Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:19 PM · 6139 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
1
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL06.INT.DHC.01130 RPL06.Interior.DHC - Control Fault Domain 1 - Install Duct (LV Side) LV Side Tie-ins Not Started 09/14/26 09/18/26 6.2 6.2
0%
107.5
RPL06.INT.DHC.01160 RPL06.Interior.DHC - Tie-ins - Control Fault Domain 1 - WBS Summary Control Fault Domain 1 Not Started 09/14/26 01/29/27 117.5 117.5
0%
40.0
RPL06.INT.SSB.01280 RPL06.Interior.SSB - BoW - Duct Drops / Trim out Balance of Walls and OverHead Not Started 09/14/26 09/18/26 6.2 6.2
0%
170.0
RPL06.INT.SSB.01300 RPL06.Interior.SSB - Loading Dock and Storage - Install Fire Life Safety / Fire Alarm Loading Dock and Storage Not Started 09/14/26 09/22/26 8.8 8.8
0%
150.0
RPL06.INT.SSB.01360 RPL06.Interior.SSB - BoW - Electrical Trim Out Balance of Walls and OverHead Not Started 09/14/26 09/22/26 8.8 8.8
0%
175.0
RPL06.INT.SSB.01380 RPL06.Interior.SSB - BoW - Security Trim Out Balance of Walls and OverHead Not Started 09/14/26 09/22/26 8.8 8.8
0%
175.0
RPL06.INT.SSB.01840 RPL06.Interior.SSB - Install Split Systems/Humidifiers OFE/MOFE & CFCI Not Started 09/14/26 09/18/26 6.2 6.2
0%
163.8
RPL06.INT.SSB.02520 RPL06.Interior.SSB - BoW - ACT - Set Wall Angle & Shoot Ceiling Wire Balance of Walls and OverHead Not Started 09/14/26 09/22/26 8.8 8.8
0%
123.8
RPL06.CON.WP2.06680 RPL06.Conn - GSIDF/DH D2 - Install & Test Network (FIM) Network Not Started 09/15/26 09/16/26 2.5 2.5
0%
372.5
RPL06.EY.DHB.01450 RPL06.EY.DHB - Install Remaining Remaining Electrical Tie-ins Tie-ins Not Started 09/15/26 09/24/26 10.0 10.0
0%
150.0
RPL06.EY.DHB.01460 RPL06.EY.DHB - Install Remaining Mechanical/refrigerantTie-ins Tie-ins Not Started 09/15/26 09/28/26 12.5 12.5
0%
147.5
RPL06.INT.CC.9000 RPL06.Interior.CC Ext. LO #17 - Close Exterior Leave Out #17 (CC - South) WBS Summary Exterior Leave Out Wall #17 (CC - South) Not Started 09/15/26 10/23/26 36.2 36.2
0%
88.8
RPL06.INT.CC.9280 RPL06.Interior.CC Ext. LO #17 - Install Mechanical Piping/ Refrigerant Lowside OH and in-wall Exterior Leave Out Wall #17 (CC - South) Not Started 09/15/26 09/17/26 3.8 3.8
0%
65.0
RPL06.INT.CC.9560 RPL06.Interior.CC Ext. LO #17 - Tie In MEPF with IMP Wall buildback Exterior Leave Out Wall #17 (CC - South) Not Started 09/15/26 09/16/26 2.5 2.5
0%
76.2
RPL06.INT.DHB.01450 RPL06.Interior.DHB - Control Fault Domain 2 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 09/15/26 10/05/26 18.8 18.8
0%
43.8
RPL06.INT.DHC.01113 RPL06.Interior.DHC - MES Skids - CDU Tie-Ins DHC - MES Skids Not Started 09/15/26 10/06/26 20.0 20.0
0%
106.2
RPL06.INT.DHD.01490 RPL06.Interior.DHD - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 4 Not Started 09/15/26 01/07/27 97.5 97.5
0%
12.5
RPL06.INT.DHD.01510 RPL06.Interior.DHD - Control Fault Domain 3 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 09/15/26 09/18/26 5.0 5.0
0%
153.8
RPL06.INT.DHD.02450 RPL06.Interior.DHD - OFE - Control Fault Domain 4 (LV Side Aisle) Control Fault Domain 4 Not Started 09/15/26 09/18/26 5.0 5.0
0%
95.0
RPL06.INT.ENDC.01320 RPL06.Interior.End-Corridor - Install Toilet Accessories Fit out Not Started 09/15/26 09/23/26 8.8 8.8
0%
181.2
RPL06.INT.ENDC.06840 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Install Acoustical Ceiling Restrooms Not Started 09/15/26 09/17/26 3.8 3.8
0%
190.0
RPL06.INT.ENDC.1340 RPL06.Interior.End-Corridor - BoW - Install VAV's/Duct Branches Balance of Walls & Overhead Not Started 09/15/26 09/21/26 6.2 6.2
0%
131.2
RPL06.INT.ENDC.1360 RPL06.Interior.End-Corridor - BoW - Install Split Systems/Humidifiers Balance of Walls & Overhead Not Started 09/15/26 09/21/26 6.2 6.2
0%
131.2
RPL06.INT.ENDC.1440 RPL06.Interior.End-Corridor - BoW - Mechanical Tie-In Balance of Walls & Overhead Not Started 09/15/26 09/21/26 6.2 6.2
0%
131.2
RPL06.INT.SSB.14360 RPL06.Interior.SSB LO #01 to #05 - Hang Drywall OH & Framing Not Started 09/15/26 09/23/26 8.8 8.8
0%
72.5
RPL.06.D.63740.XG RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHD Give Milestones (XREFs) Not Started 09/16/26 09/16/26 0.0 0.0
0%
372.5
RPL.06.D.64040.XG Ready for MV Cable Pull DH D (IMVs - Qty 8)* Give Milestones (XREFs) Not Started 09/16/26 09/16/26 0.0 0.0
0%
372.5
RPL06.INT.DHC.01230 RPL06.Interior.DHC - Control Fault Domain 1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 09/16/26 09/22/26 6.2 6.2
0%
116.2
RPL06.INT.DHD.01530 RPL06.Interior.DHD - Control Fault Domain 3 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 09/16/26 09/21/26 5.0 5.0
0%
172.5
RPL06.INT.SSB.01390 RPL06.Interior.SSB - BoW - Plumbing Trim Out Balance of Walls and OverHead Not Started 09/16/26 09/24/26 8.8 8.8
0%
175.0
RPL06.INT.SSB.02880 RPL06.Interior.SSB - Final Finishes & Fixtures - Install Acoustical Ceiling Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 09/16/26 09/18/26 3.8 3.8
0%
235.0
RPL06.OFCI.6920 OFCI Delivery: FE Fiber for CFD A.1 (ROJ ) (RVCD ) Data Hall A Not Started 09/16/26 10/06/26 18.8 18.8
0%
78.8
RPL06.EY.DHA.01420 RPL06.EY.DHA - Install Condenser Units (Qty 2) OFE Not Started 09/17/26 09/28/26 10.0 10.0
0%
125.0
RPL06.EY.DHA.02060 RPL06.EY.DHA - Install reminder of Wall mounted ACs post LO buildback (Qty2) OFE Not Started 09/17/26 09/22/26 5.0 5.0
0%
150.0
RPL06.EY.DHD.01240 RPL06.EY.DHD - Install Generator including Tie-ins (#2 of Qty 2) OFE Not Started 09/17/26 09/23/26 6.2 6.2
0%
125.0
RPL06.EY.DHD.01250 RPL06.EY.DHD - Install Electrical Tie-ins (include penetration detail) Tie-ins Not Started 09/17/26 09/30/26 12.5 12.5
0%
93.8
RPL06.EY.DHD.01260 RPL06.EY.DHD - Tie-ins - WBS Summary Tie-ins Not Started 09/17/26 03/19/27 156.2 156.2
0%
103.8
RPL06.INT.CTRC.8860 RPL06.Interior.Center-Corridor - BoW - Electrical Tie-In Balance of Walls & Overhead Not Started 09/17/26 09/23/26 6.2 6.2
0%
110.0
RPL06.INT.DHC.01114 RPL06.Interior.DHC - MES Skids - BMS Tie-Ins DHC - MES Skids Not Started 09/17/26 10/08/26 20.0 20.0
0%
106.2
RPL06.INT.DHC.01210 RPL06.Interior.DHC - OFE - Control Fault Domain 2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 2 Not Started 09/17/26 12/22/26 82.5 82.5
0%
6.2
RPL06.INT.DHC.01250 RPL06.Interior.DHC - Control Fault Domain 1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 09/17/26 09/23/26 6.2 6.2
0%
116.2
RPL06.INT.DHC.02330 RPL06.Interior.DHC - OFE - Control Fault Domain 2 (LV Side Aisle) Control Fault Domain 2 Not Started 09/17/26 09/22/26 5.0 5.0
0%
68.8
RPL06.INT.DHD.01550 RPL06.Interior.DHD - Control Fault Domain 4 - Install Duct (LV Side) LV Side Tie-ins Not Started 09/17/26 09/22/26 5.0 5.0
0%
135.0
RPL06.INT.DHD.01580 RPL06.Interior.DHD - Tie-ins - Control Fault Domain 4 - WBS Summary Control Fault Domain 4 Not Started 09/17/26 02/17/27 128.8 128.8
0%
53.8
RPL06.INT.ENDC.01310 RPL06.Interior.End-Corridor - Fire Life Safe Trim Fit out Not Started 09/17/26 09/22/26 5.0 5.0
0%
177.5
RPL06.INT.SBC.03540 RPL06.Interior.SSB-Corridor - BoW - Hang Drywall (Both side) Balance of Walls & Overhead Not Started 09/17/26 09/25/26 8.8 8.8
0%
63.8
RPL06.INT.SSB.01440 RPL06.Interior.SSB - Loading Dock and Storage - Install Store Front Frames Loading Dock and Storage Not Started 09/17/26 09/25/26 8.8 8.8
0%
171.2
RPL06.INT.SSB.01480 RPL06.Interior.SSB - Loading Dock and Storage - Security Trim Out Loading Dock and Storage Not Started 09/17/26 09/25/26 8.8 8.8
0%
146.2
RPL06.INT.SSB.01490 RPL06.Interior.SSB - BoW - Install Lights (**Work with FTI to coordinate flow map light Install & duration) Balance of Walls and OverHead Not Started 09/17/26 09/30/26 12.5 12.5
0%
120.0
RPL06.INT.SSB.01500 RPL06.Interior.SSB - BoW - Install Bathroom Fixtures Balance of Walls and OverHead Not Started 09/17/26 09/25/26 8.8 8.8
0%
120.0
RPL.06.D.63340.XR Pull and Term MV Skids - RPL06 DHD Receive Milestones (XREFs) Not Started 09/18/26 09/18/26 0.0 0.0
0%
120.0
RPL.06.D.63840.XR 100MW Cx Temp Power to MV Skids RPL06 DHD Available Receive Milestones (XREFs) Not Started 09/18/26 09/18/26 0.0 0.0
0%
120.0
RPL06.CON.WP3B.01000 RPL06.Conn WP#3B - ISP - WBS Summary WP#3B ISP Not Started 09/18/26 03/18/27 153.8 153.8
0%
127.5
RPL06.CON.WP3B.01020 RPL06.Conn WP#3B - ISP DHB - WBS Summary DHB Not Started 09/18/26 01/19/27 102.5 102.5
0%
70.0
RPL06.CON.WP4.01000 RPL06.Conn - DH B Network - WBS Summary DH B Not Started 09/18/26 03/11/27 147.5 147.5
0%
37.5
RPL06.CON.WP4.01020 RPL06.Conn WP4 FENW DHB CFD1 Infrastructure Infrastructure Not Started 09/18/26 10/15/26 25.0 25.0
0%
160.0
RPL06.INT.CC.9320 RPL06.Interior.CC Ext. LO #17 - Install Fire Life Safety Lowside OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 09/18/26 09/22/26 3.8 3.8
0%
81.2
RPL06.INT.CC.9340 RPL06.Interior.CC Ext. LO #17 - Install Plumbing Lowside OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 09/18/26 09/22/26 3.8 3.8
0%
65.0
RPL06.INT.DHA.01270 RPL06.Interior.DHA - Control Fault Domain 2 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 09/18/26 10/08/26 18.8 18.8
0%
57.5
RPL06.INT.DHA.01280 RPL06.Interior.DHA - Control Fault Domain 2 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 09/18/26 10/08/26 18.8 18.8
0%
45.0
RPL06.INT.DHA.01290 RPL06.Interior.DHA - Control Fault Domain 1 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 09/18/26 10/15/26 25.0 25.0
0%
32.5
RPL06.INT.DHA.02200 RPL06.Interior.DHA - Control Fault Domain 2 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 09/18/26 10/08/26 18.8 18.8
0%
45.0
RPL06.INT.DHA.03800 RPL06.Interior.DHA - Control Fault Domain 2 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 09/18/26 10/08/26 18.8 18.8
0%
45.0
RPL06.INT.DHB.01290 RPL06.Conn DHB - CFD1 - Set Passive Racks for WP#3b (16) Infrastructure Not Started 09/18/26 09/22/26 3.8 3.8
0%
81.2
RPL06.INT.DHB.02800 RPL06.Conn DHB - CFD1 - Set Passive Racks for PON (16) Infrastructure Not Started 09/18/26 09/22/26 3.8 3.8
0%
157.5
RPL06.INT.ENDC.06780 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Final Paint Restrooms Not Started 09/18/26 09/28/26 8.8 8.8
0%
190.0
RPL06.INT.ENDC.06920 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Flooring Restrooms Not Started 09/18/26 09/28/26 8.8 8.8
0%
190.0
RPL06.INT.SSB.01400 RPL06.Interior.SSB - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out Balance of Walls and OverHead Not Started 09/18/26 09/24/26 6.2 6.2
0%
175.0
RPL06.INT.SSB.06100 RPL06.Interior.SSB LO #16 - Install Mechanical Piping/ Refrigerant Lowside OH Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/18/26 09/24/26 6.2 6.2
0%
71.2
RPL06.INT.SSB.06120 RPL06.Interior.SSB LO #16 - Install Electrical Lowside OH Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/18/26 09/28/26 8.8 8.8
0%
72.5
RPL06.INT.SSB.06140 RPL06.Interior.SSB LO #16 - Install Plumbing Lowside OH Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/18/26 09/28/26 8.8 8.8
0%
68.8
RPL06.INT.SSB.06160 RPL06.Interior.SSB LO #16 - Install Fire Life Safety Lowside OH Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/18/26 09/22/26 3.8 3.8
0%
73.8
RPL06.INT.SSB.06180 RPL06.Interior.SSB LO #16 - Install Security Lowside OH Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/18/26 09/23/26 5.0 5.0
0%
72.5
RPL06.INT.SSB.06200 RPL06.Interior.SSB LO #16 - Install Controls / EPMS / BMS OH Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/18/26 09/22/26 3.8 3.8
0%
73.8
RPL06.INT.SSB.06220 RPL06.Interior.SSB LO #16 - Fire Safing OH Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/18/26 09/24/26 6.2 6.2
0%
71.2
GCD.RPL06.5805 RMU Loop Ready for Energization - DHA Loop EY Not Started 09/21/26 09/21/26 0.0 0.0
0%
25.0
RPL06.EY.DHA.01330 RPL06.EY.DHA - Install Early EY Paving Hardscape and Landscape Not Started 09/21/26 09/25/26 6.2 6.2
0%
176.2
RPL06.EY.DHD.01280 RPL06.EY.DHD - Install BMS/EPMS Tie-ins Tie-ins Not Started 09/21/26 10/02/26 12.5 12.5
0%
93.8
RPL06.INT.DHC.01115 RPL06.Interior.DHC - MES Skids - EPMS Tie-Ins DHC - MES Skids Not Started 09/21/26 10/12/26 20.0 20.0
0%
106.2
RPL06.INT.DHC.01270 RPL06.Interior.DHC - Control Fault Domain 2 - Install Duct (LV Side) LV Side Tie-ins Not Started 09/21/26 09/24/26 5.0 5.0
0%
120.0
RPL06.INT.DHC.01300 RPL06.Interior.DHC - Tie-ins - Control Fault Domain 2 - WBS Summary Control Fault Domain 2 Not Started 09/21/26 02/09/27 120.0 120.0
0%
43.8
RPL06.INT.DHD.01650 RPL06.Interior.DHD - Control Fault Domain 4 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 09/21/26 09/24/26 5.0 5.0
0%
158.8
RPL06.INT.SSB.01700 RPL06.Interior.SSB - BoW - Install Balance of Refrigerant Line Balance of Walls and OverHead Not Started 09/21/26 09/25/26 6.2 6.2
0%
163.8
RPL06.INT.SSB.01860 RPL06.Interior.SSB - Final Finishes & Fixtures - Flooring Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 09/21/26 09/29/26 8.8 8.8
0%
235.0
RPL06.INT.SSB.02740 RPL06.Interior.SSB - Final Finishes & Fixtures - Final Paint Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 09/21/26 09/29/26 8.8 8.8
0%
235.0
RPL06.OFCI.6840 OFCI Delivery: FE Fiber for CFD B.2 (ROJ ) (RVCD ) Data Hall B Not Started 09/21/26 10/09/26 18.8 18.8
0%
76.2
RPL06.CON.WP3.01820 RPL06.Conn EF1 (South) Install OSP Pathway (for RPL06) - P3 Infrastructure Not Started 09/22/26 09/23/26 2.5 2.5
0%
98.8
RPL06.CON.WP3A.01660 RPL06.Conn EF2 (North) Install OSP Pathway (for RPL06) - P1 Infrastructure Not Started 09/22/26 09/23/26 2.5 2.5
0%
98.8
RPL06.INT.DHA.03620 RPL06.Interior.DHA - OFE - Control Fault Domain 3 (HAC) Control Fault Domain 3 Not Started 09/22/26 10/09/26 17.5 17.5
0%
-10.0
RPL06.INT.DHB.01480 RPL06.Interior.DHB - Control Fault Domain 2 - Install copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 09/22/26 10/12/26 18.8 18.8
0%
43.8
RPL06.INT.DHB.01500 RPL06.Interior.DHB - Control Fault Domain 3 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 09/22/26 10/12/26 18.8 18.8
0%
47.5
RPL06.INT.DHB.01510 RPL06.Interior.DHB - Control Fault Domain 3 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 09/22/26 10/12/26 18.8 18.8
0%
41.2
RPL06.INT.DHB.02240 RPL06.Interior.DHB - Control Fault Domain 3 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 09/22/26 10/12/26 18.8 18.8
0%
41.2
RPL06.INT.DHB.02740 RPL06.Interior.DHB - Control Fault Domain 3 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 09/22/26 10/12/26 18.8 18.8
0%
41.2
RPL06.INT.DHD.01670 RPL06.Interior.DHD - Control Fault Domain 4 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 09/22/26 09/25/26 5.0 5.0
0%
173.8
RPL06.INT.ENDC.1380 RPL06.Interior.End-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall Balance of Walls & Overhead Not Started 09/22/26 09/28/26 6.2 6.2
0%
162.5
RPL06.INT.ENDC.1460 RPL06.Interior.End-Corridor - BoW - Frame Hard Lid Balance of Walls & Overhead Not Started 09/22/26 09/28/26 6.2 6.2
0%
131.2
DCC.B6.3527 [SSDCB1] Cabling Start : Front End Production Cabling [DHB] Connectivity Not Started 09/23/26 09/23/26 0.0 0.0
0%
367.5
GCD.RPL06.3527 [RPL06] TC-C Ready : Production Cabling Start [DHB Rows 01-08] TC-C Ready: Production Cabling - DHB Not Started 09/23/26 09/23/26 0.0 0.0
0%
367.5
RPL06.CON.WP3B.01100 RPL06.Conn EF1<>DHB11 - WBS Summary EF2<>DHB.11 Not Started 09/23/26 10/08/26 15.0 15.0
0%
81.2