Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL08 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:14 PM
· 5122 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL08.INT.EC.9640 |
RPL08.Interior.EC LO #15 - Hang Drywall | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 08/04/27 | 08/09/27 | 5.0 | 5.0 |
|
171.2 |
RPL08.INT.EC.LO.9660 |
RPL08.Interior.EC LO #15 - Install Remaining Lights | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 08/04/27 | 08/09/27 | 5.0 | 5.0 |
|
161.2 |
RPL08.INT.ENDC.1760 |
RPL08.Interior.End-Corridor - BoW - Install Flooring Tiles/Resinous Flooring in specific rooms | Balance of Walls & Overhead | Not Started | 08/04/27 | 08/10/27 | 6.2 | 6.2 |
|
165.0 |
RPL08.INT.ENDC.1900 |
RPL08.Interior.End-Corridor - BoW - QC | Balance of Walls & Overhead | Not Started | 08/04/27 | 08/10/27 | 6.2 | 6.2 |
|
165.0 |
RPL08.INT.ENDC.4040 |
RPL08.Interior.EC Ext. Leave Out #18 - Install Remaining Horizontal Steel Supports for Cable Tray (IFP Add) | Exterior Leave Out Wall #18 EC - North for DHB&D HACs | Not Started | 08/04/27 | 08/05/27 | 2.5 | 2.5 |
|
152.5 |
RPL08.WP3B.015200 |
RPL08.Conn EF2<>DHC.26 Splice (A-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.26 | Not Started | 08/04/27 | 08/11/27 | 7.5 | 7.5 |
|
211.2 |
RPL08.WP3B.016640 |
RPL08.Conn EF2<>DHC.26 Install (Z-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.26 | Not Started | 08/04/27 | 08/04/27 | 1.2 | 1.2 |
|
211.2 |
RPL08.WP3B.017540 |
RPL08.Conn EF1<>DHD.35 Test Pigtails (384F) P1&4 (MES) | EF1<>DHD.35 | Not Started | 08/04/27 | 08/05/27 | 2.5 | 2.5 |
|
218.8 |
RPL08.WP3B.018260 |
RPL08.Conn EF2<>DHD.35 Test Pigtails (384F) P2&3 (LV) | EF2<>DHD.35 | Not Started | 08/04/27 | 08/05/27 | 2.5 | 2.5 |
|
218.8 |
RPL08.WP4.035820 |
RPL08.Conn DHC.25.17<>17 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/04/27 | 08/04/27 | 1.2 | 1.2 |
|
230.0 |
RPL08.WP4.036080 |
RPL08.Conn DHC.26.21<>21 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/04/27 | 08/04/27 | 1.2 | 1.2 |
|
230.0 |
RPL08.WP4.037960 |
RPL08.Conn DHC.21.03 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/04/27 | 08/05/27 | 2.5 | 2.5 |
|
231.2 |
RPL08.WP4.037980 |
RPL08.Conn DHC.22.07 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/04/27 | 08/05/27 | 2.5 | 2.5 |
|
231.2 |
RPL08.WP4.038140 |
RPL08.Conn DHC.21.04 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/04/27 | 08/17/27 | 12.5 | 12.5 |
|
218.8 |
RPL08.WP4.038160 |
RPL08.Conn DHC.22.08 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/04/27 | 08/17/27 | 12.5 | 12.5 |
|
218.8 |
RPL08.WP4.039520 |
RPL08.Conn DHA.09.36<>35 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/04/27 | 08/04/27 | 1.2 | 1.2 |
|
146.2 |
RPL08.WP4.039540 |
RPL08.Conn DHA.10.40<>39 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/04/27 | 08/04/27 | 1.2 | 1.2 |
|
146.2 |
GCD.RPL08.4365 |
[RPL08] TC-C Ready : EF Pathways complete [DHC] | TC-C Ready: Production Cabling - DHC | Not Started | 08/05/27 | 08/05/27 | 0.0 | 0.0 |
|
300.0 |
GCD.RPL08.4405 |
[RPL08] TC-C Ready : Overhead cable tray complete [DHC] | TC-C Ready: Production Cabling - DHC | Not Started | 08/05/27 | 08/05/27 | 0.0 | 0.0 |
|
300.0 |
GCD.RPL08.4665 |
L3/L4 Start - DHA Rows 17-24 | DH | Not Started | 08/05/27 | 08/05/27 | 0.0 | 0.0 |
|
132.5 |
RPL08.CX.DHA.01120 |
RPL08.CX.DHA - L3/L4 - Elec. Domain 05/06 | DHA ELECTRICAL | Not Started | 08/05/27 | 08/10/27 | 5.0 | 5.0 |
|
61.2 |
RPL08.INT.EC.9660 |
RPL08.Interior.EC LO #15 - Install DAS (Distribution Antenna System) | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
176.2 |
RPL08.INT.EC.9680 |
RPL08.Interior.EC LO #15 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 08/05/27 | 08/09/27 | 3.8 | 3.8 |
|
181.2 |
RPL08.WP4.037100 |
RPL08.Conn DHD.31.11 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/05/27 | 08/06/27 | 2.5 | 2.5 |
|
230.0 |
RPL08.WP4.037120 |
RPL08.Conn DHD.32.15 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/05/27 | 08/06/27 | 2.5 | 2.5 |
|
230.0 |
RPL08.WP4.037140 |
RPL08.Conn DHD.33.18 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/05/27 | 08/06/27 | 2.5 | 2.5 |
|
230.0 |
RPL08.WP4.037160 |
RPL08.Conn DHD.34.22 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/05/27 | 08/06/27 | 2.5 | 2.5 |
|
230.0 |
RPL08.WP4.037300 |
RPL08.Conn DHD.31.12 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/05/27 | 08/18/27 | 12.5 | 12.5 |
|
217.5 |
RPL08.WP4.037320 |
RPL08.Conn DHD.32.16 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/05/27 | 08/18/27 | 12.5 | 12.5 |
|
217.5 |
RPL08.WP4.037340 |
RPL08.Conn DHD.33.19 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/05/27 | 08/18/27 | 12.5 | 12.5 |
|
205.0 |
RPL08.WP4.037360 |
RPL08.Conn DHD.34.23 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/05/27 | 08/18/27 | 12.5 | 12.5 |
|
205.0 |
RPL08.WP4.037380 |
RPL08.Conn DHD.35.26 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/05/27 | 08/18/27 | 12.5 | 12.5 |
|
192.5 |
RPL08.WP4.037400 |
RPL08.Conn DHD.36.30 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/05/27 | 08/18/27 | 12.5 | 12.5 |
|
192.5 |
RPL08.WP4.038860 |
RPL08.Conn DHD.35.26<>25 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
226.2 |
RPL08.WP4.038880 |
RPL08.Conn DHD.36.30<>29 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
226.2 |
RPL08.WP4.039020 |
RPL08.Conn DHD.35.28<>27 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/05/27 | 08/09/27 | 3.8 | 3.8 |
|
223.8 |
RPL08.WP4.039040 |
RPL08.Conn DHD.36.32<>31 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/05/27 | 08/09/27 | 3.8 | 3.8 |
|
223.8 |
RPL08.WP4.039840 |
RPL08.Conn DHA.09.33<>33 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
146.2 |
RPL08.WP4.039860 |
RPL08.Conn DHA.10.37<>37 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 08/05/27 | 08/05/27 | 1.2 | 1.2 |
|
146.2 |
RPL08.WP4.040080 |
RPL08.Conn DHA.09 Install (Z-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 08/05/27 | 08/06/27 | 2.5 | 2.5 |
|
141.2 |
RPL08.WP4.040100 |
RPL08.Conn DHA.10 Install (Z-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 08/05/27 | 08/06/27 | 2.5 | 2.5 |
|
141.2 |
GCD.RPL08.4985 |
L3/L4 Start - DHD Rows 01-08 | DH | Not Started | 08/06/27 | 08/06/27 | 0.0 | 0.0 |
|
228.8 |
RPL08.CON.WP4.08600 |
RPL08.Conn WP4 FENW DHC CFD4 Infrastructure | Infrastructure | Not Started | 08/06/27 | 09/02/27 | 25.0 | 25.0 |
|
206.2 |
RPL08.CX.DHD.01040 |
RPL08.CX.DHD - L3/L4 - Elec. Domain 01/02 | DHD ELECTRICAL | Not Started | 08/06/27 | 08/11/27 | 5.0 | 5.0 |
|
143.8 |
RPL08.EY.DHD.01460 |
RPL08.EY.DHD - Remaining L2 Checklist Completion | Tie-ins | Not Started | 08/06/27 | 08/12/27 | 6.2 | 6.2 |
|
216.2 |
RPL08.EY.ENDC.01120 |
RPL08.EY.End - Install Perm Paving | Hardscape and Landscape | Not Started | 08/06/27 | 08/12/27 | 6.2 | 6.2 |
|
237.5 |
RPL08.EY.ENDC.01130 |
RPL08.EY.End - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 08/06/27 | 09/02/27 | 25.0 | 25.0 |
|
157.5 |
RPL08.EY.ENDC.01140 |
RPL08.EY.End - Install Mechanical Main (include penetration detail) | Tie-ins | Not Started | 08/06/27 | 08/26/27 | 18.8 | 18.8 |
|
151.2 |
RPL08.EY.ENDC.01160 |
RPL08.EY.End - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 08/06/27 | 10/15/27 | 62.5 | 62.5 |
|
237.5 |
RPL08.EY.ENDC.02120 |
RPL08.EY.End - Install Remaining Permanent Duct with insulation to AHU Units | Temp Conditions | Not Started | 08/06/27 | 08/17/27 | 10.0 | 10.0 |
|
172.5 |
RPL08.INT.DHC.01620 |
RPL08.Conn DHC - CFD4 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 08/06/27 | 08/10/27 | 3.8 | 3.8 |
|
175.0 |
RPL08.INT.DHC.01960 |
RPL08.Interior.DHC - Final Clean | Tie-Ins | Not Started | 08/06/27 | 08/11/27 | 5.0 | 5.0 |
|
253.8 |
RPL08.INT.DHC.02650 |
RPL08.Conn DHC - CFD4 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 08/06/27 | 08/10/27 | 3.8 | 3.8 |
|
206.2 |
RPL08.INT.EC.9340 |
RPL08.Interior.ECr LO #14 - Electrical L2 Checklist Completion | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 08/06/27 | 08/06/27 | 1.2 | 1.2 |
|
183.8 |
RPL08.INT.EC.9700 |
RPL08.Interior.EC LO #15 - Install Remaining Lights | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 08/06/27 | 08/11/27 | 5.0 | 5.0 |
|
176.2 |
RPL08.INT.EC.LO.9560 |
RPL08.Interior.EC LO #15 - Electrical Trim Out | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 08/06/27 | 08/06/27 | 1.2 | 1.2 |
|
166.2 |
RPL08.INT.EC.LO.9580 |
RPL08.Interior.EC LO #15 - Security Trim Out | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 08/06/27 | 08/06/27 | 1.2 | 1.2 |
|
166.2 |
RPL08.INT.EC.LO.9780 |
RPL08.Interior.EC LO #15 - Install Remaining Refrigerant Line | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 08/06/27 | 08/10/27 | 3.8 | 3.8 |
|
172.5 |
RPL08.INT.ENDC.5100 |
RPL08.Interior.EC Ext. Leave Out #19 - Install Electrical Lowside OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 08/06/27 | 08/11/27 | 5.0 | 5.0 |
|
143.8 |
RPL08.INT.ENDC.5120 |
RPL08.Interior.EC Ext. Leave Out #19 - Install Plumbing Lowside OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 08/06/27 | 08/11/27 | 5.0 | 5.0 |
|
143.8 |
RPL08.INT.ENDC.5140 |
RPL08.Interior.EC Ext. Leave Out #19 - Install Fire Life Safety Lowside OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 08/06/27 | 08/11/27 | 5.0 | 5.0 |
|
143.8 |
RPL08.INT.ENDC.5160 |
RPL08.Interior.EC Ext. Leave Out #19 - Install Security Lowside OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 08/06/27 | 08/11/27 | 5.0 | 5.0 |
|
143.8 |
RPL08.INT.ENDC.5180 |
RPL08.Interior.EC Ext. Leave Out #19 - Install Controls / EPMS / BMS OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 08/06/27 | 08/12/27 | 6.2 | 6.2 |
|
142.5 |
RPL08.INT.ENDC.5200 |
RPL08.Interior.EC Ext. Leave Out #19 - Fire Safing OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 08/06/27 | 08/09/27 | 2.5 | 2.5 |
|
146.2 |
RPL08.INT.ENDC.5520 |
RPL08.Interior.EC Ext. Leave Out #19 - Install Remaining Refrigerant Line | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 08/06/27 | 08/10/27 | 3.8 | 3.8 |
|
193.8 |
RPL08.WP3B.017560 |
RPL08.Conn EF1<>DHD.36 Test Pigtails (384F) P1&4 (MES) | EF1<>DHD.36 | Not Started | 08/06/27 | 08/09/27 | 2.5 | 2.5 |
|
216.2 |
RPL08.WP3B.018280 |
RPL08.Conn EF2<>DHD.36 Test Pigtails (384F) P2&3 (LV) | EF2<>DHD.36 | Not Started | 08/06/27 | 08/09/27 | 2.5 | 2.5 |
|
216.2 |
RPL08.WP4.033340 |
RPL08.Conn DHD.35 Install (A-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 08/06/27 | 08/09/27 | 2.5 | 2.5 |
|
218.8 |
RPL08.WP4.033840 |
RPL08.Conn DHD.35 Install (A-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 08/06/27 | 08/09/27 | 2.5 | 2.5 |
|
221.2 |
RPL08.WP4.034580 |
RPL08.Conn DHD.35 Install (A-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 08/06/27 | 08/11/27 | 5.0 | 5.0 |
|
221.2 |
RPL08.WP4.037180 |
RPL08.Conn DHD.35.25 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/06/27 | 08/09/27 | 2.5 | 2.5 |
|
228.8 |
RPL08.WP4.037460 |
RPL08.Conn DHC.25.19<>19 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/06/27 | 08/06/27 | 1.2 | 1.2 |
|
228.8 |
RPL08.WP4.037840 |
RPL08.Conn DHC.25.18<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/06/27 | 08/10/27 | 3.8 | 3.8 |
|
218.8 |
RPL08.WP4.037860 |
RPL08.Conn DHC.26.23<>23 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 08/06/27 | 08/06/27 | 1.2 | 1.2 |
|
228.8 |
RPL08.WP4.038000 |
RPL08.Conn DHC.26.22<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 08/06/27 | 08/10/27 | 3.8 | 3.8 |
|
218.8 |
RPL08.WP4.040280 |
RPL08.Conn DHA.09.35<>35 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 08/06/27 | 08/06/27 | 1.2 | 1.2 |
|
146.2 |
RPL08.WP4.040300 |
RPL08.Conn DHA.10.39<>39 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 08/06/27 | 08/06/27 | 1.2 | 1.2 |
|
146.2 |
RPL08.WP4.047500 |
RPL08.Conn BE ISP DHA.NC4 Install Trunks Extenders FTSW (RSL) to STSW 288f | Network Core 4 | Not Started | 08/06/27 | 08/10/27 | 3.8 | 3.8 |
|
240.0 |
RPL08.CON.WP2.09160 |
RPL08.Conn - CorpNet & FacNet Available (DH C) - All IDFs | WP#02 GS | Not Started | 08/09/27 | 08/09/27 | 0.0 | 0.0 |
|
297.5 |
RPL08.CON.WP2.09220 |
RPL08.Conn - CorpNet & FacNet Available (All locations) | WP#02 GS | Not Started | 08/09/27 | 08/09/27 | 0.0 | 0.0 |
|
297.5 |
RPL08.Conn.MS.01060 |
RPL08.Conn Wifi Ready - DH C (Pred from RPL10 CorpNet needed?) | Connectivity Milestones | Not Started | 08/09/27 | 08/09/27 | 0.0 | 0.0 |
|
248.8 |
RPL08.EY.DHD.01470 |
RPL08.EY.DHD - Install Landscaping | Hardscape and Landscape | Not Started | 08/09/27 | 08/20/27 | 12.5 | 12.5 |
|
286.2 |
RPL08.INT.EC.9360 |
RPL08.Interior.ECr LO #14 - Mechanical L2 Checklist Completion | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 08/09/27 | 08/09/27 | 1.2 | 1.2 |
|
183.8 |
RPL08.WP3B.017340 |
RPL08.Conn EF1<>DHC.25 Test Pigtails (384F) P1&4 (LV) | EF1<>DHC.25 | Not Started | 08/09/27 | 08/10/27 | 2.5 | 2.5 |
|
215.0 |
RPL08.WP4.040600 |
RPL08.Conn DHA.09 Install (Z-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 08/09/27 | 08/12/27 | 5.0 | 5.0 |
|
141.2 |
RPL08.WP4.040620 |
RPL08.Conn DHA.10 Install (Z-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 08/09/27 | 08/12/27 | 5.0 | 5.0 |
|
141.2 |
RPL08.CX.DHD.01060 |
RPL08.CX.DHD - L3/L4 - UPS Start-up | DHD ELECTRICAL | Not Started | 08/10/27 | 08/23/27 | 12.5 | 12.5 |
|
193.8 |
RPL08.EY.DHC.01460 |
RPL08.EY.DHC - Remaining L2 Checklist Completion | Tie-ins | Not Started | 08/10/27 | 08/16/27 | 6.2 | 6.2 |
|
223.8 |
RPL08.EY.ENDC.01180 |
RPL08.EY.End - Install BMS/EPMS Tie-ins | Tie-ins | Not Started | 08/10/27 | 08/30/27 | 18.8 | 18.8 |
|
161.2 |
RPL08.INT.EC.9720 |
RPL08.Interior.EC LO #15 - Tape Finish Paint | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 08/10/27 | 08/16/27 | 6.2 | 6.2 |
|
171.2 |
RPL08.INT.EC.LO.9620 |
RPL08.Interior.EC LO #15 - Plumbing Trim Out | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 08/10/27 | 08/10/27 | 1.2 | 1.2 |
|
166.2 |
RPL08.INT.EC.LO.9640 |
RPL08.Interior.EC LO #15 - Fire Life Safety Trim Out | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 08/10/27 | 08/10/27 | 1.2 | 1.2 |
|
166.2 |
RPL08.INT.EC.LO.9680 |
RPL08.Interior.EC LO #15 - Install Asset Tags | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 08/10/27 | 08/12/27 | 3.8 | 3.8 |
|
161.2 |
RPL08.INT.ENDC.6080 |
RPL08.Interior.EC Ext. Leave Out #19 - Drop Remaining Duct | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 08/10/27 | 08/11/27 | 2.5 | 2.5 |
|
192.5 |
RPL08.WP3B.017360 |
RPL08.Conn EF1<>DHC.26 Test Pigtails (384F) P1&4 (LV) | EF1<>DHC.26 | Not Started | 08/10/27 | 08/11/27 | 2.5 | 2.5 |
|
213.8 |
RPL08.WP3B.018060 |
RPL08.Conn EF2<>DHC.25 Test Pigtails (384F) P2&3 (MES) | EF2<>DHC.25 | Not Started | 08/10/27 | 08/11/27 | 2.5 | 2.5 |
|
213.8 |
RPL08.WP4.033360 |
RPL08.Conn DHD.36 Install (A-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 08/10/27 | 08/11/27 | 2.5 | 2.5 |
|
216.2 |
RPL08.WP4.033860 |
RPL08.Conn DHD.36 Install (A-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 08/10/27 | 08/11/27 | 2.5 | 2.5 |
|
218.8 |
RPL08.WP4.034600 |
RPL08.Conn DHD.36 Install (A-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 08/10/27 | 08/13/27 | 5.0 | 5.0 |
|
218.8 |
RPL08.WP4.035460 |
RPL08.Conn DHA.09.36 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 08/10/27 | 08/11/27 | 2.5 | 2.5 |
|
142.5 |