Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:19 PM · 6139 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
1
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL06.INT.DHB.02500 RPL06.Interior.DHB - OFE - Control Fault Domain 2 (Mech Side Aisle) Control Fault Domain 2 Not Started 08/20/26 09/08/26 16.2 16.2
0%
27.5
RPL06.INT.DHD.01092 RPL06.Interior.DHD - LV Skids and TopHat - Maintenance and Reserve Busways DHD - LV Skids and TopHat Not Started 08/20/26 09/04/26 15.0 15.0
0%
141.2
RPL06.INT.ENDC.01160 RPL06.Interior.End-Corridor - OFE - DHC (1x GS.IDF) C2 (ROJ07.23.26) OFE/MOFE & CFCI Not Started 08/20/26 08/26/26 6.2 6.2
0%
140.0
RPL06.INT.ENDC.01220 RPL06.Interior.End-Corridor - Hang Drywall Fit out Not Started 08/20/26 08/28/26 8.8 8.8
0%
177.5
RPL06.INT.ENDC.01440 RPL06.Interior.End-Corridor - OFE - UPS Gallery (2x) OFE/MOFE & CFCI Not Started 08/20/26 09/02/26 12.5 12.5
0%
195.0
RPL06.INT.ENDC.1260 RPL06.Interior.End-Corridor - BoW - Install Electrical Lowside OH and In-wall and Lights (Coordinate Lights location to Balance of Walls & Overhead Not Started 08/20/26 09/02/26 12.5 12.5
0%
131.2
RPL06.SKN.SSB.01125 RPL06.SKIN.SSB - Install Metal Canopy Glazing, Doors and Ext Devices Not Started 08/20/26 08/21/26 2.5 2.5
0%
182.5
RPL06.INT.CTRC.01670 RPL06.Interior.Center-Corridor - MOFE - Ancillary Skids Qty2 (DH A) (ROJ07.22.26) (RVCD 08.20.21) OFE/MOFE & CFCI Not Started 08/21/26 09/03/26 12.5 12.5
0%
115.0
RPL06.INT.CTRC.01690 RPL06.Interior.Center-Corridor - MOFE - Ancillary Skids Qty2 (DH B) (ROJ07.22.26) (RVCD 08.20.21) OFE/MOFE & CFCI Not Started 08/21/26 09/03/26 12.5 12.5
0%
123.8
RPL06.INT.DHA.01520 RPL06.Interior.DHA - Control Fault Domain 3 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 08/21/26 08/26/26 5.0 5.0
0%
143.8
RPL06.INT.SSB.01230 RPL06.Interior.SSB - BoW - Install Controls / EPMS / BMS OH and In-wall Balance of Walls and OverHead Not Started 08/21/26 08/31/26 8.8 8.8
0%
180.0
RPL06.INT.SSB.01310 RPL06.Interior.SSB - BoW - MEPF Hard Lid Rough-In Balance of Walls and OverHead Not Started 08/21/26 08/27/26 6.2 6.2
0%
123.8
RPL06.INT.SSB.05780 RPL06.Interior.SSB - BoW - QC - Walls Balance of Walls and OverHead Not Started 08/21/26 08/27/26 6.2 6.2
0%
123.8
RPL06.INT.SSB.14260 RPL06.Interior.SSB LO #01 to #05 - Install Backing OH & Framing Not Started 08/21/26 08/27/26 6.2 6.2
0%
72.5
RPL06.INT.CTRC.01380 RPL06.Interior.Center-Corridor (N) - Install Cable Tray - North (Early) Fit out (North) Not Started 08/24/26 08/28/26 6.2 6.2
0%
98.8
RPL06.INT.CTRC.01910 RPL06.Interior.Center-Corridor (S) - Install Cable Tray- South (Early) Fit out (South) Not Started 08/24/26 08/28/26 6.2 6.2
0%
98.8
RPL06.INT.CTRC.02030 RPL06.Interior.Center-Corridor (S) - Install Fitout (Spoke Parts, Tech, SCR etc.) - WBS Summary Fit out (South) Not Started 08/24/26 01/28/27 133.8 133.8
0%
30.0
RPL06.INT.CTRC.07200 RPL06.Interior.Center-Corridor - CFCI - 16"" FW Pipe OFE/MOFE & CFCI Not Started 08/24/26 09/28/26 31.2 31.2
0%
43.8
RPL06.INT.DHA.01540 RPL06.Interior.DHA - Control Fault Domain 4 - Install Duct (LV Side) LV Side Tie-ins Not Started 08/24/26 08/27/26 5.0 5.0
0%
96.2
RPL06.INT.DHA.01570 RPL06.Interior.DHA - Tie-ins - Control Fault Domain 4 - WBS Summary Control Fault Domain 4 Not Started 08/24/26 12/08/26 91.2 91.2
0%
61.2
RPL06.INT.SSB.01420 RPL06.Interior.SSB - Loading Dock and Storage - Install Dock Levelers, Pads, Exterior lights and Lock Loading Dock and Storage Not Started 08/24/26 09/01/26 8.8 8.8
0%
171.2
RPL06.SKN.SSB.01150 RPL06.SKIN.SSB - Install Perm Doors Glazing, Doors and Ext Devices Not Started 08/24/26 08/25/26 2.5 2.5
0%
182.5
RPL06.SKN.W.LO.01420 RPL06.SKIN.LO#16 - Install IMP Insulated Metal Panels Build back Exterior Leave Out Walls #16 (SSB - North of Loading Dock) Not Started 08/24/26 08/28/26 6.2 6.2
0%
68.8
RPL.06.D.63710.XG RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHA Give Milestones (XREFs) Not Started 08/25/26 08/25/26 0.0 0.0
0%
391.2
RPL.06.D.64000.XG Ready for MV Cable Pull DH A (MVs - Qty 10)* Give Milestones (XREFs) Not Started 08/25/26 08/25/26 0.0 0.0
0%
391.2
RPL06.SKN.S.LO.03060 RPL06.SKIN.LO#17 - Stemwall Water Proofing Build back Exterior Leave Out Walls #17 (CC - South) Not Started 08/25/26 08/26/26 2.5 2.5
0%
86.2
RPL06.CX.MCUP.01230 RPL06.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup3 and Dry Coolers Fill and Flush Not Started 08/26/26 09/02/26 7.5 7.5
0%
65.0
RPL06.CX.MCUP.01250 RPL06.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup4 and Dry Coolers Fill and Flush Not Started 08/26/26 09/02/26 7.5 7.5
0%
72.5
RPL06.EY.DHA.01250 RPL06.EY.DHA - Install Electrical Tie-ins (include penetration detail) Tie-ins Not Started 08/26/26 09/09/26 12.5 12.5
0%
25.0
RPL06.EY.DHA.01260 RPL06.EY.DHA - Tie-ins - WBS Summary Tie-ins Not Started 08/26/26 11/13/26 70.0 70.0
0%
125.0
RPL06.INT.CTRC.1300 RPL06.Interior.Center-Corridor - BoW - Install Plumbing Lowside OH and In-wall Balance of Walls & Overhead Not Started 08/26/26 09/03/26 8.8 8.8
0%
37.5
RPL06.INT.DHA.01630 RPL06.Interior.DHA - OFE - Control Fault Domain 5 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 5 Not Started 08/26/26 11/19/26 75.0 75.0
0%
8.8
RPL06.INT.DHA.01650 RPL06.Interior.DHA - Control Fault Domain 4 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 08/26/26 08/31/26 5.0 5.0
0%
120.0
RPL06.INT.DHA.03720 RPL06.Interior.DHA - OFE - Control Fault Domain 5 (LV Side Aisle) Control Fault Domain 5 Not Started 08/26/26 08/31/26 5.0 5.0
0%
45.0
RPL06.INT.DHC.01060 RPL06.Interior.DHC - OFE - LV Skids and TopHat - Set / Place / Anchor OFE/MOFE & CFCI Not Started 08/26/26 09/14/26 16.2 16.2
0%
58.8
RPL06.INT.DHC.01070 RPL06.Interior.DHC - OFE - MES Skids - Set / Place / Anchor OFE/MOFE & CFCI Not Started 08/26/26 09/14/26 16.2 16.2
0%
65.0
RPL06.INT.DHD.01120 RPL06.Interior.DHD - OFE - Control Fault Domain 1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 1 Not Started 08/26/26 11/20/26 76.2 76.2
0%
20.0
RPL06.INT.DHD.02270 RPL06.Interior.DHD - OFE - Control Fault Domain 1 (LV Side Aisle) Control Fault Domain 1 Not Started 08/26/26 09/01/26 6.2 6.2
0%
70.0
RPL06.INT.ENDC.01430 RPL06.Interior.End-Corridor - MOFE - Ancillary Skids Qty2 (DH D) (ROJ08.20.26) (RVCD 08.25.21) OFE/MOFE & CFCI Not Started 08/26/26 09/09/26 12.5 12.5
0%
142.5
RPL06.INT.ENDC.01450 RPL06.Interior.End-Corridor - MOFE - Ancillary Skids Qty2 (DH C) (ROJ08.20.26) (RVCD 08.25.21) OFE/MOFE & CFCI Not Started 08/26/26 09/09/26 12.5 12.5
0%
143.8
RPL06.INT.ENDC.1280 RPL06.Interior.End-Corridor - BoW - Install Fire Life Safety Lowside OH and In-wall Balance of Walls & Overhead Not Started 08/26/26 09/03/26 8.8 8.8
0%
145.0
RPL06.INT.ENDC.1320 RPL06.Interior.End-Corridor - BoW - Install Security Lowside OH and In-wall Balance of Walls & Overhead Not Started 08/26/26 09/03/26 8.8 8.8
0%
216.2
RPL06.INT.SBC.03440 RPL06.Interior.SSB-Corridor - BoW - Install Electrical - Lighitng Inverter Room (XX.S2.XX) Balance of Walls & Overhead Not Started 08/26/26 09/03/26 8.8 8.8
0%
86.2
RPL06.INT.SBC.03500 RPL06.Interior.SSB-Corridor - BoW - MEPF Hard Lid Rough-In/ Close of Inspection Balance of Walls & Overhead Not Started 08/26/26 09/03/26 8.8 8.8
0%
73.8
RPL06.INT.SBC.03520 RPL06.Interior.SSB-Corridor - BoW - Install Blocking/Steel support Assembly for Metal Canopy Balance of Walls & Overhead Not Started 08/26/26 09/01/26 6.2 6.2
0%
63.8
RPL06.INT.SSB.01545 RPL06.Interior.SSB - BoW - Notify META of TV installation & Conf Sound (+25d Install TV) Balance of Walls and OverHead Not Started 08/26/26 08/26/26 0.0 0.0
0%
163.8
RPL06.CFCI.5290 RPL06 - Fabricate / Deliver - Carpet Tile (CFCI) Div. 09 - Carpet Not Started 08/27/26 10/22/26 50.0 50.0
0%
138.8
RPL06.CON.WP2.06800 RPL06.Conn - GSIDF/DH C2 - WBS Summary Int. IDF OFE/MOFE - GSIDF6C2 Not Started 08/27/26 09/10/26 12.5 12.5
0%
377.5
RPL06.CON.WP2.06820 RPL06.Conn - GSIDF/DH C2 - Install Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 08/27/26 08/27/26 1.2 1.2
0%
296.2
RPL06.INT.CTRC.1320 RPL06.Interior.Center-Corridor - BoW - Install Security Lowside OH and In-wall Balance of Walls & Overhead Not Started 08/27/26 09/04/26 8.8 8.8
0%
87.5
RPL06.INT.DHA.01170 RPL06.Interior.DHA - Control Fault Domain 1 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 08/27/26 09/24/26 25.0 25.0
0%
45.0
RPL06.INT.DHA.01180 RPL06.Interior.DHA - Control Fault Domain 1 - Pull EPMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 08/27/26 09/24/26 25.0 25.0
0%
45.0
RPL06.INT.DHA.01190 RPL06.Interior.DHA - Control Fault Domain 1 - Set UPS and Panel (2) Remaining Tie-ins post Mech Side Aisle install Not Started 08/27/26 09/24/26 25.0 25.0
0%
32.5
RPL06.INT.DHA.01660 RPL06.Interior.DHA - Control Fault Domain 4 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 08/27/26 09/01/26 5.0 5.0
0%
143.8
RPL06.INT.DHB.01340 RPL06.Interior.DHB - Control Fault Domain 1 - Install copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 08/27/26 09/24/26 25.0 25.0
0%
32.5
RPL06.INT.DHD.01093 RPL06.Interior.DHD - LV Skids and TopHat - Top Hat Busway DHD - LV Skids and TopHat Not Started 08/27/26 09/14/26 15.0 15.0
0%
141.2
RPL06.INT.DHD.01112 RPL06.Interior.DHD - MES Skids - Piping Tie-Ins & Inspections DHD - MES Skids Not Started 08/27/26 09/18/26 20.0 20.0
0%
118.8
RPL06.INT.ENDC.01190 RPL06.Interior.End-Corridor - OFE - DHD (1x GS.IDF) D2 (ROJ07.23.26) OFE/MOFE & CFCI Not Started 08/27/26 09/02/26 6.2 6.2
0%
140.0
RPL06.INT.ENDC.07020 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Fixture Install (Lights) Restrooms Not Started 08/27/26 09/04/26 8.8 8.8
0%
208.8
RPL06.INT.ENDC.07120 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (Post Restrooms Not Started 08/27/26 09/02/26 6.2 6.2
0%
190.0
RPL06.INT.SSB.01250 RPL06.Interior.SSB - Loading Dock and Storage - Install Security Loading Dock and Storage Not Started 08/27/26 09/04/26 8.8 8.8
0%
150.0
RPL06.INT.SSB.01470 RPL06.Interior.SSB - Loading Dock and Storage - Install Unit Heaters Loading Dock and Storage Not Started 08/27/26 09/02/26 6.2 6.2
0%
181.2
RPL06.INT.SSB.01760 RPL06.Interior.SSB - Loading Dock and Storage - Mechanical Tie-In Loading Dock and Storage Not Started 08/27/26 09/02/26 6.2 6.2
0%
181.2
RPL06.INT.SSB.01780 RPL06.Interior.SSB - Loading Dock and Storage - Install Split Systems/Humidifiers Loading Dock and Storage Not Started 08/27/26 09/02/26 6.2 6.2
0%
175.0
RPL06.SKN.S.LO.03080 RPL06.SKIN.LO#17 - Install IMP Flashing Build back Exterior Leave Out Walls #17 (CC - South) Not Started 08/27/26 08/28/26 2.5 2.5
0%
86.2
RPL06.CON.WP2.06840 RPL06.Conn - GSIDF/DH C2 - Install Cabling (Pull, Splice & terminate) Cabling Not Started 08/28/26 09/04/26 7.5 7.5
0%
378.8
RPL06.CON.WP2.06860 RPL06.Conn - GSIDF/DH C2 - Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 08/28/26 09/10/26 11.2 11.2
0%
296.2
RPL06.EY.DHA.01280 RPL06.EY.DHA - Install BMS/EPMS Tie-ins Tie-ins Not Started 08/28/26 09/11/26 12.5 12.5
0%
25.0
RPL06.EY.DHB.01290 RPL06.EY.DHB - Install Sleeves MEPL Hardscape and Landscape Not Started 08/28/26 09/03/26 6.2 6.2
0%
176.2
RPL06.EY.DHB.01300 RPL06.EY.DHB - MV Loop - L2 Checklist Completion Tie-ins Not Started 08/28/26 09/11/26 12.5 12.5
0%
18.8
RPL06.EY.DHB.01320 RPL06.EY.DHB - Install Hardscape and Landscape - WBS Summary Hardscape and Landscape Not Started 08/28/26 10/30/26 56.2 56.2
0%
332.5
RPL06.INT.DHA.01680 RPL06.Interior.DHA - Control Fault Domain 5 - Install Duct (LV Side) LV Side Tie-ins Not Started 08/28/26 09/02/26 5.0 5.0
0%
81.2
RPL06.INT.DHA.01710 RPL06.Interior.DHA - Tie-ins - Control Fault Domain 5 - WBS Summary Control Fault Domain 5 Not Started 08/28/26 12/30/26 105.0 105.0
0%
33.8
RPL06.INT.DHC.01090 RPL06.Interior.DHC - LV Skids and TopHat Tie-ins (LOE) DHC - LV Skids and TopHat Not Started 08/28/26 09/28/26 26.2 26.2
0%
145.0
RPL06.INT.DHC.01091 RPL06.Interior.DHC - LV Skids and TopHat - Set & Anchor Interconnects DHC - LV Skids and TopHat Not Started 08/28/26 09/16/26 16.2 16.2
0%
145.0
RPL06.INT.DHC.01100 RPL06.Interior.DHC - Tie-ins - WBS Summary Tie-Ins Not Started 08/28/26 03/04/27 158.8 158.8
0%
158.8
RPL06.INT.DHD.01130 RPL06.Interior.DHD - Control Fault Domain 1 - Install Duct (LV Side) LV Side Tie-ins Not Started 08/28/26 09/03/26 6.2 6.2
0%
103.8
RPL06.INT.DHD.01160 RPL06.Interior.DHD - Tie-ins - Control Fault Domain 1 - WBS Summary Control Fault Domain 1 Not Started 08/28/26 01/14/27 117.5 117.5
0%
36.2
RPL06.INT.SSB.01320 RPL06.Interior.SSB - BoW - Hang Drywall Balance of Walls and OverHead Not Started 08/28/26 09/08/26 8.8 8.8
0%
123.8
RPL06.INT.SSB.02420 RPL06.Interior.SSB - Final Finishes & Fixtures - Fixture Install (Lights) Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 08/28/26 09/08/26 8.8 8.8
0%
253.8
RPL06.INT.SSB.06740 RPL06.Interior.SSB - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (Post Drywall) Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 08/28/26 09/03/26 6.2 6.2
0%
235.0
RPL06.INT.SSB.14280 RPL06.Interior.SSB LO #01 to #05 - QC - Backings/Walls OH & Framing Not Started 08/28/26 09/03/26 6.2 6.2
0%
72.5
DCC.B6.3035 [SSDCB1] Production Gear Delivered [DHB] Front End (SSW &FSW) Connectivity Not Started 08/31/26 08/31/26 0.0 0.0
0%
176.2
RPL06.CON.WP3A.01000 RPL06.Conn - OSP - WBS Summary WP#3A OSP Not Started 08/31/26 10/01/26 28.8 28.8
0%
160.0
RPL06.CON.WP3A.01200 RPL06.Conn - Production EF2 (North) - WBS Summary Prod EF2 (North) Not Started 08/31/26 10/01/26 28.8 28.8
0%
160.0
RPL06.CON.WP3A.01600 RPL06.Conn - Production EF1 (South) - WBS Summary Prod EF1 (South) Not Started 08/31/26 10/01/26 28.8 28.8
0%
160.0
RPL06.CON.WP3A.01620 RPL06.Conn EF2 (North) Infrastructure 1 (Racks & Vertical Cable Manager, Ladder Racks) Infrastructure Not Started 08/31/26 09/14/26 12.5 12.5
0%
98.8
RPL06.CON.WP3A.01740 RPL06.Conn EF1 (South) Infrastructure 1 (Racks & Vertical Cable Manager, Ladder Racks) Infrastructure Not Started 08/31/26 09/14/26 12.5 12.5
0%
98.8
RPL06.CON.WP3B.0900 RPL06.Conn WP4 Pull/Install/Test Universal Fabric EF1(South)<>EF2 (North) EF1 <> EF2 Not Started 08/31/26 09/04/26 6.2 6.2
0%
188.8
RPL06.INT.DHA.01780 RPL06.Interior.DHA - Control Fault Domain 5 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 08/31/26 09/03/26 5.0 5.0
0%
105.0
RPL06.INT.DHA.03560 RPL06.Interior.DHA - OFE - Control Fault Domain 2 (HAC) Control Fault Domain 2 Not Started 08/31/26 09/21/26 18.8 18.8
0%
-10.0
RPL06.INT.DHB.01360 RPL06.Interior.DHB - Control Fault Domain 2 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 08/31/26 09/21/26 18.8 18.8
0%
56.2
RPL06.INT.DHB.01370 RPL06.Interior.DHB - Control Fault Domain 2 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 08/31/26 09/21/26 18.8 18.8
0%
43.8
RPL06.INT.DHB.02220 RPL06.Interior.DHB - Control Fault Domain 2 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 08/31/26 09/21/26 18.8 18.8
0%
43.8
RPL06.INT.DHB.02720 RPL06.Interior.DHB - Control Fault Domain 2 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 08/31/26 09/21/26 18.8 18.8
0%
43.8
RPL06.INT.DHD.01113 RPL06.Interior.DHD - MES Skids - CDU Tie-Ins DHD - MES Skids Not Started 08/31/26 09/22/26 20.0 20.0
0%
118.8
RPL06.INT.ENDC.01240 RPL06.Interior.End-Corridor - Tape Finish Paint Fit out Not Started 08/31/26 09/02/26 3.8 3.8
0%
177.5
RPL06.INT.SSBC.03540 RPL06.Interior.SSB-Corridor - Final Paint Fit out Not Started 08/31/26 09/04/26 6.2 6.2
0%
121.2
RPL06.SKN.S.LO.03100 RPL06.SKIN.LO#17 - Install IMP Insulated Metal Panels Build back Exterior Leave Out Walls #17 (CC - South) Not Started 08/31/26 09/01/26 2.5 2.5
0%
86.2
RPL06.SKN.W.LO.01440 RPL06.SKIN.LO#16 - Install IMP Flashing & Caulking Build back Exterior Leave Out Walls #16 (SSB - North of Loading Dock) Not Started 08/31/26 09/04/26 6.2 6.2
0%
68.8