Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:19 PM
· 6139 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
1
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL06.INT.DHB.02500 |
RPL06.Interior.DHB - OFE - Control Fault Domain 2 (Mech Side Aisle) | Control Fault Domain 2 | Not Started | 08/20/26 | 09/08/26 | 16.2 | 16.2 |
|
27.5 |
RPL06.INT.DHD.01092 |
RPL06.Interior.DHD - LV Skids and TopHat - Maintenance and Reserve Busways | DHD - LV Skids and TopHat | Not Started | 08/20/26 | 09/04/26 | 15.0 | 15.0 |
|
141.2 |
RPL06.INT.ENDC.01160 |
RPL06.Interior.End-Corridor - OFE - DHC (1x GS.IDF) C2 (ROJ07.23.26) | OFE/MOFE & CFCI | Not Started | 08/20/26 | 08/26/26 | 6.2 | 6.2 |
|
140.0 |
RPL06.INT.ENDC.01220 |
RPL06.Interior.End-Corridor - Hang Drywall | Fit out | Not Started | 08/20/26 | 08/28/26 | 8.8 | 8.8 |
|
177.5 |
RPL06.INT.ENDC.01440 |
RPL06.Interior.End-Corridor - OFE - UPS Gallery (2x) | OFE/MOFE & CFCI | Not Started | 08/20/26 | 09/02/26 | 12.5 | 12.5 |
|
195.0 |
RPL06.INT.ENDC.1260 |
RPL06.Interior.End-Corridor - BoW - Install Electrical Lowside OH and In-wall and Lights (Coordinate Lights location to | Balance of Walls & Overhead | Not Started | 08/20/26 | 09/02/26 | 12.5 | 12.5 |
|
131.2 |
RPL06.SKN.SSB.01125 |
RPL06.SKIN.SSB - Install Metal Canopy | Glazing, Doors and Ext Devices | Not Started | 08/20/26 | 08/21/26 | 2.5 | 2.5 |
|
182.5 |
RPL06.INT.CTRC.01670 |
RPL06.Interior.Center-Corridor - MOFE - Ancillary Skids Qty2 (DH A) (ROJ07.22.26) (RVCD 08.20.21) | OFE/MOFE & CFCI | Not Started | 08/21/26 | 09/03/26 | 12.5 | 12.5 |
|
115.0 |
RPL06.INT.CTRC.01690 |
RPL06.Interior.Center-Corridor - MOFE - Ancillary Skids Qty2 (DH B) (ROJ07.22.26) (RVCD 08.20.21) | OFE/MOFE & CFCI | Not Started | 08/21/26 | 09/03/26 | 12.5 | 12.5 |
|
123.8 |
RPL06.INT.DHA.01520 |
RPL06.Interior.DHA - Control Fault Domain 3 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 08/21/26 | 08/26/26 | 5.0 | 5.0 |
|
143.8 |
RPL06.INT.SSB.01230 |
RPL06.Interior.SSB - BoW - Install Controls / EPMS / BMS OH and In-wall | Balance of Walls and OverHead | Not Started | 08/21/26 | 08/31/26 | 8.8 | 8.8 |
|
180.0 |
RPL06.INT.SSB.01310 |
RPL06.Interior.SSB - BoW - MEPF Hard Lid Rough-In | Balance of Walls and OverHead | Not Started | 08/21/26 | 08/27/26 | 6.2 | 6.2 |
|
123.8 |
RPL06.INT.SSB.05780 |
RPL06.Interior.SSB - BoW - QC - Walls | Balance of Walls and OverHead | Not Started | 08/21/26 | 08/27/26 | 6.2 | 6.2 |
|
123.8 |
RPL06.INT.SSB.14260 |
RPL06.Interior.SSB LO #01 to #05 - Install Backing | OH & Framing | Not Started | 08/21/26 | 08/27/26 | 6.2 | 6.2 |
|
72.5 |
RPL06.INT.CTRC.01380 |
RPL06.Interior.Center-Corridor (N) - Install Cable Tray - North (Early) | Fit out (North) | Not Started | 08/24/26 | 08/28/26 | 6.2 | 6.2 |
|
98.8 |
RPL06.INT.CTRC.01910 |
RPL06.Interior.Center-Corridor (S) - Install Cable Tray- South (Early) | Fit out (South) | Not Started | 08/24/26 | 08/28/26 | 6.2 | 6.2 |
|
98.8 |
RPL06.INT.CTRC.02030 |
RPL06.Interior.Center-Corridor (S) - Install Fitout (Spoke Parts, Tech, SCR etc.) - WBS Summary | Fit out (South) | Not Started | 08/24/26 | 01/28/27 | 133.8 | 133.8 |
|
30.0 |
RPL06.INT.CTRC.07200 |
RPL06.Interior.Center-Corridor - CFCI - 16"" FW Pipe | OFE/MOFE & CFCI | Not Started | 08/24/26 | 09/28/26 | 31.2 | 31.2 |
|
43.8 |
RPL06.INT.DHA.01540 |
RPL06.Interior.DHA - Control Fault Domain 4 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 08/24/26 | 08/27/26 | 5.0 | 5.0 |
|
96.2 |
RPL06.INT.DHA.01570 |
RPL06.Interior.DHA - Tie-ins - Control Fault Domain 4 - WBS Summary | Control Fault Domain 4 | Not Started | 08/24/26 | 12/08/26 | 91.2 | 91.2 |
|
61.2 |
RPL06.INT.SSB.01420 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Dock Levelers, Pads, Exterior lights and Lock | Loading Dock and Storage | Not Started | 08/24/26 | 09/01/26 | 8.8 | 8.8 |
|
171.2 |
RPL06.SKN.SSB.01150 |
RPL06.SKIN.SSB - Install Perm Doors | Glazing, Doors and Ext Devices | Not Started | 08/24/26 | 08/25/26 | 2.5 | 2.5 |
|
182.5 |
RPL06.SKN.W.LO.01420 |
RPL06.SKIN.LO#16 - Install IMP Insulated Metal Panels | Build back Exterior Leave Out Walls #16 (SSB - North of Loading Dock) | Not Started | 08/24/26 | 08/28/26 | 6.2 | 6.2 |
|
68.8 |
RPL.06.D.63710.XG |
RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHA | Give Milestones (XREFs) | Not Started | 08/25/26 | 08/25/26 | 0.0 | 0.0 |
|
391.2 |
RPL.06.D.64000.XG |
Ready for MV Cable Pull DH A (MVs - Qty 10)* | Give Milestones (XREFs) | Not Started | 08/25/26 | 08/25/26 | 0.0 | 0.0 |
|
391.2 |
RPL06.SKN.S.LO.03060 |
RPL06.SKIN.LO#17 - Stemwall Water Proofing | Build back Exterior Leave Out Walls #17 (CC - South) | Not Started | 08/25/26 | 08/26/26 | 2.5 | 2.5 |
|
86.2 |
RPL06.CX.MCUP.01230 |
RPL06.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup3 and Dry Coolers | Fill and Flush | Not Started | 08/26/26 | 09/02/26 | 7.5 | 7.5 |
|
65.0 |
RPL06.CX.MCUP.01250 |
RPL06.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup4 and Dry Coolers | Fill and Flush | Not Started | 08/26/26 | 09/02/26 | 7.5 | 7.5 |
|
72.5 |
RPL06.EY.DHA.01250 |
RPL06.EY.DHA - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 08/26/26 | 09/09/26 | 12.5 | 12.5 |
|
25.0 |
RPL06.EY.DHA.01260 |
RPL06.EY.DHA - Tie-ins - WBS Summary | Tie-ins | Not Started | 08/26/26 | 11/13/26 | 70.0 | 70.0 |
|
125.0 |
RPL06.INT.CTRC.1300 |
RPL06.Interior.Center-Corridor - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 08/26/26 | 09/03/26 | 8.8 | 8.8 |
|
37.5 |
RPL06.INT.DHA.01630 |
RPL06.Interior.DHA - OFE - Control Fault Domain 5 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 5 | Not Started | 08/26/26 | 11/19/26 | 75.0 | 75.0 |
|
8.8 |
RPL06.INT.DHA.01650 |
RPL06.Interior.DHA - Control Fault Domain 4 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 08/26/26 | 08/31/26 | 5.0 | 5.0 |
|
120.0 |
RPL06.INT.DHA.03720 |
RPL06.Interior.DHA - OFE - Control Fault Domain 5 (LV Side Aisle) | Control Fault Domain 5 | Not Started | 08/26/26 | 08/31/26 | 5.0 | 5.0 |
|
45.0 |
RPL06.INT.DHC.01060 |
RPL06.Interior.DHC - OFE - LV Skids and TopHat - Set / Place / Anchor | OFE/MOFE & CFCI | Not Started | 08/26/26 | 09/14/26 | 16.2 | 16.2 |
|
58.8 |
RPL06.INT.DHC.01070 |
RPL06.Interior.DHC - OFE - MES Skids - Set / Place / Anchor | OFE/MOFE & CFCI | Not Started | 08/26/26 | 09/14/26 | 16.2 | 16.2 |
|
65.0 |
RPL06.INT.DHD.01120 |
RPL06.Interior.DHD - OFE - Control Fault Domain 1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 1 | Not Started | 08/26/26 | 11/20/26 | 76.2 | 76.2 |
|
20.0 |
RPL06.INT.DHD.02270 |
RPL06.Interior.DHD - OFE - Control Fault Domain 1 (LV Side Aisle) | Control Fault Domain 1 | Not Started | 08/26/26 | 09/01/26 | 6.2 | 6.2 |
|
70.0 |
RPL06.INT.ENDC.01430 |
RPL06.Interior.End-Corridor - MOFE - Ancillary Skids Qty2 (DH D) (ROJ08.20.26) (RVCD 08.25.21) | OFE/MOFE & CFCI | Not Started | 08/26/26 | 09/09/26 | 12.5 | 12.5 |
|
142.5 |
RPL06.INT.ENDC.01450 |
RPL06.Interior.End-Corridor - MOFE - Ancillary Skids Qty2 (DH C) (ROJ08.20.26) (RVCD 08.25.21) | OFE/MOFE & CFCI | Not Started | 08/26/26 | 09/09/26 | 12.5 | 12.5 |
|
143.8 |
RPL06.INT.ENDC.1280 |
RPL06.Interior.End-Corridor - BoW - Install Fire Life Safety Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 08/26/26 | 09/03/26 | 8.8 | 8.8 |
|
145.0 |
RPL06.INT.ENDC.1320 |
RPL06.Interior.End-Corridor - BoW - Install Security Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 08/26/26 | 09/03/26 | 8.8 | 8.8 |
|
216.2 |
RPL06.INT.SBC.03440 |
RPL06.Interior.SSB-Corridor - BoW - Install Electrical - Lighitng Inverter Room (XX.S2.XX) | Balance of Walls & Overhead | Not Started | 08/26/26 | 09/03/26 | 8.8 | 8.8 |
|
86.2 |
RPL06.INT.SBC.03500 |
RPL06.Interior.SSB-Corridor - BoW - MEPF Hard Lid Rough-In/ Close of Inspection | Balance of Walls & Overhead | Not Started | 08/26/26 | 09/03/26 | 8.8 | 8.8 |
|
73.8 |
RPL06.INT.SBC.03520 |
RPL06.Interior.SSB-Corridor - BoW - Install Blocking/Steel support Assembly for Metal Canopy | Balance of Walls & Overhead | Not Started | 08/26/26 | 09/01/26 | 6.2 | 6.2 |
|
63.8 |
RPL06.INT.SSB.01545 |
RPL06.Interior.SSB - BoW - Notify META of TV installation & Conf Sound (+25d Install TV) | Balance of Walls and OverHead | Not Started | 08/26/26 | 08/26/26 | 0.0 | 0.0 |
|
163.8 |
RPL06.CFCI.5290 |
RPL06 - Fabricate / Deliver - Carpet Tile | (CFCI) Div. 09 - Carpet | Not Started | 08/27/26 | 10/22/26 | 50.0 | 50.0 |
|
138.8 |
RPL06.CON.WP2.06800 |
RPL06.Conn - GSIDF/DH C2 - WBS Summary | Int. IDF OFE/MOFE - GSIDF6C2 | Not Started | 08/27/26 | 09/10/26 | 12.5 | 12.5 |
|
377.5 |
RPL06.CON.WP2.06820 |
RPL06.Conn - GSIDF/DH C2 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 08/27/26 | 08/27/26 | 1.2 | 1.2 |
|
296.2 |
RPL06.INT.CTRC.1320 |
RPL06.Interior.Center-Corridor - BoW - Install Security Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 08/27/26 | 09/04/26 | 8.8 | 8.8 |
|
87.5 |
RPL06.INT.DHA.01170 |
RPL06.Interior.DHA - Control Fault Domain 1 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/27/26 | 09/24/26 | 25.0 | 25.0 |
|
45.0 |
RPL06.INT.DHA.01180 |
RPL06.Interior.DHA - Control Fault Domain 1 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/27/26 | 09/24/26 | 25.0 | 25.0 |
|
45.0 |
RPL06.INT.DHA.01190 |
RPL06.Interior.DHA - Control Fault Domain 1 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/27/26 | 09/24/26 | 25.0 | 25.0 |
|
32.5 |
RPL06.INT.DHA.01660 |
RPL06.Interior.DHA - Control Fault Domain 4 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 08/27/26 | 09/01/26 | 5.0 | 5.0 |
|
143.8 |
RPL06.INT.DHB.01340 |
RPL06.Interior.DHB - Control Fault Domain 1 - Install copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/27/26 | 09/24/26 | 25.0 | 25.0 |
|
32.5 |
RPL06.INT.DHD.01093 |
RPL06.Interior.DHD - LV Skids and TopHat - Top Hat Busway | DHD - LV Skids and TopHat | Not Started | 08/27/26 | 09/14/26 | 15.0 | 15.0 |
|
141.2 |
RPL06.INT.DHD.01112 |
RPL06.Interior.DHD - MES Skids - Piping Tie-Ins & Inspections | DHD - MES Skids | Not Started | 08/27/26 | 09/18/26 | 20.0 | 20.0 |
|
118.8 |
RPL06.INT.ENDC.01190 |
RPL06.Interior.End-Corridor - OFE - DHD (1x GS.IDF) D2 (ROJ07.23.26) | OFE/MOFE & CFCI | Not Started | 08/27/26 | 09/02/26 | 6.2 | 6.2 |
|
140.0 |
RPL06.INT.ENDC.07020 |
RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Fixture Install (Lights) | Restrooms | Not Started | 08/27/26 | 09/04/26 | 8.8 | 8.8 |
|
208.8 |
RPL06.INT.ENDC.07120 |
RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (Post | Restrooms | Not Started | 08/27/26 | 09/02/26 | 6.2 | 6.2 |
|
190.0 |
RPL06.INT.SSB.01250 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Security | Loading Dock and Storage | Not Started | 08/27/26 | 09/04/26 | 8.8 | 8.8 |
|
150.0 |
RPL06.INT.SSB.01470 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Unit Heaters | Loading Dock and Storage | Not Started | 08/27/26 | 09/02/26 | 6.2 | 6.2 |
|
181.2 |
RPL06.INT.SSB.01760 |
RPL06.Interior.SSB - Loading Dock and Storage - Mechanical Tie-In | Loading Dock and Storage | Not Started | 08/27/26 | 09/02/26 | 6.2 | 6.2 |
|
181.2 |
RPL06.INT.SSB.01780 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Split Systems/Humidifiers | Loading Dock and Storage | Not Started | 08/27/26 | 09/02/26 | 6.2 | 6.2 |
|
175.0 |
RPL06.SKN.S.LO.03080 |
RPL06.SKIN.LO#17 - Install IMP Flashing | Build back Exterior Leave Out Walls #17 (CC - South) | Not Started | 08/27/26 | 08/28/26 | 2.5 | 2.5 |
|
86.2 |
RPL06.CON.WP2.06840 |
RPL06.Conn - GSIDF/DH C2 - Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 08/28/26 | 09/04/26 | 7.5 | 7.5 |
|
378.8 |
RPL06.CON.WP2.06860 |
RPL06.Conn - GSIDF/DH C2 - Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 08/28/26 | 09/10/26 | 11.2 | 11.2 |
|
296.2 |
RPL06.EY.DHA.01280 |
RPL06.EY.DHA - Install BMS/EPMS Tie-ins | Tie-ins | Not Started | 08/28/26 | 09/11/26 | 12.5 | 12.5 |
|
25.0 |
RPL06.EY.DHB.01290 |
RPL06.EY.DHB - Install Sleeves MEPL | Hardscape and Landscape | Not Started | 08/28/26 | 09/03/26 | 6.2 | 6.2 |
|
176.2 |
RPL06.EY.DHB.01300 |
RPL06.EY.DHB - MV Loop - L2 Checklist Completion | Tie-ins | Not Started | 08/28/26 | 09/11/26 | 12.5 | 12.5 |
|
18.8 |
RPL06.EY.DHB.01320 |
RPL06.EY.DHB - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 08/28/26 | 10/30/26 | 56.2 | 56.2 |
|
332.5 |
RPL06.INT.DHA.01680 |
RPL06.Interior.DHA - Control Fault Domain 5 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 08/28/26 | 09/02/26 | 5.0 | 5.0 |
|
81.2 |
RPL06.INT.DHA.01710 |
RPL06.Interior.DHA - Tie-ins - Control Fault Domain 5 - WBS Summary | Control Fault Domain 5 | Not Started | 08/28/26 | 12/30/26 | 105.0 | 105.0 |
|
33.8 |
RPL06.INT.DHC.01090 |
RPL06.Interior.DHC - LV Skids and TopHat Tie-ins (LOE) | DHC - LV Skids and TopHat | Not Started | 08/28/26 | 09/28/26 | 26.2 | 26.2 |
|
145.0 |
RPL06.INT.DHC.01091 |
RPL06.Interior.DHC - LV Skids and TopHat - Set & Anchor Interconnects | DHC - LV Skids and TopHat | Not Started | 08/28/26 | 09/16/26 | 16.2 | 16.2 |
|
145.0 |
RPL06.INT.DHC.01100 |
RPL06.Interior.DHC - Tie-ins - WBS Summary | Tie-Ins | Not Started | 08/28/26 | 03/04/27 | 158.8 | 158.8 |
|
158.8 |
RPL06.INT.DHD.01130 |
RPL06.Interior.DHD - Control Fault Domain 1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 08/28/26 | 09/03/26 | 6.2 | 6.2 |
|
103.8 |
RPL06.INT.DHD.01160 |
RPL06.Interior.DHD - Tie-ins - Control Fault Domain 1 - WBS Summary | Control Fault Domain 1 | Not Started | 08/28/26 | 01/14/27 | 117.5 | 117.5 |
|
36.2 |
RPL06.INT.SSB.01320 |
RPL06.Interior.SSB - BoW - Hang Drywall | Balance of Walls and OverHead | Not Started | 08/28/26 | 09/08/26 | 8.8 | 8.8 |
|
123.8 |
RPL06.INT.SSB.02420 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Fixture Install (Lights) | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 08/28/26 | 09/08/26 | 8.8 | 8.8 |
|
253.8 |
RPL06.INT.SSB.06740 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (Post Drywall) | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 08/28/26 | 09/03/26 | 6.2 | 6.2 |
|
235.0 |
RPL06.INT.SSB.14280 |
RPL06.Interior.SSB LO #01 to #05 - QC - Backings/Walls | OH & Framing | Not Started | 08/28/26 | 09/03/26 | 6.2 | 6.2 |
|
72.5 |
DCC.B6.3035 |
[SSDCB1] Production Gear Delivered [DHB] Front End (SSW &FSW) | Connectivity | Not Started | 08/31/26 | 08/31/26 | 0.0 | 0.0 |
|
176.2 |
RPL06.CON.WP3A.01000 |
RPL06.Conn - OSP - WBS Summary | WP#3A OSP | Not Started | 08/31/26 | 10/01/26 | 28.8 | 28.8 |
|
160.0 |
RPL06.CON.WP3A.01200 |
RPL06.Conn - Production EF2 (North) - WBS Summary | Prod EF2 (North) | Not Started | 08/31/26 | 10/01/26 | 28.8 | 28.8 |
|
160.0 |
RPL06.CON.WP3A.01600 |
RPL06.Conn - Production EF1 (South) - WBS Summary | Prod EF1 (South) | Not Started | 08/31/26 | 10/01/26 | 28.8 | 28.8 |
|
160.0 |
RPL06.CON.WP3A.01620 |
RPL06.Conn EF2 (North) Infrastructure 1 (Racks & Vertical Cable Manager, Ladder Racks) | Infrastructure | Not Started | 08/31/26 | 09/14/26 | 12.5 | 12.5 |
|
98.8 |
RPL06.CON.WP3A.01740 |
RPL06.Conn EF1 (South) Infrastructure 1 (Racks & Vertical Cable Manager, Ladder Racks) | Infrastructure | Not Started | 08/31/26 | 09/14/26 | 12.5 | 12.5 |
|
98.8 |
RPL06.CON.WP3B.0900 |
RPL06.Conn WP4 Pull/Install/Test Universal Fabric EF1(South)<>EF2 (North) | EF1 <> EF2 | Not Started | 08/31/26 | 09/04/26 | 6.2 | 6.2 |
|
188.8 |
RPL06.INT.DHA.01780 |
RPL06.Interior.DHA - Control Fault Domain 5 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 08/31/26 | 09/03/26 | 5.0 | 5.0 |
|
105.0 |
RPL06.INT.DHA.03560 |
RPL06.Interior.DHA - OFE - Control Fault Domain 2 (HAC) | Control Fault Domain 2 | Not Started | 08/31/26 | 09/21/26 | 18.8 | 18.8 |
|
-10.0 |
RPL06.INT.DHB.01360 |
RPL06.Interior.DHB - Control Fault Domain 2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/31/26 | 09/21/26 | 18.8 | 18.8 |
|
56.2 |
RPL06.INT.DHB.01370 |
RPL06.Interior.DHB - Control Fault Domain 2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/31/26 | 09/21/26 | 18.8 | 18.8 |
|
43.8 |
RPL06.INT.DHB.02220 |
RPL06.Interior.DHB - Control Fault Domain 2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/31/26 | 09/21/26 | 18.8 | 18.8 |
|
43.8 |
RPL06.INT.DHB.02720 |
RPL06.Interior.DHB - Control Fault Domain 2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 08/31/26 | 09/21/26 | 18.8 | 18.8 |
|
43.8 |
RPL06.INT.DHD.01113 |
RPL06.Interior.DHD - MES Skids - CDU Tie-Ins | DHD - MES Skids | Not Started | 08/31/26 | 09/22/26 | 20.0 | 20.0 |
|
118.8 |
RPL06.INT.ENDC.01240 |
RPL06.Interior.End-Corridor - Tape Finish Paint | Fit out | Not Started | 08/31/26 | 09/02/26 | 3.8 | 3.8 |
|
177.5 |
RPL06.INT.SSBC.03540 |
RPL06.Interior.SSB-Corridor - Final Paint | Fit out | Not Started | 08/31/26 | 09/04/26 | 6.2 | 6.2 |
|
121.2 |
RPL06.SKN.S.LO.03100 |
RPL06.SKIN.LO#17 - Install IMP Insulated Metal Panels | Build back Exterior Leave Out Walls #17 (CC - South) | Not Started | 08/31/26 | 09/01/26 | 2.5 | 2.5 |
|
86.2 |
RPL06.SKN.W.LO.01440 |
RPL06.SKIN.LO#16 - Install IMP Flashing & Caulking | Build back Exterior Leave Out Walls #16 (SSB - North of Loading Dock) | Not Started | 08/31/26 | 09/04/26 | 6.2 | 6.2 |
|
68.8 |