Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:19 PM
· 6139 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
7
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL06.EY.DHD.01810 |
RPL06.EY.DHD - Remaining Connections to SD | GL 25-28 | Not Started | 04/20/26 | 04/20/26 | 1.2 | 1.2 |
|
195.0 |
RPL06.SKN.N.01010 |
RPL06.SKIN.North - Install IMP Insulated Metal Panels System - WBS Summary | DBC Move 2 | Not Started | 04/20/26 | 05/13/26 | 22.5 | 22.5 |
|
393.8 |
RPL06.SKN.S.01000 |
RPL06.SKIN.South - Install IMP - Flashing,Panels & Caulking - Gridlines 6-01/6-09 (33 P with temp closures for openings) | DBC Move 2 | Not Started | 04/20/26 | 04/22/26 | 3.8 | 3.8 |
|
3.8 |
RPL06.STR.DHAB.01035 |
RPL06.Structure.DHAB - Install Decking & Detailing turnover #5 - Grid lines 6-14/6-18 | Steel and Decking | Not Started | 04/20/26 | 04/22/26 | 3.8 | 3.8 |
|
2.5 |
RPL06.STR.DHAB.01060 |
RPL06.Structure.DHAB - Adjust AB to adjust MEP Verts and Grounding wire | Prep | Not Started | 04/20/26 | 04/24/26 | 6.2 | 6.2 |
|
27.5 |
RPL06.STR.DHAB.01070 |
RPL06.Structure.DHAB - Install Remaining UG and Subgrade Prep - WBS Summary | Prep | Not Started | 04/20/26 | 04/29/26 | 10.0 | 10.0 |
|
27.5 |
RPL06.EY.DHD.01790 |
RPL06.EY.DHD - Flow Fill (GL 25-28) - Post East side SD realignment and connections | GL 25-28 | Not Started | 04/21/26 | 04/22/26 | 2.5 | 2.5 |
|
195.0 |
RPL06.MCUP.LP1.1620 |
RPL06.MCUP.Loop 1 - Set mCUPs 06MY.MCUP.04 (1 per 5 days) | OFE | Not Started | 04/21/26 | 04/27/26 | 6.2 | 6.2 |
|
100.0 |
RPL06.SKN.SSB.01070 |
RPL06.SKIN.SSB - Install Security | Glazing, Doors and Ext Devices | Not Started | 04/21/26 | 04/22/26 | 2.5 | 2.5 |
|
288.8 |
RPL06.EY.SSB.01110 |
RPL06.EY.SSB - Install LD Electrical UG | Loading Dock | Not Started | 04/22/26 | 04/27/26 | 5.0 | 5.0 |
|
-11.2 |
RPL06.EY.SSB.01140 |
RPL06.EY.SSB - Install Loading Dock, UG Utilities, OFE - WBS Summary | Loading Dock | Not Started | 04/22/26 | 06/22/26 | 53.8 | 53.8 |
|
197.5 |
RPL06.EY.SSB.02080 |
RPL06.EY.SSB - Flow Fill (South End) | Underground | Not Started | 04/22/26 | 04/23/26 | 2.5 | 2.5 |
|
83.8 |
RPL06.MCUP.LP1.1880 |
RPL06.MCUP.Loop 1 - Tie-in Mechanical #3 | Tie-Ins Mechanical | Not Started | 04/22/26 | 05/08/26 | 16.2 | 16.2 |
|
113.8 |
RPL06.SKN.SSB.01060 |
RPL06.SKIN.SSB - Install Awning over Doors | Glazing, Doors and Ext Devices | Not Started | 04/22/26 | 04/28/26 | 6.2 | 6.2 |
|
295.0 |
RPL06.SKN.SSB.01075 |
RPL06.SKIN.SSB - QC Blocking | Glazing, Doors and Ext Devices | Not Started | 04/22/26 | 04/23/26 | 2.5 | 2.5 |
|
285.0 |
RPL06.SKN.SSB.01100 |
RPL06.SKIN.SSB - Install Roof System - Install Temp Flashing at EJ | Roofing | Not Started | 04/22/26 | 04/23/26 | 2.5 | 2.5 |
|
28.8 |
RPL06.SKN.SSB.01110 |
RPL06.SKIN.SSB - Install Roof System - DenseDeck & Flame Down (6-1 to 6-9) | Roofing | Not Started | 04/22/26 | 04/30/26 | 8.8 | 8.8 |
|
-7.5 |
RPL06.EY.DHA.01110 |
RPL06.EY.DHA - Install SD, DW, FW UG | Underground | Not Started | 04/23/26 | 05/06/26 | 12.5 | 12.5 |
|
47.5 |
RPL06.EY.DHD.01830 |
RPL06.EY.DHD - Flow Fill Cure (GL 25-28) - Post East side SD realignment and connections | GL 25-28 | Not Started | 04/23/26 | 04/25/26 | 3.8 | 3.8 |
|
285.0 |
RPL06.SKN.S.01030 |
RPL06.SKIN.South - Install IMP - Flashing,Panels & Caulking - Gridlines 6-10/6-14 (with temp closures for openings) | DBC Move 2 | Not Started | 04/23/26 | 04/24/26 | 2.5 | 2.5 |
|
3.8 |
RPL06.STR.DHCD.01015 |
RPL06.Structure.DHCD - Install Decking & Detailing turnover #6 - Grid lines 6-18/6-21 | Steel and Decking | Not Started | 04/23/26 | 04/27/26 | 3.8 | 3.8 |
|
2.5 |
GCD.RPL06.1500 |
Start Slab-On-Grade Concrete - RPL06 | Construction Milestones | Not Started | 04/24/26 | 04/24/26 | 0.0 | 0.0 |
|
330.0 |
RPL06.EY.ENDC.01020 |
RPL06.EY.End - Install Foundations, UG Utilities, OFE - WBS Summary | EY.EC | Not Started | 04/24/26 | 05/17/27 | 332.5 | 332.5 |
|
166.2 |
RPL06.EY.ENDC.01300 |
RPL06.EY.DHD.T1 - Install Shallow Tent UG | Tent 1 | Not Started | 04/24/26 | 04/28/26 | 3.8 | 3.8 |
|
3.8 |
RPL06.EY.SSB.02100 |
RPL06.EY.SSB - Flow Fill Cure (South End) | Underground | Not Started | 04/24/26 | 04/26/26 | 3.8 | 3.8 |
|
125.0 |
RPL06.LOG.1860 |
Steel Crane #1 Demobilzation | Steel Crane 1 | Not Started | 04/24/26 | 04/24/26 | 0.0 | 0.0 |
|
43.8 |
RPL06.LOG.1880 |
Steel Crane #2 Demobilization | Steel Crane 2 | Not Started | 04/24/26 | 04/24/26 | 0.0 | 0.0 |
|
43.8 |
RPL06.STR.SSB.01140 |
RPL06.Structure.SSB - SOG F/R/P #1 - Grid lines 6-01/6-04 and Storm Shelter Deck (Pours-1&2) | F/R/P | Not Started | 04/24/26 | 04/30/26 | 6.2 | 6.2 |
|
-7.5 |
RPL06.STR.SSB.01150 |
RPL06.Structure.SSB - SOG F/R/P - WBS Summary | F/R/P | Not Started | 04/24/26 | 05/14/26 | 18.8 | 18.8 |
|
115.0 |
PRE.MIR.1260 |
Balance of Trades SA - Meta Review / Authorization | Meta Internal Review of Trade Partner Bids | Not Started | 04/27/26 | 05/08/26 | 12.5 | 12.5 |
|
120.0 |
PRE.TPA.1240 |
Glass / Metal Panel / Glazing - Award and Issue Subcontract | DPR issue Trade Parter Agreements | Not Started | 04/27/26 | 05/01/26 | 6.2 | 6.2 |
|
220.0 |
RPL.06.D.64120.XG |
Ready for MV Cable Pull mCUP - Loop#1 (Qty 4)* | Give Milestones (XREFs) | Not Started | 04/27/26 | 04/27/26 | 0.0 | 0.0 |
|
496.2 |
RPL06.LOG.1040 |
MCUP 500 Ton Crane Movement 2 | 300 Ton Crane | Not Started | 04/27/26 | 04/27/26 | 0.0 | 0.0 |
|
191.2 |
RPL06.SKN.S.01040 |
RPL06.SKIN.South - Install IMP EJ - Grid lines 6-09/6-10 | DBC Move 2 | Not Started | 04/27/26 | 05/01/26 | 6.2 | 6.2 |
|
15.0 |
RPL06.STR.DHAB.01090 |
RPL06.Structure.DHAB - Asphalt Emulsion and Wrap Steel Columns | Prep | Not Started | 04/27/26 | 04/29/26 | 3.8 | 3.8 |
|
27.5 |
RPL06.EY.SSB.01150 |
RPL06.EY.SSB - Install LD Mechanical UG | Loading Dock | Not Started | 04/28/26 | 05/11/26 | 12.5 | 12.5 |
|
-11.2 |
RPL06.MCUP.LP2.1280 |
RPL06.MCUP.Loop 2 - Set mCUPs XXMY.MCUP.05 (1 per 5 days) | OFE | Not Started | 04/28/26 | 05/04/26 | 6.2 | 6.2 |
|
191.2 |
RPL06.SKN.S.01160 |
RPL06.SKIN.South - Install IMP - Flashing,Panels & Caulking - Gridlines 6-14/6-22 (with temp closures for openings) | DBC Move 2 | Not Started | 04/28/26 | 04/30/26 | 3.8 | 3.8 |
|
2.5 |
RPL06.STR.DHCD.01025 |
RPL06.Structure.DHCD - Install Decking & Detailing turnover #7 - Grid lines 6-21/6-25 | Steel and Decking | Not Started | 04/28/26 | 04/30/26 | 3.8 | 3.8 |
|
6.2 |
RPL06.EY.ENDC.01360 |
RPL06.EY.DHD.T2 - Install Shallow Tent UG | Tent 2 | Not Started | 04/29/26 | 05/01/26 | 3.8 | 3.8 |
|
8.8 |
RPL06.EY.ENDC.1310 |
RPL06.EY.DHD.T1 - Install Tent Final Grading | Tent 1 | Not Started | 04/29/26 | 04/30/26 | 2.5 | 2.5 |
|
3.8 |
RPL06.EY.SSB.02120 |
RPL06.EY.SSB - Flow Fill (North End) | Underground | Not Started | 04/29/26 | 04/30/26 | 2.5 | 2.5 |
|
80.0 |
RPL06.MCUP.LP1.1240 |
RPL06.MCUP.Loop 1 - Set GS.IDF Hut (1x GS.IDF) 6X01 (ROJ03.25.26) | OFE | Not Started | 04/29/26 | 05/05/26 | 6.2 | 6.2 |
|
95.0 |
RPL06.MCUP.LP1.1260 |
RPL06.MCUP.Loop 1 - Set GS.IDF Hut (1x GS.IDF) 6X02 (ROJ03.25.26) | OFE | Not Started | 04/29/26 | 05/05/26 | 6.2 | 6.2 |
|
98.8 |
ICM.B6.1855 |
[SSDCB1] Delivery of MES - Multi Trade Rack (First Delivery) | Construction | Not Started | 05/01/26 | 05/01/26 | 0.0 | 0.0 |
|
126.2 |
PRE.FA.1200 |
Glass / Glazing - Final Agreement | Trade Partner Final Agreement | Not Started | 05/01/26 | 05/01/26 | 0.0 | 0.0 |
|
220.0 |
RPL06.CFCI.5700 |
RPL06 - Submittals Review & Approval - Glass / Frames | Glass & Glazing (Alum. Entrances & Curtainwall) | Not Started | 05/01/26 | 05/21/26 | 18.8 | 18.8 |
|
140.0 |
RPL06.EY.DHC.01100 |
RPL06.EY.DHC - Install SD, DW, FW UG (GL 17-23) | GL 17-23 | Not Started | 05/01/26 | 05/07/26 | 6.2 | 6.2 |
|
178.8 |
RPL06.EY.ENDC.1330 |
RPL06.EY.DHD.T1 - Install F/R/P Tent 1 SOG | Tent 1 | Not Started | 05/01/26 | 05/07/26 | 6.2 | 6.2 |
|
3.8 |
RPL06.EY.SSB.02140 |
RPL06.EY.SSB - Flow Fill Cure (North End) | Underground | Not Started | 05/01/26 | 05/03/26 | 3.8 | 3.8 |
|
116.2 |
RPL06.LOG.1160 |
Dry Cooler 230 Ton Crane Movement 02 | 100 Ton Crane | Not Started | 05/01/26 | 05/01/26 | 0.0 | 0.0 |
|
190.0 |
RPL06.MCUP.LP1.1640 |
RPL06.MCUP.Loop 1 - Set Electrical Skids #3 | OFE | Not Started | 05/01/26 | 05/04/26 | 2.5 | 2.5 |
|
106.2 |
RPL06.MCUP.LP1.1680 |
RPL06.MCUP.Loop 1 - Set Electrical Skids #4 | OFE | Not Started | 05/01/26 | 05/04/26 | 2.5 | 2.5 |
|
106.2 |
RPL06.SKN.N.01030 |
RPL06.SKIN.North - Install IMP - Flashing,Panels & Caulking - Gridlines 6-10/6-14 (with temp closures for openings) | DBC Move 3 | Not Started | 05/01/26 | 05/04/26 | 2.5 | 2.5 |
|
2.5 |
RPL06.SKN.S.01010 |
RPL06.SKIN.South - Install IMP Insulated Metal Panels System - WBS Summary | DBC Move 3 | Not Started | 05/01/26 | 05/27/26 | 22.5 | 22.5 |
|
382.5 |
RPL06.SKN.S.01140 |
RPL06.SKIN.South - Install Stair Tower (DH A) | DBC Move 3 | Not Started | 05/01/26 | 05/04/26 | 2.5 | 2.5 |
|
127.5 |
RPL06.SKN.SSB.01130 |
RPL06.SKIN.SSB - Install Roof System - Final Roof | Roofing | Not Started | 05/01/26 | 05/21/26 | 18.8 | 18.8 |
|
22.5 |
RPL06.STR.DHAB.01110 |
RPL06.Structure.DHAB - SOG F/R/P - Grid Lines 6-11/6-23 - WBS Summary | F/R/P | Not Started | 05/01/26 | 06/14/26 | 37.5 | 37.5 |
|
10.0 |
RPL06.STR.DHAB.01160 |
RPL06.Structure.DHAB - SOG F/R/P #2 - Grid lines 6-04/6-07 (Pour-3) | F/R/P | Not Started | 05/01/26 | 05/04/26 | 2.5 | 2.5 |
|
13.8 |
RPL06.STR.DHCD.01035 |
RPL06.Structure.DHCD - Install Decking & Detailing turnover #8 - Grid lines 6-25/6-28 | Steel and Decking | Not Started | 05/01/26 | 05/06/26 | 5.0 | 5.0 |
|
6.2 |
RPL06.STR.DHCD.01060 |
RPL06.Structure.DHCD - Adjust AB to adjust MEP Verts and Grounding wire | Prep | Not Started | 05/01/26 | 05/07/26 | 6.2 | 6.2 |
|
27.5 |
RPL06.STR.DHCD.01070 |
RPL06.Structure.DHCD - Install Remaining UG and Subgrade Prep - WBS Summary | Prep | Not Started | 05/01/26 | 05/12/26 | 10.0 | 10.0 |
|
27.5 |
RPL06.STR.SSB.01190 |
RPL06.Structure.SSB - Zone SOG Cure | F/R/P | Not Started | 05/01/26 | 05/05/26 | 6.2 | 6.2 |
|
-10.0 |
RPL.06.D.63750.XG |
RMUs Set - mCUP Loop 1 | Give Milestones (XREFs) | Not Started | 05/04/26 | 05/04/26 | 0.0 | 0.0 |
|
490.0 |
RPL06.EY.DHB.01060 |
RPL06.EY.DHB - Install Electrical UG (GL 01-09) | GL 01-09 | Not Started | 05/04/26 | 05/15/26 | 12.5 | 12.5 |
|
45.0 |
RPL06.EY.DHB.01120 |
RPL06.EY.DHB - Install BMS/EPMS UG (GL 01-09) | GL 01-09 | Not Started | 05/04/26 | 05/15/26 | 12.5 | 12.5 |
|
45.0 |
RPL06.EY.DHB.01540 |
RPL06.EY.DHB - Install Grounding UG (GL 01-09) | GL 01-09 | Not Started | 05/04/26 | 05/15/26 | 12.5 | 12.5 |
|
45.0 |
RPL06.EY.ENDC.1610 |
RPL06.EY.DHD.T2 - Install Tent Final Grading | Tent 2 | Not Started | 05/04/26 | 05/05/26 | 2.5 | 2.5 |
|
8.8 |
RPL06.EY.SSB.01000 |
RPL06.EY.SSB - Install F/R/P Equipment Pads | Foundations | Not Started | 05/04/26 | 05/15/26 | 12.5 | 12.5 |
|
81.2 |
RPL06.EY.SSB.01010 |
RPL06.EY.SSB - Install Foundations - WBS Summary | Foundations | Not Started | 05/04/26 | 05/22/26 | 18.8 | 18.8 |
|
81.2 |
RPL06.INT.1000 |
RPL06.Interior.BLDG - Install Priority OH, Walls, OFE and Fitout - WBS Summary | Interior Build-out | Not Started | 05/04/26 | 05/12/27 | 321.2 | 321.2 |
|
98.8 |
RPL06.INT.SSB.01040 |
RPL06.Interior.SSB - Priority - Install Temp Lighting (Show In Model) | Early Priority OH MEPF | Not Started | 05/04/26 | 05/08/26 | 6.2 | 6.2 |
|
-5.0 |
RPL06.MCUP.LP1.1460 |
RPL06.MCUP.Loop 1 - Tie-in Mechanical #1 (Includes FWM) | Tie-Ins Mechanical | Not Started | 05/04/26 | 05/22/26 | 18.8 | 18.8 |
|
101.2 |
RPL06.MCUP.LP1.1980 |
RPL06.MCUP.Loop 1 - Tie-in Mechanical #4 | Tie-Ins Mechanical | Not Started | 05/04/26 | 05/20/26 | 16.2 | 16.2 |
|
103.8 |
RPL06.MCUP.LP2.1220 |
RPL06.MCUP.Loop 2 - Set mCup #5 & #6 - Dry Coolers (12) (4 per week) | OFE | Not Started | 05/04/26 | 05/22/26 | 18.8 | 18.8 |
|
190.0 |
RPL06.VDC.1780 |
T2-4 (DH A & B) - GC QC BIM Model | TIER 2 - 4 - DH A & B | Not Started | 05/04/26 | 05/04/26 | 0.0 | 0.0 |
|
12.5 |
RPL.GF.D.N6145.XG |
GS.IDF Hut 1 Install Complete for RPL06 | Give Milestones (XREFs) | Not Started | 05/05/26 | 05/05/26 | 0.0 | 0.0 |
|
488.8 |
RPL.GF.D.N6155.XG |
GS.IDF Hut 2 Install Complete for RPL06 | Give Milestones (XREFs) | Not Started | 05/05/26 | 05/05/26 | 0.0 | 0.0 |
|
488.8 |
RPL06.INT.SSBC.01020 |
RPL06.Interior.SSB-Corridor - Install Priority OH, Walls, OFE and Fitout - WBS Summary | SSB Corridor | Not Started | 05/05/26 | 12/21/26 | 198.8 | 198.8 |
|
108.8 |
RPL06.INT.SSBC.02410 |
RPL06.Interior.SSBC - Priority GL6.04 - (P0) including GS.EF(2.7). GS.MDF(2.2) & MDF Mech. (4.6) - WBS Summary | Priority Wall Grid Line 6-04 | Not Started | 05/05/26 | 06/08/26 | 30.0 | 30.0 |
|
95.0 |
RPL06.INT.SSBC.02420 |
RPL06.Interior.SSBC - Priority GL6.04 - (P0) Apply Intumescent Paint to Deck (Coordination of soffits to sealer) - Day | Priority Wall Grid Line 6-04 | Not Started | 05/05/26 | 05/13/26 | 8.8 | 8.8 |
|
13.8 |
RPL06.INT.SSBC.06640 |
RPL06.Interior.SSBC - Priority GL6.04 - (P0) Apply Intumescent Paint to Deck (Coordination of soffits to sealer) - Swing | Priority Wall Grid Line 6-04 | Not Started | 05/05/26 | 05/13/26 | 8.8 | 8.8 |
|
13.8 |
RPL06.MCUP.LP1.1820 |
RPL06.MCUP.Loop 1 - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 05/05/26 | 07/08/26 | 56.2 | 56.2 |
|
433.8 |
RPL06.MCUP.LP1.1840 |
RPL06.MCUP.Loop 1 - Install Sleeves MEPL | Hardscape and Landscape | Not Started | 05/05/26 | 05/11/26 | 6.2 | 6.2 |
|
433.8 |
RPL06.MCUP.LP2.1360 |
RPL06.MCUP.Loop 2 - Set mCUPs XXMY.MCUP.06 (1 per 5 days) | OFE | Not Started | 05/05/26 | 05/11/26 | 6.2 | 6.2 |
|
191.2 |
RPL06.SKN.N.01040 |
RPL06.SKIN.North - Install IMP EJ - Grid lines 6-09/6-10 | DBC Move 2 | Not Started | 05/05/26 | 05/11/26 | 6.2 | 6.2 |
|
7.5 |
RPL06.SKN.N.01180 |
RPL06.SKIN.North - Install IMP - Flashing,Panels & Caulking - Gridlines 6-14/6-22 (with temp closures for openings) | DBC Move 3 | Not Started | 05/05/26 | 05/07/26 | 3.8 | 3.8 |
|
2.5 |
RPL06.STR.DHAB.01170 |
RPL06.Structure.DHAB - SOG F/R/P #3 - Grid lines 6-07/6-11 (Pour-4) | F/R/P | Not Started | 05/05/26 | 05/06/26 | 2.5 | 2.5 |
|
17.5 |
GCD.RPL06.1320 |
Steel Complete - RPL06 | Construction Milestones | Not Started | 05/06/26 | 05/06/26 | 0.0 | 0.0 |
|
32.5 |
RPL06.CON.WP2.07000 |
RPL06.Conn - Ext. GSIDFs - WBS Summary | GS.IDF (Exterior) | Not Started | 05/06/26 | 07/28/26 | 72.5 | 72.5 |
|
416.2 |
RPL06.CON.WP2.07200 |
RPL06.Conn - Ext. GSIDF6X01 (mCUP yard) - WBS Summary | Ext. IDF Hut - GSIDF6X01 | Not Started | 05/06/26 | 06/23/26 | 42.5 | 42.5 |
|
446.2 |
RPL06.CON.WP2.07220 |
RPL06.Conn - Ext. GSIDF6X01 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 05/06/26 | 05/06/26 | 1.2 | 1.2 |
|
292.5 |
RPL06.CON.WP2.07400 |
RPL06.Conn - Ext. GSIDF6X02 (mCUP yard) - WBS Summary | Ext. IDF Hut - GSIDF6X02 | Not Started | 05/06/26 | 06/23/26 | 42.5 | 42.5 |
|
446.2 |
RPL06.CON.WP2.07420 |
RPL06.Conn - Ext. GSIDF6X02 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 05/06/26 | 05/06/26 | 1.2 | 1.2 |
|
290.0 |
RPL06.EY.ENDC.1630 |
RPL06.EY.DHD.T2 - Install F/R/P Tent 2 SOG | Tent 2 | Not Started | 05/06/26 | 05/12/26 | 6.2 | 6.2 |
|
8.8 |
RPL06.INT.SSB.01000 |
RPL06.Interior.SSB - Priority - WBS Summary | Priority Walls and OverHead | Not Started | 05/06/26 | 06/29/26 | 47.5 | 47.5 |
|
245.0 |
RPL06.INT.SSB.01005 |
RPL06.Interior - Priority - Install Hangers Support (SSB to Center Corr) (All Trades) | Early Priority OH MEPF | Not Started | 05/06/26 | 05/19/26 | 12.5 | 12.5 |
|
-7.5 |
RPL06.INT.SSB.01020 |
RPL06.Interior.SSB - Install Priority OH, Walls and Fitout - WBS Summary | SSB | Not Started | 05/06/26 | 12/08/26 | 186.2 | 186.2 |
|
202.5 |
RPL06.INT.SSB.03180 |
RPL06.Interior.SSB - Priority - Install Priority Soffit for Wall Tie-Ins/ Rock & HoW & Draft Blanket - Day | Priority Walls and OverHead | Not Started | 05/06/26 | 05/12/26 | 6.2 | 6.2 |
|
63.8 |
RPL06.INT.SSB.06800 |
RPL06.Interior.SSB - Priority - Install Priority Soffit for Wall Tie-Ins/ Rock & HoW & Draft Blanket - Swing | Priority Walls and OverHead | Not Started | 05/06/26 | 05/12/26 | 6.2 | 6.2 |
|
63.8 |