Schedule Viewer

Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:19 PM · 6139 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
2
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL06.INT.DHB.01350 RPL06.Interior.DHB - Control Fault Domain 2 - Install Duct (LV Side) LV Side Tie-ins Not Started 07/29/26 08/03/26 5.0 5.0
0%
72.5
RPL06.INT.DHB.01380 RPL06.Interior.DHB - Tie-ins - Control Fault Domain 2 - WBS Summary Control Fault Domain 2 Not Started 07/29/26 10/19/26 72.5 72.5
0%
43.8
RPL06.INT.DHD.02130 RPL06.Interior.DHD - Priority - Install Mechanical Piping OverHead Not Started 07/29/26 08/13/26 15.0 15.0
0%
58.8
RPL06.INT.DHD.02150 RPL06.Interior.DHD - Priority - Install Electrical OverHead Not Started 07/29/26 08/11/26 12.5 12.5
0%
58.8
RPL06.INT.SSB.01260 RPL06.Interior.SSB - BoW - Install Fire Life Safety Lowside OH and In-wall Balance of Walls and OverHead Not Started 07/29/26 08/06/26 8.8 8.8
0%
130.0
RPL06.INT.SSB.01800 RPL06.Interior.SSB - BoW - Install Plumbing Lowside OH and In-wall Balance of Walls and OverHead Not Started 07/29/26 08/06/26 8.8 8.8
0%
123.8
RPL06.INT.SSB.03060 RPL06.Interior.SSB - Final Finishes & Fixtures - Hang Drywall and Fire/Caulking Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 07/29/26 08/04/26 6.2 6.2
0%
247.5
RPL06.INT.SSB.06660 RPL06.Interior.SSB - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (Pre Drywall) Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 07/29/26 08/04/26 6.2 6.2
0%
235.0
RPL06.INT.SSBC.3600 RPL06.Interior.SSBC LO #06 - Install Asset Tags Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 07/29/26 07/29/26 1.2 1.2
0%
120.0
RPL06.CFCI.5110 RPL06 - Submittals Review & Approval - Carpet (CFCI) Div. 09 - Carpet Not Started 07/30/26 08/26/26 25.0 25.0
0%
138.8
RPL06.INT.CTRC.9020 RPL06.Interior.Center-Corridor - Priority - MEP OH over Cable Tray Priority Walls & Overhead Not Started 07/30/26 08/07/26 8.8 8.8
0%
43.8
RPL06.INT.DHA.01092 RPL06.Interior.DHA - LV Skids and TopHat - Maintenance and Reserve Busways DHA - LV Skids and TopHat Not Started 07/30/26 08/17/26 16.2 16.2
0%
76.2
RPL06.INT.ENDC.6220 RPL06.Interior.End-Cor - Priority GL6.27 - (P3) Install MEP In-Wall/Backing Priority Wall Grid Line 6-27 Not Started 07/30/26 08/03/26 3.8 3.8
0%
188.8
RPL06.INT.SSB.14060 RPL06.Interior.SSB LO #01 to #05 - Install In-Wall Rough-in OH & Framing Not Started 07/30/26 07/31/26 2.5 2.5
0%
72.5
RPL06.INT.SSBC.3520 RPL06.Interior.SSBC LO #06 - Plumbing Trim Out Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 07/30/26 07/31/26 2.5 2.5
0%
127.5
RPL06.INT.SSBC.3620 RPL06.Interior.SSBC LO #06 - Install Door (Verify with Trades before installation) Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 07/30/26 07/30/26 1.2 1.2
0%
120.0
RPL06.MCUP.LP2.1960 RPL06.MCUP.Loop 2 - Install Exterior Signage Hardscape and Landscape Not Started 07/30/26 08/12/26 12.5 12.5
0%
402.5
RPL06.SKN.W.LO.01385 RPL06.SKIN.LO#16 - Cure Stemwall Build back Exterior Leave Out Walls #16 (SSB - North of Loading Dock) Not Started 07/30/26 08/07/26 8.8 8.8
0%
68.8
RPL06.INT.DHA.02325 RPL06.Interior.DHA - Priority - Install Controls / EPMS / BMS OverHead Not Started 07/31/26 08/05/26 5.0 5.0
0%
241.2
RPL06.INT.DHB.01205 RPL06.Interior.DHB - MES Skids - EPMS Tie-Ins DHB - MES Skids Not Started 07/31/26 08/27/26 25.0 25.0
0%
70.0
RPL06.INT.DHB.01440 RPL06.Interior.DHB - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 3 Not Started 07/31/26 09/28/26 51.2 51.2
0%
25.0
RPL06.INT.DHB.01460 RPL06.Interior.DHB - Control Fault Domain 2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 07/31/26 08/05/26 5.0 5.0
0%
81.2
RPL06.INT.DHB.02520 RPL06.Interior.DHB - OFE - Control Fault Domain 3 (LV Side Aisle) Control Fault Domain 3 Not Started 07/31/26 08/05/26 5.0 5.0
0%
33.8
RPL06.INT.ENDC.01200 RPL06.Interior.End-Corridor - Install Controls / EPMS / BMS Fit out Not Started 07/31/26 08/05/26 5.0 5.0
0%
177.5
RPL06.INT.ENDC.6200 RPL06.Interior.End-Cor - Priority GL6.27 - (P3) Install IMP Wall Priority Wall Grid Line 6-27 Not Started 07/31/26 08/05/26 5.0 5.0
0%
131.2
RPL06.INT.SSBC.01180 RPL06.Interior.SSB-Corridor - Install Fitout (GS.MDF Mech & Elec2x, Riser Room, GS Fiber Entry Room, Carrier MDF) - WBS Fit out Not Started 07/31/26 12/21/26 122.5 122.5
0%
108.8
RPL06.INT.SSBC.01210 RPL06.Interior.SSB-Corridor - Install Split Systems/Humidifiers Fit out Not Started 07/31/26 08/06/26 6.2 6.2
0%
158.8
RPL06.INT.SSBC.01390 RPL06.Interior.SSB-Corridor - Install Battery **?? Fit out Not Started 07/31/26 08/13/26 12.5 12.5
0%
128.8
RPL06.INT.SSBC.01590 RPL06.Interior.SSB-Corridor - Install Mechanical Tie-Ins (needs to micro plan) Fit out Not Started 07/31/26 08/06/26 6.2 6.2
0%
165.0
RPL06.INT.SSBC.3540 RPL06.Interior.SSBC LO #06 - Fire Life Safety Trim Out Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 07/31/26 07/31/26 1.2 1.2
0%
127.5
RPL06.INT.SSBC.4560 RPL06.Interior.SSBC LO #07 - Install Remaining Lights Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 07/31/26 08/04/26 3.8 3.8
0%
113.8
RPL06.INT.SSBC.4580 RPL06.Interior.SSBC LO #07 - Install Flooring Tiles/Resinous Flooring in specific rooms Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 07/31/26 08/04/26 3.8 3.8
0%
125.0
RPL06.INT.SSBC.4720 RPL06.Interior.SSBC LO #07 - Fire Safing / Wall Finishes Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 07/31/26 08/03/26 2.5 2.5
0%
121.2
ICM.B6.2550 [SSDCB1] L3/L4 Start mCUP [1-4] - RPL06 Commissioning Not Started 08/03/26 08/03/26 0.0 0.0
0%
243.8
RPL.06.D.63210.XR 500kva Temp Power Skids Energized (First 10 MW or Gen) Receive Milestones (XREFs) Not Started 08/03/26 08/03/26 0.0 0.0
0%
55.0
RPL.06.D.63320.XR Pull and Term MV Skids - RPL06 DHB Receive Milestones (XREFs) Not Started 08/03/26 08/03/26 0.0 0.0
0%
55.0
RPL.06.D.63410.XR SS Power to RPL06 MSG 1B Numeric (Cx Temp) Receive Milestones (XREFs) Not Started 08/03/26 08/03/26 0.0 0.0
0%
55.0
RPL.06.D.63510.XR Substation Perm Power Cutover - RPL06 DH & mCUPs Receive Milestones (XREFs) Not Started 08/03/26 08/03/26 0.0 0.0
0%
55.0
RPL.06.D.63820.XR 100MW Cx Temp Power to MV Skids RPL06 DHB Available Receive Milestones (XREFs) Not Started 08/03/26 08/03/26 0.0 0.0
0%
55.0
RPL06.CX.MCUP.01050 RPL06.CX.mCup Loop 1 - L3/L4 - mCUP mCUP 1-4 Not Started 08/03/26 09/10/26 35.0 35.0
0%
72.5
RPL06.EY.SSB.01260 RPL06.EY.SSB - L2 Checklist Completion Tie-ins Not Started 08/03/26 08/14/26 12.5 12.5
0%
42.5
RPL06.INT.DHA.01120 RPL06.Interior.DHA - OFE - Control Fault Domain 1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 1 Not Started 08/03/26 08/31/26 26.2 26.2
0%
21.2
RPL06.INT.DHA.03480 RPL06.Interior.DHA - OFE - Control Fault Domain 1 (LV Side Aisle) Control Fault Domain 1 Not Started 08/03/26 08/07/26 6.2 6.2
0%
-10.0
RPL06.INT.DHB.01470 RPL06.Interior.DHB - Control Fault Domain 2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 08/03/26 08/06/26 5.0 5.0
0%
81.2
RPL06.INT.SBC.03320 RPL06.Interior.SSB-Corridor - BoW - Install Plumbing Lowside OH and In-wall Balance of Walls & Overhead Not Started 08/03/26 08/11/26 8.8 8.8
0%
63.8
RPL06.INT.SSB.03080 RPL06.Interior.SSB - Loading Dock and Storage - Tape Finish Paint (Top Out) *Verify Scope Loading Dock and Storage Not Started 08/03/26 08/12/26 10.0 10.0
0%
150.0
RPL06.INT.SSB.14080 RPL06.Interior.SSB LO #01 to #05 - Install Mechanical Piping & Refrigerant Lowside OH and in-wall OH & Framing Not Started 08/03/26 08/05/26 3.8 3.8
0%
72.5
RPL06.INT.SSBC.3640 RPL06.Interior.SSBC LO #06 - Electrical L2 Checklist Completion Interior Leave Out Wall #06 SSB/SSBC North for MDF2 Not Started 08/03/26 08/14/26 12.5 12.5
0%
127.5
RPL06.SKN.DHCD.01060 RPL06.SKIN.DHCD - Install Security Glazing, Doors and Ext Devices Not Started 08/03/26 08/04/26 2.5 2.5
0%
295.0
RPL06.CX.MCUP.01350 RPL06.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - Temp Flush Skid (PR Purgerite flush system) Fill and Flush Not Started 08/04/26 08/10/26 6.2 6.2
0%
65.0
RPL06.INT.DHA.03500 RPL06.Interior.DHA - OFE - Control Fault Domain 1 (HAC) Control Fault Domain 1 Not Started 08/04/26 08/28/26 23.8 23.8
0%
-10.0
RPL06.INT.DHB.01490 RPL06.Interior.DHB - Control Fault Domain 3 - Install Duct (LV Side) LV Side Tie-ins Not Started 08/04/26 08/07/26 5.0 5.0
0%
83.8
RPL06.INT.DHB.01520 RPL06.Interior.DHB - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary Control Fault Domain 3 Not Started 08/04/26 11/02/26 80.0 80.0
0%
63.8
RPL06.INT.ENDC.07060 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Install Cement Board/ Drywall Restrooms Not Started 08/04/26 08/10/26 6.2 6.2
0%
190.0
RPL06.INT.ENDC.6240 RPL06.Interior.End-Cor - Priority GL6.27 - (P3) Hang Drywall (Both Sides) Priority Wall Grid Line 6-27 Not Started 08/04/26 08/06/26 3.8 3.8
0%
188.8
RPL06.INT.SSB.01200 RPL06.Interior.SSB - Priority - Install Store Front Frames & Glass (Testing if Required) Balance of Walls and OverHead Not Started 08/04/26 08/24/26 18.8 18.8
0%
140.0
RPL06.INT.SSBC.4420 RPL06.Interior.SSBC LO #07 - Electrical Trim Out Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 08/04/26 08/05/26 2.5 2.5
0%
121.2
RPL06.INT.SSBC.4440 RPL06.Interior.SSBC LO #07 - Security Trim Out Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 08/04/26 08/05/26 2.5 2.5
0%
121.2
RPL06.CFCI.5060 RPL06 - Fabricate / Deliver - Interior Painting (Spec 09 91 23) XX (CFCI) Div. 09 - Painting Not Started 08/05/26 09/01/26 25.0 25.0
0%
146.2
RPL06.CFCI.5140 RPL06 - Fabricate / Deliver -Epoxy Flooring (Spec 09 67 23) XX (CFCI) Div. 09 - Epoxy Flooring Not Started 08/05/26 08/25/26 18.8 18.8
0%
190.0
RPL06.CFCI.5260 RPL06 - Fabricate / Deliver - Specialities (CFCI) Div. 10 - Specialities Not Started 08/05/26 09/16/26 37.5 37.5
0%
120.0
RPL06.CFCI.5370 Campus - Fabricate / Deliver - Landscaping / Irrigation (CFCI) Div. 32 - Landscape/ Irrigation Not Started 08/05/26 10/28/26 75.0 75.0
0%
297.5
RPL06.INT.CTRC.1200 RPL06.Interior.Center-Corridor - Priority - Install Fire Safing/ Seal Penetrations through Soffit (Highside OH space) Priority Walls & Overhead Not Started 08/05/26 08/07/26 3.8 3.8
0%
37.5
RPL06.INT.CTRC.1220 RPL06.Interior.Center-Corridor - BoW - Frame Balance of Wall Balance of Walls & Overhead Not Started 08/05/26 08/11/26 6.2 6.2
0%
37.5
RPL06.INT.CTRC.1230 RPL06.Interior.Center-Corridor - BoW - Balance Of Wall (ERAD, Maintance, Network infra, Spoke, Bathroom, etc) - WBS Summ Balance of Walls & Overhead Not Started 08/05/26 01/20/27 142.5 142.5
0%
37.5
RPL06.INT.CTRC.2020 RPL06.Interior.Center-Corridor - Priority - Fixed Draft/Smoke Curtain Patching Priority Walls & Overhead Not Started 08/05/26 08/07/26 3.8 3.8
0%
37.5
RPL06.INT.DHA.01130 RPL06.Interior.DHA - Control Fault Domain 1 - Install Duct (LV Side) LV Side Tie-ins Not Started 08/05/26 08/11/26 6.2 6.2
0%
46.2
RPL06.INT.DHA.01160 RPL06.Interior.DHA - Tie-ins - Control Fault Domain 1 - WBS Summary Control Fault Domain 1 Not Started 08/05/26 10/15/26 63.8 63.8
0%
32.5
RPL06.INT.DHD.01050 RPL06.Interior.DHD - Priority - Install FA / Linear heat detection OverHead Not Started 08/05/26 08/11/26 6.2 6.2
0%
58.8
RPL06.INT.SSB.06680 RPL06.Interior.SSB - Final Finishes & Fixtures - Install Cement Board/ Drywall Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 08/05/26 08/11/26 6.2 6.2
0%
235.0
RPL06.INT.SSBC.4600 RPL06.Interior.SSBC LO #07 - Install Asset Tags Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 08/05/26 08/05/26 1.2 1.2
0%
113.8
RPL06.INT.DHA.01093 RPL06.Interior.DHA - LV Skids and TopHat - Top Hat Busway DHA - LV Skids and TopHat Not Started 08/06/26 08/24/26 16.2 16.2
0%
76.2
RPL06.INT.DHA.01112 RPL06.Interior.DHA - MES Skids - Piping Tie-Ins & Inspections DHA - MES Skids Not Started 08/06/26 09/02/26 25.0 25.0
0%
57.5
RPL06.INT.DHB.01230 RPL06.Interior.DHB - Control Fault Domain 1 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 08/06/26 09/02/26 25.0 25.0
0%
45.0
RPL06.INT.DHB.01240 RPL06.Interior.DHB - Control Fault Domain 1 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 08/06/26 09/02/26 25.0 25.0
0%
32.5
RPL06.INT.DHB.01580 RPL06.Interior.DHB - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 4 Not Started 08/06/26 10/15/26 62.5 62.5
0%
22.5
RPL06.INT.DHB.01600 RPL06.Interior.DHB - Control Fault Domain 3 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 08/06/26 08/11/26 5.0 5.0
0%
107.5
RPL06.INT.DHB.02120 RPL06.Interior.DHB - Control Fault Domain 1 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 08/06/26 09/02/26 25.0 25.0
0%
32.5
RPL06.INT.DHB.02580 RPL06.Interior.DHB - OFE - Control Fault Domain 4 (LV Side Aisle) Control Fault Domain 4 Not Started 08/06/26 08/11/26 5.0 5.0
0%
46.2
RPL06.INT.DHB.02700 RPL06.Interior.DHB - Control Fault Domain 1 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 08/06/26 09/02/26 25.0 25.0
0%
32.5
RPL06.INT.ENDC.01210 RPL06.Interior.End-Corridor - Install Fire Life Safety OH and In-wall Fit out Not Started 08/06/26 08/19/26 12.5 12.5
0%
177.5
RPL06.INT.ENDC.1205 RPL06.Interior.End-Corridor - Balance Of Wall - (ERAD, Maintance, Network infra, Spoke, etc) - WBS Summary Balance of Walls & Overhead Not Started 08/06/26 04/09/27 210.0 210.0
0%
52.5
RPL06.INT.ENDC.1220 RPL06.Interior.End-Corridor - Frame Balance of Wall Balance of Walls & Overhead Not Started 08/06/26 08/12/26 6.2 6.2
0%
131.2
RPL06.INT.ENDC.6080 RPL06.Interior.End-Corridor - Early In-wall for Ancillary Skids (Room #3.6) Priority Wall Grid Line 6-27 Not Started 08/06/26 08/10/26 3.8 3.8
0%
147.5
RPL06.INT.SSB.14100 RPL06.Interior.SSB LO #01 to #05 - Install Fire Life Safety Lowside OH and In-wall OH & Framing Not Started 08/06/26 08/06/26 1.2 1.2
0%
95.0
RPL06.INT.SSB.14120 RPL06.Interior.SSB LO #01 to #05 - Install Plumbing Lowside OH and In-wall OH & Framing Not Started 08/06/26 08/07/26 2.5 2.5
0%
72.5
RPL06.INT.SSBC.4520 RPL06.Interior.SSBC LO #07 - Plumbing Trim Out Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 08/06/26 08/07/26 2.5 2.5
0%
121.2
RPL06.INT.SSBC.4620 RPL06.Interior.SSBC LO #07 - Install Door (Verify with Trades before installation) Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 08/06/26 08/06/26 1.2 1.2
0%
113.8
RPL06.INT.DHA.01220 RPL06.Interior.DHA - Control Fault Domain 1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 08/07/26 08/13/26 6.2 6.2
0%
55.0
RPL06.INT.DHA.03520 RPL06.Interior.DHA - OFE - Control Fault Domain 1 (Mech Side Aisle) Control Fault Domain 1 Not Started 08/07/26 08/31/26 21.2 21.2
0%
21.2
RPL06.INT.DHB.01610 RPL06.Interior.DHB - Control Fault Domain 3 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 08/07/26 08/12/26 5.0 5.0
0%
135.0
RPL06.INT.ENDC.6260 RPL06.Interior.End-Cor - Priority GL6.27 - (P3) Tape Finish Paint (Both Sides) Priority Wall Grid Line 6-27 Not Started 08/07/26 08/13/26 6.2 6.2
0%
188.8
RPL06.INT.SSB.01220 RPL06.Interior.SSB - BoW - Install Security Lowside OH and In-wall Balance of Walls and OverHead Not Started 08/07/26 08/17/26 8.8 8.8
0%
192.5
RPL06.INT.SSB.01240 RPL06.Interior.SSB - BoW - Install VAV's/Duct Branches Balance of Walls and OverHead Not Started 08/07/26 08/20/26 12.5 12.5
0%
180.0
RPL06.INT.SSB.01820 RPL06.Interior.SSB - BoW - Mechanical Tie-In Balance of Walls and OverHead Not Started 08/07/26 08/13/26 6.2 6.2
0%
123.8
RPL06.INT.SSB.14140 RPL06.Interior.SSB LO #01 to #05 - Install Security Lowside OH and In-wall OH & Framing Not Started 08/07/26 08/10/26 2.5 2.5
0%
95.0
RPL06.INT.SSBC.01230 RPL06.Interior.SSB-Corridor - Install Remaining Refrigerant Line Fit out Not Started 08/07/26 08/13/26 6.2 6.2
0%
158.8
RPL06.INT.SSBC.4540 RPL06.Interior.SSBC LO #07 - Fire Life Safety Trim Out Interior Leave Out Wall #07 SSB/SSBC South for MDF1 Not Started 08/07/26 08/07/26 1.2 1.2
0%
121.2
RPL06.INT.CTRC.1940 RPL06.Interior.Center-Corridor - BoW - Install Vertical Tube Steel Support for Cable Tray (IFP Add) Balance of Walls & Overhead Not Started 08/10/26 08/13/26 5.0 5.0
0%
43.8
RPL06.INT.DHA.01113 RPL06.Interior.DHA - MES Skids - CDU Tie-Ins ( 2 per day) DHA - MES Skids Not Started 08/10/26 09/04/26 25.0 25.0
0%
57.5