Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:19 PM · 6139 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL06.INT.DHA.01800 RPL06.Interior.DHA - Control Fault Domain 5 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 09/01/26 09/04/26 5.0 5.0
0%
105.0
RPL06.INT.DHC.02210 RPL06.Interior.DHC - Priority - Install Temp Doors Frame Hardware OverHead Not Started 09/01/26 09/03/26 3.8 3.8
0%
305.0
RPL06.INT.DHD.01230 RPL06.Interior.DHD - Control Fault Domain 1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 09/01/26 09/08/26 6.2 6.2
0%
112.5
RPL06.EY.DHB.01420 RPL06.EY.DHB - Install Condenser Units (Qty 2) OFE Not Started 09/02/26 09/14/26 10.0 10.0
0%
147.5
RPL06.EY.DHB.01525 RPL06.EY.DHB - Install Floor Mounted Outdoor Split AC Units (Qty 4) OFE Not Started 09/02/26 09/11/26 8.8 8.8
0%
148.8
RPL06.EY.DHC.01220 RPL06.EY.DHC - Install MV, RMUs & Electrical Panels (Qty8) OFE Not Started 09/02/26 09/30/26 25.0 25.0
0%
103.8
RPL06.EY.DHC.01230 RPL06.EY.DHC - OFE - MV - WBS Summary OFE Not Started 09/02/26 03/09/27 158.8 158.8
0%
113.8
RPL06.INT.DHC.01110 RPL06.Interior.DHC - MES Skids Tie-ins (LOE) DHC - MES Skids Not Started 09/02/26 10/12/26 35.0 35.0
0%
106.2
RPL06.INT.DHC.01111 RPL06.Interior.DHC - MES Skids - Set & Anchor Interconnects DHC - MES Skids Not Started 09/02/26 09/24/26 20.0 20.0
0%
106.2
RPL06.INT.DHD.01114 RPL06.Interior.DHD - MES Skids - BMS Tie-Ins DHD - MES Skids Not Started 09/02/26 09/24/26 20.0 20.0
0%
118.8
RPL06.INT.DHD.01210 RPL06.Interior.DHD - OFE - Control Fault Domain 2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 2 Not Started 09/02/26 12/08/26 82.5 82.5
0%
17.5
RPL06.INT.DHD.01250 RPL06.Interior.DHD - Control Fault Domain 1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 09/02/26 09/09/26 6.2 6.2
0%
112.5
RPL06.INT.DHD.02330 RPL06.Interior.DHD - OFE - Control Fault Domain 2 (LV Side Aisle) Control Fault Domain 2 Not Started 09/02/26 09/08/26 5.0 5.0
0%
80.0
RPL06.INT.SBC.05820 RPL06.Interior.SSB-Corridor - BoW - Install Backing (Both side) Balance of Walls & Overhead Not Started 09/02/26 09/09/26 6.2 6.2
0%
63.8
RPL06.INT.SSB.01350 RPL06.Interior.SSB - Loading Dock and Storage - Tape Finish Paint *Verify Scope Loading Dock and Storage Not Started 09/02/26 09/04/26 3.8 3.8
0%
146.2
RPL06.INT.SSB.01530 RPL06.Interior.SSB - Loading Dock and Storage - Install OverHead Doors Loading Dock and Storage Not Started 09/02/26 09/16/26 12.5 12.5
0%
171.2
RPL06.OFCI.4000 OFCI Delivery: FE Fiber for CFD B.1 (ROJ ) (RVCD ) Data Hall B Not Started 09/02/26 09/23/26 18.8 18.8
0%
81.2
RPL06.SKN.S.LO.03120 RPL06.SKIN.LO#17 - Install IMP Flashing & Caulking Build back Exterior Leave Out Walls #17 (CC - South) Not Started 09/02/26 09/03/26 2.5 2.5
0%
86.2
RPL06.CON.WP2.06600 RPL06.Conn - GSIDF/DH D2 - WBS Summary Int. IDF OFE/MOFE - GSIDF6D2 Not Started 09/03/26 09/17/26 12.5 12.5
0%
371.2
RPL06.CON.WP2.06620 RPL06.Conn - GSIDF/DH D2 - Install Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 09/03/26 09/03/26 1.2 1.2
0%
277.5
RPL06.INT.DHA.01240 RPL06.Interior.DHA - Control Fault Domain 1 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 09/03/26 10/01/26 25.0 25.0
0%
32.5
RPL06.INT.DHA.03580 RPL06.Interior.DHA - OFE - Control Fault Domain 2 (Mech Side Aisle) Control Fault Domain 2 Not Started 09/03/26 09/22/26 16.2 16.2
0%
18.8
RPL06.INT.DHB.01430 RPL06.Interior.DHB - Control Fault Domain 1 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 09/03/26 10/01/26 25.0 25.0
0%
32.5
RPL06.INT.DHC.01092 RPL06.Interior.DHC - LV Skids and TopHat - Maintenance and Reserve Busways DHC - LV Skids and TopHat Not Started 09/03/26 09/21/26 15.0 15.0
0%
145.0
RPL06.INT.ENDC.01250 RPL06.Interior.End-Corridor - Set Equipment / Interior (CRAC Units) OFE/MOFE & CFCI Not Started 09/03/26 09/08/26 3.8 3.8
0%
177.5
RPL06.INT.ENDC.01270 RPL06.Interior.End-Corridor - Install Tile Fit out Not Started 09/03/26 09/14/26 8.8 8.8
0%
181.2
RPL06.INT.ENDC.01420 RPL06.Interior.End-Corridor - Install Remaining Refrigerant Line Fit out Not Started 09/03/26 09/10/26 6.2 6.2
0%
218.8
RPL06.INT.ENDC.06800 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - MEP Trims Restrooms Not Started 09/03/26 09/14/26 8.8 8.8
0%
190.0
RPL06.INT.ENDC.07100 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Install Tile/ Grout Restrooms Not Started 09/03/26 09/17/26 12.5 12.5
0%
190.0
RPL06.INT.ENDC.07140 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Install Fixtures, Partitions & Accessories Restrooms Not Started 09/03/26 09/14/26 8.8 8.8
0%
190.0
RPL06.INT.ENDC.1300 RPL06.Interior.End-Corridor - BoW - Install Plumbing/Mechanical Lowside OH and In-wall Balance of Walls & Overhead Not Started 09/03/26 09/14/26 8.8 8.8
0%
131.2
RPL06.INT.SSB.06000 RPL06.Interior.SSB LO #16 - Close Exterior LO #16 (SSB - North of Loading Dock) WBS Summary Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/03/26 11/24/26 71.2 71.2
0%
68.8
RPL06.INT.SSB.06020 RPL06.Interior.SSB LO #16 - IMP In Wall MEP Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/03/26 09/04/26 2.5 2.5
0%
68.8
RPL06.CON.WP2.06640 RPL06.Conn - GSIDF/DH D2 - Install Cabling (Pull, Splice & terminate) Cabling Not Started 09/04/26 09/14/26 7.5 7.5
0%
372.5
RPL06.CON.WP2.06660 RPL06.Conn - GSIDF/DH D2 - Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 09/04/26 09/17/26 11.2 11.2
0%
277.5
RPL06.EY.DHA.01290 RPL06.EY.DHA - MV Loop - L2 Checklist Completion Tie-ins Not Started 09/04/26 09/18/26 12.5 12.5
0%
25.0
RPL06.EY.DHB.01330 RPL06.EY.DHB - Install Early EY Paving Hardscape and Landscape Not Started 09/04/26 09/11/26 6.2 6.2
0%
176.2
RPL06.INT.CTRC.01260 RPL06.Interior.Center-Corridor (N) - Electrical OFE Tie In Fit out (North) Not Started 09/04/26 09/11/26 6.2 6.2
0%
123.8
RPL06.INT.CTRC.01850 RPL06.Interior.Center-Corridor (S) - Electrical OFE Tie In Fit out (South) Not Started 09/04/26 09/11/26 6.2 6.2
0%
115.0
RPL06.INT.CTRC.1340 RPL06.Interior.Center-Corridor - BoW - Install VAV's/Duct Branches Balance of Walls & Overhead Not Started 09/04/26 09/11/26 6.2 6.2
0%
113.8
RPL06.INT.CTRC.1440 RPL06.Interior.Center-Corridor - BoW - Mechanical Tie-In Balance of Walls & Overhead Not Started 09/04/26 09/11/26 6.2 6.2
0%
37.5
RPL06.INT.DHC.02170 RPL06.Interior.DHC - Priority - Install Security OverHead Not Started 09/04/26 09/08/26 2.5 2.5
0%
305.0
RPL06.INT.DHD.01115 RPL06.Interior.DHD - MES Skids - EPMS Tie-In DHD - MES Skids Not Started 09/04/26 09/28/26 20.0 20.0
0%
118.8
RPL06.INT.DHD.01270 RPL06.Interior.DHD - Control Fault Domain 2 - Install Duct (LV Side) LV Side Tie-ins Not Started 09/04/26 09/10/26 5.0 5.0
0%
116.2
RPL06.INT.DHD.01300 RPL06.Interior.DHD - Tie-ins - Control Fault Domain 2 - WBS Summary Control Fault Domain 2 Not Started 09/04/26 01/26/27 120.0 120.0
0%
40.0
RPL06.INT.SSB.02480 RPL06.Interior.SSB - Final Finishes & Fixtures - MEP Trims Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 09/04/26 09/15/26 8.8 8.8
0%
235.0
RPL06.INT.SSB.06720 RPL06.Interior.SSB - Final Finishes & Fixtures - Install Tile/ Grout Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 09/04/26 09/18/26 12.5 12.5
0%
235.0
RPL06.INT.SSB.06760 RPL06.Interior.SSB - Final Finishes & Fixtures - Install Fixtures, Partitions & Accessories Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 09/04/26 09/15/26 8.8 8.8
0%
235.0
RPL06.INT.SSB.14180 RPL06.Interior.SSB LO #01 to #05 - Install Door Frames OH & Framing Not Started 09/04/26 09/08/26 2.5 2.5
0%
72.5
RPL06.CON.WP2.06880 RPL06.Conn - GSIDF/DH C2 - Install & Test Network (FIM) Network Not Started 09/08/26 09/09/26 2.5 2.5
0%
378.8
RPL06.INT.CTRC.1420 RPL06.Interior.Center-Corridor - BoW - Install Electrical - Lighitng Inverter Room (XX.S2.XX) Balance of Walls & Overhead Not Started 09/08/26 09/16/26 8.8 8.8
0%
87.5
RPL06.INT.DHB.01390 RPL06.Interior.DHB - Control Fault Domain 2 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 09/08/26 09/28/26 18.8 18.8
0%
56.2
RPL06.INT.DHB.01400 RPL06.Interior.DHB - Control Fault Domain 2 - Pull EPMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 09/08/26 09/28/26 18.8 18.8
0%
56.2
RPL06.INT.DHB.01410 RPL06.Interior.DHB - Control Fault Domain 2 - Set UPS and Panel (2) Remaining Tie-ins post Mech Side Aisle install Not Started 09/08/26 09/28/26 18.8 18.8
0%
43.8
RPL06.INT.DHB.02540 RPL06.Interior.DHB - OFE - Control Fault Domain 3 (HAC) Control Fault Domain 3 Not Started 09/08/26 09/25/26 17.5 17.5
0%
2.5
RPL06.INT.SSB.01270 RPL06.Interior.SSB - Loading Dock and Storage - Install Controls / EPMS / BMS Loading Dock and Storage Not Started 09/08/26 09/11/26 5.0 5.0
0%
150.0
RPL06.INT.SSB.01430 RPL06.Interior.SSB - Loading Dock and Storage - Electrical Trim Out Loading Dock and Storage Not Started 09/08/26 09/16/26 8.8 8.8
0%
146.2
RPL06.INT.SSB.01460 RPL06.Interior.SSB - Loading Dock and Storage - Install Lighting and Devices Loading Dock and Storage Not Started 09/08/26 09/16/26 8.8 8.8
0%
163.8
RPL06.INT.SSB.01920 RPL06.Interior.SSB - Loading Dock and Storage - Install Remaining Refrigerant Line Loading Dock and Storage Not Started 09/08/26 09/14/26 6.2 6.2
0%
172.5
RPL06.INT.SSB.06040 RPL06.Interior.SSB LO #16 - QC - Backings/Walls Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/08/26 09/08/26 1.2 1.2
0%
68.8
RPL06.INT.SSBC.01420 RPL06.Interior.SSB-Corridor - Final Clean Fit out Not Started 09/08/26 09/11/26 5.0 5.0
0%
121.2
RPL06.INT.DHC.02190 RPL06.Interior.DHC - Priority - Install Controls / EPMS / BMS OverHead Not Started 09/09/26 09/11/26 3.8 3.8
0%
305.0
RPL06.INT.DHD.01350 RPL06.Interior.DHD - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 3 Not Started 09/09/26 12/22/26 90.0 90.0
0%
15.0
RPL06.INT.DHD.01370 RPL06.Interior.DHD - Control Fault Domain 2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 09/09/26 09/14/26 5.0 5.0
0%
125.0
RPL06.INT.DHD.02390 RPL06.Interior.DHD - OFE - Control Fault Domain 3 (LV Side Aisle) Control Fault Domain 3 Not Started 09/09/26 09/14/26 5.0 5.0
0%
87.5
RPL06.INT.ENDC.01280 RPL06.Interior.End-Corridor - Duct Drops / Trim out Fit out Not Started 09/09/26 09/16/26 7.5 7.5
0%
177.5
RPL06.INT.ENDC.01290 RPL06.Interior.End-Corridor - Install Battery Fit out Not Started 09/09/26 09/22/26 12.5 12.5
0%
196.2
RPL06.INT.ENDC.01590 RPL06.Interior.End-Corridor - Install Electrical - DHD/DHC UPS Gallery Fit out Not Started 09/09/26 09/15/26 6.2 6.2
0%
183.8
RPL06.INT.SSB.01340 RPL06.Interior.SSB - BoW - Tape Finish Paint Balance of Walls and OverHead Not Started 09/09/26 09/11/26 3.8 3.8
0%
123.8
RPL06.INT.SSB.06060 RPL06.Interior.SSB LO #16 - Hang Exterior Wall Drywall Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/09/26 09/10/26 2.5 2.5
0%
68.8
RPL06.INT.SSB.14340 RPL06.Interior.SSB LO #01 to #05 - MEPF Hard Lid Rough-In/ Close up Inspection OH & Framing Not Started 09/09/26 09/14/26 5.0 5.0
0%
72.5
GCD.RPL06.2071 L3/L4 Finish mCUP [1-4] - RPL06 mCup Not Started 09/10/26 09/10/26 0.0 0.0
0%
208.8
RPL06.INT.DHC.01120 RPL06.Interior.DHC - OFE - Control Fault Domain 1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 1 Not Started 09/10/26 12/08/26 76.2 76.2
0%
8.8
RPL06.INT.DHC.02270 RPL06.Interior.DHC - OFE - Control Fault Domain 1 (LV Side Aisle) Control Fault Domain 1 Not Started 09/10/26 09/16/26 6.2 6.2
0%
58.8
RPL06.INT.DHD.01390 RPL06.Interior.DHD - Control Fault Domain 2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 09/10/26 09/15/26 5.0 5.0
0%
125.0
RPL06.INT.ENDC.6180 RPL06.Interior.End-Corridor - BoW - Electrical Tie-In Balance of Walls & Overhead Not Started 09/10/26 09/16/26 6.2 6.2
0%
206.2
RPL06.INT.SBC.05840 RPL06.Interior.SSB-Corridor - BoW - QC - Backings/Walls (Both side) Balance of Walls & Overhead Not Started 09/10/26 09/16/26 6.2 6.2
0%
63.8
RPL06.CX.MCUP.01090 RPL06.CX.mCup Loop 1 - L3/L4 - mCUP - IST System Testing mCUP 1-4 Not Started 09/11/26 09/24/26 12.5 12.5
0%
196.2
RPL06.INT.DHA.01250 RPL06.Interior.DHA - Control Fault Domain 1 - Install Copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 09/11/26 10/08/26 25.0 25.0
0%
32.5
RPL06.INT.DHB.02560 RPL06.Interior.DHB - OFE - Control Fault Domain 3 (Mech Side Aisle) Control Fault Domain 3 Not Started 09/11/26 09/28/26 15.0 15.0
0%
25.0
RPL06.INT.DHC.01093 RPL06.Interior.DHC - LV Skids and TopHat - Top Hat Busway DHC - LV Skids and TopHat Not Started 09/11/26 09/28/26 15.0 15.0
0%
145.0
RPL06.INT.DHC.01112 RPL06.Interior.DHC - MES Skids - Piping Tie-Ins & Inspections DHC - MES Skids Not Started 09/11/26 10/02/26 20.0 20.0
0%
106.2
RPL06.INT.DHD.01410 RPL06.Interior.DHD - Control Fault Domain 3 - Install Duct (LV Side) LV Side Tie-ins Not Started 09/11/26 09/16/26 5.0 5.0
0%
130.0
RPL06.INT.DHD.01440 RPL06.Interior.DHD - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary Control Fault Domain 3 Not Started 09/11/26 02/02/27 121.2 121.2
0%
60.0
RPL06.INT.SSB.06080 RPL06.Interior.SSB LO #16 - Tape Finish Paint Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/11/26 09/17/26 6.2 6.2
0%
68.8
GCD.RPL06.1116 RPL06 EY Ready for Energization Construction Milestones Not Started 09/14/26 09/14/26 0.0 0.0
0%
207.5
GCD.RPL06.5765 RMU Loop Ready for Energization - DHB Loop EY Not Started 09/14/26 09/14/26 0.0 0.0
0%
18.8
ICM.B6.2530 [SSDCB1] L3/L4 Start EY Commissioning Not Started 09/14/26 09/14/26 0.0 0.0
0%
173.8
RPL06.CON.WP3A.01640 RPL06.Conn EF2 (North) Infrastructure 2 (Waterfalls & VCM etc.) Infrastructure Not Started 09/14/26 09/21/26 7.5 7.5
0%
98.8
RPL06.CON.WP3A.01760 RPL06.Conn EF1 (South) Infrastructure 2 (Waterfalls & VCM etc.) Infrastructure Not Started 09/14/26 09/21/26 7.5 7.5
0%
98.8
RPL06.CX.DHB.01000 RPL06.CX.DHB - L3, L4, IST - WBS Summary DHB Not Started 09/14/26 05/06/27 201.2 201.2
0%
162.5
RPL06.CX.DHB.01010 RPL06.CX.DHB - L3 - WBS Summary (Electrical) DHB ELECTRICAL Not Started 09/14/26 12/22/26 86.2 86.2
0%
87.5
RPL06.CX.DHB.01020 RPL06.CX.DHB - L3/L4 - MV Skids (10) Loop DHB ELECTRICAL Not Started 09/14/26 09/25/26 12.5 12.5
0%
18.8
RPL06.EY.DHA.01300 RPL06.EY.DHA - Install Sleeves MEPL Hardscape and Landscape Not Started 09/14/26 09/18/26 6.2 6.2
0%
176.2
RPL06.EY.DHA.01320 RPL06.EY.DHA - Install Hardscape and Landscape - WBS Summary Hardscape and Landscape Not Started 09/14/26 11/16/26 56.2 56.2
0%
320.0
RPL06.EY.DHB.01340 RPL06.EY.DHB - Install Lighting Hardscape and Landscape Not Started 09/14/26 09/25/26 12.5 12.5
0%
176.2
RPL06.INT.CTRC.01290 RPL06.Interior.Center-Corridor (N) - Mechanical OFE Tie In Fit out (North) Not Started 09/14/26 09/16/26 3.8 3.8
0%
123.8
RPL06.INT.CTRC.01870 RPL06.Interior.Center-Corridor (S) - Mechanical OFE Tie In Fit out (South) Not Started 09/14/26 09/16/26 3.8 3.8
0%
115.0
RPL06.INT.CTRC.1380 RPL06.Interior.Center-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall Balance of Walls & Overhead Not Started 09/14/26 09/18/26 6.2 6.2
0%
113.8
RPL06.INT.CTRC.1460 RPL06.Interior.Center-Corridor - BoW - Frame Hard Lid Balance of Walls & Overhead Not Started 09/14/26 09/22/26 8.8 8.8
0%
37.5