Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL07 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:16 PM
· 5237 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL07.WP4.013320 |
RPL07.Conn DHA.03 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 01/19/27 | 01/19/27 | 1.2 | 1.2 |
|
142.5 |
RPL07.WP4.013340 |
RPL07.Conn DHA.04 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 01/19/27 | 01/19/27 | 1.2 | 1.2 |
|
142.5 |
RPL07.WP4.013400 |
RPL07.Conn DHB.13.10<>09 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 01/19/27 | 01/19/27 | 1.2 | 1.2 |
|
137.5 |
RPL07.WP4.013420 |
RPL07.Conn DHB.14.14<>13 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 01/19/27 | 01/19/27 | 1.2 | 1.2 |
|
137.5 |
RPL07.WP4.013520 |
RPL07.Conn DHB.13.12<>11 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 01/19/27 | 01/22/27 | 5.0 | 5.0 |
|
133.8 |
RPL07.WP4.013540 |
RPL07.Conn DHB.14.16<>15 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 01/19/27 | 01/22/27 | 5.0 | 5.0 |
|
133.8 |
RPL07.WP4.013920 |
RPL07.Conn DHA.03.09<>09 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 01/19/27 | 01/21/27 | 3.8 | 3.8 |
|
133.8 |
RPL07.WP4.013940 |
RPL07.Conn DHA.04.13<>13 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 01/19/27 | 01/21/27 | 3.8 | 3.8 |
|
133.8 |
RPL07.WP4.013960 |
RPL07.Conn DHA.03 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 01/19/27 | 01/21/27 | 3.8 | 3.8 |
|
152.5 |
RPL07.WP4.013980 |
RPL07.Conn DHA.04 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 01/19/27 | 01/21/27 | 3.8 | 3.8 |
|
152.5 |
RPL07.CON.WP2.08760 |
RPL07.Conn - GSIDF/DH B1 - Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 01/20/27 | 01/27/27 | 7.5 | 7.5 |
|
291.2 |
RPL07.CON.WP2.08800 |
RPL07.Conn - GSIDF/DH B1 - Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 01/20/27 | 02/04/27 | 15.0 | 15.0 |
|
123.8 |
RPL07.CON.WP3B.01980 |
RPL07.Conn EF1<>DHA.04 - WBS Summary | EF1<>DHA.04 | Not Started | 01/20/27 | 02/02/27 | 12.5 | 12.5 |
|
130.0 |
RPL07.CON.WP4.01400 |
RPL07.Conn WP4 FENW DHB CFD3 Infrastructure | Infrastructure | Not Started | 01/20/27 | 02/17/27 | 25.0 | 25.0 |
|
117.5 |
RPL07.CX.DHA.01380 |
RPL07.CX.DHA - L3/L4 - Control Fault Domain 03 - FW Flush and Fill | Control Fault Domain 3 | Not Started | 01/20/27 | 01/28/27 | 8.8 | 8.8 |
|
73.8 |
RPL07.INT.CTRC.2000 |
RPL07.Interior.Center-Corridor LO #10 & #12 - Close Interior Leave Out #10 DHB/CC (For HACs in DHB) WBS Summary | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 01/20/27 | 03/03/27 | 37.5 | 37.5 |
|
41.2 |
RPL07.INT.CTRC.2520 |
RPL07.Interior.Center-Corridor LO #10 & #12 - Install IMP Wall at Leave Out (DH B) | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 01/20/27 | 01/22/27 | 3.8 | 3.8 |
|
37.5 |
RPL07.INT.CTRC.2540 |
RPL07.Interior.Center-Corridor LO #10 & #12 - Tie In MEPF with IMP Wall buildback | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 01/20/27 | 01/25/27 | 5.0 | 5.0 |
|
41.2 |
RPL07.INT.DHA.01580 |
RPL07.Interior.DHA - Control Fault Domain 4 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 01/20/27 | 02/17/27 | 25.0 | 25.0 |
|
55.0 |
RPL07.INT.DHA.01590 |
RPL07.Interior.DHA - Control Fault Domain 4 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 01/20/27 | 02/17/27 | 25.0 | 25.0 |
|
55.0 |
RPL07.INT.DHA.01600 |
RPL07.Interior.DHA - Control Fault Domain 4 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 01/20/27 | 02/17/27 | 25.0 | 25.0 |
|
48.8 |
RPL07.INT.DHB.01560 |
RPL07.Conn DHB - CFD3 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 01/20/27 | 01/22/27 | 3.8 | 3.8 |
|
86.2 |
RPL07.INT.DHB.01850 |
RPL07.Interior.DHB - Control Fault Domain 4 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 01/20/27 | 02/17/27 | 25.0 | 25.0 |
|
48.8 |
RPL07.INT.DHB.02840 |
RPL07.Conn DHB - CFD3 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 01/20/27 | 01/22/27 | 3.8 | 3.8 |
|
113.8 |
RPL07.INT.ENDC.1580 |
RPL07.Interior.End-Corridor - BoW - Tape Finish Paint | Balance of Walls & Overhead | Not Started | 01/20/27 | 01/22/27 | 3.8 | 3.8 |
|
125.0 |
RPL07.WP3B.011160 |
RPL07.Conn EF1<>DHA.01 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHA.04 | Not Started | 01/20/27 | 01/20/27 | 1.2 | 1.2 |
|
120.0 |
RPL07.WP3B.012580 |
RPL07.Conn EF1<>DHA.03 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.03 | Not Started | 01/20/27 | 01/20/27 | 1.2 | 1.2 |
|
131.2 |
RPL07.WP4.013640 |
RPL07.Conn DHA.03 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 01/20/27 | 01/21/27 | 2.5 | 2.5 |
|
142.5 |
RPL07.WP4.013660 |
RPL07.Conn DHA.04 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 01/20/27 | 01/21/27 | 2.5 | 2.5 |
|
142.5 |
RPL07.INT.CTRC.06920 |
RPL07.Interior.Center-Corridor - Final Finishes & Fixtures - Fixture Install (Lights) | Restrooms | Not Started | 01/21/27 | 01/29/27 | 8.8 | 8.8 |
|
60.0 |
RPL07.INT.CTRC.06940 |
RPL07.Interior.Center-Corridor - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (P | Restrooms | Not Started | 01/21/27 | 01/27/27 | 6.2 | 6.2 |
|
36.2 |
RPL07.INT.CTRC.8900 |
RPL07.Interior.Center-Corridor LO #10 & #12 - Install IMP Wall at Leave Out (DH D) | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 01/21/27 | 01/25/27 | 3.8 | 3.8 |
|
41.2 |
RPL07.INT.SBC.04040 |
RPL07.Interior.SSB-Corridor - BoW - Final Clean | Balance of Walls & Overhead | Not Started | 01/21/27 | 01/26/27 | 5.0 | 5.0 |
|
90.0 |
RPL07.INT.SSB.01390 |
RPL07.Interior.SSB - BoW - Plumbing Trim Out | Balance of Walls and OverHead | Not Started | 01/21/27 | 01/29/27 | 8.8 | 8.8 |
|
128.8 |
RPL07.INT.SSB.14680 |
RPL07.Interior.SSB LO #01 to #05 - Final Clean | Finishes | Not Started | 01/21/27 | 01/26/27 | 5.0 | 5.0 |
|
87.5 |
RPL07.WP3B.012600 |
RPL07.Conn EF1<>DHA.04 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.04 | Not Started | 01/21/27 | 01/21/27 | 1.2 | 1.2 |
|
130.0 |
RPL07.WP3B.014020 |
RPL07.Conn EF1<>DHA.03 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.03 | Not Started | 01/21/27 | 01/28/27 | 7.5 | 7.5 |
|
131.2 |
RPL07.WP3B.015460 |
RPL07.Conn EF1<>DHA.03 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.03 | Not Started | 01/21/27 | 01/21/27 | 1.2 | 1.2 |
|
131.2 |
RPL07.INT.DHA.03760 |
RPL07.Interior.DHA - OFE - Control Fault Domain 5 (Mech Side Aisle) | Control Fault Domain 5 | Not Started | 01/22/27 | 02/09/27 | 16.2 | 16.2 |
|
46.2 |
RPL07.INT.DHB.01770 |
RPL07.Interior.DHB - Control Fault Domain 5 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 01/22/27 | 02/19/27 | 25.0 | 25.0 |
|
46.2 |
RPL07.INT.DHB.01780 |
RPL07.Interior.DHB - Control Fault Domain 5 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 01/22/27 | 02/19/27 | 25.0 | 25.0 |
|
53.8 |
RPL07.INT.DHB.01790 |
RPL07.Interior.DHB - Control Fault Domain 5 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 01/22/27 | 02/19/27 | 25.0 | 25.0 |
|
46.2 |
RPL07.INT.DHB.02280 |
RPL07.Interior.DHB - Control Fault Domain 5 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 01/22/27 | 02/19/27 | 25.0 | 25.0 |
|
46.2 |
RPL07.INT.DHD.02290 |
RPL07.Interior.DHD - OFE - Control Fault Domain 1 (HAC) | Control Fault Domain 1 | Not Started | 01/22/27 | 02/11/27 | 18.8 | 18.8 |
|
30.0 |
RPL07.INT.SSB.01520 |
RPL07.Interior.SSB - Loading Dock and Storage - Install Shelving | Loading Dock and Storage | Not Started | 01/22/27 | 01/27/27 | 5.0 | 5.0 |
|
131.2 |
RPL07.WP3B.014040 |
RPL07.Conn EF1<>DHA.04 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.04 | Not Started | 01/22/27 | 01/29/27 | 7.5 | 7.5 |
|
130.0 |
RPL07.WP3B.015480 |
RPL07.Conn EF1<>DHA.04 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.04 | Not Started | 01/22/27 | 01/22/27 | 1.2 | 1.2 |
|
130.0 |
RPL07.WP4.014760 |
RPL07.Conn DHA.03.11<>11 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 01/22/27 | 01/26/27 | 3.8 | 3.8 |
|
133.8 |
RPL07.WP4.014780 |
RPL07.Conn DHA.04.15<>15 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 01/22/27 | 01/26/27 | 3.8 | 3.8 |
|
133.8 |
GCD.RPL07.3351 |
[RPL07] FacNet Live RPL07 - DHB - Only MDF2 | TC-C Ready: FacNet Live | Not Started | 01/25/27 | 01/25/27 | 0.0 | 0.0 |
|
297.5 |
GCD.RPL07.3353 |
[RPL07] FacNet Live RPL07 - DHA - Only MDF1 | TC-C Ready: FacNet Live | Not Started | 01/25/27 | 01/25/27 | 0.0 | 0.0 |
|
297.5 |
GCD.RPL07.3355 |
[RPL07] FacNet Live RPL07 - DHA&B | TC-C Ready: FacNet Live | Not Started | 01/25/27 | 01/25/27 | 0.0 | 0.0 |
|
297.5 |
GCD.RPL07.3529 |
[RPL07] TC-C Ready : Production Cabling Start [DHB Rows 17-24] | TC-C Ready: Production Cabling - DHB | Not Started | 01/25/27 | 01/25/27 | 0.0 | 0.0 |
|
298.8 |
ICM.B7.3350 |
[SSDCB2] CorpNet Live [GS.MDF 1/2 & MSG] | Connectivity | Not Started | 01/25/27 | 01/25/27 | 0.0 | 0.0 |
|
266.2 |
ICM.B7.3355 |
[SSDCB2] FacNet Live [GS.MDF 1/2 & MSG] | Connectivity | Not Started | 01/25/27 | 01/25/27 | 0.0 | 0.0 |
|
266.2 |
RPL07.CON.WP2.11060 |
RPL07.Conn - GSMDF1(South)<>DH B - CFD3 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH B - Rack#01 MES side | Not Started | 01/25/27 | 01/27/27 | 3.8 | 3.8 |
|
121.2 |
RPL07.CON.WP2.12060 |
RPL07.Conn - GSMDF2(North)<>DH B - CFD3 Rack #50 Pull, Install & Patch PON Trunks | MDF2 <> DH B - Rack#50 LV side | Not Started | 01/25/27 | 01/29/27 | 6.2 | 6.2 |
|
113.8 |
RPL07.CON.WP3B.01240 |
RPL07.Conn EF2<>DHB.15 - WBS Summary | EF2<>DHB.15 | Not Started | 01/25/27 | 02/08/27 | 13.8 | 13.8 |
|
115.0 |
RPL07.INT.CTRC.1820 |
RPL07.Interior.Center-Corridor - BoW - Electrical L2 Checklist Completion | Balance of Walls & Overhead | Not Started | 01/25/27 | 02/05/27 | 12.5 | 12.5 |
|
68.8 |
RPL07.INT.ENDC.1600 |
RPL07.Interior.End-Corridor - BoW - Electrical Trim Out | Balance of Walls & Overhead | Not Started | 01/25/27 | 02/02/27 | 8.8 | 8.8 |
|
125.0 |
RPL07.INT.ENDC.1620 |
RPL07.Interior.End-Corridor - BoW - Security Trim Out | Balance of Walls & Overhead | Not Started | 01/25/27 | 02/02/27 | 8.8 | 8.8 |
|
125.0 |
RPL07.INT.ENDC.1640 |
RPL07.Interior.End-Corridor - BoW - Duct Drops / Trim out | Balance of Walls & Overhead | Not Started | 01/25/27 | 01/29/27 | 6.2 | 6.2 |
|
125.0 |
RPL07.INT.ENDC.1740 |
RPL07.Interior.End-Corridor - BoW - Install Remaining Lights | Balance of Walls & Overhead | Not Started | 01/25/27 | 02/05/27 | 12.5 | 12.5 |
|
143.8 |
RPL07.INT.ENDC.1980 |
RPL07.Interior.End-Corridor - BoW - Install Balance Of Refrigerant Line | Balance of Walls & Overhead | Not Started | 01/25/27 | 01/29/27 | 6.2 | 6.2 |
|
152.5 |
RPL07.INT.SSB.01400 |
RPL07.Interior.SSB - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls and OverHead | Not Started | 01/25/27 | 01/29/27 | 6.2 | 6.2 |
|
128.8 |
RPL07.WP3B.012100 |
RPL07.Conn EF2<>DHB.15 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.15 | Not Started | 01/25/27 | 01/26/27 | 2.5 | 2.5 |
|
105.0 |
RPL07.WP4.013760 |
RPL07.Conn DHB.15 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 01/25/27 | 01/25/27 | 1.2 | 1.2 |
|
125.0 |
RPL07.WP4.013780 |
RPL07.Conn DHB.16 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 01/25/27 | 01/25/27 | 1.2 | 1.2 |
|
125.0 |
RPL07.WP4.014120 |
RPL07.Conn DHB.15.17 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 01/25/27 | 02/05/27 | 12.5 | 12.5 |
|
86.2 |
RPL07.WP4.014140 |
RPL07.Conn DHB.16.21 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 01/25/27 | 02/05/27 | 12.5 | 12.5 |
|
86.2 |
RPL07.WP4.014400 |
RPL07.Conn DHB.15 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 01/25/27 | 01/25/27 | 1.2 | 1.2 |
|
115.0 |
RPL07.WP4.014420 |
RPL07.Conn DHB.16 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 01/25/27 | 01/25/27 | 1.2 | 1.2 |
|
115.0 |
RPL07.WP4.014440 |
RPL07.Conn DHB.13.12<>11 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 01/25/27 | 01/25/27 | 1.2 | 1.2 |
|
133.8 |
RPL07.WP4.014460 |
RPL07.Conn DHB.14.16<>15 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 01/25/27 | 01/25/27 | 1.2 | 1.2 |
|
133.8 |
RPL07.WP4.014640 |
RPL07.Conn DHA.03.09<>09 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 01/25/27 | 01/25/27 | 1.2 | 1.2 |
|
147.5 |
RPL07.WP4.014660 |
RPL07.Conn DHA.04.13<>13 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 01/25/27 | 01/25/27 | 1.2 | 1.2 |
|
147.5 |
RPL07.CX.DHC.01060 |
RPL07.CX.DHC - L3/L4 - House Power (for mechainical) | DHC HOUSE POWER | Not Started | 01/26/27 | 02/08/27 | 12.5 | 12.5 |
|
133.8 |
RPL07.INT.CTRC.2560 |
RPL07.Interior.Center-Corridor LO #10 - Install Vertical Tube Steel Support for Cable Tray (IFP Add) | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 01/26/27 | 01/27/27 | 2.5 | 2.5 |
|
67.5 |
RPL07.INT.CTRC.2660 |
RPL07.Interior.Center-Corridor LO #10 & #12 - Install Mechanical Piping Lowside OH | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 01/26/27 | 01/28/27 | 3.8 | 3.8 |
|
41.2 |
RPL07.INT.CTRC.7760 |
RPL07.Interior.Center-Corridor LO #10 - Frame Out All Walls | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 01/26/27 | 01/28/27 | 3.8 | 3.8 |
|
51.2 |
RPL07.INT.SSB.02200 |
RPL07.Interior.SSB - Final Finishes & Fixtures - Mechanical L2 Checklist Completion | Final Finishes & Fixtures (Includes Restrooms, Kitchen, TFW, etc.) | Not Started | 01/26/27 | 02/08/27 | 12.5 | 12.5 |
|
210.0 |
RPL07.PR..FE.0040 |
RPL07.PR.IDFB2 R/S/P and Provisioning at GS.IDF B2 | MDFs & IDFs | Not Started | 01/26/27 | 03/02/27 | 31.2 | 31.2 |
|
266.2 |
RPL07.PR..FE.0060 |
RPL07.PR.IDFA2 R/S/P and Provisioning at GS.IDF A2 | MDFs & IDFs | Not Started | 01/26/27 | 03/02/27 | 31.2 | 31.2 |
|
266.2 |
RPL07.WP4.014160 |
RPL07.Conn DHB.15 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 01/26/27 | 01/26/27 | 1.2 | 1.2 |
|
125.0 |
RPL07.WP4.014180 |
RPL07.Conn DHB.16 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 01/26/27 | 01/26/27 | 1.2 | 1.2 |
|
125.0 |
RPL07.WP4.014800 |
RPL07.Conn DHB.15.17<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 01/26/27 | 01/28/27 | 3.8 | 3.8 |
|
115.0 |
RPL07.WP4.014820 |
RPL07.Conn DHB.16.21<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 01/26/27 | 01/28/27 | 3.8 | 3.8 |
|
115.0 |
RPL07.WP4.014840 |
RPL07.Conn DHB.15 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 01/26/27 | 01/28/27 | 3.8 | 3.8 |
|
133.8 |
RPL07.WP4.014860 |
RPL07.Conn DHB.16 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 01/26/27 | 01/28/27 | 3.8 | 3.8 |
|
133.8 |
GCD.RPL07.1735 |
Start FSHAC set in place - RPL07 - DHC&D | Construction Milestones | Not Started | 01/27/27 | 01/27/27 | 0.0 | 0.0 |
|
250.0 |
RPL07.CON.WP2.08820 |
RPL07.Conn - GSIDF/DH A1 - WBS Summary | Int. IDF Stick Build - GSIDF7A1 | Not Started | 01/27/27 | 02/19/27 | 21.2 | 21.2 |
|
275.0 |
RPL07.CON.WP2.08840 |
RPL07.Conn - GSIDF/DH A1 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 01/27/27 | 02/02/27 | 6.2 | 6.2 |
|
123.8 |
RPL07.CON.WP3B.01220 |
RPL07.Conn EF2<>DHB.16 - WBS Summary | EF2<>DHB.16 | Not Started | 01/27/27 | 02/10/27 | 13.8 | 13.8 |
|
110.0 |
RPL07.CX.DHB.01560 |
RPL07.CX.DHB - L3/L4 - Control Fault Domain 04 - FW Flush and Fill | Control Fault Domain 4 | Not Started | 01/27/27 | 02/04/27 | 8.8 | 8.8 |
|
75.0 |
RPL07.INT.DHA.01640 |
RPL07.Interior.DHA - Control Fault Domain 4 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 01/27/27 | 02/24/27 | 25.0 | 25.0 |
|
67.5 |
RPL07.INT.DHA.01670 |
RPL07.Interior.DHA - Control Fault Domain 4 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 01/27/27 | 02/24/27 | 25.0 | 25.0 |
|
48.8 |
RPL07.INT.DHD.02310 |
RPL07.Interior.DHD - OFE - Control Fault Domain 1 (Mech Side Aisle) | Control Fault Domain 1 | Not Started | 01/27/27 | 02/12/27 | 16.2 | 16.2 |
|
37.5 |
RPL07.INT.ENDC.1700 |
RPL07.Interior.End-Corridor - BoW - Plumbing Trim Out | Balance of Walls & Overhead | Not Started | 01/27/27 | 02/02/27 | 6.2 | 6.2 |
|
125.0 |
RPL07.INT.ENDC.1720 |
RPL07.Interior.End-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls & Overhead | Not Started | 01/27/27 | 02/04/27 | 8.8 | 8.8 |
|
125.0 |
RPL07.INT.SSB.06480 |
RPL07.Interior.SSB LO #16 - Final Clean | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 01/27/27 | 02/01/27 | 5.0 | 5.0 |
|
67.5 |