Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:19 PM
· 6139 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL06.INT.DHA.01800 |
RPL06.Interior.DHA - Control Fault Domain 5 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 09/01/26 | 09/04/26 | 5.0 | 5.0 |
|
105.0 |
RPL06.INT.DHC.02210 |
RPL06.Interior.DHC - Priority - Install Temp Doors Frame Hardware | OverHead | Not Started | 09/01/26 | 09/03/26 | 3.8 | 3.8 |
|
305.0 |
RPL06.INT.DHD.01230 |
RPL06.Interior.DHD - Control Fault Domain 1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 09/01/26 | 09/08/26 | 6.2 | 6.2 |
|
112.5 |
RPL06.EY.DHB.01420 |
RPL06.EY.DHB - Install Condenser Units (Qty 2) | OFE | Not Started | 09/02/26 | 09/14/26 | 10.0 | 10.0 |
|
147.5 |
RPL06.EY.DHB.01525 |
RPL06.EY.DHB - Install Floor Mounted Outdoor Split AC Units (Qty 4) | OFE | Not Started | 09/02/26 | 09/11/26 | 8.8 | 8.8 |
|
148.8 |
RPL06.EY.DHC.01220 |
RPL06.EY.DHC - Install MV, RMUs & Electrical Panels (Qty8) | OFE | Not Started | 09/02/26 | 09/30/26 | 25.0 | 25.0 |
|
103.8 |
RPL06.EY.DHC.01230 |
RPL06.EY.DHC - OFE - MV - WBS Summary | OFE | Not Started | 09/02/26 | 03/09/27 | 158.8 | 158.8 |
|
113.8 |
RPL06.INT.DHC.01110 |
RPL06.Interior.DHC - MES Skids Tie-ins (LOE) | DHC - MES Skids | Not Started | 09/02/26 | 10/12/26 | 35.0 | 35.0 |
|
106.2 |
RPL06.INT.DHC.01111 |
RPL06.Interior.DHC - MES Skids - Set & Anchor Interconnects | DHC - MES Skids | Not Started | 09/02/26 | 09/24/26 | 20.0 | 20.0 |
|
106.2 |
RPL06.INT.DHD.01114 |
RPL06.Interior.DHD - MES Skids - BMS Tie-Ins | DHD - MES Skids | Not Started | 09/02/26 | 09/24/26 | 20.0 | 20.0 |
|
118.8 |
RPL06.INT.DHD.01210 |
RPL06.Interior.DHD - OFE - Control Fault Domain 2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 2 | Not Started | 09/02/26 | 12/08/26 | 82.5 | 82.5 |
|
17.5 |
RPL06.INT.DHD.01250 |
RPL06.Interior.DHD - Control Fault Domain 1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 09/02/26 | 09/09/26 | 6.2 | 6.2 |
|
112.5 |
RPL06.INT.DHD.02330 |
RPL06.Interior.DHD - OFE - Control Fault Domain 2 (LV Side Aisle) | Control Fault Domain 2 | Not Started | 09/02/26 | 09/08/26 | 5.0 | 5.0 |
|
80.0 |
RPL06.INT.SBC.05820 |
RPL06.Interior.SSB-Corridor - BoW - Install Backing (Both side) | Balance of Walls & Overhead | Not Started | 09/02/26 | 09/09/26 | 6.2 | 6.2 |
|
63.8 |
RPL06.INT.SSB.01350 |
RPL06.Interior.SSB - Loading Dock and Storage - Tape Finish Paint *Verify Scope | Loading Dock and Storage | Not Started | 09/02/26 | 09/04/26 | 3.8 | 3.8 |
|
146.2 |
RPL06.INT.SSB.01530 |
RPL06.Interior.SSB - Loading Dock and Storage - Install OverHead Doors | Loading Dock and Storage | Not Started | 09/02/26 | 09/16/26 | 12.5 | 12.5 |
|
171.2 |
RPL06.OFCI.4000 |
OFCI Delivery: FE Fiber for CFD B.1 (ROJ ) (RVCD ) | Data Hall B | Not Started | 09/02/26 | 09/23/26 | 18.8 | 18.8 |
|
81.2 |
RPL06.SKN.S.LO.03120 |
RPL06.SKIN.LO#17 - Install IMP Flashing & Caulking | Build back Exterior Leave Out Walls #17 (CC - South) | Not Started | 09/02/26 | 09/03/26 | 2.5 | 2.5 |
|
86.2 |
RPL06.CON.WP2.06600 |
RPL06.Conn - GSIDF/DH D2 - WBS Summary | Int. IDF OFE/MOFE - GSIDF6D2 | Not Started | 09/03/26 | 09/17/26 | 12.5 | 12.5 |
|
371.2 |
RPL06.CON.WP2.06620 |
RPL06.Conn - GSIDF/DH D2 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 09/03/26 | 09/03/26 | 1.2 | 1.2 |
|
277.5 |
RPL06.INT.DHA.01240 |
RPL06.Interior.DHA - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/03/26 | 10/01/26 | 25.0 | 25.0 |
|
32.5 |
RPL06.INT.DHA.03580 |
RPL06.Interior.DHA - OFE - Control Fault Domain 2 (Mech Side Aisle) | Control Fault Domain 2 | Not Started | 09/03/26 | 09/22/26 | 16.2 | 16.2 |
|
18.8 |
RPL06.INT.DHB.01430 |
RPL06.Interior.DHB - Control Fault Domain 1 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/03/26 | 10/01/26 | 25.0 | 25.0 |
|
32.5 |
RPL06.INT.DHC.01092 |
RPL06.Interior.DHC - LV Skids and TopHat - Maintenance and Reserve Busways | DHC - LV Skids and TopHat | Not Started | 09/03/26 | 09/21/26 | 15.0 | 15.0 |
|
145.0 |
RPL06.INT.ENDC.01250 |
RPL06.Interior.End-Corridor - Set Equipment / Interior (CRAC Units) | OFE/MOFE & CFCI | Not Started | 09/03/26 | 09/08/26 | 3.8 | 3.8 |
|
177.5 |
RPL06.INT.ENDC.01270 |
RPL06.Interior.End-Corridor - Install Tile | Fit out | Not Started | 09/03/26 | 09/14/26 | 8.8 | 8.8 |
|
181.2 |
RPL06.INT.ENDC.01420 |
RPL06.Interior.End-Corridor - Install Remaining Refrigerant Line | Fit out | Not Started | 09/03/26 | 09/10/26 | 6.2 | 6.2 |
|
218.8 |
RPL06.INT.ENDC.06800 |
RPL06.Interior.End-Corridor - Final Finishes & Fixtures - MEP Trims | Restrooms | Not Started | 09/03/26 | 09/14/26 | 8.8 | 8.8 |
|
190.0 |
RPL06.INT.ENDC.07100 |
RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Install Tile/ Grout | Restrooms | Not Started | 09/03/26 | 09/17/26 | 12.5 | 12.5 |
|
190.0 |
RPL06.INT.ENDC.07140 |
RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Install Fixtures, Partitions & Accessories | Restrooms | Not Started | 09/03/26 | 09/14/26 | 8.8 | 8.8 |
|
190.0 |
RPL06.INT.ENDC.1300 |
RPL06.Interior.End-Corridor - BoW - Install Plumbing/Mechanical Lowside OH and In-wall | Balance of Walls & Overhead | Not Started | 09/03/26 | 09/14/26 | 8.8 | 8.8 |
|
131.2 |
RPL06.INT.SSB.06000 |
RPL06.Interior.SSB LO #16 - Close Exterior LO #16 (SSB - North of Loading Dock) WBS Summary | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/03/26 | 11/24/26 | 71.2 | 71.2 |
|
68.8 |
RPL06.INT.SSB.06020 |
RPL06.Interior.SSB LO #16 - IMP In Wall MEP | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/03/26 | 09/04/26 | 2.5 | 2.5 |
|
68.8 |
RPL06.CON.WP2.06640 |
RPL06.Conn - GSIDF/DH D2 - Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 09/04/26 | 09/14/26 | 7.5 | 7.5 |
|
372.5 |
RPL06.CON.WP2.06660 |
RPL06.Conn - GSIDF/DH D2 - Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 09/04/26 | 09/17/26 | 11.2 | 11.2 |
|
277.5 |
RPL06.EY.DHA.01290 |
RPL06.EY.DHA - MV Loop - L2 Checklist Completion | Tie-ins | Not Started | 09/04/26 | 09/18/26 | 12.5 | 12.5 |
|
25.0 |
RPL06.EY.DHB.01330 |
RPL06.EY.DHB - Install Early EY Paving | Hardscape and Landscape | Not Started | 09/04/26 | 09/11/26 | 6.2 | 6.2 |
|
176.2 |
RPL06.INT.CTRC.01260 |
RPL06.Interior.Center-Corridor (N) - Electrical OFE Tie In | Fit out (North) | Not Started | 09/04/26 | 09/11/26 | 6.2 | 6.2 |
|
123.8 |
RPL06.INT.CTRC.01850 |
RPL06.Interior.Center-Corridor (S) - Electrical OFE Tie In | Fit out (South) | Not Started | 09/04/26 | 09/11/26 | 6.2 | 6.2 |
|
115.0 |
RPL06.INT.CTRC.1340 |
RPL06.Interior.Center-Corridor - BoW - Install VAV's/Duct Branches | Balance of Walls & Overhead | Not Started | 09/04/26 | 09/11/26 | 6.2 | 6.2 |
|
113.8 |
RPL06.INT.CTRC.1440 |
RPL06.Interior.Center-Corridor - BoW - Mechanical Tie-In | Balance of Walls & Overhead | Not Started | 09/04/26 | 09/11/26 | 6.2 | 6.2 |
|
37.5 |
RPL06.INT.DHC.02170 |
RPL06.Interior.DHC - Priority - Install Security | OverHead | Not Started | 09/04/26 | 09/08/26 | 2.5 | 2.5 |
|
305.0 |
RPL06.INT.DHD.01115 |
RPL06.Interior.DHD - MES Skids - EPMS Tie-In | DHD - MES Skids | Not Started | 09/04/26 | 09/28/26 | 20.0 | 20.0 |
|
118.8 |
RPL06.INT.DHD.01270 |
RPL06.Interior.DHD - Control Fault Domain 2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 09/04/26 | 09/10/26 | 5.0 | 5.0 |
|
116.2 |
RPL06.INT.DHD.01300 |
RPL06.Interior.DHD - Tie-ins - Control Fault Domain 2 - WBS Summary | Control Fault Domain 2 | Not Started | 09/04/26 | 01/26/27 | 120.0 | 120.0 |
|
40.0 |
RPL06.INT.SSB.02480 |
RPL06.Interior.SSB - Final Finishes & Fixtures - MEP Trims | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 09/04/26 | 09/15/26 | 8.8 | 8.8 |
|
235.0 |
RPL06.INT.SSB.06720 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Install Tile/ Grout | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 09/04/26 | 09/18/26 | 12.5 | 12.5 |
|
235.0 |
RPL06.INT.SSB.06760 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Install Fixtures, Partitions & Accessories | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 09/04/26 | 09/15/26 | 8.8 | 8.8 |
|
235.0 |
RPL06.INT.SSB.14180 |
RPL06.Interior.SSB LO #01 to #05 - Install Door Frames | OH & Framing | Not Started | 09/04/26 | 09/08/26 | 2.5 | 2.5 |
|
72.5 |
RPL06.CON.WP2.06880 |
RPL06.Conn - GSIDF/DH C2 - Install & Test Network (FIM) | Network | Not Started | 09/08/26 | 09/09/26 | 2.5 | 2.5 |
|
378.8 |
RPL06.INT.CTRC.1420 |
RPL06.Interior.Center-Corridor - BoW - Install Electrical - Lighitng Inverter Room (XX.S2.XX) | Balance of Walls & Overhead | Not Started | 09/08/26 | 09/16/26 | 8.8 | 8.8 |
|
87.5 |
RPL06.INT.DHB.01390 |
RPL06.Interior.DHB - Control Fault Domain 2 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/08/26 | 09/28/26 | 18.8 | 18.8 |
|
56.2 |
RPL06.INT.DHB.01400 |
RPL06.Interior.DHB - Control Fault Domain 2 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/08/26 | 09/28/26 | 18.8 | 18.8 |
|
56.2 |
RPL06.INT.DHB.01410 |
RPL06.Interior.DHB - Control Fault Domain 2 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/08/26 | 09/28/26 | 18.8 | 18.8 |
|
43.8 |
RPL06.INT.DHB.02540 |
RPL06.Interior.DHB - OFE - Control Fault Domain 3 (HAC) | Control Fault Domain 3 | Not Started | 09/08/26 | 09/25/26 | 17.5 | 17.5 |
|
2.5 |
RPL06.INT.SSB.01270 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Controls / EPMS / BMS | Loading Dock and Storage | Not Started | 09/08/26 | 09/11/26 | 5.0 | 5.0 |
|
150.0 |
RPL06.INT.SSB.01430 |
RPL06.Interior.SSB - Loading Dock and Storage - Electrical Trim Out | Loading Dock and Storage | Not Started | 09/08/26 | 09/16/26 | 8.8 | 8.8 |
|
146.2 |
RPL06.INT.SSB.01460 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Lighting and Devices | Loading Dock and Storage | Not Started | 09/08/26 | 09/16/26 | 8.8 | 8.8 |
|
163.8 |
RPL06.INT.SSB.01920 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Remaining Refrigerant Line | Loading Dock and Storage | Not Started | 09/08/26 | 09/14/26 | 6.2 | 6.2 |
|
172.5 |
RPL06.INT.SSB.06040 |
RPL06.Interior.SSB LO #16 - QC - Backings/Walls | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/08/26 | 09/08/26 | 1.2 | 1.2 |
|
68.8 |
RPL06.INT.SSBC.01420 |
RPL06.Interior.SSB-Corridor - Final Clean | Fit out | Not Started | 09/08/26 | 09/11/26 | 5.0 | 5.0 |
|
121.2 |
RPL06.INT.DHC.02190 |
RPL06.Interior.DHC - Priority - Install Controls / EPMS / BMS | OverHead | Not Started | 09/09/26 | 09/11/26 | 3.8 | 3.8 |
|
305.0 |
RPL06.INT.DHD.01350 |
RPL06.Interior.DHD - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 3 | Not Started | 09/09/26 | 12/22/26 | 90.0 | 90.0 |
|
15.0 |
RPL06.INT.DHD.01370 |
RPL06.Interior.DHD - Control Fault Domain 2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 09/09/26 | 09/14/26 | 5.0 | 5.0 |
|
125.0 |
RPL06.INT.DHD.02390 |
RPL06.Interior.DHD - OFE - Control Fault Domain 3 (LV Side Aisle) | Control Fault Domain 3 | Not Started | 09/09/26 | 09/14/26 | 5.0 | 5.0 |
|
87.5 |
RPL06.INT.ENDC.01280 |
RPL06.Interior.End-Corridor - Duct Drops / Trim out | Fit out | Not Started | 09/09/26 | 09/16/26 | 7.5 | 7.5 |
|
177.5 |
RPL06.INT.ENDC.01290 |
RPL06.Interior.End-Corridor - Install Battery | Fit out | Not Started | 09/09/26 | 09/22/26 | 12.5 | 12.5 |
|
196.2 |
RPL06.INT.ENDC.01590 |
RPL06.Interior.End-Corridor - Install Electrical - DHD/DHC UPS Gallery | Fit out | Not Started | 09/09/26 | 09/15/26 | 6.2 | 6.2 |
|
183.8 |
RPL06.INT.SSB.01340 |
RPL06.Interior.SSB - BoW - Tape Finish Paint | Balance of Walls and OverHead | Not Started | 09/09/26 | 09/11/26 | 3.8 | 3.8 |
|
123.8 |
RPL06.INT.SSB.06060 |
RPL06.Interior.SSB LO #16 - Hang Exterior Wall Drywall | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/09/26 | 09/10/26 | 2.5 | 2.5 |
|
68.8 |
RPL06.INT.SSB.14340 |
RPL06.Interior.SSB LO #01 to #05 - MEPF Hard Lid Rough-In/ Close up Inspection | OH & Framing | Not Started | 09/09/26 | 09/14/26 | 5.0 | 5.0 |
|
72.5 |
GCD.RPL06.2071 |
L3/L4 Finish mCUP [1-4] - RPL06 | mCup | Not Started | 09/10/26 | 09/10/26 | 0.0 | 0.0 |
|
208.8 |
RPL06.INT.DHC.01120 |
RPL06.Interior.DHC - OFE - Control Fault Domain 1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 1 | Not Started | 09/10/26 | 12/08/26 | 76.2 | 76.2 |
|
8.8 |
RPL06.INT.DHC.02270 |
RPL06.Interior.DHC - OFE - Control Fault Domain 1 (LV Side Aisle) | Control Fault Domain 1 | Not Started | 09/10/26 | 09/16/26 | 6.2 | 6.2 |
|
58.8 |
RPL06.INT.DHD.01390 |
RPL06.Interior.DHD - Control Fault Domain 2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 09/10/26 | 09/15/26 | 5.0 | 5.0 |
|
125.0 |
RPL06.INT.ENDC.6180 |
RPL06.Interior.End-Corridor - BoW - Electrical Tie-In | Balance of Walls & Overhead | Not Started | 09/10/26 | 09/16/26 | 6.2 | 6.2 |
|
206.2 |
RPL06.INT.SBC.05840 |
RPL06.Interior.SSB-Corridor - BoW - QC - Backings/Walls (Both side) | Balance of Walls & Overhead | Not Started | 09/10/26 | 09/16/26 | 6.2 | 6.2 |
|
63.8 |
RPL06.CX.MCUP.01090 |
RPL06.CX.mCup Loop 1 - L3/L4 - mCUP - IST System Testing | mCUP 1-4 | Not Started | 09/11/26 | 09/24/26 | 12.5 | 12.5 |
|
196.2 |
RPL06.INT.DHA.01250 |
RPL06.Interior.DHA - Control Fault Domain 1 - Install Copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/11/26 | 10/08/26 | 25.0 | 25.0 |
|
32.5 |
RPL06.INT.DHB.02560 |
RPL06.Interior.DHB - OFE - Control Fault Domain 3 (Mech Side Aisle) | Control Fault Domain 3 | Not Started | 09/11/26 | 09/28/26 | 15.0 | 15.0 |
|
25.0 |
RPL06.INT.DHC.01093 |
RPL06.Interior.DHC - LV Skids and TopHat - Top Hat Busway | DHC - LV Skids and TopHat | Not Started | 09/11/26 | 09/28/26 | 15.0 | 15.0 |
|
145.0 |
RPL06.INT.DHC.01112 |
RPL06.Interior.DHC - MES Skids - Piping Tie-Ins & Inspections | DHC - MES Skids | Not Started | 09/11/26 | 10/02/26 | 20.0 | 20.0 |
|
106.2 |
RPL06.INT.DHD.01410 |
RPL06.Interior.DHD - Control Fault Domain 3 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 09/11/26 | 09/16/26 | 5.0 | 5.0 |
|
130.0 |
RPL06.INT.DHD.01440 |
RPL06.Interior.DHD - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary | Control Fault Domain 3 | Not Started | 09/11/26 | 02/02/27 | 121.2 | 121.2 |
|
60.0 |
RPL06.INT.SSB.06080 |
RPL06.Interior.SSB LO #16 - Tape Finish Paint | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/11/26 | 09/17/26 | 6.2 | 6.2 |
|
68.8 |
GCD.RPL06.1116 |
RPL06 EY Ready for Energization | Construction Milestones | Not Started | 09/14/26 | 09/14/26 | 0.0 | 0.0 |
|
207.5 |
GCD.RPL06.5765 |
RMU Loop Ready for Energization - DHB Loop | EY | Not Started | 09/14/26 | 09/14/26 | 0.0 | 0.0 |
|
18.8 |
ICM.B6.2530 |
[SSDCB1] L3/L4 Start EY | Commissioning | Not Started | 09/14/26 | 09/14/26 | 0.0 | 0.0 |
|
173.8 |
RPL06.CON.WP3A.01640 |
RPL06.Conn EF2 (North) Infrastructure 2 (Waterfalls & VCM etc.) | Infrastructure | Not Started | 09/14/26 | 09/21/26 | 7.5 | 7.5 |
|
98.8 |
RPL06.CON.WP3A.01760 |
RPL06.Conn EF1 (South) Infrastructure 2 (Waterfalls & VCM etc.) | Infrastructure | Not Started | 09/14/26 | 09/21/26 | 7.5 | 7.5 |
|
98.8 |
RPL06.CX.DHB.01000 |
RPL06.CX.DHB - L3, L4, IST - WBS Summary | DHB | Not Started | 09/14/26 | 05/06/27 | 201.2 | 201.2 |
|
162.5 |
RPL06.CX.DHB.01010 |
RPL06.CX.DHB - L3 - WBS Summary (Electrical) | DHB ELECTRICAL | Not Started | 09/14/26 | 12/22/26 | 86.2 | 86.2 |
|
87.5 |
RPL06.CX.DHB.01020 |
RPL06.CX.DHB - L3/L4 - MV Skids (10) Loop | DHB ELECTRICAL | Not Started | 09/14/26 | 09/25/26 | 12.5 | 12.5 |
|
18.8 |
RPL06.EY.DHA.01300 |
RPL06.EY.DHA - Install Sleeves MEPL | Hardscape and Landscape | Not Started | 09/14/26 | 09/18/26 | 6.2 | 6.2 |
|
176.2 |
RPL06.EY.DHA.01320 |
RPL06.EY.DHA - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 09/14/26 | 11/16/26 | 56.2 | 56.2 |
|
320.0 |
RPL06.EY.DHB.01340 |
RPL06.EY.DHB - Install Lighting | Hardscape and Landscape | Not Started | 09/14/26 | 09/25/26 | 12.5 | 12.5 |
|
176.2 |
RPL06.INT.CTRC.01290 |
RPL06.Interior.Center-Corridor (N) - Mechanical OFE Tie In | Fit out (North) | Not Started | 09/14/26 | 09/16/26 | 3.8 | 3.8 |
|
123.8 |
RPL06.INT.CTRC.01870 |
RPL06.Interior.Center-Corridor (S) - Mechanical OFE Tie In | Fit out (South) | Not Started | 09/14/26 | 09/16/26 | 3.8 | 3.8 |
|
115.0 |
RPL06.INT.CTRC.1380 |
RPL06.Interior.Center-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall | Balance of Walls & Overhead | Not Started | 09/14/26 | 09/18/26 | 6.2 | 6.2 |
|
113.8 |
RPL06.INT.CTRC.1460 |
RPL06.Interior.Center-Corridor - BoW - Frame Hard Lid | Balance of Walls & Overhead | Not Started | 09/14/26 | 09/22/26 | 8.8 | 8.8 |
|