Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:19 PM
· 6139 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
2
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL06.INT.DHB.01350 |
RPL06.Interior.DHB - Control Fault Domain 2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 07/29/26 | 08/03/26 | 5.0 | 5.0 |
|
72.5 |
RPL06.INT.DHB.01380 |
RPL06.Interior.DHB - Tie-ins - Control Fault Domain 2 - WBS Summary | Control Fault Domain 2 | Not Started | 07/29/26 | 10/19/26 | 72.5 | 72.5 |
|
43.8 |
RPL06.INT.DHD.02130 |
RPL06.Interior.DHD - Priority - Install Mechanical Piping | OverHead | Not Started | 07/29/26 | 08/13/26 | 15.0 | 15.0 |
|
58.8 |
RPL06.INT.DHD.02150 |
RPL06.Interior.DHD - Priority - Install Electrical | OverHead | Not Started | 07/29/26 | 08/11/26 | 12.5 | 12.5 |
|
58.8 |
RPL06.INT.SSB.01260 |
RPL06.Interior.SSB - BoW - Install Fire Life Safety Lowside OH and In-wall | Balance of Walls and OverHead | Not Started | 07/29/26 | 08/06/26 | 8.8 | 8.8 |
|
130.0 |
RPL06.INT.SSB.01800 |
RPL06.Interior.SSB - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls and OverHead | Not Started | 07/29/26 | 08/06/26 | 8.8 | 8.8 |
|
123.8 |
RPL06.INT.SSB.03060 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Hang Drywall and Fire/Caulking | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 07/29/26 | 08/04/26 | 6.2 | 6.2 |
|
247.5 |
RPL06.INT.SSB.06660 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (Pre Drywall) | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 07/29/26 | 08/04/26 | 6.2 | 6.2 |
|
235.0 |
RPL06.INT.SSBC.3600 |
RPL06.Interior.SSBC LO #06 - Install Asset Tags | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 07/29/26 | 07/29/26 | 1.2 | 1.2 |
|
120.0 |
RPL06.CFCI.5110 |
RPL06 - Submittals Review & Approval - Carpet | (CFCI) Div. 09 - Carpet | Not Started | 07/30/26 | 08/26/26 | 25.0 | 25.0 |
|
138.8 |
RPL06.INT.CTRC.9020 |
RPL06.Interior.Center-Corridor - Priority - MEP OH over Cable Tray | Priority Walls & Overhead | Not Started | 07/30/26 | 08/07/26 | 8.8 | 8.8 |
|
43.8 |
RPL06.INT.DHA.01092 |
RPL06.Interior.DHA - LV Skids and TopHat - Maintenance and Reserve Busways | DHA - LV Skids and TopHat | Not Started | 07/30/26 | 08/17/26 | 16.2 | 16.2 |
|
76.2 |
RPL06.INT.ENDC.6220 |
RPL06.Interior.End-Cor - Priority GL6.27 - (P3) Install MEP In-Wall/Backing | Priority Wall Grid Line 6-27 | Not Started | 07/30/26 | 08/03/26 | 3.8 | 3.8 |
|
188.8 |
RPL06.INT.SSB.14060 |
RPL06.Interior.SSB LO #01 to #05 - Install In-Wall Rough-in | OH & Framing | Not Started | 07/30/26 | 07/31/26 | 2.5 | 2.5 |
|
72.5 |
RPL06.INT.SSBC.3520 |
RPL06.Interior.SSBC LO #06 - Plumbing Trim Out | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 07/30/26 | 07/31/26 | 2.5 | 2.5 |
|
127.5 |
RPL06.INT.SSBC.3620 |
RPL06.Interior.SSBC LO #06 - Install Door (Verify with Trades before installation) | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 07/30/26 | 07/30/26 | 1.2 | 1.2 |
|
120.0 |
RPL06.MCUP.LP2.1960 |
RPL06.MCUP.Loop 2 - Install Exterior Signage | Hardscape and Landscape | Not Started | 07/30/26 | 08/12/26 | 12.5 | 12.5 |
|
402.5 |
RPL06.SKN.W.LO.01385 |
RPL06.SKIN.LO#16 - Cure Stemwall | Build back Exterior Leave Out Walls #16 (SSB - North of Loading Dock) | Not Started | 07/30/26 | 08/07/26 | 8.8 | 8.8 |
|
68.8 |
RPL06.INT.DHA.02325 |
RPL06.Interior.DHA - Priority - Install Controls / EPMS / BMS | OverHead | Not Started | 07/31/26 | 08/05/26 | 5.0 | 5.0 |
|
241.2 |
RPL06.INT.DHB.01205 |
RPL06.Interior.DHB - MES Skids - EPMS Tie-Ins | DHB - MES Skids | Not Started | 07/31/26 | 08/27/26 | 25.0 | 25.0 |
|
70.0 |
RPL06.INT.DHB.01440 |
RPL06.Interior.DHB - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 3 | Not Started | 07/31/26 | 09/28/26 | 51.2 | 51.2 |
|
25.0 |
RPL06.INT.DHB.01460 |
RPL06.Interior.DHB - Control Fault Domain 2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 07/31/26 | 08/05/26 | 5.0 | 5.0 |
|
81.2 |
RPL06.INT.DHB.02520 |
RPL06.Interior.DHB - OFE - Control Fault Domain 3 (LV Side Aisle) | Control Fault Domain 3 | Not Started | 07/31/26 | 08/05/26 | 5.0 | 5.0 |
|
33.8 |
RPL06.INT.ENDC.01200 |
RPL06.Interior.End-Corridor - Install Controls / EPMS / BMS | Fit out | Not Started | 07/31/26 | 08/05/26 | 5.0 | 5.0 |
|
177.5 |
RPL06.INT.ENDC.6200 |
RPL06.Interior.End-Cor - Priority GL6.27 - (P3) Install IMP Wall | Priority Wall Grid Line 6-27 | Not Started | 07/31/26 | 08/05/26 | 5.0 | 5.0 |
|
131.2 |
RPL06.INT.SSBC.01180 |
RPL06.Interior.SSB-Corridor - Install Fitout (GS.MDF Mech & Elec2x, Riser Room, GS Fiber Entry Room, Carrier MDF) - WBS | Fit out | Not Started | 07/31/26 | 12/21/26 | 122.5 | 122.5 |
|
108.8 |
RPL06.INT.SSBC.01210 |
RPL06.Interior.SSB-Corridor - Install Split Systems/Humidifiers | Fit out | Not Started | 07/31/26 | 08/06/26 | 6.2 | 6.2 |
|
158.8 |
RPL06.INT.SSBC.01390 |
RPL06.Interior.SSB-Corridor - Install Battery **?? | Fit out | Not Started | 07/31/26 | 08/13/26 | 12.5 | 12.5 |
|
128.8 |
RPL06.INT.SSBC.01590 |
RPL06.Interior.SSB-Corridor - Install Mechanical Tie-Ins (needs to micro plan) | Fit out | Not Started | 07/31/26 | 08/06/26 | 6.2 | 6.2 |
|
165.0 |
RPL06.INT.SSBC.3540 |
RPL06.Interior.SSBC LO #06 - Fire Life Safety Trim Out | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 07/31/26 | 07/31/26 | 1.2 | 1.2 |
|
127.5 |
RPL06.INT.SSBC.4560 |
RPL06.Interior.SSBC LO #07 - Install Remaining Lights | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 07/31/26 | 08/04/26 | 3.8 | 3.8 |
|
113.8 |
RPL06.INT.SSBC.4580 |
RPL06.Interior.SSBC LO #07 - Install Flooring Tiles/Resinous Flooring in specific rooms | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 07/31/26 | 08/04/26 | 3.8 | 3.8 |
|
125.0 |
RPL06.INT.SSBC.4720 |
RPL06.Interior.SSBC LO #07 - Fire Safing / Wall Finishes | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 07/31/26 | 08/03/26 | 2.5 | 2.5 |
|
121.2 |
ICM.B6.2550 |
[SSDCB1] L3/L4 Start mCUP [1-4] - RPL06 | Commissioning | Not Started | 08/03/26 | 08/03/26 | 0.0 | 0.0 |
|
243.8 |
RPL.06.D.63210.XR |
500kva Temp Power Skids Energized (First 10 MW or Gen) | Receive Milestones (XREFs) | Not Started | 08/03/26 | 08/03/26 | 0.0 | 0.0 |
|
55.0 |
RPL.06.D.63320.XR |
Pull and Term MV Skids - RPL06 DHB | Receive Milestones (XREFs) | Not Started | 08/03/26 | 08/03/26 | 0.0 | 0.0 |
|
55.0 |
RPL.06.D.63410.XR |
SS Power to RPL06 MSG 1B Numeric (Cx Temp) | Receive Milestones (XREFs) | Not Started | 08/03/26 | 08/03/26 | 0.0 | 0.0 |
|
55.0 |
RPL.06.D.63510.XR |
Substation Perm Power Cutover - RPL06 DH & mCUPs | Receive Milestones (XREFs) | Not Started | 08/03/26 | 08/03/26 | 0.0 | 0.0 |
|
55.0 |
RPL.06.D.63820.XR |
100MW Cx Temp Power to MV Skids RPL06 DHB Available | Receive Milestones (XREFs) | Not Started | 08/03/26 | 08/03/26 | 0.0 | 0.0 |
|
55.0 |
RPL06.CX.MCUP.01050 |
RPL06.CX.mCup Loop 1 - L3/L4 - mCUP | mCUP 1-4 | Not Started | 08/03/26 | 09/10/26 | 35.0 | 35.0 |
|
72.5 |
RPL06.EY.SSB.01260 |
RPL06.EY.SSB - L2 Checklist Completion | Tie-ins | Not Started | 08/03/26 | 08/14/26 | 12.5 | 12.5 |
|
42.5 |
RPL06.INT.DHA.01120 |
RPL06.Interior.DHA - OFE - Control Fault Domain 1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 1 | Not Started | 08/03/26 | 08/31/26 | 26.2 | 26.2 |
|
21.2 |
RPL06.INT.DHA.03480 |
RPL06.Interior.DHA - OFE - Control Fault Domain 1 (LV Side Aisle) | Control Fault Domain 1 | Not Started | 08/03/26 | 08/07/26 | 6.2 | 6.2 |
|
-10.0 |
RPL06.INT.DHB.01470 |
RPL06.Interior.DHB - Control Fault Domain 2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 08/03/26 | 08/06/26 | 5.0 | 5.0 |
|
81.2 |
RPL06.INT.SBC.03320 |
RPL06.Interior.SSB-Corridor - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 08/03/26 | 08/11/26 | 8.8 | 8.8 |
|
63.8 |
RPL06.INT.SSB.03080 |
RPL06.Interior.SSB - Loading Dock and Storage - Tape Finish Paint (Top Out) *Verify Scope | Loading Dock and Storage | Not Started | 08/03/26 | 08/12/26 | 10.0 | 10.0 |
|
150.0 |
RPL06.INT.SSB.14080 |
RPL06.Interior.SSB LO #01 to #05 - Install Mechanical Piping & Refrigerant Lowside OH and in-wall | OH & Framing | Not Started | 08/03/26 | 08/05/26 | 3.8 | 3.8 |
|
72.5 |
RPL06.INT.SSBC.3640 |
RPL06.Interior.SSBC LO #06 - Electrical L2 Checklist Completion | Interior Leave Out Wall #06 SSB/SSBC North for MDF2 | Not Started | 08/03/26 | 08/14/26 | 12.5 | 12.5 |
|
127.5 |
RPL06.SKN.DHCD.01060 |
RPL06.SKIN.DHCD - Install Security | Glazing, Doors and Ext Devices | Not Started | 08/03/26 | 08/04/26 | 2.5 | 2.5 |
|
295.0 |
RPL06.CX.MCUP.01350 |
RPL06.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - Temp Flush Skid (PR Purgerite flush system) | Fill and Flush | Not Started | 08/04/26 | 08/10/26 | 6.2 | 6.2 |
|
65.0 |
RPL06.INT.DHA.03500 |
RPL06.Interior.DHA - OFE - Control Fault Domain 1 (HAC) | Control Fault Domain 1 | Not Started | 08/04/26 | 08/28/26 | 23.8 | 23.8 |
|
-10.0 |
RPL06.INT.DHB.01490 |
RPL06.Interior.DHB - Control Fault Domain 3 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 08/04/26 | 08/07/26 | 5.0 | 5.0 |
|
83.8 |
RPL06.INT.DHB.01520 |
RPL06.Interior.DHB - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary | Control Fault Domain 3 | Not Started | 08/04/26 | 11/02/26 | 80.0 | 80.0 |
|
63.8 |
RPL06.INT.ENDC.07060 |
RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Install Cement Board/ Drywall | Restrooms | Not Started | 08/04/26 | 08/10/26 | 6.2 | 6.2 |
|
190.0 |
RPL06.INT.ENDC.6240 |
RPL06.Interior.End-Cor - Priority GL6.27 - (P3) Hang Drywall (Both Sides) | Priority Wall Grid Line 6-27 | Not Started | 08/04/26 | 08/06/26 | 3.8 | 3.8 |
|
188.8 |
RPL06.INT.SSB.01200 |
RPL06.Interior.SSB - Priority - Install Store Front Frames & Glass (Testing if Required) | Balance of Walls and OverHead | Not Started | 08/04/26 | 08/24/26 | 18.8 | 18.8 |
|
140.0 |
RPL06.INT.SSBC.4420 |
RPL06.Interior.SSBC LO #07 - Electrical Trim Out | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 08/04/26 | 08/05/26 | 2.5 | 2.5 |
|
121.2 |
RPL06.INT.SSBC.4440 |
RPL06.Interior.SSBC LO #07 - Security Trim Out | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 08/04/26 | 08/05/26 | 2.5 | 2.5 |
|
121.2 |
RPL06.CFCI.5060 |
RPL06 - Fabricate / Deliver - Interior Painting (Spec 09 91 23) XX | (CFCI) Div. 09 - Painting | Not Started | 08/05/26 | 09/01/26 | 25.0 | 25.0 |
|
146.2 |
RPL06.CFCI.5140 |
RPL06 - Fabricate / Deliver -Epoxy Flooring (Spec 09 67 23) XX | (CFCI) Div. 09 - Epoxy Flooring | Not Started | 08/05/26 | 08/25/26 | 18.8 | 18.8 |
|
190.0 |
RPL06.CFCI.5260 |
RPL06 - Fabricate / Deliver - Specialities | (CFCI) Div. 10 - Specialities | Not Started | 08/05/26 | 09/16/26 | 37.5 | 37.5 |
|
120.0 |
RPL06.CFCI.5370 |
Campus - Fabricate / Deliver - Landscaping / Irrigation | (CFCI) Div. 32 - Landscape/ Irrigation | Not Started | 08/05/26 | 10/28/26 | 75.0 | 75.0 |
|
297.5 |
RPL06.INT.CTRC.1200 |
RPL06.Interior.Center-Corridor - Priority - Install Fire Safing/ Seal Penetrations through Soffit (Highside OH space) | Priority Walls & Overhead | Not Started | 08/05/26 | 08/07/26 | 3.8 | 3.8 |
|
37.5 |
RPL06.INT.CTRC.1220 |
RPL06.Interior.Center-Corridor - BoW - Frame Balance of Wall | Balance of Walls & Overhead | Not Started | 08/05/26 | 08/11/26 | 6.2 | 6.2 |
|
37.5 |
RPL06.INT.CTRC.1230 |
RPL06.Interior.Center-Corridor - BoW - Balance Of Wall (ERAD, Maintance, Network infra, Spoke, Bathroom, etc) - WBS Summ | Balance of Walls & Overhead | Not Started | 08/05/26 | 01/20/27 | 142.5 | 142.5 |
|
37.5 |
RPL06.INT.CTRC.2020 |
RPL06.Interior.Center-Corridor - Priority - Fixed Draft/Smoke Curtain Patching | Priority Walls & Overhead | Not Started | 08/05/26 | 08/07/26 | 3.8 | 3.8 |
|
37.5 |
RPL06.INT.DHA.01130 |
RPL06.Interior.DHA - Control Fault Domain 1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 08/05/26 | 08/11/26 | 6.2 | 6.2 |
|
46.2 |
RPL06.INT.DHA.01160 |
RPL06.Interior.DHA - Tie-ins - Control Fault Domain 1 - WBS Summary | Control Fault Domain 1 | Not Started | 08/05/26 | 10/15/26 | 63.8 | 63.8 |
|
32.5 |
RPL06.INT.DHD.01050 |
RPL06.Interior.DHD - Priority - Install FA / Linear heat detection | OverHead | Not Started | 08/05/26 | 08/11/26 | 6.2 | 6.2 |
|
58.8 |
RPL06.INT.SSB.06680 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Install Cement Board/ Drywall | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 08/05/26 | 08/11/26 | 6.2 | 6.2 |
|
235.0 |
RPL06.INT.SSBC.4600 |
RPL06.Interior.SSBC LO #07 - Install Asset Tags | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 08/05/26 | 08/05/26 | 1.2 | 1.2 |
|
113.8 |
RPL06.INT.DHA.01093 |
RPL06.Interior.DHA - LV Skids and TopHat - Top Hat Busway | DHA - LV Skids and TopHat | Not Started | 08/06/26 | 08/24/26 | 16.2 | 16.2 |
|
76.2 |
RPL06.INT.DHA.01112 |
RPL06.Interior.DHA - MES Skids - Piping Tie-Ins & Inspections | DHA - MES Skids | Not Started | 08/06/26 | 09/02/26 | 25.0 | 25.0 |
|
57.5 |
RPL06.INT.DHB.01230 |
RPL06.Interior.DHB - Control Fault Domain 1 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/06/26 | 09/02/26 | 25.0 | 25.0 |
|
45.0 |
RPL06.INT.DHB.01240 |
RPL06.Interior.DHB - Control Fault Domain 1 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/06/26 | 09/02/26 | 25.0 | 25.0 |
|
32.5 |
RPL06.INT.DHB.01580 |
RPL06.Interior.DHB - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 4 | Not Started | 08/06/26 | 10/15/26 | 62.5 | 62.5 |
|
22.5 |
RPL06.INT.DHB.01600 |
RPL06.Interior.DHB - Control Fault Domain 3 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 08/06/26 | 08/11/26 | 5.0 | 5.0 |
|
107.5 |
RPL06.INT.DHB.02120 |
RPL06.Interior.DHB - Control Fault Domain 1 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/06/26 | 09/02/26 | 25.0 | 25.0 |
|
32.5 |
RPL06.INT.DHB.02580 |
RPL06.Interior.DHB - OFE - Control Fault Domain 4 (LV Side Aisle) | Control Fault Domain 4 | Not Started | 08/06/26 | 08/11/26 | 5.0 | 5.0 |
|
46.2 |
RPL06.INT.DHB.02700 |
RPL06.Interior.DHB - Control Fault Domain 1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/06/26 | 09/02/26 | 25.0 | 25.0 |
|
32.5 |
RPL06.INT.ENDC.01210 |
RPL06.Interior.End-Corridor - Install Fire Life Safety OH and In-wall | Fit out | Not Started | 08/06/26 | 08/19/26 | 12.5 | 12.5 |
|
177.5 |
RPL06.INT.ENDC.1205 |
RPL06.Interior.End-Corridor - Balance Of Wall - (ERAD, Maintance, Network infra, Spoke, etc) - WBS Summary | Balance of Walls & Overhead | Not Started | 08/06/26 | 04/09/27 | 210.0 | 210.0 |
|
52.5 |
RPL06.INT.ENDC.1220 |
RPL06.Interior.End-Corridor - Frame Balance of Wall | Balance of Walls & Overhead | Not Started | 08/06/26 | 08/12/26 | 6.2 | 6.2 |
|
131.2 |
RPL06.INT.ENDC.6080 |
RPL06.Interior.End-Corridor - Early In-wall for Ancillary Skids (Room #3.6) | Priority Wall Grid Line 6-27 | Not Started | 08/06/26 | 08/10/26 | 3.8 | 3.8 |
|
147.5 |
RPL06.INT.SSB.14100 |
RPL06.Interior.SSB LO #01 to #05 - Install Fire Life Safety Lowside OH and In-wall | OH & Framing | Not Started | 08/06/26 | 08/06/26 | 1.2 | 1.2 |
|
95.0 |
RPL06.INT.SSB.14120 |
RPL06.Interior.SSB LO #01 to #05 - Install Plumbing Lowside OH and In-wall | OH & Framing | Not Started | 08/06/26 | 08/07/26 | 2.5 | 2.5 |
|
72.5 |
RPL06.INT.SSBC.4520 |
RPL06.Interior.SSBC LO #07 - Plumbing Trim Out | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 08/06/26 | 08/07/26 | 2.5 | 2.5 |
|
121.2 |
RPL06.INT.SSBC.4620 |
RPL06.Interior.SSBC LO #07 - Install Door (Verify with Trades before installation) | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 08/06/26 | 08/06/26 | 1.2 | 1.2 |
|
113.8 |
RPL06.INT.DHA.01220 |
RPL06.Interior.DHA - Control Fault Domain 1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 08/07/26 | 08/13/26 | 6.2 | 6.2 |
|
55.0 |
RPL06.INT.DHA.03520 |
RPL06.Interior.DHA - OFE - Control Fault Domain 1 (Mech Side Aisle) | Control Fault Domain 1 | Not Started | 08/07/26 | 08/31/26 | 21.2 | 21.2 |
|
21.2 |
RPL06.INT.DHB.01610 |
RPL06.Interior.DHB - Control Fault Domain 3 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 08/07/26 | 08/12/26 | 5.0 | 5.0 |
|
135.0 |
RPL06.INT.ENDC.6260 |
RPL06.Interior.End-Cor - Priority GL6.27 - (P3) Tape Finish Paint (Both Sides) | Priority Wall Grid Line 6-27 | Not Started | 08/07/26 | 08/13/26 | 6.2 | 6.2 |
|
188.8 |
RPL06.INT.SSB.01220 |
RPL06.Interior.SSB - BoW - Install Security Lowside OH and In-wall | Balance of Walls and OverHead | Not Started | 08/07/26 | 08/17/26 | 8.8 | 8.8 |
|
192.5 |
RPL06.INT.SSB.01240 |
RPL06.Interior.SSB - BoW - Install VAV's/Duct Branches | Balance of Walls and OverHead | Not Started | 08/07/26 | 08/20/26 | 12.5 | 12.5 |
|
180.0 |
RPL06.INT.SSB.01820 |
RPL06.Interior.SSB - BoW - Mechanical Tie-In | Balance of Walls and OverHead | Not Started | 08/07/26 | 08/13/26 | 6.2 | 6.2 |
|
123.8 |
RPL06.INT.SSB.14140 |
RPL06.Interior.SSB LO #01 to #05 - Install Security Lowside OH and In-wall | OH & Framing | Not Started | 08/07/26 | 08/10/26 | 2.5 | 2.5 |
|
95.0 |
RPL06.INT.SSBC.01230 |
RPL06.Interior.SSB-Corridor - Install Remaining Refrigerant Line | Fit out | Not Started | 08/07/26 | 08/13/26 | 6.2 | 6.2 |
|
158.8 |
RPL06.INT.SSBC.4540 |
RPL06.Interior.SSBC LO #07 - Fire Life Safety Trim Out | Interior Leave Out Wall #07 SSB/SSBC South for MDF1 | Not Started | 08/07/26 | 08/07/26 | 1.2 | 1.2 |
|
121.2 |
RPL06.INT.CTRC.1940 |
RPL06.Interior.Center-Corridor - BoW - Install Vertical Tube Steel Support for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 08/10/26 | 08/13/26 | 5.0 | 5.0 |
|
43.8 |
RPL06.INT.DHA.01113 |
RPL06.Interior.DHA - MES Skids - CDU Tie-Ins ( 2 per day) | DHA - MES Skids | Not Started | 08/10/26 | 09/04/26 | 25.0 | 25.0 |
|
57.5 |