
227.5 |
RPL08.WP3B.015860 |
RPL08.Conn EF1<>DHC.23 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHC.23 | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
227.5 |
RPL08.WP3B.016580 |
RPL08.Conn EF2<>DHC.23 Install (Z-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.23 | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
227.5 |
RPL08.WP4.028720 |
RPL08.Conn DHC.23 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
238.8 |
RPL08.WP4.028740 |
RPL08.Conn DHC.24 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
238.8 |
RPL08.WP4.033280 |
RPL08.Conn DHB.17.26<>25 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
148.8 |
RPL08.WP4.033560 |
RPL08.Conn DHB.17 Install (Z-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 07/16/27 | 07/19/27 | 2.5 | 2.5 |
|
143.8 |
RPL08.WP4.033580 |
RPL08.Conn DHB.18 Install (Z-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 07/16/27 | 07/19/27 | 2.5 | 2.5 |
|
143.8 |
RPL08.WP4.034120 |
RPL08.Conn DHB.18.30<>29 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | In-Row | Not Started | 07/16/27 | 07/16/27 | 1.2 | 1.2 |
|
151.2 |
RPL08.WP4.035100 |
RPL08.Conn DHA.05 Install (Z-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 07/16/27 | 07/21/27 | 5.0 | 5.0 |
|
161.2 |
RPL08.WP4.035120 |
RPL08.Conn DHA.06 Install (Z-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 07/16/27 | 07/21/27 | 5.0 | 5.0 |
|
161.2 |
RPL08.WP4.046960 |
RPL08.Conn BE ISP DHB.NC3 Install Trunks Extenders FTSW (RSL) to STSW 288f | Network Core 3 | Not Started | 07/16/27 | 07/20/27 | 3.8 | 3.8 |
|
300.0 |
RPL08.WP4.047400 |
RPL08.Conn BE ISP DHA.NC1 Install Trunks Extenders FTSW (RSL) to STSW 288f | Network Core 1 | Not Started | 07/16/27 | 07/20/27 | 3.8 | 3.8 |
|
240.0 |
RPL08.EY.DHD.01400 |
RPL08.EY.DHD - Cure for Remaining Equipment Pads (High Early Mix) | Foundations | Not Started | 07/17/27 | 07/23/27 | 8.8 | 8.8 |
|
320.0 |
GCD.RPL08.1390 |
IMP Complete - RPL08 | Construction Milestones | Not Started | 07/19/27 | 07/19/27 | 0.0 | 0.0 |
|
181.2 |
RPL08.CON.WP4.06600 |
RPL08.Conn WP4 FENW DHD CFD4 Infrastructure | Infrastructure | Not Started | 07/19/27 | 08/13/27 | 25.0 | 25.0 |
|
223.8 |
RPL08.Conn.FIM.01320 |
RPL08.Conn FIM - DHB - Control Fault Domain B.5 | DHB | Not Started | 07/19/27 | 08/13/27 | 25.0 | 25.0 |
|
133.8 |
RPL08.EY.DHD.01390 |
RPL08.EY.DHD - Install Remaining EY Paving | Hardscape and Landscape | Not Started | 07/19/27 | 07/23/27 | 6.2 | 6.2 |
|
260.0 |
RPL08.INT.DHD.01620 |
RPL08.Conn DHD - CFD4 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 07/19/27 | 07/21/27 | 3.8 | 3.8 |
|
192.5 |
RPL08.INT.DHD.01960 |
RPL08.Interior.DHD - Final Clean | Tie-Ins | Not Started | 07/19/27 | 07/22/27 | 5.0 | 5.0 |
|
261.2 |
RPL08.INT.DHD.02650 |
RPL08.Conn DHD - CFD4 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 07/19/27 | 07/21/27 | 3.8 | 3.8 |
|
223.8 |
RPL08.INT.EC.9180 |
RPL08.Interior.ECr LO #14 - Install Remaining Lights | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 07/19/27 | 07/22/27 | 5.0 | 5.0 |
|
183.8 |