Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:19 PM
· 6139 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
1
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL06.INT.DHC.01130 |
RPL06.Interior.DHC - Control Fault Domain 1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 09/14/26 | 09/18/26 | 6.2 | 6.2 |
|
107.5 |
RPL06.INT.DHC.01160 |
RPL06.Interior.DHC - Tie-ins - Control Fault Domain 1 - WBS Summary | Control Fault Domain 1 | Not Started | 09/14/26 | 01/29/27 | 117.5 | 117.5 |
|
40.0 |
RPL06.INT.SSB.01280 |
RPL06.Interior.SSB - BoW - Duct Drops / Trim out | Balance of Walls and OverHead | Not Started | 09/14/26 | 09/18/26 | 6.2 | 6.2 |
|
170.0 |
RPL06.INT.SSB.01300 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Fire Life Safety / Fire Alarm | Loading Dock and Storage | Not Started | 09/14/26 | 09/22/26 | 8.8 | 8.8 |
|
150.0 |
RPL06.INT.SSB.01360 |
RPL06.Interior.SSB - BoW - Electrical Trim Out | Balance of Walls and OverHead | Not Started | 09/14/26 | 09/22/26 | 8.8 | 8.8 |
|
175.0 |
RPL06.INT.SSB.01380 |
RPL06.Interior.SSB - BoW - Security Trim Out | Balance of Walls and OverHead | Not Started | 09/14/26 | 09/22/26 | 8.8 | 8.8 |
|
175.0 |
RPL06.INT.SSB.01840 |
RPL06.Interior.SSB - Install Split Systems/Humidifiers | OFE/MOFE & CFCI | Not Started | 09/14/26 | 09/18/26 | 6.2 | 6.2 |
|
163.8 |
RPL06.INT.SSB.02520 |
RPL06.Interior.SSB - BoW - ACT - Set Wall Angle & Shoot Ceiling Wire | Balance of Walls and OverHead | Not Started | 09/14/26 | 09/22/26 | 8.8 | 8.8 |
|
123.8 |
RPL06.CON.WP2.06680 |
RPL06.Conn - GSIDF/DH D2 - Install & Test Network (FIM) | Network | Not Started | 09/15/26 | 09/16/26 | 2.5 | 2.5 |
|
372.5 |
RPL06.EY.DHB.01450 |
RPL06.EY.DHB - Install Remaining Remaining Electrical Tie-ins | Tie-ins | Not Started | 09/15/26 | 09/24/26 | 10.0 | 10.0 |
|
150.0 |
RPL06.EY.DHB.01460 |
RPL06.EY.DHB - Install Remaining Mechanical/refrigerantTie-ins | Tie-ins | Not Started | 09/15/26 | 09/28/26 | 12.5 | 12.5 |
|
147.5 |
RPL06.INT.CC.9000 |
RPL06.Interior.CC Ext. LO #17 - Close Exterior Leave Out #17 (CC - South) WBS Summary | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/15/26 | 10/23/26 | 36.2 | 36.2 |
|
88.8 |
RPL06.INT.CC.9280 |
RPL06.Interior.CC Ext. LO #17 - Install Mechanical Piping/ Refrigerant Lowside OH and in-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/15/26 | 09/17/26 | 3.8 | 3.8 |
|
65.0 |
RPL06.INT.CC.9560 |
RPL06.Interior.CC Ext. LO #17 - Tie In MEPF with IMP Wall buildback | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/15/26 | 09/16/26 | 2.5 | 2.5 |
|
76.2 |
RPL06.INT.DHB.01450 |
RPL06.Interior.DHB - Control Fault Domain 2 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/15/26 | 10/05/26 | 18.8 | 18.8 |
|
43.8 |
RPL06.INT.DHC.01113 |
RPL06.Interior.DHC - MES Skids - CDU Tie-Ins | DHC - MES Skids | Not Started | 09/15/26 | 10/06/26 | 20.0 | 20.0 |
|
106.2 |
RPL06.INT.DHD.01490 |
RPL06.Interior.DHD - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 4 | Not Started | 09/15/26 | 01/07/27 | 97.5 | 97.5 |
|
12.5 |
RPL06.INT.DHD.01510 |
RPL06.Interior.DHD - Control Fault Domain 3 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 09/15/26 | 09/18/26 | 5.0 | 5.0 |
|
153.8 |
RPL06.INT.DHD.02450 |
RPL06.Interior.DHD - OFE - Control Fault Domain 4 (LV Side Aisle) | Control Fault Domain 4 | Not Started | 09/15/26 | 09/18/26 | 5.0 | 5.0 |
|
95.0 |
RPL06.INT.ENDC.01320 |
RPL06.Interior.End-Corridor - Install Toilet Accessories | Fit out | Not Started | 09/15/26 | 09/23/26 | 8.8 | 8.8 |
|
181.2 |
RPL06.INT.ENDC.06840 |
RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Install Acoustical Ceiling | Restrooms | Not Started | 09/15/26 | 09/17/26 | 3.8 | 3.8 |
|
190.0 |
RPL06.INT.ENDC.1340 |
RPL06.Interior.End-Corridor - BoW - Install VAV's/Duct Branches | Balance of Walls & Overhead | Not Started | 09/15/26 | 09/21/26 | 6.2 | 6.2 |
|
131.2 |
RPL06.INT.ENDC.1360 |
RPL06.Interior.End-Corridor - BoW - Install Split Systems/Humidifiers | Balance of Walls & Overhead | Not Started | 09/15/26 | 09/21/26 | 6.2 | 6.2 |
|
131.2 |
RPL06.INT.ENDC.1440 |
RPL06.Interior.End-Corridor - BoW - Mechanical Tie-In | Balance of Walls & Overhead | Not Started | 09/15/26 | 09/21/26 | 6.2 | 6.2 |
|
131.2 |
RPL06.INT.SSB.14360 |
RPL06.Interior.SSB LO #01 to #05 - Hang Drywall | OH & Framing | Not Started | 09/15/26 | 09/23/26 | 8.8 | 8.8 |
|
72.5 |
RPL.06.D.63740.XG |
RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHD | Give Milestones (XREFs) | Not Started | 09/16/26 | 09/16/26 | 0.0 | 0.0 |
|
372.5 |
RPL.06.D.64040.XG |
Ready for MV Cable Pull DH D (IMVs - Qty 8)* | Give Milestones (XREFs) | Not Started | 09/16/26 | 09/16/26 | 0.0 | 0.0 |
|
372.5 |
RPL06.INT.DHC.01230 |
RPL06.Interior.DHC - Control Fault Domain 1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 09/16/26 | 09/22/26 | 6.2 | 6.2 |
|
116.2 |
RPL06.INT.DHD.01530 |
RPL06.Interior.DHD - Control Fault Domain 3 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 09/16/26 | 09/21/26 | 5.0 | 5.0 |
|
172.5 |
RPL06.INT.SSB.01390 |
RPL06.Interior.SSB - BoW - Plumbing Trim Out | Balance of Walls and OverHead | Not Started | 09/16/26 | 09/24/26 | 8.8 | 8.8 |
|
175.0 |
RPL06.INT.SSB.02880 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Install Acoustical Ceiling | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 09/16/26 | 09/18/26 | 3.8 | 3.8 |
|
235.0 |
RPL06.OFCI.6920 |
OFCI Delivery: FE Fiber for CFD A.1 (ROJ ) (RVCD ) | Data Hall A | Not Started | 09/16/26 | 10/06/26 | 18.8 | 18.8 |
|
78.8 |
RPL06.EY.DHA.01420 |
RPL06.EY.DHA - Install Condenser Units (Qty 2) | OFE | Not Started | 09/17/26 | 09/28/26 | 10.0 | 10.0 |
|
125.0 |
RPL06.EY.DHA.02060 |
RPL06.EY.DHA - Install reminder of Wall mounted ACs post LO buildback (Qty2) | OFE | Not Started | 09/17/26 | 09/22/26 | 5.0 | 5.0 |
|
150.0 |
RPL06.EY.DHD.01240 |
RPL06.EY.DHD - Install Generator including Tie-ins (#2 of Qty 2) | OFE | Not Started | 09/17/26 | 09/23/26 | 6.2 | 6.2 |
|
125.0 |
RPL06.EY.DHD.01250 |
RPL06.EY.DHD - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 09/17/26 | 09/30/26 | 12.5 | 12.5 |
|
93.8 |
RPL06.EY.DHD.01260 |
RPL06.EY.DHD - Tie-ins - WBS Summary | Tie-ins | Not Started | 09/17/26 | 03/19/27 | 156.2 | 156.2 |
|
103.8 |
RPL06.INT.CTRC.8860 |
RPL06.Interior.Center-Corridor - BoW - Electrical Tie-In | Balance of Walls & Overhead | Not Started | 09/17/26 | 09/23/26 | 6.2 | 6.2 |
|
110.0 |
RPL06.INT.DHC.01114 |
RPL06.Interior.DHC - MES Skids - BMS Tie-Ins | DHC - MES Skids | Not Started | 09/17/26 | 10/08/26 | 20.0 | 20.0 |
|
106.2 |
RPL06.INT.DHC.01210 |
RPL06.Interior.DHC - OFE - Control Fault Domain 2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 2 | Not Started | 09/17/26 | 12/22/26 | 82.5 | 82.5 |
|
6.2 |
RPL06.INT.DHC.01250 |
RPL06.Interior.DHC - Control Fault Domain 1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 09/17/26 | 09/23/26 | 6.2 | 6.2 |
|
116.2 |
RPL06.INT.DHC.02330 |
RPL06.Interior.DHC - OFE - Control Fault Domain 2 (LV Side Aisle) | Control Fault Domain 2 | Not Started | 09/17/26 | 09/22/26 | 5.0 | 5.0 |
|
68.8 |
RPL06.INT.DHD.01550 |
RPL06.Interior.DHD - Control Fault Domain 4 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 09/17/26 | 09/22/26 | 5.0 | 5.0 |
|
135.0 |
RPL06.INT.DHD.01580 |
RPL06.Interior.DHD - Tie-ins - Control Fault Domain 4 - WBS Summary | Control Fault Domain 4 | Not Started | 09/17/26 | 02/17/27 | 128.8 | 128.8 |
|
53.8 |
RPL06.INT.ENDC.01310 |
RPL06.Interior.End-Corridor - Fire Life Safe Trim | Fit out | Not Started | 09/17/26 | 09/22/26 | 5.0 | 5.0 |
|
177.5 |
RPL06.INT.SBC.03540 |
RPL06.Interior.SSB-Corridor - BoW - Hang Drywall (Both side) | Balance of Walls & Overhead | Not Started | 09/17/26 | 09/25/26 | 8.8 | 8.8 |
|
63.8 |
RPL06.INT.SSB.01440 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Store Front Frames | Loading Dock and Storage | Not Started | 09/17/26 | 09/25/26 | 8.8 | 8.8 |
|
171.2 |
RPL06.INT.SSB.01480 |
RPL06.Interior.SSB - Loading Dock and Storage - Security Trim Out | Loading Dock and Storage | Not Started | 09/17/26 | 09/25/26 | 8.8 | 8.8 |
|
146.2 |
RPL06.INT.SSB.01490 |
RPL06.Interior.SSB - BoW - Install Lights (**Work with FTI to coordinate flow map light Install & duration) | Balance of Walls and OverHead | Not Started | 09/17/26 | 09/30/26 | 12.5 | 12.5 |
|
120.0 |
RPL06.INT.SSB.01500 |
RPL06.Interior.SSB - BoW - Install Bathroom Fixtures | Balance of Walls and OverHead | Not Started | 09/17/26 | 09/25/26 | 8.8 | 8.8 |
|
120.0 |
RPL.06.D.63340.XR |
Pull and Term MV Skids - RPL06 DHD | Receive Milestones (XREFs) | Not Started | 09/18/26 | 09/18/26 | 0.0 | 0.0 |
|
120.0 |
RPL.06.D.63840.XR |
100MW Cx Temp Power to MV Skids RPL06 DHD Available | Receive Milestones (XREFs) | Not Started | 09/18/26 | 09/18/26 | 0.0 | 0.0 |
|
120.0 |
RPL06.CON.WP3B.01000 |
RPL06.Conn WP#3B - ISP - WBS Summary | WP#3B ISP | Not Started | 09/18/26 | 03/18/27 | 153.8 | 153.8 |
|
127.5 |
RPL06.CON.WP3B.01020 |
RPL06.Conn WP#3B - ISP DHB - WBS Summary | DHB | Not Started | 09/18/26 | 01/19/27 | 102.5 | 102.5 |
|
70.0 |
RPL06.CON.WP4.01000 |
RPL06.Conn - DH B Network - WBS Summary | DH B | Not Started | 09/18/26 | 03/11/27 | 147.5 | 147.5 |
|
37.5 |
RPL06.CON.WP4.01020 |
RPL06.Conn WP4 FENW DHB CFD1 Infrastructure | Infrastructure | Not Started | 09/18/26 | 10/15/26 | 25.0 | 25.0 |
|
160.0 |
RPL06.INT.CC.9320 |
RPL06.Interior.CC Ext. LO #17 - Install Fire Life Safety Lowside OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/18/26 | 09/22/26 | 3.8 | 3.8 |
|
81.2 |
RPL06.INT.CC.9340 |
RPL06.Interior.CC Ext. LO #17 - Install Plumbing Lowside OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/18/26 | 09/22/26 | 3.8 | 3.8 |
|
65.0 |
RPL06.INT.DHA.01270 |
RPL06.Interior.DHA - Control Fault Domain 2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/18/26 | 10/08/26 | 18.8 | 18.8 |
|
57.5 |
RPL06.INT.DHA.01280 |
RPL06.Interior.DHA - Control Fault Domain 2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/18/26 | 10/08/26 | 18.8 | 18.8 |
|
45.0 |
RPL06.INT.DHA.01290 |
RPL06.Interior.DHA - Control Fault Domain 1 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/18/26 | 10/15/26 | 25.0 | 25.0 |
|
32.5 |
RPL06.INT.DHA.02200 |
RPL06.Interior.DHA - Control Fault Domain 2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/18/26 | 10/08/26 | 18.8 | 18.8 |
|
45.0 |
RPL06.INT.DHA.03800 |
RPL06.Interior.DHA - Control Fault Domain 2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/18/26 | 10/08/26 | 18.8 | 18.8 |
|
45.0 |
RPL06.INT.DHB.01290 |
RPL06.Conn DHB - CFD1 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 09/18/26 | 09/22/26 | 3.8 | 3.8 |
|
81.2 |
RPL06.INT.DHB.02800 |
RPL06.Conn DHB - CFD1 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 09/18/26 | 09/22/26 | 3.8 | 3.8 |
|
157.5 |
RPL06.INT.ENDC.06780 |
RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Final Paint | Restrooms | Not Started | 09/18/26 | 09/28/26 | 8.8 | 8.8 |
|
190.0 |
RPL06.INT.ENDC.06920 |
RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Flooring | Restrooms | Not Started | 09/18/26 | 09/28/26 | 8.8 | 8.8 |
|
190.0 |
RPL06.INT.SSB.01400 |
RPL06.Interior.SSB - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls and OverHead | Not Started | 09/18/26 | 09/24/26 | 6.2 | 6.2 |
|
175.0 |
RPL06.INT.SSB.06100 |
RPL06.Interior.SSB LO #16 - Install Mechanical Piping/ Refrigerant Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/18/26 | 09/24/26 | 6.2 | 6.2 |
|
71.2 |
RPL06.INT.SSB.06120 |
RPL06.Interior.SSB LO #16 - Install Electrical Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/18/26 | 09/28/26 | 8.8 | 8.8 |
|
72.5 |
RPL06.INT.SSB.06140 |
RPL06.Interior.SSB LO #16 - Install Plumbing Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/18/26 | 09/28/26 | 8.8 | 8.8 |
|
68.8 |
RPL06.INT.SSB.06160 |
RPL06.Interior.SSB LO #16 - Install Fire Life Safety Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/18/26 | 09/22/26 | 3.8 | 3.8 |
|
73.8 |
RPL06.INT.SSB.06180 |
RPL06.Interior.SSB LO #16 - Install Security Lowside OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/18/26 | 09/23/26 | 5.0 | 5.0 |
|
72.5 |
RPL06.INT.SSB.06200 |
RPL06.Interior.SSB LO #16 - Install Controls / EPMS / BMS OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/18/26 | 09/22/26 | 3.8 | 3.8 |
|
73.8 |
RPL06.INT.SSB.06220 |
RPL06.Interior.SSB LO #16 - Fire Safing OH | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/18/26 | 09/24/26 | 6.2 | 6.2 |
|
71.2 |
GCD.RPL06.5805 |
RMU Loop Ready for Energization - DHA Loop | EY | Not Started | 09/21/26 | 09/21/26 | 0.0 | 0.0 |
|
25.0 |
RPL06.EY.DHA.01330 |
RPL06.EY.DHA - Install Early EY Paving | Hardscape and Landscape | Not Started | 09/21/26 | 09/25/26 | 6.2 | 6.2 |
|
176.2 |
RPL06.EY.DHD.01280 |
RPL06.EY.DHD - Install BMS/EPMS Tie-ins | Tie-ins | Not Started | 09/21/26 | 10/02/26 | 12.5 | 12.5 |
|
93.8 |
RPL06.INT.DHC.01115 |
RPL06.Interior.DHC - MES Skids - EPMS Tie-Ins | DHC - MES Skids | Not Started | 09/21/26 | 10/12/26 | 20.0 | 20.0 |
|
106.2 |
RPL06.INT.DHC.01270 |
RPL06.Interior.DHC - Control Fault Domain 2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 09/21/26 | 09/24/26 | 5.0 | 5.0 |
|
120.0 |
RPL06.INT.DHC.01300 |
RPL06.Interior.DHC - Tie-ins - Control Fault Domain 2 - WBS Summary | Control Fault Domain 2 | Not Started | 09/21/26 | 02/09/27 | 120.0 | 120.0 |
|
43.8 |
RPL06.INT.DHD.01650 |
RPL06.Interior.DHD - Control Fault Domain 4 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 09/21/26 | 09/24/26 | 5.0 | 5.0 |
|
158.8 |
RPL06.INT.SSB.01700 |
RPL06.Interior.SSB - BoW - Install Balance of Refrigerant Line | Balance of Walls and OverHead | Not Started | 09/21/26 | 09/25/26 | 6.2 | 6.2 |
|
163.8 |
RPL06.INT.SSB.01860 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Flooring | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 09/21/26 | 09/29/26 | 8.8 | 8.8 |
|
235.0 |
RPL06.INT.SSB.02740 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Final Paint | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 09/21/26 | 09/29/26 | 8.8 | 8.8 |
|
235.0 |
RPL06.OFCI.6840 |
OFCI Delivery: FE Fiber for CFD B.2 (ROJ ) (RVCD ) | Data Hall B | Not Started | 09/21/26 | 10/09/26 | 18.8 | 18.8 |
|
76.2 |
RPL06.CON.WP3.01820 |
RPL06.Conn EF1 (South) Install OSP Pathway (for RPL06) - P3 | Infrastructure | Not Started | 09/22/26 | 09/23/26 | 2.5 | 2.5 |
|
98.8 |
RPL06.CON.WP3A.01660 |
RPL06.Conn EF2 (North) Install OSP Pathway (for RPL06) - P1 | Infrastructure | Not Started | 09/22/26 | 09/23/26 | 2.5 | 2.5 |
|
98.8 |
RPL06.INT.DHA.03620 |
RPL06.Interior.DHA - OFE - Control Fault Domain 3 (HAC) | Control Fault Domain 3 | Not Started | 09/22/26 | 10/09/26 | 17.5 | 17.5 |
|
-10.0 |
RPL06.INT.DHB.01480 |
RPL06.Interior.DHB - Control Fault Domain 2 - Install copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/22/26 | 10/12/26 | 18.8 | 18.8 |
|
43.8 |
RPL06.INT.DHB.01500 |
RPL06.Interior.DHB - Control Fault Domain 3 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/22/26 | 10/12/26 | 18.8 | 18.8 |
|
47.5 |
RPL06.INT.DHB.01510 |
RPL06.Interior.DHB - Control Fault Domain 3 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/22/26 | 10/12/26 | 18.8 | 18.8 |
|
41.2 |
RPL06.INT.DHB.02240 |
RPL06.Interior.DHB - Control Fault Domain 3 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/22/26 | 10/12/26 | 18.8 | 18.8 |
|
41.2 |
RPL06.INT.DHB.02740 |
RPL06.Interior.DHB - Control Fault Domain 3 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/22/26 | 10/12/26 | 18.8 | 18.8 |
|
41.2 |
RPL06.INT.DHD.01670 |
RPL06.Interior.DHD - Control Fault Domain 4 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 09/22/26 | 09/25/26 | 5.0 | 5.0 |
|
173.8 |
RPL06.INT.ENDC.1380 |
RPL06.Interior.End-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall | Balance of Walls & Overhead | Not Started | 09/22/26 | 09/28/26 | 6.2 | 6.2 |
|
162.5 |
RPL06.INT.ENDC.1460 |
RPL06.Interior.End-Corridor - BoW - Frame Hard Lid | Balance of Walls & Overhead | Not Started | 09/22/26 | 09/28/26 | 6.2 | 6.2 |
|
131.2 |
DCC.B6.3527 |
[SSDCB1] Cabling Start : Front End Production Cabling [DHB] | Connectivity | Not Started | 09/23/26 | 09/23/26 | 0.0 | 0.0 |
|
367.5 |
GCD.RPL06.3527 |
[RPL06] TC-C Ready : Production Cabling Start [DHB Rows 01-08] | TC-C Ready: Production Cabling - DHB | Not Started | 09/23/26 | 09/23/26 | 0.0 | 0.0 |
|
367.5 |
RPL06.CON.WP3B.01100 |
RPL06.Conn EF1<>DHB11 - WBS Summary | EF2<>DHB.11 | Not Started | 09/23/26 | 10/08/26 | 15.0 | 15.0 |
|
81.2 |