Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL07 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:16 PM
· 5237 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL07.CON.WP4.01800 |
RPL07.Conn WP4 FENW DHB CFD5 Infrastructure | Infrastructure | Not Started | 03/08/27 | 04/05/27 | 25.0 | 25.0 |
|
77.5 |
RPL07.CX.DHA.01500 |
RPL07.CX.DHA - L3/L4 - Control Fault Domain 05 - FW Flush and Fill | Control Fault Domain 5 | Not Started | 03/08/27 | 03/16/27 | 8.8 | 8.8 |
|
73.8 |
RPL07.INT.CTRC.01950 |
RPL07.Interior.Center-Corridor (S) - Install Lighting | Fit out (South) | Not Started | 03/08/27 | 03/16/27 | 8.8 | 8.8 |
|
22.5 |
RPL07.INT.CTRC.02050 |
RPL07.Interior.Center-Corridor (S) - Final Paint and Tube Steel Paint (IFP Add) | Fit out (South) | Not Started | 03/08/27 | 03/19/27 | 12.5 | 12.5 |
|
38.8 |
RPL07.INT.CTRC.8300 |
RPL07.Interior.Center-Corridor LO #10 - Electrical L2 Checklist Completion | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 03/08/27 | 03/08/27 | 1.2 | 1.2 |
|
53.8 |
RPL07.INT.CTRC.8580 |
RPL07.Interior.Center-Corridor LO #11 - Tape Finish Paint | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 03/08/27 | 03/12/27 | 6.2 | 6.2 |
|
41.2 |
RPL07.INT.CTRC.8740 |
RPL07.Interior.Center-Corridor LO #11 - Install Remaining Lights | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 03/08/27 | 03/11/27 | 5.0 | 5.0 |
|
43.8 |
RPL07.INT.DHB.01840 |
RPL07.Conn DHB - CFD5 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 03/08/27 | 03/10/27 | 3.8 | 3.8 |
|
46.2 |
RPL07.INT.DHB.02050 |
RPL07.Interior.DHB - Final Clean | Tie-Ins | Not Started | 03/08/27 | 03/11/27 | 5.0 | 5.0 |
|
101.2 |
RPL07.INT.DHB.02880 |
RPL07.Conn DHB - CFD5 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 03/08/27 | 03/10/27 | 3.8 | 3.8 |
|
75.0 |
RPL07.WP3B.011300 |
RPL07.Conn EF1<>DHB.11 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.11 | Not Started | 03/08/27 | 03/09/27 | 2.5 | 2.5 |
|
56.2 |
RPL07.WP4.019820 |
RPL07.Conn DHA.07.27<>27 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/08/27 | 03/10/27 | 3.8 | 3.8 |
|
96.2 |
RPL07.WP4.020080 |
RPL07.Conn DHA.08.31<>31 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/08/27 | 03/10/27 | 3.8 | 3.8 |
|
96.2 |
RPL07.CX.DHD.01080 |
RPL07.CX.DHD - L4 - WBS Summary (Mechanical) | DHD MECHANICAL | Not Started | 03/09/27 | 08/10/27 | 135.0 | 135.0 |
|
46.2 |
RPL07.CX.DHD.01260 |
RPL07.CX.DHD - L3/L4 - Control Fault Domain 01 - FW Flush and Fill | Control Fault Domain 1 | Not Started | 03/09/27 | 03/17/27 | 8.8 | 8.8 |
|
102.5 |
RPL07.INT.CTRC.07120 |
RPL07.Interior.Center-Corridor - Final Finishes & Fixtures - Electrical L2 Checklist Completion | Restrooms | Not Started | 03/09/27 | 03/22/27 | 12.5 | 12.5 |
|
36.2 |
RPL07.INT.CTRC.3940 |
RPL07.Interior.Center-Corridor LO #11 & #13 - Electrical Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
12.5 |
RPL07.INT.CTRC.3960 |
RPL07.Interior.Center-Corridor LO #11 & #13 - Security Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
12.5 |
RPL07.INT.CTRC.8320 |
RPL07.Interior.Center-Corridor LO #10 - Mechanical L2 Checklist Completion | Remaining of LO Wall #10 (Spoke Parts & Spoke Tech) | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
53.8 |
RPL07.INT.DHD.01260 |
RPL07.Interior.DHD - Control Fault Domain 1 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/09/27 | 04/06/27 | 25.0 | 25.0 |
|
70.0 |
RPL07.INT.DHD.01310 |
RPL07.Interior.DHD - Control Fault Domain 2 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/09/27 | 04/06/27 | 25.0 | 25.0 |
|
83.8 |
RPL07.INT.DHD.01320 |
RPL07.Interior.DHD - Control Fault Domain 2 - Pull EMPS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/09/27 | 04/06/27 | 25.0 | 25.0 |
|
83.8 |
RPL07.INT.DHD.01330 |
RPL07.Interior.DHD - Control Fault Domain 2 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/09/27 | 04/06/27 | 25.0 | 25.0 |
|
71.2 |
RPL07.WP4.019740 |
RPL07.Conn DHA.07.25<>25 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
110.0 |
RPL07.WP4.019980 |
RPL07.Conn DHA.08.29<>29 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
110.0 |
RPL07.WP4.020100 |
RPL07.Conn DHA.05.19 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/09/27 | 03/22/27 | 12.5 | 12.5 |
|
86.2 |
RPL07.WP4.020120 |
RPL07.Conn DHA.06.23 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/09/27 | 03/22/27 | 12.5 | 12.5 |
|
86.2 |
RPL07.WP4.020340 |
RPL07.Conn DHB.15.20 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/09/27 | 03/22/27 | 12.5 | 12.5 |
|
86.2 |
RPL07.WP4.020360 |
RPL07.Conn DHB.16.24 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/09/27 | 03/22/27 | 12.5 | 12.5 |
|
86.2 |
RPL07.WP4.020400 |
RPL07.Conn DHB.18.31<>31 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
98.8 |
RPL07.WP4.020420 |
RPL07.Conn DHB.17.28<>27 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
96.2 |
RPL07.CON.WP3B.01100 |
RPL07.Conn EF1<>DHB.12 - WBS Summary | EF1<>DHB.12 | Not Started | 03/10/27 | 03/24/27 | 13.8 | 13.8 |
|
73.8 |
RPL07.CX.SSBC.01020 |
RPL07.CX.SSB COR - Remaining Electrical Equipment | SSB Corridor | Not Started | 03/10/27 | 03/16/27 | 6.2 | 6.2 |
|
100.0 |
RPL07.EY.SSB.01310 |
RPL07.EY.SSB - Install Lighting | Hardscape and Landscape | Not Started | 03/10/27 | 03/31/27 | 18.8 | 18.8 |
|
67.5 |
RPL07.WP3B.011320 |
RPL07.Conn EF1<>DHB.12 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 03/10/27 | 03/11/27 | 2.5 | 2.5 |
|
56.2 |
RPL07.WP3B.012740 |
RPL07.Conn EF1<>DHB.11 Install (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.11 | Not Started | 03/10/27 | 03/10/27 | 1.2 | 1.2 |
|
76.2 |
RPL07.WP4.033760 |
RPL07.Conn DHB.18.31<>31 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 03/10/27 | 03/10/27 | 1.2 | 1.2 |
|
98.8 |
GCD.RPL07.4005 |
[RPL07] TC-C Ready : Production Cabling Start [DHB Rows 33-40] | TC-C Ready: Production Cabling - DHB | Not Started | 03/11/27 | 03/11/27 | 0.0 | 0.0 |
|
258.8 |
RPL07.CON.WP2.11100 |
RPL07.Conn - GSMDF1(South)<>DH B - CFD5 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH B - Rack#01 MES side | Not Started | 03/11/27 | 03/15/27 | 3.8 | 3.8 |
|
88.8 |
RPL07.CON.WP2.12100 |
RPL07.Conn - GSMDF2(North)<>DH B - CFD5 Rack #50 Pull, Install & Patch PON Trunks | MDF2 <> DH B - Rack#50 LV side | Not Started | 03/11/27 | 03/17/27 | 6.2 | 6.2 |
|
86.2 |
RPL07.CON.WP3B.01400 |
RPL07.Conn EF2<>DHB.19 - WBS Summary | EF2<>DHB.19 | Not Started | 03/11/27 | 03/24/27 | 12.5 | 12.5 |
|
73.8 |
RPL07.INT.CTRC.4040 |
RPL07.Interior.Center-Corridor LO #11 & #13 - Plumbing Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
12.5 |
RPL07.INT.CTRC.4060 |
RPL07.Interior.Center-Corridor LO #11 & #13 - Fire Life Safety Trim Out | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
12.5 |
RPL07.INT.DHC.01220 |
RPL07.Interior.DHC - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/11/27 | 04/08/27 | 25.0 | 25.0 |
|
63.8 |
RPL07.WP3B.012180 |
RPL07.Conn EF2<>DHB.19 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.19 | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
72.5 |
RPL07.WP3B.014180 |
RPL07.Conn EF1<>DHB.11 Splice (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.11 | Not Started | 03/11/27 | 03/18/27 | 7.5 | 7.5 |
|
76.2 |
RPL07.WP3B.015620 |
RPL07.Conn EF1<>DHB.11 Install (Z-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.11 | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
76.2 |
RPL07.WP4.019700 |
RPL07.Conn DHB.19 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
85.0 |
RPL07.WP4.019720 |
RPL07.Conn DHB.20 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
85.0 |
RPL07.WP4.019900 |
RPL07.Conn DHB.19.33 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/11/27 | 03/24/27 | 12.5 | 12.5 |
|
46.2 |
RPL07.WP4.019920 |
RPL07.Conn DHB.20.37 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/11/27 | 03/24/27 | 12.5 | 12.5 |
|
46.2 |
RPL07.WP4.020380 |
RPL07.Conn DHA.07.27<>27 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
108.8 |
RPL07.WP4.020520 |
RPL07.Conn DHA.07.26<>25 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 03/11/27 | 03/16/27 | 5.0 | 5.0 |
|
96.2 |
RPL07.WP4.020660 |
RPL07.Conn DHB.19 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
77.5 |
RPL07.WP4.020680 |
RPL07.Conn DHB.20 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
75.0 |
RPL07.WP4.020700 |
RPL07.Conn DHA.08.31<>31 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
108.8 |
RPL07.WP4.020800 |
RPL07.Conn DHA.08.30<>29 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 03/11/27 | 03/16/27 | 5.0 | 5.0 |
|
96.2 |
RPL07.CON.WP3B.01200 |
RPL07.Conn EF1<>DHB.13 - WBS Summary | EF1<>DHB.13 | Not Started | 03/12/27 | 03/29/27 | 13.8 | 13.8 |
|
71.2 |
RPL07.CON.WP3B.01380 |
RPL07.Conn EF2<>DHB.20 - WBS Summary | EF2<>DHB.20 | Not Started | 03/12/27 | 03/25/27 | 12.5 | 12.5 |
|
72.5 |
RPL07.INT.CTRC.4120 |
RPL07.Interior.Center-Corridor LO #11 & #13 - Install Asset Tags | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 03/12/27 | 03/16/27 | 3.8 | 3.8 |
|
12.5 |
RPL07.INT.CTRC.8680 |
RPL07.Interior.Center-Corridor LO #11 - Install Asset Tags | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 03/12/27 | 03/15/27 | 2.5 | 2.5 |
|
43.8 |
RPL07.INT.SSB.01590 |
RPL07.Interior.SSB - BoW - Electrical L2 Checklist Completion | Balance of Walls and OverHead | Not Started | 03/12/27 | 03/23/27 | 10.0 | 10.0 |
|
77.5 |
RPL07.WP3B.011340 |
RPL07.Conn EF1<>DHB.13 Pull Pigtails (384F) P1&4 (MES) | EF1<>DHB.13 | Not Started | 03/12/27 | 03/15/27 | 2.5 | 2.5 |
|
56.2 |
RPL07.WP3B.012200 |
RPL07.Conn EF2<>DHB.20 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.20 | Not Started | 03/12/27 | 03/12/27 | 1.2 | 1.2 |
|
72.5 |
RPL07.WP3B.012760 |
RPL07.Conn EF1<>DHB.12 Install (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 03/12/27 | 03/12/27 | 1.2 | 1.2 |
|
73.8 |
RPL07.WP3B.013620 |
RPL07.Conn EF2<>DHB.19 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.19 | Not Started | 03/12/27 | 03/12/27 | 1.2 | 1.2 |
|
73.8 |
RPL07.WP3B.016980 |
RPL07.Conn EF1<>DHA.07 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.07 | Not Started | 03/12/27 | 03/15/27 | 2.5 | 2.5 |
|
88.8 |
RPL07.WP4.019940 |
RPL07.Conn DHB.19 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 03/12/27 | 03/12/27 | 1.2 | 1.2 |
|
85.0 |
RPL07.WP4.019960 |
RPL07.Conn DHB.20 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 03/12/27 | 03/12/27 | 1.2 | 1.2 |
|
85.0 |
RPL07.WP4.020940 |
RPL07.Conn DHB.20.37<>37 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 03/12/27 | 03/16/27 | 3.8 | 3.8 |
|
75.0 |
RPL07.WP4.020960 |
RPL07.Conn DHB.19 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 03/12/27 | 03/16/27 | 3.8 | 3.8 |
|
93.8 |
RPL07.WP4.020980 |
RPL07.Conn DHB.20 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 03/12/27 | 03/16/27 | 3.8 | 3.8 |
|
93.8 |
RPL07.WP4.021000 |
RPL07.Conn DHB.19.34<>33 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 03/12/27 | 03/17/27 | 5.0 | 5.0 |
|
77.5 |
RPL07.INT.CTRC.01510 |
RPL07.Interior.Center-Corridor (N) - Remaining L2 Checklist Completion | Fit out (North) | Not Started | 03/15/27 | 03/19/27 | 6.2 | 6.2 |
|
90.0 |
RPL07.INT.CTRC.8600 |
RPL07.Interior.Center-Corridor LO #11 - Electrical Trim Out | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 03/15/27 | 03/17/27 | 3.8 | 3.8 |
|
41.2 |
RPL07.INT.CTRC.8620 |
RPL07.Interior.Center-Corridor LO #11 - Security Trim Out | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 03/15/27 | 03/17/27 | 3.8 | 3.8 |
|
41.2 |
RPL07.INT.CTRC.8880 |
RPL07.Interior.Center-Corridor LO #11 - Install Remaining Refrigerant Line | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 03/15/27 | 03/17/27 | 3.8 | 3.8 |
|
45.0 |
RPL07.INT.DHC.02410 |
RPL07.Interior.DHC - OFE - Control Fault Domain 3 (HAC) | Control Fault Domain 3 | Not Started | 03/15/27 | 03/29/27 | 12.5 | 12.5 |
|
46.2 |
RPL07.INT.DHD.02470 |
RPL07.Interior.DHD - OFE - Control Fault Domain 4 (HAC) | Control Fault Domain 4 | Not Started | 03/15/27 | 03/29/27 | 12.5 | 12.5 |
|
30.0 |
RPL07.WP3B.013640 |
RPL07.Conn EF2<>DHB.20 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.20 | Not Started | 03/15/27 | 03/15/27 | 1.2 | 1.2 |
|
72.5 |
RPL07.WP3B.014200 |
RPL07.Conn EF1<>DHB.12 Splice (A-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 03/15/27 | 03/22/27 | 7.5 | 7.5 |
|
73.8 |
RPL07.WP3B.015060 |
RPL07.Conn EF2<>DHB.19 Splice (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.19 | Not Started | 03/15/27 | 03/22/27 | 7.5 | 7.5 |
|
73.8 |
RPL07.WP3B.015640 |
RPL07.Conn EF1<>DHB.12 Install (Z-End) Pigtails (384F) P1&4 (MES) | EF1<>DHB.12 | Not Started | 03/15/27 | 03/15/27 | 1.2 | 1.2 |
|
73.8 |
RPL07.WP3B.016500 |
RPL07.Conn EF2<>DHB.19 Install (Z-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.19 | Not Started | 03/15/27 | 03/15/27 | 1.2 | 1.2 |
|
73.8 |
RPL07.WP3B.017000 |
RPL07.Conn EF1<>DHA.08 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.08 | Not Started | 03/15/27 | 03/16/27 | 2.5 | 2.5 |
|
93.8 |
RPL07.WP4.020140 |
RPL07.Conn DHB.19 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 03/15/27 | 03/15/27 | 1.2 | 1.2 |
|
85.0 |
RPL07.WP4.020160 |
RPL07.Conn DHB.20 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 03/15/27 | 03/15/27 | 1.2 | 1.2 |
|
85.0 |
GCD.RPL07.3865 |
L3/L4 Start - DHB Rows 33-40 | DH | Not Started | 03/16/27 | 03/16/27 | 0.0 | 0.0 |
|
78.8 |
GCD.RPL07.4725 |
L3/L4 Finish - DHA Rows 09-16 | DH | Not Started | 03/16/27 | 03/16/27 | 0.0 | 0.0 |
|
90.0 |
RPL07.CON.WP3A.01660 |
RPL07.Conn EF2 (North) Install OSP Pathway (for RPL07) - P1 | Infrastructure | Not Started | 03/16/27 | 03/19/27 | 5.0 | 5.0 |
|
245.0 |
RPL07.CON.WP3A.01760 |
RPL07.Conn EF1 (South) Infrastructure 2 (Waterfalls & VCM etc.) | Infrastructure | Not Started | 03/16/27 | 03/30/27 | 12.5 | 12.5 |
|
65.0 |
RPL07.CON.WP3A.01780 |
RPL07.Conn EF2 (North) Pull, Terminate, Install, & Test OSP Cable for RPL10<>RPL07 | Cabling | Not Started | 03/16/27 | 03/19/27 | 5.0 | 5.0 |
|
77.5 |
RPL07.CON.WP3B.01160 |
RPL07.Conn EF1<>DHB.14 - WBS Summary | EF1<>DHB.14 | Not Started | 03/16/27 | 03/31/27 | 13.8 | 13.8 |
|
68.8 |
RPL07.CX.DHB.01150 |
RPL07.CX.DHB - L3/L4 - Elec. Domain 09/10 | DHB ELECTRICAL | Not Started | 03/16/27 | 03/19/27 | 5.0 | 5.0 |
|
47.5 |
RPL07.INT.CTRC.07140 |
RPL07.Interior.Center-Corridor - Final Finishes & Fixtures - Mechanical L2 Checklist Completion | Restrooms | Not Started | 03/16/27 | 03/30/27 | 12.5 | 12.5 |
|
36.2 |
RPL07.INT.CTRC.8700 |
RPL07.Interior.Center-Corridor LO #11 - Install Door (Verify with Trades before installation) | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 03/16/27 | 03/17/27 | 2.5 | 2.5 |
|
43.8 |
RPL07.INT.DHD.01360 |
RPL07.Interior.DHD - Control Fault Domain 2 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/16/27 | 04/13/27 | 25.0 | 25.0 |
|
71.2 |
RPL07.INT.DHD.01410 |
RPL07.Interior.DHD - Control Fault Domain 3 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/16/27 | 04/13/27 | 25.0 | 25.0 |
|
85.0 |
RPL07.INT.DHD.01420 |
RPL07.Interior.DHD - Control Fault Domain 3 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/16/27 | 04/13/27 | 25.0 | 25.0 |
|
91.2 |
RPL07.INT.DHD.01430 |
RPL07.Interior.DHD - Control Fault Domain 3 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 03/16/27 | 04/13/27 | 25.0 | 25.0 |
|
85.0 |