Schedule Viewer

Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL07 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:16 PM · 5237 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL07.WP4.013320 RPL07.Conn DHA.03 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 01/19/27 01/19/27 1.2 1.2
0%
142.5
RPL07.WP4.013340 RPL07.Conn DHA.04 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 01/19/27 01/19/27 1.2 1.2
0%
142.5
RPL07.WP4.013400 RPL07.Conn DHB.13.10<>09 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 01/19/27 01/19/27 1.2 1.2
0%
137.5
RPL07.WP4.013420 RPL07.Conn DHB.14.14<>13 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Jumpers Not Started 01/19/27 01/19/27 1.2 1.2
0%
137.5
RPL07.WP4.013520 RPL07.Conn DHB.13.12<>11 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 01/19/27 01/22/27 5.0 5.0
0%
133.8
RPL07.WP4.013540 RPL07.Conn DHB.14.16<>15 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Jumpers Not Started 01/19/27 01/22/27 5.0 5.0
0%
133.8
RPL07.WP4.013920 RPL07.Conn DHA.03.09<>09 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 01/19/27 01/21/27 3.8 3.8
0%
133.8
RPL07.WP4.013940 RPL07.Conn DHA.04.13<>13 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 01/19/27 01/21/27 3.8 3.8
0%
133.8
RPL07.WP4.013960 RPL07.Conn DHA.03 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 01/19/27 01/21/27 3.8 3.8
0%
152.5
RPL07.WP4.013980 RPL07.Conn DHA.04 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 01/19/27 01/21/27 3.8 3.8
0%
152.5
RPL07.CON.WP2.08760 RPL07.Conn - GSIDF/DH B1 - Install Cabling (Pull, Splice & terminate) Cabling Not Started 01/20/27 01/27/27 7.5 7.5
0%
291.2
RPL07.CON.WP2.08800 RPL07.Conn - GSIDF/DH B1 - Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 01/20/27 02/04/27 15.0 15.0
0%
123.8
RPL07.CON.WP3B.01980 RPL07.Conn EF1<>DHA.04 - WBS Summary EF1<>DHA.04 Not Started 01/20/27 02/02/27 12.5 12.5
0%
130.0
RPL07.CON.WP4.01400 RPL07.Conn WP4 FENW DHB CFD3 Infrastructure Infrastructure Not Started 01/20/27 02/17/27 25.0 25.0
0%
117.5
RPL07.CX.DHA.01380 RPL07.CX.DHA - L3/L4 - Control Fault Domain 03 - FW Flush and Fill Control Fault Domain 3 Not Started 01/20/27 01/28/27 8.8 8.8
0%
73.8
RPL07.INT.CTRC.2000 RPL07.Interior.Center-Corridor LO #10 & #12 - Close Interior Leave Out #10 DHB/CC (For HACs in DHB) WBS Summary Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 01/20/27 03/03/27 37.5 37.5
0%
41.2
RPL07.INT.CTRC.2520 RPL07.Interior.Center-Corridor LO #10 & #12 - Install IMP Wall at Leave Out (DH B) Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 01/20/27 01/22/27 3.8 3.8
0%
37.5
RPL07.INT.CTRC.2540 RPL07.Interior.Center-Corridor LO #10 & #12 - Tie In MEPF with IMP Wall buildback Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 01/20/27 01/25/27 5.0 5.0
0%
41.2
RPL07.INT.DHA.01580 RPL07.Interior.DHA - Control Fault Domain 4 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 01/20/27 02/17/27 25.0 25.0
0%
55.0
RPL07.INT.DHA.01590 RPL07.Interior.DHA - Control Fault Domain 4 - Pull EMPS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 01/20/27 02/17/27 25.0 25.0
0%
55.0
RPL07.INT.DHA.01600 RPL07.Interior.DHA - Control Fault Domain 4 - Set UPS and Panel (2) Remaining Tie-ins post Mech Side Aisle install Not Started 01/20/27 02/17/27 25.0 25.0
0%
48.8
RPL07.INT.DHB.01560 RPL07.Conn DHB - CFD3 - Set Passive Racks for WP#3b (16) Infrastructure Not Started 01/20/27 01/22/27 3.8 3.8
0%
86.2
RPL07.INT.DHB.01850 RPL07.Interior.DHB - Control Fault Domain 4 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 01/20/27 02/17/27 25.0 25.0
0%
48.8
RPL07.INT.DHB.02840 RPL07.Conn DHB - CFD3 - Set Passive Racks for PON (16) Infrastructure Not Started 01/20/27 01/22/27 3.8 3.8
0%
113.8
RPL07.INT.ENDC.1580 RPL07.Interior.End-Corridor - BoW - Tape Finish Paint Balance of Walls & Overhead Not Started 01/20/27 01/22/27 3.8 3.8
0%
125.0
RPL07.WP3B.011160 RPL07.Conn EF1<>DHA.01 Pull Pigtails (384F) P1&4 (LV) EF1<>DHA.04 Not Started 01/20/27 01/20/27 1.2 1.2
0%
120.0
RPL07.WP3B.012580 RPL07.Conn EF1<>DHA.03 Install (A-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.03 Not Started 01/20/27 01/20/27 1.2 1.2
0%
131.2
RPL07.WP4.013640 RPL07.Conn DHA.03 Pull Trunk (384F) [RSW<>FSW] Trunks Not Started 01/20/27 01/21/27 2.5 2.5
0%
142.5
RPL07.WP4.013660 RPL07.Conn DHA.04 Pull Trunk (384F) [RSW<>FSW] Trunks Not Started 01/20/27 01/21/27 2.5 2.5
0%
142.5
RPL07.INT.CTRC.06920 RPL07.Interior.Center-Corridor - Final Finishes & Fixtures - Fixture Install (Lights) Restrooms Not Started 01/21/27 01/29/27 8.8 8.8
0%
60.0
RPL07.INT.CTRC.06940 RPL07.Interior.Center-Corridor - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (P Restrooms Not Started 01/21/27 01/27/27 6.2 6.2
0%
36.2
RPL07.INT.CTRC.8900 RPL07.Interior.Center-Corridor LO #10 & #12 - Install IMP Wall at Leave Out (DH D) Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 01/21/27 01/25/27 3.8 3.8
0%
41.2
RPL07.INT.SBC.04040 RPL07.Interior.SSB-Corridor - BoW - Final Clean Balance of Walls & Overhead Not Started 01/21/27 01/26/27 5.0 5.0
0%
90.0
RPL07.INT.SSB.01390 RPL07.Interior.SSB - BoW - Plumbing Trim Out Balance of Walls and OverHead Not Started 01/21/27 01/29/27 8.8 8.8
0%
128.8
RPL07.INT.SSB.14680 RPL07.Interior.SSB LO #01 to #05 - Final Clean Finishes Not Started 01/21/27 01/26/27 5.0 5.0
0%
87.5
RPL07.WP3B.012600 RPL07.Conn EF1<>DHA.04 Install (A-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.04 Not Started 01/21/27 01/21/27 1.2 1.2
0%
130.0
RPL07.WP3B.014020 RPL07.Conn EF1<>DHA.03 Splice (A-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.03 Not Started 01/21/27 01/28/27 7.5 7.5
0%
131.2
RPL07.WP3B.015460 RPL07.Conn EF1<>DHA.03 Install (Z-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.03 Not Started 01/21/27 01/21/27 1.2 1.2
0%
131.2
RPL07.INT.DHA.03760 RPL07.Interior.DHA - OFE - Control Fault Domain 5 (Mech Side Aisle) Control Fault Domain 5 Not Started 01/22/27 02/09/27 16.2 16.2
0%
46.2
RPL07.INT.DHB.01770 RPL07.Interior.DHB - Control Fault Domain 5 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 01/22/27 02/19/27 25.0 25.0
0%
46.2
RPL07.INT.DHB.01780 RPL07.Interior.DHB - Control Fault Domain 5 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 01/22/27 02/19/27 25.0 25.0
0%
53.8
RPL07.INT.DHB.01790 RPL07.Interior.DHB - Control Fault Domain 5 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 01/22/27 02/19/27 25.0 25.0
0%
46.2
RPL07.INT.DHB.02280 RPL07.Interior.DHB - Control Fault Domain 5 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 01/22/27 02/19/27 25.0 25.0
0%
46.2
RPL07.INT.DHD.02290 RPL07.Interior.DHD - OFE - Control Fault Domain 1 (HAC) Control Fault Domain 1 Not Started 01/22/27 02/11/27 18.8 18.8
0%
30.0
RPL07.INT.SSB.01520 RPL07.Interior.SSB - Loading Dock and Storage - Install Shelving Loading Dock and Storage Not Started 01/22/27 01/27/27 5.0 5.0
0%
131.2
RPL07.WP3B.014040 RPL07.Conn EF1<>DHA.04 Splice (A-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.04 Not Started 01/22/27 01/29/27 7.5 7.5
0%
130.0
RPL07.WP3B.015480 RPL07.Conn EF1<>DHA.04 Install (Z-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.04 Not Started 01/22/27 01/22/27 1.2 1.2
0%
130.0
RPL07.WP4.014760 RPL07.Conn DHA.03.11<>11 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 01/22/27 01/26/27 3.8 3.8
0%
133.8
RPL07.WP4.014780 RPL07.Conn DHA.04.15<>15 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 01/22/27 01/26/27 3.8 3.8
0%
133.8
GCD.RPL07.3351 [RPL07] FacNet Live RPL07 - DHB - Only MDF2 TC-C Ready: FacNet Live Not Started 01/25/27 01/25/27 0.0 0.0
0%
297.5
GCD.RPL07.3353 [RPL07] FacNet Live RPL07 - DHA - Only MDF1 TC-C Ready: FacNet Live Not Started 01/25/27 01/25/27 0.0 0.0
0%
297.5
GCD.RPL07.3355 [RPL07] FacNet Live RPL07 - DHA&B TC-C Ready: FacNet Live Not Started 01/25/27 01/25/27 0.0 0.0
0%
297.5
GCD.RPL07.3529 [RPL07] TC-C Ready : Production Cabling Start [DHB Rows 17-24] TC-C Ready: Production Cabling - DHB Not Started 01/25/27 01/25/27 0.0 0.0
0%
298.8
ICM.B7.3350 [SSDCB2] CorpNet Live [GS.MDF 1/2 & MSG] Connectivity Not Started 01/25/27 01/25/27 0.0 0.0
0%
266.2
ICM.B7.3355 [SSDCB2] FacNet Live [GS.MDF 1/2 & MSG] Connectivity Not Started 01/25/27 01/25/27 0.0 0.0
0%
266.2
RPL07.CON.WP2.11060 RPL07.Conn - GSMDF1(South)<>DH B - CFD3 Rack #01 Pull, Install & Test PON Trunks MDF1 <> DH B - Rack#01 MES side Not Started 01/25/27 01/27/27 3.8 3.8
0%
121.2
RPL07.CON.WP2.12060 RPL07.Conn - GSMDF2(North)<>DH B - CFD3 Rack #50 Pull, Install & Patch PON Trunks MDF2 <> DH B - Rack#50 LV side Not Started 01/25/27 01/29/27 6.2 6.2
0%
113.8
RPL07.CON.WP3B.01240 RPL07.Conn EF2<>DHB.15 - WBS Summary EF2<>DHB.15 Not Started 01/25/27 02/08/27 13.8 13.8
0%
115.0
RPL07.INT.CTRC.1820 RPL07.Interior.Center-Corridor - BoW - Electrical L2 Checklist Completion Balance of Walls & Overhead Not Started 01/25/27 02/05/27 12.5 12.5
0%
68.8
RPL07.INT.ENDC.1600 RPL07.Interior.End-Corridor - BoW - Electrical Trim Out Balance of Walls & Overhead Not Started 01/25/27 02/02/27 8.8 8.8
0%
125.0
RPL07.INT.ENDC.1620 RPL07.Interior.End-Corridor - BoW - Security Trim Out Balance of Walls & Overhead Not Started 01/25/27 02/02/27 8.8 8.8
0%
125.0
RPL07.INT.ENDC.1640 RPL07.Interior.End-Corridor - BoW - Duct Drops / Trim out Balance of Walls & Overhead Not Started 01/25/27 01/29/27 6.2 6.2
0%
125.0
RPL07.INT.ENDC.1740 RPL07.Interior.End-Corridor - BoW - Install Remaining Lights Balance of Walls & Overhead Not Started 01/25/27 02/05/27 12.5 12.5
0%
143.8
RPL07.INT.ENDC.1980 RPL07.Interior.End-Corridor - BoW - Install Balance Of Refrigerant Line Balance of Walls & Overhead Not Started 01/25/27 01/29/27 6.2 6.2
0%
152.5
RPL07.INT.SSB.01400 RPL07.Interior.SSB - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out Balance of Walls and OverHead Not Started 01/25/27 01/29/27 6.2 6.2
0%
128.8
RPL07.WP3B.012100 RPL07.Conn EF2<>DHB.15 Pull Pigtails (384F) P2&3 (LV) EF2<>DHB.15 Not Started 01/25/27 01/26/27 2.5 2.5
0%
105.0
RPL07.WP4.013760 RPL07.Conn DHB.15 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 01/25/27 01/25/27 1.2 1.2
0%
125.0
RPL07.WP4.013780 RPL07.Conn DHB.16 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 01/25/27 01/25/27 1.2 1.2
0%
125.0
RPL07.WP4.014120 RPL07.Conn DHB.15.17 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 01/25/27 02/05/27 12.5 12.5
0%
86.2
RPL07.WP4.014140 RPL07.Conn DHB.16.21 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 01/25/27 02/05/27 12.5 12.5
0%
86.2
RPL07.WP4.014400 RPL07.Conn DHB.15 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 01/25/27 01/25/27 1.2 1.2
0%
115.0
RPL07.WP4.014420 RPL07.Conn DHB.16 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 01/25/27 01/25/27 1.2 1.2
0%
115.0
RPL07.WP4.014440 RPL07.Conn DHB.13.12<>11 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 01/25/27 01/25/27 1.2 1.2
0%
133.8
RPL07.WP4.014460 RPL07.Conn DHB.14.16<>15 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Jumpers Not Started 01/25/27 01/25/27 1.2 1.2
0%
133.8
RPL07.WP4.014640 RPL07.Conn DHA.03.09<>09 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 01/25/27 01/25/27 1.2 1.2
0%
147.5
RPL07.WP4.014660 RPL07.Conn DHA.04.13<>13 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 01/25/27 01/25/27 1.2 1.2
0%
147.5
RPL07.CX.DHC.01060 RPL07.CX.DHC - L3/L4 - House Power (for mechainical) DHC HOUSE POWER Not Started 01/26/27 02/08/27 12.5 12.5
0%
133.8
RPL07.INT.CTRC.2560 RPL07.Interior.Center-Corridor LO #10 - Install Vertical Tube Steel Support for Cable Tray (IFP Add) Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 01/26/27 01/27/27 2.5 2.5
0%
67.5
RPL07.INT.CTRC.2660 RPL07.Interior.Center-Corridor LO #10 & #12 - Install Mechanical Piping Lowside OH Interior Leave Out Wall #10, #12 (DHB/CC) Not Started 01/26/27 01/28/27 3.8 3.8
0%
41.2
RPL07.INT.CTRC.7760 RPL07.Interior.Center-Corridor LO #10 - Frame Out All Walls Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) Not Started 01/26/27 01/28/27 3.8 3.8
0%
51.2
RPL07.INT.SSB.02200 RPL07.Interior.SSB - Final Finishes & Fixtures - Mechanical L2 Checklist Completion Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) Not Started 01/26/27 02/08/27 12.5 12.5
0%
210.0
RPL07.PR..FE.0040 RPL07.PR.IDFB2 R/S/P and Provisioning at GS.IDF B2 MDFs & IDFs Not Started 01/26/27 03/02/27 31.2 31.2
0%
266.2
RPL07.PR..FE.0060 RPL07.PR.IDFA2 R/S/P and Provisioning at GS.IDF A2 MDFs & IDFs Not Started 01/26/27 03/02/27 31.2 31.2
0%
266.2
RPL07.WP4.014160 RPL07.Conn DHB.15 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 01/26/27 01/26/27 1.2 1.2
0%
125.0
RPL07.WP4.014180 RPL07.Conn DHB.16 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 01/26/27 01/26/27 1.2 1.2
0%
125.0
RPL07.WP4.014800 RPL07.Conn DHB.15.17<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 01/26/27 01/28/27 3.8 3.8
0%
115.0
RPL07.WP4.014820 RPL07.Conn DHB.16.21<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 01/26/27 01/28/27 3.8 3.8
0%
115.0
RPL07.WP4.014840 RPL07.Conn DHB.15 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 01/26/27 01/28/27 3.8 3.8
0%
133.8
RPL07.WP4.014860 RPL07.Conn DHB.16 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 01/26/27 01/28/27 3.8 3.8
0%
133.8
GCD.RPL07.1735 Start FSHAC set in place - RPL07 - DHC&D Construction Milestones Not Started 01/27/27 01/27/27 0.0 0.0
0%
250.0
RPL07.CON.WP2.08820 RPL07.Conn - GSIDF/DH A1 - WBS Summary Int. IDF Stick Build - GSIDF7A1 Not Started 01/27/27 02/19/27 21.2 21.2
0%
275.0
RPL07.CON.WP2.08840 RPL07.Conn - GSIDF/DH A1 - Install Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 01/27/27 02/02/27 6.2 6.2
0%
123.8
RPL07.CON.WP3B.01220 RPL07.Conn EF2<>DHB.16 - WBS Summary EF2<>DHB.16 Not Started 01/27/27 02/10/27 13.8 13.8
0%
110.0
RPL07.CX.DHB.01560 RPL07.CX.DHB - L3/L4 - Control Fault Domain 04 - FW Flush and Fill Control Fault Domain 4 Not Started 01/27/27 02/04/27 8.8 8.8
0%
75.0
RPL07.INT.DHA.01640 RPL07.Interior.DHA - Control Fault Domain 4 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 01/27/27 02/24/27 25.0 25.0
0%
67.5
RPL07.INT.DHA.01670 RPL07.Interior.DHA - Control Fault Domain 4 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) Remaining Tie-ins post Mech Side Aisle install Not Started 01/27/27 02/24/27 25.0 25.0
0%
48.8
RPL07.INT.DHD.02310 RPL07.Interior.DHD - OFE - Control Fault Domain 1 (Mech Side Aisle) Control Fault Domain 1 Not Started 01/27/27 02/12/27 16.2 16.2
0%
37.5
RPL07.INT.ENDC.1700 RPL07.Interior.End-Corridor - BoW - Plumbing Trim Out Balance of Walls & Overhead Not Started 01/27/27 02/02/27 6.2 6.2
0%
125.0
RPL07.INT.ENDC.1720 RPL07.Interior.End-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out Balance of Walls & Overhead Not Started 01/27/27 02/04/27 8.8 8.8
0%
125.0
RPL07.INT.SSB.06480 RPL07.Interior.SSB LO #16 - Final Clean Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 01/27/27 02/01/27 5.0 5.0
0%
67.5